一种粉细砂路基的填筑压实方法 Download PDFInfo
- Publication number
- CN108570909A CN108570909A CN201810458926.3A CN201810458926A CN108570909A CN 108570909 A CN108570909 A CN 108570909A CN 201810458926 A CN201810458926 A CN 201810458926A CN 108570909 A CN108570909 A CN 108570909A
- Authority
- CN
- China
- Prior art keywords
- coefficient
- extra
- fine sand
- compaction
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C21/00—Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种粉细砂路基的填筑压实方法,其步骤如下:A、确定粉细砂填料的压实密度;B、填筑试验段进行碾压层表面松散土层厚度h0的测试;C、粉细砂路基的压实与错层检测。用振动压路机碾压,压出一层碾压层;在当前碾压层选取测点,刨去测点范围内h0厚的表面土层,进行压实系数K及地基系数K30检测,最后将刨去的表面土层的粉细砂填料进行回填、夯实,得到当前填筑层;D、采用履带式推土机进行终压,并在土层表面进行压实系数K和地基系数K30检测。该方法能在保证路基压实质量的前提下,有效降低路基施工成本。
Description
技术领域
本发明涉及一种粉细砂路基的填筑压实方法。
背景技术
在河滩、滨海和沙漠地带筑路时,由于土石填料匮乏,常利用砂类土进行路基填筑。砂类土作为填料具有强度高、透水性好、抗变形能力强等优点,但其中的粉细砂因颗粒组成均匀、颗粒之间的黏结力小,表现出结构松散、不易压实的特性。因此,填筑时必须进行逐层检测,即:在填筑压实一层(30-50cm)砂类土后,需在现场进行压实系数K及地基系数K30检测,测出该层路基符合要求后,再进行上一层的填筑、压实和检测试验,直至路基填筑压实至规定厚度(2m以上),从而保证路基的承载能力符合要求。
砂类土填筑路基现场通常采用滚轮式振动压路机对粉细砂填料进行填筑压实。但压路机在碾压过程中,其碾压轮产生的揉搓剪应力τs远大于粉细砂填料的抗剪强度τf,引起表层填料土体破坏隆起而成为松散状态,形成松散表层,导致本填筑层测得的地基系数K30和压实系数K的数值均偏小;再次碾压会再次产生剪切破坏,也即无法通过增加碾压次数来提高地基系数K30及压实系数K的测试值;而在后续的上一层填筑压实时,前(下)一填筑层的松散表层会被明显压密,且承载能力会显著提高。因此,现有的砂类土填筑方法,由于其填筑中的检测不能准确反映,而是劣化了粉细砂填料在良好压实下的力学性能,导致本可使用的砂类土填料无法满足测试指标而弃用,另用匮乏的土石填料。若用履带式推土机对砂性土进行填筑压实,虽然可以较好的压密表层填土,但由于履带式推土机的压实面积小、效率低,施工成本会明显增加。
发明内容
本发明的目的是提供一种粉细砂路基的填筑压实方法,该方法能在保证路基压实质量的前提下,有效降低路基施工成本。
本发明实现其发明目的所采用的技术方案是,一种粉细砂路基的填筑压实方法,其步骤如下:
A、确定粉细砂填料的压实密度
根据粉细砂填料的最大干密度ρdmax、粉细砂填料的最优含水率w0和设计的压实系数K0,计算出粉细砂填料的设计压实密度ρ0,ρ0=K0·ρdmax(1+w0);
B、碾压层表面松散土层厚度的测试
在现场选取试验段,由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压、振动压路机碾压,压出一层碾压层;再重复以上的操作两次,共压出三层碾压层,完成路基的试验填筑碾压;
在试验填筑碾压的路基上,以0.1m的间隔从上至下选取至少六个测点,用环刀法测出各测点的粉细砂含水率w和压实密度ρ,得到各测点的干密度ρd=ρ/(1+w),并计算出各测点的实际压实系数K=ρd/ρdmax;
绘制压实系数K沿测点深度h的变化曲线,曲线上斜率变化最大的点所对应的测点深度,即为碾压层表面松散土层的测试厚度h0;
C、粉细砂路基的压实与错层检测
C1、由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压;
C2、用振动压路机碾压,压出一层碾压层;
C3、在当前碾压层选取测点,刨去当前碾压层测点范围内的表面土层,刨去的表面土层的厚度为碾压层表面松散土层的测试厚度h0;然后,在测点进行压实系数K及地基系数K30检测,得到当前碾压层的压实系数K及地基系数K30;最后将刨去的表面土层的粉细砂填料进行回填、夯实,得到当前填筑层;
