CN104102765A - BIM (Building Information Modeling)-based curtain wall parametrization design method - Google Patents

BIM (Building Information Modeling)-based curtain wall parametrization design method Download PDF

Info

Publication number
CN104102765A
CN104102765A CN201410282300.3A CN201410282300A CN104102765A CN 104102765 A CN104102765 A CN 104102765A CN 201410282300 A CN201410282300 A CN 201410282300A CN 104102765 A CN104102765 A CN 104102765A
Authority
CN
China
Prior art keywords
curtain wall
bim
model
design
design method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410282300.3A
Other languages
Chinese (zh)
Inventor
梁少宁
付文锋
麦惠明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GOLDEN CURTAIN WALL GROUP Co Ltd
Original Assignee
GOLDEN CURTAIN WALL GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GOLDEN CURTAIN WALL GROUP Co Ltd filed Critical GOLDEN CURTAIN WALL GROUP Co Ltd
Priority to CN201410282300.3A priority Critical patent/CN104102765A/en
Publication of CN104102765A publication Critical patent/CN104102765A/en
Pending legal-status Critical Current

Links

Landscapes

  • Instructional Devices (AREA)

Abstract

The invention relates to a BIM (Building Information Modeling)-based curtain wall parametrization design method, which comprises the following steps: building a BIM mass model of a curtain wall; building multiple parametrization basic unit plate models; assembling each basic unit plate model to the BIM mass model in a simulating manner, checking collision, and judging the feasibility of the designing scheme according to the assembly situation; integrating the well-assembled BIM model with other crossed professional BIM model, and checking whether the integrated model conflicts or not. Through BIM, the parametrization design of a curtain wall project is realized, the problem of building a curved-surface curtain wall by using standard rectangular unit plates is handled, the parametrization dimension driven design and adjustment functions are integrated, so that the control dimension of the curtain wall units is amended at any time, thus the design efficiency is improved, the error rate is reduced, and a project delay risk is lowered; the collision checking function of the BIM technology is adopted, so the change, monitoring and dynamic management on the curtain wall design are realized. The BIM-based curtain wall parametrization design method can be used in the design of curtain walls.

Description

A kind of curtain wall parameterization design method based on BIM
Technical field
The present invention relates to Curtain Wall Design, particularly relate to a kind of curtain wall parameterization design method based on BIM.
Background technology
BIM(Building Information Modeling), be called again BIM, it is a kind of Computer Applied Technology of novel engineering construction industry, by design, use every relevant information data of construction-engineering project as the basis of model, in the planning of construction project, design, construction, in the lifecycle process in the stages such as operation management, share and transmit, make engineering technical personnel make correct understanding and efficient reply to various architecture informations, for design team, unit in charge of construction and the each side including building unit of operation build main body provides the basis of collaborative work, enhancing productivity, cost-saving and reduction of erection time aspect plays a significant role.In the time of the design phase, introducing BIM technology, and develop the design application for project singularity, is the forward position of current Curtain Wall Design technology.
Compared with other curtain wall forms, type unitized curtain wall has the features such as short construction period, machining precision is high, anti-seismic performance is excellent.If but need to be built into bi-curved curtain wall moulding, common flat rectangular element would be difficult to be competent at conventionally; The cell cube of surface modeling needs to customize a large amount of section bar molds, also need curtain skeleton if desired, panel etc. carry out the deep processing processing such as stretch bending, have not only increased the cost of curtain wall, and the processing of unit plate, installation easily occur scale error also having construction delay equivalent risk.
Summary of the invention
In order to overcome above-mentioned technical matters, the object of the present invention is to provide a kind of curtain wall parameterization design method based on BIM easy to use, the method is effectively increased work efficiency, and reduces construction error rate.
The technical solution adopted in the present invention is:
A curtain wall parameterization design method based on BIM, comprises the following steps:
A. set up curtain wall BIM figure model;
B. set up several parameterized elementary cell blocky model;
C. after each elementary cell blocky model simulation is assembled on BIM figure model, check collision, and judge design proposal feasibility according to assembling situation;
D. the errorless BIM model of assembling and other are intersected to professional BIM model integration, whether inspection Integrated Models conflicts.
As the further improvement of technique scheme, described step a sets up in BIM software platform, and figure model comprises the reference mark key element of the conceptual model of buildings and absolute altitude, axle net, outer profile size.
As the further improvement of technique scheme, described step a comprises the outer skin of curtain walling of figure model carried out to lattice, divide the plate lattice of grid as cell curtain wall, on ready-portioned grid, set up three-point fix plane simultaneously.
As the further improvement of technique scheme, in described step b, according to the CAD plane node design proposal of curtain wall system, set up satisfactory several elementary cell blocky model, and make the key dimension parametrization of elementary cell plate, make elementary cell plate to change and to drive plate size according to its parameter.In addition, set up a benchmark job face, the plane of orientation as elementary cell plate in block mold.The method set parametrization Dimension Drive design and adjust function, to revise at any time the controlling dimension of curtain wall unit, make it effectively to improve design efficiency, reduce error rate and construction delay risk.
As the further improvement of technique scheme, in described step c, parameterized elementary cell blocky model is imported in figure model, and its parameter is accurately located according to three-point fix plane, generate and size of mesh opening unit plate of the same size, and be assembled into curtain wall block mold.By above technology, not only can realize curtain wall profiles and structure optimized design, and then solve a difficult problem for each rectangular element plate lattice complanation of curved surface curtain wall, also can make the unit plate of curtain wall realize the even batch modification of adjustment that parametrization drives.
As the further improvement of technique scheme, in described step c, the technological means of collision detection or 3D construction simulation by BIM software platform, instant inspection unit plate size and structure node, to adapt to Curtain Wall Design function and processing, mounting process requirement.
As the further improvement of technique scheme, in described step c, when Curtain Wall Design scheme is infeasible, adjust the curtain wall lattice of figure model or adjust elementary cell blocky model.
As the further improvement of technique scheme, to undesirable elementary cell blocky model again modeling to increase elementary cell plate kind, repeating step b and c afterwards.In addition, each unit plate will be by type, size, structure difference are given respectively numbering, to add up rapidly, search and revise.
The invention has the beneficial effects as follows: the present invention is by BIM modeling, realize the Parametric designing of curtain wall engineering, overcome a difficult problem of utilizing regular rectangular shape unit plate to build curved surface curtain wall, and set of the present invention parametrization Dimension Drive design and adjust function, to revise at any time the controlling dimension of curtain wall unit, make it effectively to improve design efficiency, reduce error rate and construction delay risk; By the collision detection function of BIM technology, realize change, monitoring and the dynamic management of Curtain Wall Design simultaneously.
Brief description of the drawings
Below in conjunction with drawings and embodiments, the present invention is further described.
Fig. 1 is design flow diagram of the present invention.
Embodiment
As shown in Figure 1, the implementation method of the present embodiment is as follows.
(1) according to the design drawing of architectural CAD scheme, in BIM software platform (REVIT), set up complete curtain wall figure model, this model mainly comprises the key elements such as the reference mark of the conceptual model of buildings and absolute altitude, axle net, outer profile size.
(2) by the requirement of architectural drawing, the outer skin of curtain walling of figure model is carried out to preliminary lattice, divide grid as the plate lattice of cell curtain wall, if outer skin of curtain walling is curved surface, can select to divide UV gauze lattice.Meanwhile, on ready-portioned grid, set up a three-point fix plane.
(3) according to the CAD plane node design proposal of curtain wall system, foundation meets the several elementary cell blocky model of task precision, depth requirements, and make the key dimension parametrization of elementary cell plate, make elementary cell plate to change and to drive plate size according to its parameter.In addition, establish a benchmark job face, the plane of orientation as elementary cell plate in block mold.This step can be carried out with the 2nd step is parallel.
(4) parameterized elementary cell plate is imported in the figure model of the 2nd step foundation, and its parameter can accurately be located according to grid location face, allocation control points, can generate adaptively and curtain wall size of mesh opening unit plate of the same size simultaneously.
(5) after the elementary cell plate establishing combined in BIM figure model being seated, the function that the softwares such as recycling " collision detection ", " 3D construction simulation " carry, instant plate size and even the structure node of checking, to adapt to the requirements such as Curtain Wall Design function and processing, mounting process.Undesirable plate need be rethought its structure and size, increases elementary cell plate kind or adjusts its structure, and repeat the 3rd, the modeling process of 4 steps; Meanwhile also can adopt the method for adjusting curtain wall lattice, afterwards the 3rd, the modeling process of 4 steps.In addition, each elementary cell plate will be by type, size, structure difference are given respectively numbering, to add up rapidly, search and revise.
(6) after building curtain wall entirety BIM model forming, then itself and other are intersected to professional BIM model integration, to check contingent interference or collision, if any generation, coordinate immediately and revise corresponding design.Like this, the cell curtain wall of complex model can be realized the collaborative design professional with other in the design phase, and after pinpointing the problems, according to the instant adjusted design scheme of its parameterized BIM model, to improve design efficiency, reduces project risk.
The method for designing of the present embodiment has the following advantages:
1. method is simply easy to realization, applied widely, can be used for curtain wall engineering and other professional collaborative designs in large complicated engineering project, coordinates and management;
2. realize the Parametric designing of whole curtain wall engineering, particularly cell curtain wall, solved a difficult problem that builds curved surface curtain wall with rectangular flat cell curtain wall with higher efficiency;
3. install, automatically add up the functions such as curtain wall plate by collision detection and the analog simulation of BIM technology, realize change, monitoring and the dynamic management of Curtain Wall Design.
The above is the preferred embodiment of the present invention, and it does not form limiting the scope of the invention.Method for designing in the present embodiment is not only applicable to cell curtain wall, also can flexible Application other curtain walls, peripheral structure form in construction work.

Claims (8)

1. the curtain wall parameterization design method based on BIM, is characterized in that, comprises the following steps:
A. set up curtain wall BIM figure model;
B. set up several parameterized elementary cell blocky model;
C. after each elementary cell blocky model simulation is assembled on BIM figure model, check collision, and judge design proposal feasibility according to assembling situation;
D. the errorless BIM model of assembling and other are intersected to professional BIM model integration, whether inspection Integrated Models conflicts.
2. the curtain wall parameterization design method based on BIM according to claim 1, it is characterized in that: described step a sets up in BIM software platform, figure model comprises the reference mark key element of the conceptual model of buildings and absolute altitude, axle net, outer profile size.
3. the curtain wall parameterization design method based on BIM according to claim 1 and 2, it is characterized in that: described step a comprises the outer skin of curtain walling of figure model is carried out to lattice, divide the plate lattice of grid as cell curtain wall, on ready-portioned grid, set up three-point fix plane simultaneously.
4. the curtain wall parameterization design method based on BIM according to claim 3, it is characterized in that: in described step b, according to the CAD plane node design proposal of curtain wall system, set up satisfactory several elementary cell blocky model, and make the key dimension parametrization of elementary cell plate, make elementary cell plate to change and to drive plate size according to its parameter.
5. the curtain wall parameterization design method based on BIM according to claim 4, it is characterized in that: in described step c, parameterized elementary cell blocky model is imported in figure model, and its parameter is accurately located according to three-point fix plane, generate and size of mesh opening unit plate of the same size, and be assembled into curtain wall block mold.
6. the curtain wall parameterization design method based on BIM according to claim 5, it is characterized in that: in described step c, the technological means of collision detection or 3D construction simulation by BIM software platform, instant inspection unit plate size and structure node, to adapt to Curtain Wall Design function and processing, mounting process requirement.
7. the curtain wall parameterization design method based on BIM according to claim 6, is characterized in that: in described step c, adjust the curtain wall lattice of figure model or adjust elementary cell blocky model when Curtain Wall Design scheme is infeasible.
8. the curtain wall parameterization design method based on BIM according to claim 7, is characterized in that: to undesirable elementary cell blocky model again modeling to increase elementary cell plate kind, repeating step b and c afterwards.
CN201410282300.3A 2014-06-23 2014-06-23 BIM (Building Information Modeling)-based curtain wall parametrization design method Pending CN104102765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410282300.3A CN104102765A (en) 2014-06-23 2014-06-23 BIM (Building Information Modeling)-based curtain wall parametrization design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410282300.3A CN104102765A (en) 2014-06-23 2014-06-23 BIM (Building Information Modeling)-based curtain wall parametrization design method

