CN105279329A - BIM (Building Information Modeling)-based sample plate guide quality management method - Google Patents

BIM (Building Information Modeling)-based sample plate guide quality management method Download PDF

Info

Publication number
CN105279329A
CN105279329A CN201510672444.4A CN201510672444A CN105279329A CN 105279329 A CN105279329 A CN 105279329A CN 201510672444 A CN201510672444 A CN 201510672444A CN 105279329 A CN105279329 A CN 105279329A
Authority
CN
China
Prior art keywords
model
quality
bim
pipeline
dimensional visualization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510672444.4A
Other languages
Chinese (zh)
Other versions
CN105279329B (en
Inventor
金仁才
张石磊
王旭良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510672444.4A priority Critical patent/CN105279329B/en
Publication of CN105279329A publication Critical patent/CN105279329A/en
Application granted granted Critical
Publication of CN105279329B publication Critical patent/CN105279329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/80Technologies aiming to reduce greenhouse gasses emissions common to all road transportation technologies
    • Y02T10/82Elements for improving aerodynamics

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Instructional Devices (AREA)

Abstract

The invention discloses a BIM (Building Information Modeling)-based sample plate guide quality management method, which comprises the following steps: 1) converting the building, the structure and the electromechanical model of a design institute into a three-dimensional model in Autodesk Revit, and finishing collision check and pipeline deepening in the Autodesk Navisworks; 2) independently manufacturing the three-dimensional visual models of key structure models; 3) independently manufacturing the three-dimensional visual models of electromechanical pipe fitting modules; 4) independently manufacturing the three-dimensional visual models of decoration modules; and 5) according to a structure template, a pipeline template, a curtain wall template and a decoration template, manufacturing a plate. The management method provided by the invention is convenient for technical disclosure and pre-job training, is favorable for eliminating the common quality problems of engineering and controlling site operation quality, enables more visual quality inspection and acceptance and accelerates the integral level of the engineering construction quality to be improved.

Description

A kind of model based on BIM is led the way method for quality control
Technical field
The present invention relates to the quality management field that model is led the way, specifically relate to a kind of model based on BIM and to lead the way method for quality control.
Background technology
It is a kind of entity work that traditional sample is led the way, namely high standard, high-quality building model are built out in advance, guide project in construction to high-quality, zero defect and exquisiteness future development by these building models, the existing defects but these entity samples are led the way.First, entity sample can not move, can not be directly in sight in construction part, and this makes instantiate template become a mere formality, and Site quality control effect is not strong; Secondly, though instantiate template is little, but also need labor intensive and material resources to build, this can increase some unnecessary expenses expenditure, these expenses expenditure also just limits construction enterprises and all entity samples all can not be set up out, just build the instantiate template of some emphasis, so the range of application that model is led the way receives limitation.For two defects of above-mentioned entity sample, invention introduces BIM technology.BIM model is virtual technology, not consumable material, as long as there is a removable IPAD just can use by any part at the scene.In addition, BIM has higher accuracy, directly can be contrasted, find out the defect of project in construction by scene photograph and BIM virtual sample.So, the model based on BIM lead the way method for quality control have save material, the advantage such as precision is high, field quality check is convenient, be the model that Virtual Simulation combines with quality management.
Summary of the invention
For the technical matters existed in prior art, a kind of model based on BIM is the object of the present invention is to provide to lead the way method for quality control.
To achieve these goals, the technical solution adopted in the present invention is: a kind of model based on BIM is led the way method for quality control, comprises the following steps:
1) building of designing institute, structure and electromechanical model are converted into three-dimensional model in AutodeskRevit, and in AutodeskNavisworks, complete collision detection and pipeline in-depth;
2) three-dimensional visualization model of key structure module is made respectively, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, key Quality Control, quality check result and remarks quality satisfactory after correcting, the position for complexity makes its blast detail drawing and connection detail;
3) three-dimensional visualization model of difference maker fulgurite part module, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, critical construction technology, qualifying point, check result, emphasis safeguard position, the position for complexity makes blast detail drawing and connection detail;
4) three-dimensional visualization model of decorative module is made respectively, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, the internal structural map of stripping epidermis, inspection of quality record, the position for complexity makes blast detail drawing and connection detail;
5) according to the template construct plate board of structure, pipeline, curtain wall and decoration.
Preferably, step 2) in the three-dimensional visualization model of key structure module comprise reinforcing bar node model, model sheetinstallat technique model, post empiricism model, wall bushing model.
Preferably, in step 3), the three-dimensional visualization model of dynamo-electric pipe fitting module comprises and dynamo-electric installs model, dynamo-electric model room model, basement machine room that pipeline is intensive.
Preferably, in step 4) the three-dimensional visualization model of decorative module comprise layering plaster decorative engineering model, roof waterproof layer model, masonry construction model, door and window construction model.
Beneficial effect of the present invention shows:
Method for quality control proposed by the invention, starts with from key modules such as structure, pipeline, curtain wall and decorations, in conjunction with construction technology, mixes corresponding connection detail and blast detail drawing, be convenient to confide a technological secret and pre-job training.Be conducive to eliminating construction quality common fault, controlling site operation quality, more intuitively carry out quality inspection and examination simultaneously, promote that the integral level of engineering construction quality improves.
Accompanying drawing explanation
Fig. 1 is that model is led the way the process flow diagram of method for quality control.
Embodiment
For further describing the present invention, below in conjunction with embodiment, it is described further.
As shown in Figure 1, a kind of model based on BIM is led the way method for quality control, and 1) building of designing institute, structure and electromechanical model are converted into three-dimensional model in AutodeskRevit, and in AutodeskNavisworks, complete collision detection and pipeline in-depth.
2) three-dimensional visualization model of key structure module is made respectively, comprise reinforcing bar node model, model sheetinstallat technique model, post empiricism model, wall bushing model, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, key Quality Control, quality check result and remarks quality satisfactory after correcting, the position for complexity makes its blast detail drawing and connection detail.
3) three-dimensional visualization model of difference maker fulgurite part module, comprise and dynamo-electric model, dynamo-electric model room model, basement machine room that pipeline is intensive are installed, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, critical construction technology, qualifying point, check result, emphasis safeguard position, the position for complexity makes blast detail drawing and connection detail.
4) three-dimensional visualization model of decorative module is made respectively, comprise layering plaster decorative engineering model, roof waterproof layer model, masonry construction model, door and window construction model, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, the internal structural map of stripping epidermis, inspection of quality record, the position for complexity makes blast detail drawing and connection detail.
5) according to the template construct plate board of structure, pipeline, curtain wall and decoration.
The present invention proposes a kind of model based on BIM to lead the way method for quality control, emphasis comprises three large contents: (1) BIM modelling and collision detection; (2) structure, pipeline, the crucial model information model of decorative module are built; (3) the three-dimensional visualization quality based on model model is told somebody what one's real intentions are.Wherein, second step is the core that model is led the way, and comprises reinforcing bar node model, model sheetinstallat technique model, post empiricism model, wall bushing model for structural key module; Electromechanical pipeline module is comprised and dynamo-electric model, dynamo-electric model room model, basement machine room that pipeline is intensive is installed; For decorative module comprise layering plaster decorative engineering model, roof waterproof layer model, masonry construction model, door and window construction model.In order to realize quality management target, all add such as in above-mentioned three class models: the quality control information such as material, model, kind, erection sequence, production time, set-up time, key Quality Control, quality check result, remarks quality satisfactory after correcting.Efficient quality management and control is realized by abundant species, information digitizing model that is complete, three-dimensional visualization.Because BIM model coordinates IPAD mobile terminal device, can realize lightweight, mobile, can the real-time dynamic quality management of contrast, the present invention can be implemented and operate at the construction field (site) more easily, and promotional value is remarkable.
Above content is only to design example of the present invention and explanation; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.

Claims (4)

1. to lead the way a method for quality control based on the model of BIM, it is characterized in that, comprise the following steps:
1) building of designing institute, structure and electromechanical model are converted into three-dimensional model in AutodeskRevit, and in AutodeskNavisworks, complete collision detection and pipeline in-depth;
2) three-dimensional visualization model of key structure module is made respectively, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, key Quality Control, quality check result and remarks quality satisfactory after correcting, the position for complexity makes its blast detail drawing and connection detail;
3) three-dimensional visualization model of difference maker fulgurite part module, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, critical construction technology, qualifying point, check result, emphasis safeguard position, the position for complexity makes blast detail drawing and connection detail;
4) three-dimensional visualization model of decorative module is made respectively, and indicate size and the size of its each parts, its attribute of last specific definition, comprise material, model, kind, erection sequence, production time, set-up time, the internal structural map of stripping epidermis, inspection of quality record, the position for complexity makes blast detail drawing and connection detail;
5) according to the template construct plate board of structure, pipeline, curtain wall and decoration.
2. the model based on BIM according to claim 1 is led the way method for quality control, it is characterized in that, step 2) described in the three-dimensional visualization model of key structure module comprise reinforcing bar node model, model sheetinstallat technique model, post empiricism model, wall bushing model.
3. the model based on BIM according to claim 1 is led the way method for quality control, it is characterized in that, the three-dimensional visualization model of dynamo-electric pipe fitting module described in step 3) comprises dynamo-electricly installs model, dynamo-electric model room model, basement machine room that pipeline is intensive.
4. the model based on BIM according to claim 1 is led the way method for quality control, it is characterized in that, the three-dimensional visualization model of decorative module described in step 4) comprises layering and to plaster decorative engineering model, roof waterproof layer model, masonry construction model, door and window construction model.
CN201510672444.4A 2015-10-13 2015-10-13 A kind of template based on BIM is led the way method for quality control Active CN105279329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510672444.4A CN105279329B (en) 2015-10-13 2015-10-13 A kind of template based on BIM is led the way method for quality control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510672444.4A CN105279329B (en) 2015-10-13 2015-10-13 A kind of template based on BIM is led the way method for quality control

Publications (2)

Publication Number Publication Date
CN105279329A true CN105279329A (en) 2016-01-27
CN105279329B CN105279329B (en) 2019-02-26

Family

ID=55148339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510672444.4A Active CN105279329B (en) 2015-10-13 2015-10-13 A kind of template based on BIM is led the way method for quality control

Country Status (1)

Country Link
CN (1) CN105279329B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956257A (en) * 2016-04-28 2016-09-21 上海宝冶集团有限公司 BIM-based aluminum alloy template deep design method
CN106088598A (en) * 2016-06-12 2016-11-09 中国十七冶集团有限公司 A kind of BIM technology is used to carry out the method led the way of model of constructing
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN106296026A (en) * 2016-08-18 2017-01-04 中国建筑第八工程局有限公司 A kind of virtual model based on BIM technology is led the way quality management-control method
CN107103151A (en) * 2017-05-15 2017-08-29 贵州精正检测有限公司 A kind of method and apparatus of the fabricated construction based on BIM
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
CN108133078A (en) * 2017-12-01 2018-06-08 中国建筑第八工程局有限公司 Virtual model based on 720 distant view photographs is led the way quality management-control method
CN108252519A (en) * 2018-03-14 2018-07-06 中铁八局集团第四工程有限公司 A kind of construction method of the house construction engineering template construction technique model based on BIM
CN108376376A (en) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 Construction engineering quality management standardized method based on BIM models
CN108629472A (en) * 2017-03-22 2018-10-09 北京鸿业同行科技有限公司 BIM model qualities check platform

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103198195A (en) * 2013-04-16 2013-07-10 上海上安机电设计事务所有限公司 BIM-based (building information modeling-based) building engineering model collision detection method
CN204303029U (en) * 2013-08-13 2015-04-29 中铁上海工程局集团有限公司 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
CN104765904A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103198195A (en) * 2013-04-16 2013-07-10 上海上安机电设计事务所有限公司 BIM-based (building information modeling-based) building engineering model collision detection method
CN204303029U (en) * 2013-08-13 2015-04-29 中铁上海工程局集团有限公司 For the BIM Database Systems of subway pipeline collision detection and later stage operation maintenance
CN104765904A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨海军: "BIM技术在建筑机电工程中的应用", 《铁道建筑技术》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956257A (en) * 2016-04-28 2016-09-21 上海宝冶集团有限公司 BIM-based aluminum alloy template deep design method
CN106088598A (en) * 2016-06-12 2016-11-09 中国十七冶集团有限公司 A kind of BIM technology is used to carry out the method led the way of model of constructing
CN106250638A (en) * 2016-08-04 2016-12-21 中建三局第建设工程有限责任公司 A kind of backform comprehensive Design based on BIM and application process
CN106296026A (en) * 2016-08-18 2017-01-04 中国建筑第八工程局有限公司 A kind of virtual model based on BIM technology is led the way quality management-control method
CN108629472A (en) * 2017-03-22 2018-10-09 北京鸿业同行科技有限公司 BIM model qualities check platform
CN107103151A (en) * 2017-05-15 2017-08-29 贵州精正检测有限公司 A kind of method and apparatus of the fabricated construction based on BIM
CN107103151B (en) * 2017-05-15 2021-11-05 首钢水城钢铁(集团)赛德建设有限公司 Method and device for assembling type structure based on BIM
CN108133078A (en) * 2017-12-01 2018-06-08 中国建筑第八工程局有限公司 Virtual model based on 720 distant view photographs is led the way quality management-control method
CN108133078B (en) * 2017-12-01 2022-03-01 中国建筑第八工程局有限公司 Virtual sample plate guidance quality control method based on 720 panoramic photos
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
CN108376376A (en) * 2018-02-02 2018-08-07 北京筑业志远软件开发有限公司 Construction engineering quality management standardized method based on BIM models
CN108376376B (en) * 2018-02-02 2021-11-09 北京筑业志远软件开发有限公司 BIM model-based construction engineering quality management standardization method
CN108252519A (en) * 2018-03-14 2018-07-06 中铁八局集团第四工程有限公司 A kind of construction method of the house construction engineering template construction technique model based on BIM

Also Published As

Publication number Publication date
CN105279329B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
CN105279329A (en) BIM (Building Information Modeling)-based sample plate guide quality management method
Tan et al. Construction-oriented design for manufacture and assembly guidelines
CN104252558B (en) A kind of non-standard construction fender member digital control processing preprocess method based on BIM platform
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN105781064A (en) Floor tile laying construction method based on building information modeling (BIM)
CN110287513A (en) A kind of built-in fitting construction method based on BIM technology
CN107145695A (en) A kind of parametric modeling production method of fabricated shear wall structure prefabricated outer wall panel
CN109583033B (en) Application method and system of BIM self-adaptive model in construction of special-shaped curtain wall
CN105550386A (en) Precast concrete deepening design method based on Revit
CN106013535A (en) BIM-based pre-assembling method for double-curved glass curtain wall
CN106446225A (en) Digitized modeling and filing method for historic building based on BIM technique
CN111177824A (en) Aluminum alloy formwork construction method based on BIM technology
CN105320012A (en) Multimedia dynamic stage control method and system
CN104631826A (en) Construction general layout method based on BIM
CN107299762A (en) A kind of concrete pouring procedure based on BIM
CN107516161A (en) A kind of project progress management-control method based on BIM
CN106844840B (en) Method for realizing rapid modeling of subway station based on BIM
CN107194112A (en) The method being laid out based on BIM to garden landscape
CN109409850A (en) Assembled architecture concrete casting production method based on BIM technology
CN112182718B (en) Component design method and device based on BIM and 3D technology and storage medium
CN110750823A (en) BIM visual display method
CN111581699A (en) BIM (building information modeling) technical application method for rapidly outputting machining drawing and extracting materials of European building
CN110765520A (en) Parameterized BIM modeling method
CN103324806A (en) Sketchup workshop auto-modeling method on the basis of language Ruby
CN115600298A (en) BIM building forward design standardization plotting method based on revit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant