CN105350512A - 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法 - Google Patents

一种碳酸盐岩块石填料强夯加冲击碾压的施工方法 Download PDF

Info

Publication number
CN105350512A
CN105350512A CN201510634981.XA CN201510634981A CN105350512A CN 105350512 A CN105350512 A CN 105350512A CN 201510634981 A CN201510634981 A CN 201510634981A CN 105350512 A CN105350512 A CN 105350512A
Authority
CN
China
Prior art keywords
rock
impact
rolling
construction method
carbonate rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510634981.XA
Other languages
English (en)
Inventor
沈志平
陈德茂
谢涛
余永康
王鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201510634981.XA priority Critical patent/CN105350512A/zh
Publication of CN105350512A publication Critical patent/CN105350512A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明公开了一种碳酸盐岩块石填料强夯加冲击碾压的施工方法:首先,铺摊碳酸盐岩块石填料至6m高度,采用4000kN?m能级强夯机以一定间距进行点夯;完成夯击后,将场地平整,采用冲击式压路机对填筑体进行补强。本发明能使得深层和表层地基都得到有效加固,是处理块石地基的较好方法,也能够显著快加施工进度,降低工程成本。

Description

一种碳酸盐岩块石填料强夯加冲击碾压的施工方法
技术领域
本发明涉及地基夯实处理技术,特别是处理碳酸盐岩块石地基强夯结合冲击碾压的方法。
背景技术
随着建筑用地日趋紧张,开山填沟造地的人工填方地基将成为解决建设用地的重要途径。在山区人工填方地基场地的基础决定着整个工程项目结构的稳定性、耐久性和使用功能。对于高填方地基,特别是填石地基,传统的分层碾压和重夯都有较大的局限性,强夯的有效加固深度达4.0m,有效影响深度在5.0~6.0m,冲击碾压影响深度在1.5m左右,都无法满足部分工程地基更高的密实、均匀、稳定性的需求。因此利用强夯加冲击碾压技术的有效结合,能够解决分层碾压、重夯技术的压实功能低、级配和粒径要求高、工期长、施工质量难以保证等局限。两者结合使得深层和表层地基都得到有效加固,是处理块石高填方地基的较好方法,能显著减小工后沉降,提高地基强度和均匀性,也可以加快施工进度,降低工程成本,达到工程要求。
发明内容
本发明要解决的技术问题是:提供一种强夯加冲击碾压的施工方法,解决部分工程对碳酸盐岩块石填料密实度和稳定性的更高需求,并且能够短缩工期,提高工程质量。
本发明的技术方案为:一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,包括对施工场地进行清表、整平,标记施工界限、边界线以及测量地基初始高程,其特征在于:对碳酸盐岩块石填料分层堆填后,采用强夯机进行点夯,强夯完毕后,整平场地,使用冲击式压路机对填筑体补强。所述强夯机为4000kN•m能级。碳酸盐岩块石填料铺摊厚度为6m。强夯处理时,夯击第一遍间距按5m正方形布点,第二遍夯点位于第一遍夯点中间,单点击数≥10击。对填筑体进行补强时,采用三边双轮25KJ冲击式压路机冲压,冲压遍数≥20遍。
碳酸盐岩填料强夯加冲击碾压的施工方法有以下主要步骤:
步骤一、在强夯前对施工场地进行清表、整平,标记施工界限、边界线以及测量地基初始高程。对碳酸盐岩块石填料分层堆填后,采用强夯机进行点夯,强夯完毕后,整平场地,使用冲击式压路机对填筑体补强。
步骤二、将步骤一中碳酸盐岩填料分层虚铺至6m高度,采用4000kN•m能级强夯法处理。
步骤三、填筑体每层强夯处理完成后,必须整平,然后采用冲击碾压进行补强。
步骤四、完成一遍作业后,用高精度水准仪测量填筑体平均沉降量,当填筑体平均沉降量满足标准时停止碾压。在碾压后填筑体的基础上,不断重复上述步骤二、三,直至填筑到填方体的设计标高。
本发明采用了强夯与冲击碾压联合施工,能够提高地基的强度和均匀性,也可以加快施工进度,降低工程成本,并且满足设计和规范要求,工程质量优良。
附图说明
图1为本发明流程示意图。
具体实施方式
一种碳酸盐岩填料强夯加冲击碾压的施工方法,该方法包括以下具体步骤:
步骤一、在强夯前对施工场地进行清表、整平,标记施工界限、边界线以及测量地基初始高程。
步骤二、将碳酸盐岩填料分层虚铺至6m高度,采用4000kN•m能级强夯法处理。强夯处理时,夯击第一遍间距按5m正方形布点,第二遍夯点位于第一遍夯点中间,单点击数≥10击。以保证填筑体厚度在强夯处理的有效处理深度范围内,同时保证夯击的均匀性。
步骤三、填筑体每层强夯处理完成后,将场地平整,然后进行冲击补强。对填筑体进行补强时,采用三边双轮25KJ冲击式压路机冲压,冲压遍数≥20遍。
步骤四、完成一遍作业后,用高精度水准仪测量填筑体平均沉降量,当填筑体平均沉降量满足标准时停止碾压。在碾压后填筑体的基础上,不断重复上述步骤二、三,直至填筑到填方体的设计标高。

Claims (5)

1.一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,包括对施工场地进行清表、整平,标记施工界限、边界线以及测量地基初始高程,其特征在于:对碳酸盐岩块石填料分层堆填后,采用强夯机进行点夯,强夯完毕后,整平场地,使用冲击式压路机对填筑体补强。
2.根据权利要求1所述的一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,其特征在于:所述强夯机为4000kN•m能级。
3.根据权利要求1所述的一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,其特征在于:碳酸盐岩块石填料铺摊厚度为6m。
4.根据权利要求1所述的一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,其特征在于:强夯处理时,夯击第一遍间距按5m正方形布点,第二遍夯点位于第一遍夯点中间,单点击数≥10击。
5.根据权利要求1所述的一种碳酸盐岩块石填料强夯加冲击碾压的施工方法,其特征在于:对填筑体进行补强时,采用三边双轮25KJ冲击式压路机冲压,冲压遍数≥20遍。
CN201510634981.XA 2015-09-30 2015-09-30 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法 Pending CN105350512A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510634981.XA CN105350512A (zh) 2015-09-30 2015-09-30 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510634981.XA CN105350512A (zh) 2015-09-30 2015-09-30 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法

Publications (1)

Publication Number Publication Date
CN105350512A true CN105350512A (zh) 2016-02-24

Family

ID=55326564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510634981.XA Pending CN105350512A (zh) 2015-09-30 2015-09-30 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法

Country Status (1)

Country Link
CN (1) CN105350512A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087946A (zh) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 一种碳酸盐岩大块石强夯复合换填置换地基加固方法
CN108301393A (zh) * 2018-02-12 2018-07-20 中国科学院武汉岩土力学研究所 一种浅层吹填珊瑚砂地基洒水冲击碾压施工工法
CN113969524A (zh) * 2021-10-20 2022-01-25 中交路桥华南工程有限公司 填石路堤的施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1263188A (zh) * 1999-02-12 2000-08-16 蓝派冲击压实技术开发(北京)有限公司 利用冲击压来处理道路的方法
CN2494837Y (zh) * 2001-07-30 2002-06-12 北京欣路特科技发展有限公司 自行式强夯机
JP2002285539A (ja) * 2001-03-26 2002-10-03 Fumio Kinoshita 改良土壌の締固方法及び改良土壌の締固装置及び柱状体
CN102251512A (zh) * 2011-05-05 2011-11-23 西安建筑科技大学 振动碾压与强夯联合压实黄土高填方体的施工方法
CN102518117A (zh) * 2011-11-16 2012-06-27 辽宁省石油化工规划设计院有限公司 一种振冲碎石桩与强夯组合复合地基的施工方法
CN102619208A (zh) * 2012-04-18 2012-08-01 贵州正业工程技术投资有限公司 一种碳酸盐岩大块石填料原位试验方法
CN103114569A (zh) * 2013-02-07 2013-05-22 山西机械化建设集团公司 超高能级直接强夯进行低含水量湿陷性黄土处理工艺

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1263188A (zh) * 1999-02-12 2000-08-16 蓝派冲击压实技术开发(北京)有限公司 利用冲击压来处理道路的方法
JP2002285539A (ja) * 2001-03-26 2002-10-03 Fumio Kinoshita 改良土壌の締固方法及び改良土壌の締固装置及び柱状体
CN2494837Y (zh) * 2001-07-30 2002-06-12 北京欣路特科技发展有限公司 自行式强夯机
CN102251512A (zh) * 2011-05-05 2011-11-23 西安建筑科技大学 振动碾压与强夯联合压实黄土高填方体的施工方法
CN102518117A (zh) * 2011-11-16 2012-06-27 辽宁省石油化工规划设计院有限公司 一种振冲碎石桩与强夯组合复合地基的施工方法
CN102619208A (zh) * 2012-04-18 2012-08-01 贵州正业工程技术投资有限公司 一种碳酸盐岩大块石填料原位试验方法
CN103114569A (zh) * 2013-02-07 2013-05-22 山西机械化建设集团公司 超高能级直接强夯进行低含水量湿陷性黄土处理工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王志文: "浅层软土地基的组合加固法-浅谈浦东国际机场第二跑道基础的地基处理施工", 《上海空港》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087946A (zh) * 2016-06-13 2016-11-09 贵州正业工程技术投资有限公司 一种碳酸盐岩大块石强夯复合换填置换地基加固方法
CN108301393A (zh) * 2018-02-12 2018-07-20 中国科学院武汉岩土力学研究所 一种浅层吹填珊瑚砂地基洒水冲击碾压施工工法
CN113969524A (zh) * 2021-10-20 2022-01-25 中交路桥华南工程有限公司 填石路堤的施工方法

Similar Documents

Publication Publication Date Title
CN104131546B (zh) 一种湿陷性黄土地基的处理方法
CN204356594U (zh) 无砟轨道膨胀土路堑-基床构造
CN102251512A (zh) 振动碾压与强夯联合压实黄土高填方体的施工方法
CN101016740A (zh) 多重增压快速固结密实软土地基处理方法
CN110761264A (zh) 一种滨海淤泥软土地基二次强夯碎石置换加固方法
CN101575848A (zh) 组合锤法地基处理方法
CN105350512A (zh) 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法
CN107869138A (zh) 高填方石料换填地基处理施工方法
CN105200973A (zh) 一种软弱地基综合处理方法
CN108570909A (zh) 一种粉细砂路基的填筑压实方法
CN101787689B (zh) 昔格达土高边坡填方的强夯施工方法
CN103993533B (zh) 用于黄土地区高填方路堤的综合压实方法
CN104818658B (zh) 一种湿陷性黄土地基层上道路拓宽方法
CN104727295A (zh) 预成孔填料置换平锤强夯法
CN102677681A (zh) 大型土方快速回填分层处理方法
CN105369797A (zh) 湿陷性黄土真空辐射固结法
CN104404918B (zh) 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法
CN103122631A (zh) 软土地基堆载冲压加固法
CN110029652A (zh) 一种减少湿陷性黄土工后沉降的施工工艺
CN102635044B (zh) 一种强夯对路床挖方路基的处理方法
CN207003417U (zh) 山区弃碴回填体沉降及稳定控制结构
CN206477351U (zh) 用于大厚度高湿陷性黄土地基的素土挤密桩
CN106906816B (zh) 一种改善软土地基预制桩沉桩挤土效应的方法
CN112900176B (zh) 一种高填方的土石路堤的填筑方法
CN205934899U (zh) 一种提高强夯夯击质量的消能结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160224