CN106088598A - A kind of BIM technology is used to carry out the method led the way of model of constructing - Google Patents
A kind of BIM technology is used to carry out the method led the way of model of constructing Download PDFInfo
- Publication number
- CN106088598A CN106088598A CN201610406495.7A CN201610406495A CN106088598A CN 106088598 A CN106088598 A CN 106088598A CN 201610406495 A CN201610406495 A CN 201610406495A CN 106088598 A CN106088598 A CN 106088598A
- Authority
- CN
- China
- Prior art keywords
- model
- bim
- construction
- carry out
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
The invention discloses and a kind of use BIM technology to carry out the method led the way of model of constructing, apply BIM technology, utilize that it is three-dimensional, feature intuitively, will construction model digitized, virtualization, substitute the construction model of traditional approach.As model needs to adjust, only need to revise model, whole process will not produce extra charge, both provided cost savings, decrease again the use of material and the generation of building waste, it is achieved that green construction, save material, quantify construction material according to BIM moulded dimension, reduce the generation of building waste, reduce construction cost simultaneously.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to a kind of utilization BIM technology and carry out sample of constructing
The method that plate is led the way.
Background technology
In engineering construction process, the important management that " model is led the way " is quality control on construction and engineering is provided quality goods or brilliant
Means, both can allow construction operation personnel understand construction operation main points and quality standard by model, it is also possible to allow management personnel
Grasp key point and the standard of examination of process management.Will construct model at each stage of construction, even every procedure, because of
This, each construction-engineering project will spend substantial amounts of fund on construction model.Moreover, substantial amounts of model is only used as exhibition
Showing, view and emulate use, be not certain part of building, model also needs after making to be finished to remove, transport, and is especially carrying out fine fitment sample
During plate construction, owing to color, selection and arrangement can not meet the requirement of designer and owner, generally require and carry out repeatedly model room
" construction is removed and rebuild ", both of these case not only can improve project cost, also wastes a large amount of construction material and produces building
Rubbish, pollution environment, run in the opposite direction with green construction.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide a kind of and use BIM technology to carry out the method that construction model is led the way.
The a kind of of the present invention uses BIM technology to carry out the method that construction model is led the way, and the method that model is led the way includes as follows
Step:
(1) according to drawing and code requirement, the framework of reference entity model, carry out the foundation of BIM model model;
(2) use BIM software according to Deepen Design and arrangement and method for construction, set up high-precision model room BIM model, at computer
Virtual Space shows the effect of model room;
(3) utilize the roaming of BIM software, take pictures and render function, check floor tile, wall brick and the typesetting effect of ceiling and
Room entirety overall color collocation perception;
(4) audit as requested, check, optimize, revise BIM model, form final model model;
(5) according to BIM model, job site workman and management personnel are confided a technological secret, and construction model model is projected
On the electronic curtain of job site, workmen is reminded to construct according to model;
(6) construction and regular inspection of quality are carried out according to BIM model typesetting effect or threedimensional model.
In described step (1), BIM model model is labeled with associated construction technique and technical key point.
In described step (3), floor tile, wall brick and ceiling Criterion picture library, directly adjust when BIM model model is set up
Take replacement.
Regular inspection of quality in described step (5), by site operation picture and BIM model typesetting Contrast on effect, if any
Aberration or working vessels are revised in time.
The invention has the beneficial effects as follows: (1), application BIM technology, utilize its three-dimensional, intuitively feature, will construction model number
Word, virtualization, substitute the construction model of traditional approach.As model needs to adjust, it is only necessary to amendment model, whole process will not
Produce extra charge, both provided cost savings, and decreased again the use of material and the generation of building waste, it is achieved that green construction.
(2), save material, quantify construction material according to BIM moulded dimension, reduce the generation of building waste, reduce construction cost simultaneously.
Detailed description of the invention
Below by specific embodiment, technical scheme is described in further detail, but the present invention is also
It is not limited to embodiment.
The a kind of of the present invention uses BIM technology to carry out the method that construction model is led the way, and the method that model is led the way includes as follows
Step:
(1) according to drawing and code requirement, the framework of reference entity model, carry out the foundation of BIM model model;
(2) use BIM software according to Deepen Design and arrangement and method for construction, set up high-precision model room BIM model, at computer
Virtual Space shows the effect of model room;
(3) utilize the roaming of BIM software, take pictures and render function, check floor tile, wall brick and the typesetting effect of ceiling and
Room entirety overall color collocation perception;
(4) audit as requested, check, optimize, revise BIM model, form final model model;
(5) according to BIM model, job site workman and management personnel are confided a technological secret, and construction model model is projected
On the electronic curtain of job site, workmen is reminded to construct according to model;
(6) construction and regular inspection of quality are carried out according to BIM model typesetting effect or threedimensional model.
In described step (1), BIM model model is labeled with associated construction technique and technical key point.
In described step (3), floor tile, wall brick and ceiling Criterion picture library, directly adjust when BIM model model is set up
Take replacement.
Regular inspection of quality in described step (5), by periodically uploading site operation picture and BIM model typesetting effect
Contrast, revises in time if any aberration or working vessels.
The foregoing is only embodiments of the invention, not thereby limit the scope of the claims of the present invention, every utilize this
Equivalent structure or equivalence flow process that bright description is made convert, or are directly or indirectly used in other relevant technology necks
Territory, is the most in like manner included in the scope of patent protection of the present invention.
Claims (4)
1. one kind is used BIM technology to carry out the method that construction model is led the way, it is characterised in that the method that model is led the way includes as follows
Step:
(1) according to drawing and code requirement, the framework of reference entity model, carry out the foundation of BIM model model;
(2) use BIM software according to Deepen Design and arrangement and method for construction, set up high-precision model room BIM model, at computer
Virtual Space shows the effect of model room;
(3) utilize the roaming of BIM software, take pictures and render function, check floor tile, wall brick and the typesetting effect of ceiling and
Room entirety overall color collocation perception;
(4) audit as requested, check, optimize, revise BIM model, form final model model;
(5) according to BIM model, job site workman and management personnel are confided a technological secret, and construction model model is projected
On the electronic curtain of job site, workmen is reminded to construct according to model;
(6) construction and regular inspection of quality are carried out according to BIM model typesetting effect or threedimensional model.
2. according to a kind of described in claim 1 use BIM technology to carry out constructing method that model leads the way, it is characterised in that
In described step (1), BIM model model is labeled with associated construction technique and technical key point.
3. according to a kind of described in claim 1 use BIM technology to carry out constructing method that model leads the way, it is characterised in that
In described step (3), floor tile, wall brick and ceiling Criterion picture library, directly transfer replacement when BIM model model is set up.
4. according to a kind of described in claim 1 use BIM technology to carry out constructing method that model leads the way, it is characterised in that
Regular inspection of quality in described step (5), by site operation picture and BIM model typesetting Contrast on effect, if any aberration or execute
Work mistake is revised in time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406495.7A CN106088598A (en) | 2016-06-12 | 2016-06-12 | A kind of BIM technology is used to carry out the method led the way of model of constructing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406495.7A CN106088598A (en) | 2016-06-12 | 2016-06-12 | A kind of BIM technology is used to carry out the method led the way of model of constructing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106088598A true CN106088598A (en) | 2016-11-09 |
Family
ID=57229140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610406495.7A Pending CN106088598A (en) | 2016-06-12 | 2016-06-12 | A kind of BIM technology is used to carry out the method led the way of model of constructing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088598A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220464A (en) * | 2017-06-28 | 2017-09-29 | 中国十七冶集团有限公司 | A kind of bridge construction process emulation and risk control method based on BIM |
CN107436985A (en) * | 2017-07-28 | 2017-12-05 | 成都智建新业建筑设计咨询有限公司 | A kind of toilet ground tile paving method based on BIM |
CN108133078A (en) * | 2017-12-01 | 2018-06-08 | 中国建筑第八工程局有限公司 | Virtual model based on 720 distant view photographs is led the way quality management-control method |
CN108416162A (en) * | 2018-03-23 | 2018-08-17 | 中国十七冶集团有限公司 | A kind of construction method of the spiral formula reinforced concrete structure based on BIM |
CN110737940A (en) * | 2019-09-30 | 2020-01-31 | 深圳市华阳国际工程设计股份有限公司 | replacement method and device for BIM drawing standard and computer storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1046813A (en) * | 1996-08-08 | 1998-02-17 | Hitachi Ltd | Equipment and method of assisting building plan |
CN105204793A (en) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | Method for applying BIM and 3D printing technology to construction |
CN105279329A (en) * | 2015-10-13 | 2016-01-27 | 中国十七冶集团有限公司 | BIM (Building Information Modeling)-based sample plate guide quality management method |
CN105446069A (en) * | 2016-01-07 | 2016-03-30 | 江苏建筑职业技术学院 | BIM-based holographic imaging full-decoration simulation display method and display system |
-
2016
- 2016-06-12 CN CN201610406495.7A patent/CN106088598A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1046813A (en) * | 1996-08-08 | 1998-02-17 | Hitachi Ltd | Equipment and method of assisting building plan |
CN105204793A (en) * | 2015-09-23 | 2015-12-30 | 中国十七冶集团有限公司 | Method for applying BIM and 3D printing technology to construction |
CN105279329A (en) * | 2015-10-13 | 2016-01-27 | 中国十七冶集团有限公司 | BIM (Building Information Modeling)-based sample plate guide quality management method |
CN105446069A (en) * | 2016-01-07 | 2016-03-30 | 江苏建筑职业技术学院 | BIM-based holographic imaging full-decoration simulation display method and display system |
Non-Patent Citations (2)
Title |
---|
王廷魁: "基于BIM的全装修房个性化设计研究", 《工程设计学报》 * |
黄道军: "腾讯北京总部大楼项目基于BIM的工程施工综合应用", 《土木建筑工程信息技术》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220464A (en) * | 2017-06-28 | 2017-09-29 | 中国十七冶集团有限公司 | A kind of bridge construction process emulation and risk control method based on BIM |
CN107436985A (en) * | 2017-07-28 | 2017-12-05 | 成都智建新业建筑设计咨询有限公司 | A kind of toilet ground tile paving method based on BIM |
CN108133078A (en) * | 2017-12-01 | 2018-06-08 | 中国建筑第八工程局有限公司 | Virtual model based on 720 distant view photographs is led the way quality management-control method |
CN108133078B (en) * | 2017-12-01 | 2022-03-01 | 中国建筑第八工程局有限公司 | Virtual sample plate guidance quality control method based on 720 panoramic photos |
CN108416162A (en) * | 2018-03-23 | 2018-08-17 | 中国十七冶集团有限公司 | A kind of construction method of the spiral formula reinforced concrete structure based on BIM |
CN110737940A (en) * | 2019-09-30 | 2020-01-31 | 深圳市华阳国际工程设计股份有限公司 | replacement method and device for BIM drawing standard and computer storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088598A (en) | A kind of BIM technology is used to carry out the method led the way of model of constructing | |
WO2017219921A1 (en) | Building co-construction system and method based on member classification and combination | |
WO2018145510A1 (en) | Bim-based construction and decoration method | |
CN108268707B (en) | ReVIT-based transfer station standard template drawing method and transfer station construction method | |
CN110569621A (en) | BIM technology-based multi-dimensional curved surface glass curtain wall design processing and installation method | |
CN105781064A (en) | Floor tile laying construction method based on building information modeling (BIM) | |
CN105930600B (en) | Masonry arrangement method and masonry arranging system | |
CN104102765A (en) | BIM (Building Information Modeling)-based curtain wall parametrization design method | |
CN105956257A (en) | BIM-based aluminum alloy template deep design method | |
CN105868502A (en) | BIM (building information modeling) based material management system and control method thereof | |
CN104200026A (en) | Method and system for formwork matching of three-dimension space software | |
CN103049620A (en) | Ship simulating system and ship simulating method used during shipbuilding | |
CN103578137A (en) | Three-dimensional modeling system and method for prefabricated parts | |
CN108763754A (en) | A kind of interior decoration design method based on BIM | |
CN105279329A (en) | BIM (Building Information Modeling)-based sample plate guide quality management method | |
CN111177824A (en) | Aluminum alloy formwork construction method based on BIM technology | |
CN1877585B (en) | Automatically designable and adjustable engineering graphics system and its building method and using method | |
CN107862133A (en) | A kind of method of Mass production bridge pier BIM models | |
CN108984876B (en) | BIM-based embedded sleeve automatic modeling method and system | |
Raspall | A procedural framework for design to fabrication | |
Mistri et al. | Remedies over barriers of automation and robotics for construction industry | |
CN101923586A (en) | CAD design reusable device based on component-standard floor part structure and method thereof | |
Nolte et al. | Gehry Partners' Fondation Louis Vuitton: Crowdsourcing Embedded Intelligence | |
CN116561871A (en) | Deep construction method for mounting embedded part of bridge bearing platform | |
Liao et al. | Application of BIM technology in the design of prefabricated architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161109 |
|
WD01 | Invention patent application deemed withdrawn after publication |