CN104746399A - 防治桥头跳车施工方法 - Google Patents
防治桥头跳车施工方法 Download PDFInfo
- Publication number
- CN104746399A CN104746399A CN201510167380.2A CN201510167380A CN104746399A CN 104746399 A CN104746399 A CN 104746399A CN 201510167380 A CN201510167380 A CN 201510167380A CN 104746399 A CN104746399 A CN 104746399A
- Authority
- CN
- China
- Prior art keywords
- compaction
- roadbed
- degree
- grid
- abutment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种防治桥头跳车施工方法,包括基底处理、修整台阶、回填、土工格栅摊铺、碾压、检测等步骤。本发明采用透水性材料加土工格栅处理桥梁台背回填,既能避免因雨水渗入而导致的路基沉降,也能优化桥台区域对基底的整体受力,能很好的避免“跳车”现象。
Description
技术领域
本发明涉及一种防治桥头跳车施工方法。
背景技术
在道路、桥梁工程施工中,桥梁台背回填是一项容易被忽视的工作,但却常常是严重影响道路、桥梁使用性能的原因之一。路面施工完成后桥梁结构物与路基连接处出现“台阶”,车辆通过时容易产生腾空现象,工程界通常称为“跳车”,“跳车”的产生有以下一些主要原因:
1、台背后的地物、地貌与其它路段不同,地形起伏大,地质条件不一,容易产生地基沉降。同时,一般桥梁处路基填筑高度较大,产生的基底应力相对较大,因此,在台后填筑地段,产生地基沉降也较其它路段大。路基与台背衔接处,因两种不同结构基底要求的承载力和沉降量不相同,导致了结构物和路基产生不均匀沉陷。
2、路基本身的压缩沉降一般情况,桥台先行施工,待路基形成后,在台背处留一缺口,当对此缺口填筑施工时,由于作业面狭小而使压实度工作不到位,特别是台背后约50~100cm范围内,达到规定的压实度要求有一定的难度,致使该处路基压实质量下降,通车后,因行车荷载反复作用引起该处路基的压缩沉降。
3、路基与桥梁台背接头处,常会产生细小缩裂缝,雨水渗入缝隙后,导致该处路基发生沉降。
总之,“跳车”产生的原因是复杂的、综合性的,其主要原因是与基底处理、填筑材料及施工工艺有密切关系,要解决桥梁台背的工后沉降问题,就必须对基底进行有效处理,并采取正确的施工措施和施工办法。
发明内容
本发明的目的在于提供一种既能避免因雨水渗入而导致的路基沉降,也能优化桥台区域对基底的整体受力,能很好的避免“跳车”现象的防治桥头跳车施工方法。
本发明的技术解决方案是:
一种防治桥头跳车施工方法,其特征是:包括下列步骤:
(1)基底处理
一般路基基底处理使压实度满足设计及规范要求,后进行台背回填;
对软土或者杂填土地基,先进行路基处理或深层路基处理,经检测达到设计指标后,再进行台背回填;
(2)修整台阶
对台背处已填筑了一定高度的路基,沿路线方向进行人工挖台阶;台阶顶宽不小于3m,高度不大于0.5m,台阶处的填土压实度符合路基填土的压实度标准,清理的松土运离施工现场;若台背处路基尚未开始填筑,则台背填筑可与路基填土同步进行;
(3)回填
回填土方时,桥梁台背区域从台后2.9米处开始填筑,将路基连接处修筑成0.6×2m的台阶,按照规定的压实度逐层碾压;
(4)土工格栅摊铺
每填筑高度为0.6m时,在压实层上摊铺钢塑土工格栅;土工格栅必须经过试验达到设计要求后才能使用;铺设按设计要求分层铺设,摊铺方向是将格栅自台背沿路线纵向展开,并按设计长度截断;土工格栅张拉须均匀用力,保证土工格栅的整体性,其纵向采用搭接法连接,搭接长度不小于0.3m,并用高强度的土工棒连接,横断面方向不需搭接,两幅并拢即可;与桥台连接部分采用紧固件锚固,压板采用6mm厚钢板,板宽15cm,钢板上的螺栓孔距板边净距不小于50mm,螺栓采用六角头螺栓M16×100mm,垫圈为A16mm,螺母为M16mm;若桥台与线路斜交,将格栅靠桥台一端截成与斜交角度相同的角度,保证格栅与线路走向平行;
(5)碾压
回填中粗砂时,作业面较小的边角处,采用电动平板夯进行夯实,且每层松铺厚度不大于15cm,采用水冲和振动碾压,先采用水冲,然后再根据作业宽度采用振动夯夯实或振动压路机碾压;台身上部根据回填宽度采用压路机碾压,先用压路机静压一遍,再振动碾压,然后再由中间向两侧碾压;每次碾压错开1/3轮宽,碾压至无明显轮迹时,检测压实度;压实度合格后再进行下一层施工;
(6)检测
台背回填分层填筑、分层检测,压实度采用灌水法或灌砂法进行检测;检测频率按JTGF10-2006执行,并同时满足每层每侧不少于6点,检测点位一般为:中间1点,左右边距离耳墙1m处各1点,或监理工程师指定的点位;检测点离台背的距离分别为30cm和1.5H;
每填一层,碾压一层,检测一层,检查频率每层左、中、右检验三个点,压实度经监理工程师检测合格方可填筑下一层。
本发明采用透水性材料(主要为中粗砂)加土工格栅处理桥梁台背回填,既能避免因雨水渗入而导致的路基沉降,也能优化桥台区域对基底的整体受力,能很好的避免“跳车”现象。
本发明提高了回填土方的整体性,使接触部位的阶梯式沉降变为连续渐变沉降,缓解了后台土方的局部下沉现象,跳车感觉明显降低。
土工格栅化学稳定性可靠,在地下寿命可达几十年,能在整个道路工程设计年限里充分发挥作用。透水性材料的回填,避免了路基因雨水渗入和水土流失而导致的路基沉降。整体技术过程工艺简单,操作方便、施工速度快,工程造价低,施工投入少。适用于路基处于软土地基,及路基处于高填方区域的台背回填。适用于一般桥梁、涵洞台背区域的回填。
下面结合实施例对本发明作进一步说明。
具体实施方式
一种防治桥头跳车施工方法,包括下列步骤:
(1)基底处理
一般路基基底处理使压实度满足设计及规范要求,后进行台背回填;
对软土或者杂填土地基,先进行路基处理或深层路基处理,经检测达到设计指标后,再进行台背回填;
(2)修整台阶
对台背处已填筑了一定高度的路基,沿路线方向进行人工挖台阶;台阶顶宽不小于3m,高度不大于0.5m,台阶处的填土压实度符合路基填土的压实度标准,清理的松土运离施工现场;若台背处路基尚未开始填筑,则台背填筑可与路基填土同步进行;
(3)回填
回填土方时,桥梁台背区域从台后2.9米处开始填筑,将路基连接处修筑成0.6×2m的台阶,按照规定的压实度逐层碾压;
(4)土工格栅摊铺
每填筑高度为0.6m时,在压实层上摊铺钢塑土工格栅;土工格栅必须经过试验达到设计要求后才能使用;铺设按设计要求分层铺设,摊铺方向是将格栅自台背沿路线纵向展开,并按设计长度截断;土工格栅张拉须均匀用力,保证土工格栅的整体性,其纵向采用搭接法连接,搭接长度不小于0.3m,并用高强度的土工棒连接,横断面方向不需搭接,两幅并拢即可;与桥台连接部分采用紧固件锚固,压板采用6mm厚钢板,板宽15cm,钢板上的螺栓孔距板边净距不小于50mm,螺栓采用六角头螺栓M16×100mm,垫圈为A16mm,螺母为M16mm;若桥台与线路斜交,将格栅靠桥台一端截成与斜交角度相同的角度,保证格栅与线路走向平行;
(5)碾压
回填中粗砂时,作业面较小的边角处,采用电动平板夯进行夯实,且每层松铺厚度不大于15cm,采用水冲和振动碾压,先采用水冲,然后再根据作业宽度采用振动夯夯实或振动压路机碾压;台身上部根据回填宽度采用压路机碾压,先用压路机静压一遍,再振动碾压,然后再由中间向两侧碾压;每次碾压错开1/3轮宽,碾压至无明显轮迹时,检测压实度;压实度合格后再进行下一层施工;
(6)检测
台背回填分层填筑、分层检测,压实度采用灌水法或灌砂法进行检测;检测频率按JTGF10-2006执行,并同时满足每层每侧不少于6点,检测点位一般为:中间1点,左右边距离耳墙1m处各1点,或监理工程师指定的点位;检测点离台背的距离分别为30cm和1.5H;
每填一层,碾压一层,检测一层,检查频率每层左、中、右检验三个点,压实度经监理工程师检测合格方可填筑下一层。
Claims (1)
1.一种防治桥头跳车施工方法,其特征是:包括下列步骤:
(1)基底处理
一般路基基底处理使压实度满足设计及规范要求,后进行台背回填;
对软土或者杂填土地基,先进行路基处理或深层路基处理,经检测达到设计指标后,再进行台背回填;
(2)修整台阶
对台背处已填筑了一定高度的路基,沿路线方向进行人工挖台阶;台阶顶宽不小于3m,高度不大于0.5m,台阶处的填土压实度符合路基填土的压实度标准,清理的松土运离施工现场;若台背处路基尚未开始填筑,则台背填筑可与路基填土同步进行;
(3)回填
回填土方时,桥梁台背区域从台后2.9米处开始填筑,将路基连接处修筑成0.6×2m的台阶,按照规定的压实度逐层碾压;
(4)土工格栅摊铺
每填筑高度为0.6m时,在压实层上摊铺钢塑土工格栅;土工格栅必须经过试验达到设计要求后才能使用;铺设按设计要求分层铺设,摊铺方向是将格栅自台背沿路线纵向展开,并按设计长度截断;土工格栅张拉须均匀用力,保证土工格栅的整体性,其纵向采用搭接法连接,搭接长度不小于0.3m,并用高强度的土工棒连接,横断面方向不需搭接,两幅并拢即可;与桥台连接部分采用紧固件锚固,压板采用6mm厚钢板,板宽15cm,钢板上的螺栓孔距板边净距不小于50mm,螺栓采用六角头螺栓M16×100mm,垫圈为A16mm,螺母为M16mm;若桥台与线路斜交,将格栅靠桥台一端截成与斜交角度相同的角度,保证格栅与线路走向平行;
(5)碾压
回填中粗砂时,作业面较小的边角处,采用电动平板夯进行夯实,且每层松铺厚度不大于15cm,采用水冲和振动碾压,先采用水冲,然后再根据作业宽度采用振动夯夯实或振动压路机碾压;台身上部根据回填宽度采用压路机碾压,先用压路机静压一遍,再振动碾压,然后再由中间向两侧碾压;每次碾压错开1/3轮宽,碾压至无明显轮迹时,检测压实度;压实度合格后再进行下一层施工;
(6)检测
台背回填分层填筑、分层检测,压实度采用灌水法或灌砂法进行检测;检测频率按JTGF10-2006执行,并同时满足每层每侧不少于6点,检测点位一般为:中间1点,左右边距离耳墙1m处各1点,或监理工程师指定的点位;检测点离台背的距离分别为30cm和1.5H;
每填一层,碾压一层,检测一层,检查频率每层左、中、右检验三个点,压实度经监理工程师检测合格方可填筑下一层。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510167380.2A CN104746399A (zh) | 2015-04-10 | 2015-04-10 | 防治桥头跳车施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510167380.2A CN104746399A (zh) | 2015-04-10 | 2015-04-10 | 防治桥头跳车施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104746399A true CN104746399A (zh) | 2015-07-01 |
Family
ID=53586604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510167380.2A Pending CN104746399A (zh) | 2015-04-10 | 2015-04-10 | 防治桥头跳车施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104746399A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105016770A (zh) * | 2015-07-09 | 2015-11-04 | 河南华泰建材开发有限公司 | 一种桥梁减跨的方法及专用桥梁减跨回填材料 |
CN106087758A (zh) * | 2016-08-06 | 2016-11-09 | 桂林理工大学 | 一种用于减缓桥头跳车的路桥连接结构的施工方法 |
CN107542016A (zh) * | 2017-08-09 | 2018-01-05 | 中铁四局集团第工程有限公司 | 一种控制路基差异沉降的填筑方法 |
CN110792009A (zh) * | 2019-10-17 | 2020-02-14 | 龙德建设有限公司 | 一种基于混凝土复合式路面的桥头跳车防治结构及其铺设方法 |
CN112095468A (zh) * | 2020-05-09 | 2020-12-18 | 如皋市规划建筑设计院有限公司 | 一种桥台高填土方法 |
CN117364799A (zh) * | 2023-10-07 | 2024-01-09 | 保利长大工程有限公司 | 台背回填标准化施工工法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003239276A (ja) * | 2003-01-23 | 2003-08-27 | Dia Consultant:Kk | 道路の構築工法 |
CN103572679A (zh) * | 2013-11-13 | 2014-02-12 | 河海大学 | 一种降低桥头跳车发生率的路堤结构及填筑方法 |
CN103741595A (zh) * | 2014-01-21 | 2014-04-23 | 浙江省交通规划设计研究院 | 一种用于治理桥头跳车的桥头结构 |
-
2015
- 2015-04-10 CN CN201510167380.2A patent/CN104746399A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003239276A (ja) * | 2003-01-23 | 2003-08-27 | Dia Consultant:Kk | 道路の構築工法 |
CN103572679A (zh) * | 2013-11-13 | 2014-02-12 | 河海大学 | 一种降低桥头跳车发生率的路堤结构及填筑方法 |
CN103741595A (zh) * | 2014-01-21 | 2014-04-23 | 浙江省交通规划设计研究院 | 一种用于治理桥头跳车的桥头结构 |
Non-Patent Citations (2)
Title |
---|
《公路工程施工组织设计实例应用手册》编写委员会: "《公路工程施工组织设计实例应用手册》", 31 October 2011, 中国建筑工业出版社 * |
侯晓莉: "特殊地段路基施工分析", 《西部探矿工程》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105016770A (zh) * | 2015-07-09 | 2015-11-04 | 河南华泰建材开发有限公司 | 一种桥梁减跨的方法及专用桥梁减跨回填材料 |
CN106087758A (zh) * | 2016-08-06 | 2016-11-09 | 桂林理工大学 | 一种用于减缓桥头跳车的路桥连接结构的施工方法 |
CN107542016A (zh) * | 2017-08-09 | 2018-01-05 | 中铁四局集团第工程有限公司 | 一种控制路基差异沉降的填筑方法 |
CN110792009A (zh) * | 2019-10-17 | 2020-02-14 | 龙德建设有限公司 | 一种基于混凝土复合式路面的桥头跳车防治结构及其铺设方法 |
CN112095468A (zh) * | 2020-05-09 | 2020-12-18 | 如皋市规划建筑设计院有限公司 | 一种桥台高填土方法 |
CN117364799A (zh) * | 2023-10-07 | 2024-01-09 | 保利长大工程有限公司 | 台背回填标准化施工工法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746399A (zh) | 防治桥头跳车施工方法 | |
US20140314497A1 (en) | Polymer grouting method for constructing gravel pile | |
CN102359046A (zh) | 一种高填方路基拼接方法 | |
CN103711056B (zh) | 钢质工具式临时施工道路及其施工方法 | |
CN101311418A (zh) | 深基坑、大面积设备基础换填方法 | |
CN203462484U (zh) | 一种既有挡土墙补强结构 | |
CN109914173A (zh) | 高速公路改扩建工程中泡沫轻质土浇筑台背结构及其施工方法 | |
CN106592608A (zh) | 一种地下综合管廊新地基与老路基差异沉降控制方法 | |
CN113802426A (zh) | 采用片石挤密加筋垫层法处理新近填土路基的方法 | |
CN104179105A (zh) | 一种逆作法刚性桩复合地基施工方法 | |
CN202849895U (zh) | 一种城市沥青路面修复结构 | |
CN102817298B (zh) | 一种在冻土上的施工方法 | |
CN104695419A (zh) | 一种软土土基的施工方法 | |
CN102296591A (zh) | 一种软土基的快速排水固结处理方法 | |
CN203960701U (zh) | 软土路基新老路基路面衔接处的差异沉降协调结构 | |
CN111576487A (zh) | 一种地下工程基础底板结构及其施工方法 | |
CN110792009A (zh) | 一种基于混凝土复合式路面的桥头跳车防治结构及其铺设方法 | |
CN102635044B (zh) | 一种强夯对路床挖方路基的处理方法 | |
CN100365210C (zh) | 定位夯实路基施工方法 | |
CN102817352B (zh) | 高含水率可液化土地基冲击碾压施工工法 | |
CN211340257U (zh) | 一种涵洞台背路基加固结构 | |
CN110438855B (zh) | 一种下穿铁路桥涵道床回填的施工方法 | |
CN111041918A (zh) | 一种路堤拓宽方法 | |
CN203144858U (zh) | 一种已通车公路路基沉降控制结构 | |
CN207228090U (zh) | 软土地区铁路车站站台沉降置换修复结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150701 |
|
RJ01 | Rejection of invention patent application after publication |