D、如当前碾压层的压实系数K<设计压实系数K0,或当前碾压层的地基系数K30<设计地基系数K30,则加大压实功或增加压实遍数,重新进行C2步的操作;否则重复进行C步的操作,直至各填筑层的总厚度达到设计厚度;
E、采用履带式推土机进行终压,并在土层表面进行压实系数K和地基系数K30检测;如检出的压实系数K<设计压实系数K0或地基系数K30<设计地基系数K30,则重新采用履带式推土机进行终压,直至检出的压实系数K≥设计压实系数K0且地基系数K30≥设计地基系数K30。
与现有技术相比,本发明的有益效果是:
一、填筑中在各碾压层表面进行压实系数K0和地基系数K30检测时,已刨去了受到压路机碾压破坏的松散表层,使得对填筑中的各个碾压层的压实系数K0和地基系数K30检测结果更准确可靠,避免了本可使用的砂类土填料无法满足测试指标而弃用,有效降低了施工成本。
二、粉细砂填料级配均匀、粒间黏结力小,碾压时表层受到滚轮的揉搓作用而破坏松散、深层承受滚轮的竖向作用而逐渐密实。粉细砂填料表层的压实密度随深度逐渐增加,而深层的压实密度处于稳定。故粉细砂填料压实系数K与深度h关系曲线将出现明显拐点的位置,即为受到碾压破坏的松散表层厚度。因此,本发明通过试验段的测试确定出的刨除土层厚度,既能有效降低松散土层对测试结果的影响,同时又保证刨除工作量不是过大,避免了施工量的浪费。
三、在完成顶层的填筑时,采用履带式推土机对松散表层进行终压,避免了压路机碾轮对表层填土的破坏,在保证填筑质量的同时,最大程度利用了砂类土,减少了刨土工作量。
具体实施方式
实施例
一种粉细砂路基的填筑压实方法,其步骤如下:
A、确定粉细砂填料的压实密度
根据粉细砂填料的最大干密度ρdmax、粉细砂填料的最优含水率w0和设计的压实系数K0,计算出粉细砂填料的设计压实密度ρ0,ρ0=K0·ρdmax(1+w0);
B、碾压层表面松散土层厚度的测试
在现场选取试验段,由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压、振动压路机碾压,压出一层碾压层;再重复以上的操作两次,共压出三层碾压层,完成路基的试验填筑碾压;
在试验填筑碾压的路基上,以0.1m的间隔从上至下选取至少六个测点,用环刀法测出各测点的粉细砂含水率w和压实密度ρ,得到各测点的干密度ρd=ρ/(1+w),并计算出各测点的实际压实系数K=ρd/ρdmax;
绘制压实系数K沿测点深度h的变化曲线,曲线上斜率变化最大的点所对应的测点深度,即为碾压层表面松散土层的测试厚度h0;
C、粉细砂路基的压实与错层检测
C1、由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压;
C2、用振动压路机碾压,压出一层碾压层;
C3、在当前碾压层选取测点,刨去当前碾压层测点范围内的表面土层,刨去的表面土层的厚度为碾压层表面松散土层的测试厚度h0;然后,在测点进行压实系数K及地基系数K30检测,得到当前碾压层的压实系数K及地基系数K30;最后将刨去的表面土层的粉细砂填料进行回填、夯实,得到当前填筑层;
D、如当前碾压层的压实系数K<设计压实系数K0,或当前碾压层的地基系数K30<设计地基系数K30,则加大压实功或增加压实遍数,重新进行C2步的操作;否则重复进行C步的操作,直至各填筑层的总厚度达到设计厚度;
E、采用履带式推土机进行终压,并在土层表面进行压实系数K和地基系数K30检测;如检出的压实系数K<设计压实系数K0或地基系数K30<设计地基系数K30,则重新采用履带式推土机进行终压,直至检出的压实系数K≥设计压实系数K0且地基系数K30≥设计地基系数K30。
Claims (1)
1.一种粉细砂路基的填筑压实方法,其步骤如下:
A、确定粉细砂填料的压实密度
根据粉细砂填料的最大干密度ρdmax、粉细砂填料的最优含水率w0和设计的压实系数K0,计算出粉细砂填料的设计压实密度ρ0,ρ0=K0·ρdmax(1+w0);
B、碾压层表面松散土层厚度的测试
在现场选取试验段,由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压、振动压路机碾压,压出一层碾压层;再重复以上的操作两次,共压出三层碾压层,完成路基的试验填筑碾压;
在试验填筑碾压的路基上,以0.1m的间隔从上至下选取至少六个测点,用环刀法测出各测点的粉细砂含水率w和压实密度ρ,得到各测点的干密度ρd=ρ/(1+w),并计算出各测点的实际压实系数K=ρd/ρdmax;
绘制压实系数K沿测点深度h的变化曲线,曲线上斜率变化最大的点所对应的测点深度,即为碾压层表面松散土层的测试厚度h0;
C、粉细砂路基的压实与错层检测
C1、由粉细砂填料加水搅拌至其含水率到达最优含水率w0,并以设计压实密度ρ0,算出碾压层厚度的投料量;以该投料量在试验段内投放粉细砂填料;再摊铺、整平、推土机初压;
C2、用振动压路机碾压,压出一层碾压层;
C3、在当前碾压层选取测点,刨去当前碾压层测点范围内的表面土层,刨去的表面土层的厚度为碾压层表面松散土层的测试厚度h0;然后,在测点进行压实系数K及地基系数K30检测,得到当前碾压层的压实系数K及地基系数K30;最后将刨去的表面土层的粉细砂填料进行回填、夯实,得到当前填筑层;
D、如当前碾压层的压实系数K<设计压实系数K0,或当前碾压层的地基系数K30<设计地基系数K30,则加大压实功或增加压实遍数,重新进行C2步的操作;否则,重复进行C步的操作,直至各填筑层的总厚度达到设计厚度;
E、采用履带式推土机进行终压,并在土层表面进行压实系数K和地基系数K30检测;如检出的压实系数K<设计压实系数K0或地基系数K30<设计地基系数K30,则重新采用履带式推土机进行终压,直至检出的压实系数K≥设计压实系数K0且地基系数K30≥设计地基系数K30。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810458926.3A CN108570909B (zh) | 2018-05-15 | 2018-05-15 | 一种粉细砂路基的填筑压实方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810458926.3A CN108570909B (zh) | 2018-05-15 | 2018-05-15 | 一种粉细砂路基的填筑压实方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108570909A true CN108570909A (zh) | 2018-09-25 |
CN108570909B CN108570909B (zh) | 2020-03-13 |
Family
ID=63572408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810458926.3A Active CN108570909B (zh) | 2018-05-15 | 2018-05-15 | 一种粉细砂路基的填筑压实方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108570909B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965563A (zh) * | 2019-12-02 | 2020-04-07 | 杨松梅 | 一种坡面土体层及压实方法 |
CN110965542A (zh) * | 2019-12-02 | 2020-04-07 | 杨松梅 | 一种建筑地基压实方法 |
CN111305179A (zh) * | 2020-03-31 | 2020-06-19 | 长安大学 | 一种基于振动频率的天然砂砾路基质量检测与评价方法 |
CN112176803A (zh) * | 2020-09-30 | 2021-01-05 | 中电建路桥集团有限公司 | 提高砂性土在路床中的压实度进而降低路基沉降的方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5352062A (en) * | 1991-09-13 | 1994-10-04 | Nippon Hodo Company, Limited | Skid road surface and method for constructing same |
CN103628363A (zh) * | 2013-12-06 | 2014-03-12 | 沈阳铁道勘察设计院有限公司 | 一种利用粉细砂作为填料填筑路基的施工方法 |
JP2015175175A (ja) * | 2014-03-17 | 2015-10-05 | 日新製鋼株式会社 | 土木材料及びその製造方法 |
CN105220670A (zh) * | 2015-09-18 | 2016-01-06 | 长安大学 | 一种路基压实度检测方法 |
CN107503256A (zh) * | 2017-07-12 | 2017-12-22 | 河海大学 | 一种砂性土改良填筑路基的施工方法 |
CN107938453A (zh) * | 2016-10-12 | 2018-04-20 | 新疆铁道勘察设计院有限公司 | 采用粉细砂作为路基填料的施工工艺 |
-
2018
- 2018-05-15 CN CN201810458926.3A patent/CN108570909B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5352062A (en) * | 1991-09-13 | 1994-10-04 | Nippon Hodo Company, Limited | Skid road surface and method for constructing same |
CN103628363A (zh) * | 2013-12-06 | 2014-03-12 | 沈阳铁道勘察设计院有限公司 | 一种利用粉细砂作为填料填筑路基的施工方法 |
JP2015175175A (ja) * | 2014-03-17 | 2015-10-05 | 日新製鋼株式会社 | 土木材料及びその製造方法 |
CN105220670A (zh) * | 2015-09-18 | 2016-01-06 | 长安大学 | 一种路基压实度检测方法 |
CN107938453A (zh) * | 2016-10-12 | 2018-04-20 | 新疆铁道勘察设计院有限公司 | 采用粉细砂作为路基填料的施工工艺 |
CN107503256A (zh) * | 2017-07-12 | 2017-12-22 | 河海大学 | 一种砂性土改良填筑路基的施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965563A (zh) * | 2019-12-02 | 2020-04-07 | 杨松梅 | 一种坡面土体层及压实方法 |
CN110965542A (zh) * | 2019-12-02 | 2020-04-07 | 杨松梅 | 一种建筑地基压实方法 |
CN111305179A (zh) * | 2020-03-31 | 2020-06-19 | 长安大学 | 一种基于振动频率的天然砂砾路基质量检测与评价方法 |
CN112176803A (zh) * | 2020-09-30 | 2021-01-05 | 中电建路桥集团有限公司 | 提高砂性土在路床中的压实度进而降低路基沉降的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108570909B (zh) | 2020-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108570909A (zh) | 一种粉细砂路基的填筑压实方法 | |
JP4887430B2 (ja) | 真空打ち固めによる快速な軟地盤処理方法 | |
CN107012755B (zh) | 风积沙路基施工方法 | |
CN104631253A (zh) | 一种高速公路94区、96区红粘土路基的改良及填筑方法 | |
CN102251512A (zh) | 振动碾压与强夯联合压实黄土高填方体的施工方法 | |
US20210108389A1 (en) | Method of strengthening and widening subgrade with geocell based on conductive polymer | |
CN104179105B (zh) | 一种逆作法刚性桩复合地基施工方法 | |
WO2021072941A1 (zh) | 一种滨海淤泥软土地基二次强夯碎石置换加固方法 | |
CN105239551A (zh) | 一种振动碾压质量控制方法 | |
CN102776877B (zh) | 超软土地基梯级真空排水固结方法 | |
CN113006091B (zh) | 一种工程弃土回填再利用的方法 | |
CN104727295B (zh) | 预成孔填料置换平锤强夯法 | |
CN103993533A (zh) | 用于黄土地区高填方路堤的综合压实方法 | |
CN111893828A (zh) | 一种机制砂改良高液限土路基填筑施工方法 | |
CN110029652A (zh) | 一种减少湿陷性黄土工后沉降的施工工艺 | |
CN104762859B (zh) | 山皮石处理软土路基的方法 | |
CN105350512A (zh) | 一种碳酸盐岩块石填料强夯加冲击碾压的施工方法 | |
CN105386448A (zh) | 一种堆石坝坝坡处理中倒坡的填筑施工方法 | |
CN112900176B (zh) | 一种高填方的土石路堤的填筑方法 | |
CN109610244A (zh) | 细粉砂物理改良的路基填筑方法 | |
CN108193574B (zh) | 利用填砂路基不均匀分层填充抗震路基的结构 | |
CN111364306A (zh) | 一种减少湿陷性黄土高填方路基工后沉降的施工方法 | |
CN113774767B (zh) | 一种机场地基填筑大吨位碾压施工方法 | |
CN113882222B (zh) | 一种用于沙漠地区道路填前原地面的压实方法 | |
CN113188513B (zh) | 高速液压夯实机智能测量分析系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |