CN104404918B - 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 - Google Patents
采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 Download PDFInfo
- Publication number
- CN104404918B CN104404918B CN201410661002.5A CN201410661002A CN104404918B CN 104404918 B CN104404918 B CN 104404918B CN 201410661002 A CN201410661002 A CN 201410661002A CN 104404918 B CN104404918 B CN 104404918B
- Authority
- CN
- China
- Prior art keywords
- clay
- crack
- membrane
- composite geo
- inverted trapezoidal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法,首先沿贯穿裂缝走向挖成一个上宽下窄的倒梯形槽,将水泥与粘土的混合泥浆沿槽底的裂缝充填灌浆,并采用碾压设备碾压密实;在倒梯形槽内分层回填粘土料,粘土回填至超过原设计高程面的10%,碾压表面平整后,铺设复合土工膜,两端进行锚固;并在复合土工膜上铺设中沙保护层及土夹石盖重即可。本发明的优点在于与常规水上抛洒粘土修补粘土铺盖局部渗漏破坏相比,处理后的结构可靠性更高,而且适用于设有碎石保护层的粘土铺盖部位,应用范围更广;与常规粘土全部挖除换填法比较,施工方便,工作周期短,造价低,处理后结构可靠性更高,而且减少了对已建工程的二次损伤。
Description
技术领域
本发明涉及水利水电工程的防渗处理,尤其是涉及一种采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法。
背景技术
在水利水电工程尤其在抽水蓄能电站工程建设中,粘土是常用的防渗材料之一。粘土防渗材料在后期运用时如产生浅层或贯穿性裂缝,将直接影响到工程的功能性和安全性。目前常规的处理办法有水上抛洒粘土或将受裂缝影响范围内的粘土全部进行换填,但是水上抛洒粘土不适用于粘土上部铺设有碎石保护层的情况;而全部挖除换填法,当粘土防渗层较厚时,不仅工程量较大,而且需要大型碾压设备对换填后的粘土进行分层碾压,确保其达到设计要求的压实度,并与前期分层碾压填筑、且已完成部分沉降量的粘土形成整体结构。由于工程投入运行后,连接库顶和库底的施工临时道路已被拆除,大型机械碾压设备下至库底作业非常困难,如采用小型设备将造成工期长,粘土压实度难以满足设计要求的情况。怎样既能修补已有缺陷,又方便施工、缩短工期,同时减少对已建工程的二次损伤影响,是水利水电工程中需要研究的问题。
发明内容
本发明的目的在于提供一种采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法,该方法在保证工程安全性和回复工程功能性的前提下,不仅施工难度低,工期短且可减少对已建工程的二次损伤。
为实现上述目的,本发明可采取下述技术方案:
本发明所述的采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法包括下述步骤:
第一步,沿贯穿裂缝走向挖除裂缝区域上部松散的粘土,至较密实且裂缝宽度小于3cm时保留下部粘土层,使其沿贯穿裂缝走向形成一个上宽下窄的倒梯形槽,所述倒梯形槽的槽底宽度为3~4m,两侧的边坡坡比以保证施工临时边坡稳定为宜;
第二步,按水泥:粘土=1:2~1:4的比例配制混合泥浆,所用粘土的粘粒含量为20%~45%;然后沿槽底的裂缝进行充填灌浆,利用混合泥浆的自重灌入并堵塞裂缝;
第三步,采用小型碾压设备将槽底碾压4~6遍;
第四步,在倒梯形槽内分层回填粘土料,并碾压密实,所用粘土料的含水量应大于最优含水量的1%~2%,压实厚度为填土厚度的2/3,每层厚度25cm;
第五步,粘土回填至原设计高程面后,继续回填,超高高度按换填粘土高度的10%控制;
第六步,将粘土表面碾压平整后,铺设复合土工膜,所述复合土工膜的膜面直接与粘土面接触,两端进行锚固;并在复合土工膜上铺设中沙保护层及土夹石盖重即可。
本发明的优点在于与常规水上抛洒粘土修补粘土铺盖局部渗漏破坏相比,处理后的结构可靠性更高,而且适用于设有碎石保护层的粘土铺盖部位,应用范围更广;与常规粘土全部挖除换填法比较,施工方便,工作周期短,造价低,处理后结构可靠性更高,而且减少了对已建工程的二次损伤。
具体实施方式
本发明所述的采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法,包括下述步骤:
第一步,沿贯穿裂缝的走向挖除裂缝区域上部松散的粘土,开挖至密实且裂缝宽度小于3cm时保留下部粘土层,使其沿贯穿裂缝走向形成一个上宽下窄的倒梯形槽,倒梯形槽的槽底宽度为3~4m,更加方便施工,两侧开挖的边坡坡比为1:1.5左右,可保持施工时临时边坡稳定,尽量减少粘土开挖换填量;
第二步,按水泥:粘土=1:2~1:4的比例配制混合泥浆,所用粘土的粘粒含量为20%~45%;然后对槽底的裂缝进行充填灌浆,利用混合泥浆的自重灌入并堵塞裂缝;
第三步,采用凸块碾或其他小型碾压设备将槽底碾压4遍,必要时也可以多碾一到两遍;
第四步,在倒梯形槽内分层回填粘土料,并碾压密实,回填粘土料采用塑性较大的粘土料,所用粘土料的含水量应大于最优含水量的1%~2%,压实厚度为填土厚度的2/3,每层厚度25cm;
第五步,粘土回填至原设计高程面后,继续回填,超高高度按换填粘土高度的10%控制;
第六步,将粘土表面碾压平整,表面铺设复合土工膜(一布一膜),复合土工膜的膜面直接与粘土面接触,两端进行锚固;并在复合土工膜的土工布上铺设中沙保护层及土夹石盖重即可。
Claims (1)
1.一种采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法,其特征在于:包括下述步骤:
第一步,沿贯穿裂缝走向挖除裂缝区域上部松散的粘土,至较密实且裂缝宽度小于3cm时保留下部粘土层,使其沿贯穿裂缝走向形成一个上宽下窄的倒梯形槽,所述倒梯形槽的槽底宽度为3~4m,两侧的边坡坡比以保证施工临时边坡稳定为宜;
第二步,按水泥:粘土=1:2~1:4的比例配制混合泥浆,所用粘土的粘粒含量为20%~45%;然后沿槽底的裂缝进行充填灌浆,利用混合泥浆的自重灌入并堵塞裂缝;
第三步,采用小型碾压设备将槽底碾压4~6遍;
第四步,在倒梯形槽内分层回填粘土料,并碾压密实,所用粘土料的含水量应大于最优含水量的1%~2%,压实厚度为填土厚度的2/3,每层厚度25cm;
第五步,粘土回填至原设计高程面后,继续回填,超高高度按换填粘土高度的10%控制;
第六步,将粘土表面碾压平整后,铺设复合土工膜,所述复合土工膜的膜面直接与粘土面接触,两端进行锚固;并在复合土工膜上铺设中砂保护层及土夹石盖重即可。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661002.5A CN104404918B (zh) | 2014-11-19 | 2014-11-19 | 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661002.5A CN104404918B (zh) | 2014-11-19 | 2014-11-19 | 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104404918A CN104404918A (zh) | 2015-03-11 |
CN104404918B true CN104404918B (zh) | 2016-03-02 |
Family
ID=52642578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410661002.5A Active CN104404918B (zh) | 2014-11-19 | 2014-11-19 | 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404918B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105442495B (zh) * | 2015-11-19 | 2017-12-29 | 浙江桐砚建筑规划设计有限公司 | 一种scl防渗膜用于水堤防渗的施工方法 |
CN106193128B (zh) * | 2016-07-11 | 2018-09-07 | 东南大学 | 阻隔有机污染物挥发的粘土覆层开裂的修补装置及其方法 |
CN107931299A (zh) * | 2017-12-14 | 2018-04-20 | 杭州市环境集团有限公司 | 相邻垃圾堆体之间的隔离锚固结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4441835A1 (de) * | 1994-11-24 | 1996-05-30 | Preussag Anlagenbau | Verfahren zum Sichern von Deponien |
CN202788022U (zh) * | 2012-08-03 | 2013-03-13 | 中程建工集团有限公司 | 一种墙体裂缝复合式修复结构 |
CN103696397A (zh) * | 2013-12-27 | 2014-04-02 | 北京轩昂环保科技股份有限公司 | 一种人工坝的防渗处理方法 |
CN203514260U (zh) * | 2013-10-25 | 2014-04-02 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种土工膜锚固防渗结构 |
-
2014
- 2014-11-19 CN CN201410661002.5A patent/CN104404918B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4441835A1 (de) * | 1994-11-24 | 1996-05-30 | Preussag Anlagenbau | Verfahren zum Sichern von Deponien |
CN202788022U (zh) * | 2012-08-03 | 2013-03-13 | 中程建工集团有限公司 | 一种墙体裂缝复合式修复结构 |
CN203514260U (zh) * | 2013-10-25 | 2014-04-02 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种土工膜锚固防渗结构 |
CN103696397A (zh) * | 2013-12-27 | 2014-04-02 | 北京轩昂环保科技股份有限公司 | 一种人工坝的防渗处理方法 |
Non-Patent Citations (3)
Title |
---|
坝体砼防渗心墙裂缝成因分析及其处理;仉奉忠;《水利水电施工》;20050331(第1期);37-39 * |
堤防劈裂灌浆防渗技术的试验与应用;徐平;《治淮》;19911231(第12期);38-39 * |
混凝土防渗墙技术在险坝加固中的应用——澄碧河水库土坝裂缝分析和防渗处理;广西壮族自治区百色地区水电局;《水利水电技术》;19780131(第1期);36-41 * |
Also Published As
Publication number | Publication date |
---|---|
CN104404918A (zh) | 2015-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103422511B (zh) | 一种复合式软土地基下输电杆塔浅埋基础地基加固方法 | |
CN103031836B (zh) | 一种在新吹填淤泥地基上快速修筑道路的方法 | |
CN102704364B (zh) | 一种粘土包边尾矿砂路基的施工方法 | |
CN105297685B (zh) | 一种基座混凝土面板堆石坝及其施工方法 | |
CN105735322A (zh) | 一种刚柔复合防渗可回收支护结构的设计施工方法 | |
CN101250868A (zh) | 降水预压联合动力固结深层加固法 | |
CN105256788A (zh) | 吹填软土地基加固处理系统及网格式真空预压联用电渗法的处理方法 | |
CN102606176A (zh) | 湿陷性黄土隧道施工方法 | |
CN104120686A (zh) | 一种高弹模垫座式复合坝 | |
CN103225267A (zh) | 深厚软土地基桥台施工方法 | |
CN104404918B (zh) | 采用复合土工膜和部分换填粘土修补粘土贯穿裂缝的方法 | |
CN103437337A (zh) | 一种采用换填垫层方式加固软土地基的方法 | |
CN104746399A (zh) | 防治桥头跳车施工方法 | |
CN105019425A (zh) | 一种排水体和固化层组合地基结构的施工方法 | |
CN103215950B (zh) | 回填区桩基接长施工方法 | |
CN104763127A (zh) | 一种耐重载防酸地坪及其施工方法 | |
CN106884427A (zh) | 水下沉管隧道以及沉管隧道过渡段软土地基加固方法 | |
CN107165151B (zh) | 一种水电站工程中沉降差的控制方法 | |
CN103276717B (zh) | 复合土工合成材料加筋垫层处理软土地基的方法 | |
CN103966981B (zh) | 风化卸荷岩体上修建拱坝的传力结构及其施工方法 | |
CN102251499A (zh) | 一种河道生态减渗方法和生态减渗土 | |
CN103993609A (zh) | 硅灰砂导排滤水多功能快硬凝结体人工修补基坑止水帷幕 | |
CN205975653U (zh) | 一种土胎模施工的独立承台结构 | |
CN205088528U (zh) | 软质岩土弃碴高填方场坪整体道床路基结构 | |
CN203741855U (zh) | 快硬硅灰导排滤水多功能凝结体人工修补基坑止水帷幕 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: Yellow River Engineering Consulting Co., Ltd. |