CN101519877A - Multi-headed fast tearing butt coupler and fabricated part - Google Patents

Multi-headed fast tearing butt coupler and fabricated part Download PDF

Info

Publication number
CN101519877A
CN101519877A CN200810060181A CN200810060181A CN101519877A CN 101519877 A CN101519877 A CN 101519877A CN 200810060181 A CN200810060181 A CN 200810060181A CN 200810060181 A CN200810060181 A CN 200810060181A CN 101519877 A CN101519877 A CN 101519877A
Authority
CN
China
Prior art keywords
nut
heading
plug
tai
reinforced hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200810060181A
Other languages
Chinese (zh)
Other versions
CN101519877B (en
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008100601811A priority Critical patent/CN101519877B/en
Publication of CN101519877A publication Critical patent/CN101519877A/en
Application granted granted Critical
Publication of CN101519877B publication Critical patent/CN101519877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention relates to a multi-headed fast tearing butt coupler and a butt joint piece, and a fabricated part formed by the multi-headed fast tearing butt coupler, and butt joint structure between the fabricated parts, and the invention includes a plug, a support-pulling screw cap is an internal thread structure, the internal thread is a tearing screw thread, the center of the cap bottom is provided with a steel bar hole, the periphery of the steel bar hole is a steel bar upset head clamping table, the plug is hollow, the center of the hollow bottom of the plug is provided with a steel bar hole, the periphery of the steel bar hole is a steel bar upset head clamping table, a pressure spring is positioned inside the support-pulling screw cap, one end of the pressure spring is positioned on the steel bar upset head clamping table, the other end thereof is provided with a tapered sleeve formed by two or a plurality of pieces, a screw thread sleeve is rotatably connected inside the support-pulling screw cap and locates the displacement on the tapered sleeve, the tail part of a connection-peg is connected with the internal thread of a raising-pulling screw cap, and the head part of the connection-peg has the ball-lacking shape and is matched with the tampered sleeve in an elastic joint way.

Description

The bull fast tearing is to clasp and prefabricated component
Technical field
The present invention relates to a kind of bull fast tearing to clasp and interfacing part, and the prefabricated component that clasp is constituted by the bull fast tearing, and the docking structure between prefabricated component and prefabricated component, belong to that prefabricated component is haled fastener and prefabricated component is made the field.
Background technology
All notice of authorization CN100348803C of this patent people, title " go up apical grafting stake button and prefabricated component under the spiral shell ", this pile for prestressed pipe reinforcing bar is haled fastener, draw nut, top to draw nut and pile tube longitudinal reinforcement to form by being positioned at rising of pile tube two ends, wherein, rising, to draw nut and top to draw nut be female thread structure, and described internal thread is for haling screw thread, and the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, and the two ends of pile tube longitudinal reinforcement are upset into heading and are connected on the Ka Tai.
This pile for prestressed pipe pile extension button draws nut, top to draw nut, combination sleeve, intermediate sleeve and connecting rod to constitute by rising, wherein, rising, to draw nut and top to draw nut be female thread structure, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, and the two ends of pile tube longitudinal reinforcement are upset into heading and are connected on the Ka Tai; Connecting rod one end is a dentalation, and the other end is an external thread structure; Two or multi-disc combination sleeve is positioned at the top and draws nut, described combination sleeve inboard to be dentalation and be complementary with dentalation in the connecting rod; Intermediate sleeve is an external thread structure, is screwed in the top and draws in the nut and be positioned at two or multi-disc combination sleeve top; During butt joint, connecting rod one end draws the screw thread of nut to spin with rising, and the other end and top draw in the nut two or multi-disc combination sleeve to form clamping.
Docking calculation between this prestressing force prefabricated component, the end of two prefabricated components that dock be respectively equipped with several rise draw nut and and with it corresponding several tops draw nut, two or multi-disc combination sleeve is positioned at the top and draws nut, intermediate sleeve is screwed in the top and draws in the nut and be positioned on two or the multi-disc combination sleeve, connecting rod one end with rise draw that nut spins, the other end and top draw two or multi-disc combination sleeve formation clamping in the nut.
Its objective reality reality is: in existing examination criteria, what detect is Stress Transfer, and in the background technology butt joint after pile tube be pressed into underground after, because reinforcing bar (rod) heading and hale the loose contact that might have minute quantity between the connecting rod in the fastener between pile tube and the pile tube, though this loose contact, belong within the scope of reliable butt joint, pile tube is not produced any influence with the quality of docking between the pile tube, but because the pile tube after the butt joint has been pressed into underground, with the standard and the detection method of existing detection can't be supporting, though it is qualified the result who detects by current standard of minute quantity therefore to have occurred, unfavorable result.
Summary of the invention
Purpose of the present invention is avoided the weak point in the background technology, designs between a kind of prefabricated component and prefabricated component that can either satisfy after reinforcing bar haled reliably to dock, and the bull fast tearing that can satisfy existing pile tube butt joint examination criteria again is to clasp and prefabricated component.
In order to realize one of purpose of the present invention.On structure design, can reinforcing bar be realized effectively haling in the concrete precast element, is the prerequisite that is related to concrete precast element quality quality, and the haling to be divided into and fixedly hale maintenance typing and location and hale displacement maintenance typing of reinforcing bar.Floor prefabricated component and bridge prefabrication spare etc. are fixedly to hale the maintenance typing; Concrete tubular pile, concrete wire then belong to the location and hale displacement maintenance typing.The key that displacement maintenance typing is haled in the location is: not only realize haling of reinforcing bar (rod iron), and will realize good butt joint the between prefabricated component and prefabricated component.Therefore on structure design, fast tearing should have two kinds of functions to clasp: the one, and every group of (two) fast tearing can be realized clamping with reinforcing bar (rod iron) two ends respectively to clasp; The 2nd, the reinforcing bar (rod iron) that haling fastener and haling between the fastener after the butt joint haled is realized Stress Transfer by the fastener of haling of self, goes into the examination criteria on ground with butt joint, the piling of satisfying existing pile tube.
Technical scheme 1: the bull fast tearing is to clasp, it comprises plug, it is female thread structure that nut is drawn on the top, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, described plug is the hollow plug, the center has reinforced hole at the bottom of the hollow of plug, the periphery of reinforced hole is reinforcing bar heading Ka Tai, stage clip is positioned at the top and draws nut, one end of stage clip is positioned on the reinforcing bar heading Ka Tai, the other end is equipped with the taper sheath that is made of two or multi-disc, the screw thread cover is screwed in the top and draws in the nut and with taper sheath superior displacement location, and the afterbody of connection-peg draws the nut internal thread to be connected with rising, and the head of connection-peg is the segment shape and is flexible clamping with taper sheath when docking and cooperates.
Technical scheme 2: the prefabricated component that clasp is constituted by the bull fast tearing, it is female thread structure that nut is drawn on the top, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement are upset into heading and are connected on the heading Ka Tai, described plug is the hollow plug, the center has reinforced hole at the bottom of the hollow of plug, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement are upset into heading and are connected on the heading Ka Tai, stage clip is positioned at the top and draws nut, one end of its stage clip is positioned on the reinforcing bar heading, the other end is equipped with the taper sheath that is made of two or multi-disc, the screw thread cover is screwed in to push up to draw in the nut and with the taper sheath superior displacement and locatees, the afterbody of connection-peg draws the nut internal thread to be connected with rising, and the head of connection-peg is flexible clamping with taper sheath when being segment shape and butt joint and cooperates.
The present invention compares with background technology, remove the advantage place that background technology is put down in writing, the one, both made prefabricated component after the butt joint be pressed into underground after, also can detect reliably with the intensity of docking intensity and prefabricated component itself between the prefabricated component according to the prefabricated component of existing examination criteria after to butt joint, guaranteed existing examination criteria and detection method and of the present invention accurately, reliably, integrate with effectively; The 2nd, be not only applicable to prefabricated component, and be applicable to reliable butt joint the between all non-metallic bodies and non-metallic body except that prefabricated component, metallic object and metallic object, be specially adapted to the bull butt joint.
Description of drawings
Fig. 1 is the structural representation before the bull fast tearing is pegged graft to clasp.
Fig. 2 is the structural representation after the bull fast tearing is pegged graft to clasp.
Fig. 3 adopts fast tearing to the structural representation before clasp made prefabricated component and prefabricated the butt joint.
Fig. 4 adopts fast tearing to the structural representation after clasp made prefabricated component and prefabricated the butt joint.
The specific embodiment
Embodiment 1: with reference to attached Fig. 1 and 2.The bull fast tearing is to clasp, it comprises plug 2, the top draws nut 8 to be female thread structure, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, described plug 2 is the hollow plug, the center has reinforced hole 1 at the bottom of the hollow of plug 2, the periphery of reinforced hole is reinforcing bar heading Ka Tai, stage clip 6 is positioned at the top and draws nut 8, one end of stage clip 6 is positioned on the reinforcing bar heading Ka Tai, the other end is equipped with the taper sheath 4 that is made of two or multi-disc and (is generally two tapered and up/down perforations in chamber that constitute taper sheath----covers, see attached Fig. 1 and 2 for details), screw thread cover 3 is screwed in to push up to draw in the nut 8 and with taper sheath 4 superior displacements and locatees, the afterbody of connection-peg 2 draws nut 1 internal thread to be connected with rising, the head of connection-peg 2 is flexible clamping with taper sheath 4 when being segment shape and butt joint and cooperates, that is to say, when connection-peg 2 is pegged graft downwards, stage clip 6 is given 2 one oppositions of connection-peg, connection-peg 2 is upwards pushed up, because screw thread cover 3 is with the amount of moving qualification on the taper sheath 4, taper sheath 4 location can't on move, therefore taper sheath 4 under the effect of pressing bullet 6 oppositions with connection-peg 2 anchor ear and form closely contact tightly, the afterbody of connection-peg 2 draws nut 1 to be internal thread to be connected with rising, simultaneously because the heading of longitudinal reinforcement 7 ends touches mutually with stage clip 6 and guaranteed longitudinal reinforcement 7 formation straightway Stress Transfer in longitudinal reinforcement 7 and the butt joint prefabricated component by stage clip 6, thereby satisfy the detection method under the existing standard and detect index, the something lost of having avoided background technology to exist is shaken.
Embodiment 2: on the basis of embodiment 1, that is to say that the other end of stage clip 6 is equipped with pad 5, the taper sheath 4 that is made of two or multi-disc is positioned on the pad 5.
Embodiment 3: with reference to accompanying drawing 3 and 4.On the basis of embodiment 1, the prefabricated component that clasp is constituted by the bull fast tearing, the top draws nut 8 to be female thread structure, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement 7 are upset into heading and are connected on the heading Ka Tai, described plug 2 is the hollow plug, the center has reinforced hole 1 at the bottom of the hollow of plug, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement are upset into heading and are connected on the heading Ka Tai, stage clip 6 is positioned at the top and draws nut 8, one end of its stage clip 6 is positioned on the reinforcing bar heading, the other end is equipped with the taper sheath 4 (be generally two tapered and up/down perforations in chamber that constitute taper sheath----covers, see attached Fig. 1 and 2 for details) that is made of two or multi-disc, and screw thread cover 3 is screwed in the top and draws in the nut 8 and with taper sheath 4 superior displacements and locate, the afterbody of connection-peg 2 draws nut 1 internal thread to be connected with rising, and the head of connection-peg 2 is flexible clamping with taper sheath 4 when being segment shape and butt joint and cooperates.Described prefabricated component two ends are equipped with respectively to rise draws nut 1 and top to draw nut 8, rises to draw nut 1 and top to draw the cap mouth of nut 8 and prefabricated component end face to put down.
Embodiment 4: on the basis of embodiment 3, that is to say that the other end of stage clip 6 is equipped with pad 5, the taper sheath 4 that is made of two or multi-disc is positioned on the pad 5.
What need understand is: though the foregoing description is to the present invention's detailed text description of contrasting; but these text descriptions; it is text description to mentality of designing of the present invention; rather than limitation of the present invention; any combination, omission or modification that does not exceed mentality of designing of the present invention all falls within the scope of protection of the present invention.

Claims (4)

1, a kind of bull fast tearing is to clasp, it comprises plug, it is female thread structure that nut is drawn on the top, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, it is characterized in that: described plug is the hollow plug, the center has reinforced hole at the bottom of the hollow of plug, the periphery of reinforced hole is reinforcing bar heading Ka Tai, stage clip is positioned at the top and draws nut, one end of stage clip is positioned on the reinforcing bar heading Ka Tai, the other end is equipped with the taper sheath that is made of two or multi-disc, the screw thread cover is screwed in the top and draws in the nut and with taper sheath superior displacement location, and the afterbody of connection-peg draws the nut internal thread to be connected with rising, and the head of connection-peg is the segment shape and is flexible clamping with taper sheath when docking and cooperates.
2, bull fast tearing according to claim 1 is characterized in that clasp: the other end of stage clip is equipped with pad, and the taper sheath that is made of two or multi-disc is positioned on the pad.
3, a kind of prefabricated component that clasp is constituted by the bull fast tearing, it is female thread structure that nut is drawn on the top, described internal thread is for haling screw thread, the center has reinforced hole at the bottom of the cap, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement are upset into heading and are connected on the heading Ka Tai, it is characterized in that: described plug 2 is the hollow plug, the center has reinforced hole at the bottom of the hollow of plug, the periphery of reinforced hole is reinforcing bar heading Ka Tai, the two ends of prefabricated component longitudinal reinforcement are upset into heading and are connected on the heading Ka Tai, it is characterized in that: stage clip is positioned at the top and draws nut, one end of its stage clip is positioned on the reinforcing bar heading, the other end is equipped with the taper sheath that is made of two or multi-disc, the screw thread cover is screwed in to push up to draw in the nut and with the taper sheath superior displacement and locatees, the afterbody of connection-peg draws the nut internal thread to be connected with rising, and the head of connection-peg is flexible clamping with taper sheath when being segment shape and butt joint and cooperates.
4, according to claim 2 by the bull fast tearing to the prefabricated component that clasp constitutes, it is characterized in that: the other end of stage clip is equipped with pad, the taper sheath that is made of two or multi-disc is positioned on the pad.
CN2008100601811A 2008-03-17 2008-03-17 Multi-headed fast tearing butt coupler and fabricated part Active CN101519877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100601811A CN101519877B (en) 2008-03-17 2008-03-17 Multi-headed fast tearing butt coupler and fabricated part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100601811A CN101519877B (en) 2008-03-17 2008-03-17 Multi-headed fast tearing butt coupler and fabricated part

Publications (2)

Publication Number Publication Date
CN101519877A true CN101519877A (en) 2009-09-02
CN101519877B CN101519877B (en) 2011-06-08

Family

ID=41080663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100601811A Active CN101519877B (en) 2008-03-17 2008-03-17 Multi-headed fast tearing butt coupler and fabricated part

Country Status (1)

Country Link
CN (1) CN101519877B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101962978A (en) * 2010-10-20 2011-02-02 同济大学 Shape memory alloy anchoring system
CN102444210A (en) * 2011-11-12 2012-05-09 大连大金马基础建设有限公司 Plug-in self-locking joint of reinforced concrete prefabricated part
CN103938620A (en) * 2014-04-10 2014-07-23 盐城市同力新型建材有限公司 Fast pile connecting method for prestressed concrete precast piles and lock-type connector pile
CN104328868A (en) * 2014-10-17 2015-02-04 钟智谦 Prestressed concrete connecting piece and connecting method
CN105133577A (en) * 2015-09-21 2015-12-09 周兆弟 Conical pressing-pulling resisting dual-purpose pile for steel strand
CN105350572A (en) * 2015-10-29 2016-02-24 周兆弟 Assembled type underground pipe gallery
CN106948492A (en) * 2017-05-06 2017-07-14 邓剑涛 A kind of self-driven lock prestressing force attachment structure and connection method
WO2018041023A1 (en) * 2016-08-29 2018-03-08 许伟敏 Non-welded quick-fit joint of phc pipe pile
CN111119166A (en) * 2019-12-30 2020-05-08 嘉兴欣创混凝土制品有限公司 Quick butt joint subassembly and quick butt joint mechanism
CN114482030A (en) * 2021-10-28 2022-05-13 广州市建筑集团有限公司 Mechanical tooth rapid pile splicing device and method for PHC tubular pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI961552A0 (en) * 1996-04-09 1996-04-09 Leimet Oy Laosfog Foer betongpaolar
DE19645853C1 (en) * 1996-11-07 1998-01-08 Fischer Georg Rohrleitung Connection between pipe and moulded part with clamping ring
KR100593285B1 (en) * 2004-08-16 2006-06-26 김석윤 Pipe fixing system
CN2861281Y (en) * 2005-05-17 2007-01-24 周兆弟 Elastic meshing body pile connecting fastener and prefab
CN100408762C (en) * 2005-05-17 2008-08-06 周兆弟 Elastic meshing body pile connecting fastener and prefab
CN201169769Y (en) * 2008-03-17 2008-12-24 周兆弟 Multi-head rapid forced pull butt-joint fastener and prefabricated part

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101962978A (en) * 2010-10-20 2011-02-02 同济大学 Shape memory alloy anchoring system
CN102444210A (en) * 2011-11-12 2012-05-09 大连大金马基础建设有限公司 Plug-in self-locking joint of reinforced concrete prefabricated part
CN103938620A (en) * 2014-04-10 2014-07-23 盐城市同力新型建材有限公司 Fast pile connecting method for prestressed concrete precast piles and lock-type connector pile
CN104328868A (en) * 2014-10-17 2015-02-04 钟智谦 Prestressed concrete connecting piece and connecting method
CN105133577A (en) * 2015-09-21 2015-12-09 周兆弟 Conical pressing-pulling resisting dual-purpose pile for steel strand
CN105350572A (en) * 2015-10-29 2016-02-24 周兆弟 Assembled type underground pipe gallery
CN105350572B (en) * 2015-10-29 2017-11-24 周兆弟 Assembled underground pipe gallery
WO2018041023A1 (en) * 2016-08-29 2018-03-08 许伟敏 Non-welded quick-fit joint of phc pipe pile
CN106948492A (en) * 2017-05-06 2017-07-14 邓剑涛 A kind of self-driven lock prestressing force attachment structure and connection method
CN111119166A (en) * 2019-12-30 2020-05-08 嘉兴欣创混凝土制品有限公司 Quick butt joint subassembly and quick butt joint mechanism
CN114482030A (en) * 2021-10-28 2022-05-13 广州市建筑集团有限公司 Mechanical tooth rapid pile splicing device and method for PHC tubular pile
CN114482030B (en) * 2021-10-28 2024-04-12 广州市建筑集团有限公司 Mechanical tooth rapid pile extension device and pile extension method for PHC pipe pile

Also Published As

Publication number Publication date
CN101519877B (en) 2011-06-08

Similar Documents

Publication Publication Date Title
CN101519876B (en) Cutting-free fast tearing butt coupler and butt joint piece
CN101519877B (en) Multi-headed fast tearing butt coupler and fabricated part
CN201314044Y (en) Abutting joint piece of dead-drawn fastener and prestressing prefabricated member consisting of abutting joint pieces of dead-drawn fastener
CN201169769Y (en) Multi-head rapid forced pull butt-joint fastener and prefabricated part
CN201891112U (en) Prefabricated part connector and concrete prefabricated part butt joint structure formed by the same
WO2009129774A3 (en) Fibre coupler
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN101368430A (en) Reinforced bar jointing sleeve
CN205301066U (en) Multi -functional model stake
CN105040678B (en) Prefabricated pile with concave-convex chuck
CN208473878U (en) The longitudinally connected device in section of jurisdiction
CN216739580U (en) Precast concrete pile
CN208934737U (en) A kind of high intensity tunnel pipe for escaping structure
CN216839392U (en) Precast concrete pile
CN212027801U (en) Novel duct piece longitudinal connector
CN201261882Y (en) Yielding anchorage
CN212715665U (en) Improved generation concrete pile steel bar connection sleeve integrated configuration
CN105904404A (en) Fuel injector detachment tool for diesel engine
CN204001989U (en) With the bounding wall guardrail of Climb proof thorns
CN100408762C (en) Elastic meshing body pile connecting fastener and prefab
CN209669849U (en) A kind of building lot stake
CN105672158A (en) High-stability anti-pulling base structure for inserting marking rod
CN104989716B (en) Attaching nut for connector
CN201250403Y (en) Clip-type anchor with low withdrawal value
CN215482892U (en) Elastic clamping type anti-pulling mechanical joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Multi-headed fast tearing butt coupler and fabricated part

Effective date of registration: 20130124

Granted publication date: 20110608

Pledgee: CITIC Bank, Limited by Share Ltd, Ningbo branch

Pledgor: Zhou Zhaodi

Registration number: 2013990000052

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200114

Granted publication date: 20110608

Pledgee: CITIC Bank, Limited by Share Ltd, Ningbo branch

Pledgor: Zhou Zhaodi

Registration number: 2013990000052

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Multi-headed fast tearing butt coupler and fabricated part

Effective date of registration: 20200403

Granted publication date: 20110608

Pledgee: CITIC Bank, Limited by Share Ltd, Ningbo branch

Pledgor: Zhou Zhaodi

Registration number: Y2020330000139

PE01 Entry into force of the registration of the contract for pledge of patent right