Publications (1)

Publication Number Publication Date
CN104102765A true CN104102765A (en) 2014-10-15

Family

ID=51670916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410282300.3A Pending CN104102765A (en) 2014-06-23 2014-06-23 BIM (Building Information Modeling)-based curtain wall parametrization design method

Country Status (1)

Country Link
CN (1) CN104102765A (en)

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104680578A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 BIM-based axis labeling method and system
CN104765904A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system
CN105447226A (en) * 2015-11-11 2016-03-30 深圳市华阳国际工程设计股份有限公司 BIM based house type parameterized design control method and system
CN105608294A (en) * 2016-01-28 2016-05-25 武汉凌云建筑装饰工程有限公司 Single-curved plate fitting hyperbolic modeling method for curtain wall design and construction
CN106284764A (en) * 2015-05-18 2017-01-04 万达商业规划研究院有限公司 Use the manufacture method of the outer curtain wall of building printing porcelain plate, aluminium sheet
CN106285028A (en) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 Reinforcement of factory building construction method in long-span heavy type crane girder based on BIM technology dismounting
CN106339558A (en) * 2016-08-30 2017-01-18 江苏国泰新点软件有限公司 Inspection method and device of building model
CN106436991A (en) * 2016-08-15 2017-02-22 江河创建集团股份有限公司 Optimizing design method for curtain wall structure of high level and super high level building
CN106484944A (en) * 2016-08-31 2017-03-08 浙江亚厦幕墙有限公司 A kind of Curtain Wall Design method based on BIM
CN106642347A (en) * 2016-12-29 2017-05-10 天津市建筑设计院 Fan coil module parametric design method based on BIM
CN107169231A (en) * 2017-06-09 2017-09-15 东风设计研究院有限公司 The Deepen Design method of structural metal containment system based on BIM
CN107368618A (en) * 2017-06-01 2017-11-21 中国建筑第八工程局有限公司 A kind of hyperbolic curtain wall construction method based on BIM technology
CN107558642A (en) * 2017-08-22 2018-01-09 中国十七冶集团有限公司 A kind of method in the large-scale open stone curtain wall installation based on BIM
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN108427440A (en) * 2018-04-02 2018-08-21 武汉凌云建筑装饰工程有限公司 The method of the special-shaped unit plate machining accuracy of parametric data control
CN108537519A (en) * 2018-05-03 2018-09-14 陕西理工大学 A kind of architectural design method based on BIM
CN108683848A (en) * 2018-05-15 2018-10-19 中国十七冶集团有限公司 A kind of 720 ° of panorama construction methods based on BIM+MR
CN108763685A (en) * 2018-05-17 2018-11-06 上海宝冶集团有限公司 A kind of construction method of spacial special-shaped curved surface curtain wall system
CN108915136A (en) * 2018-07-09 2018-11-30 中国十七冶集团有限公司 A kind of construction method of open stone curtain wall
CN109440987A (en) * 2018-09-29 2019-03-08 中铁二局集团有限公司 A kind of construction method of the element type curtain wall of super high-rise building
CN109583033A (en) * 2018-11-02 2019-04-05 广东省水利水电第三工程局有限公司 Application method and system of the BIM adaptive model in special-shaped curtain wall construction
CN109740206A (en) * 2018-12-19 2019-05-10 金刚幕墙集团有限公司 A kind of element type curtain wall parametric modeling and project amount statistical method based on BIM
CN110287567A (en) * 2019-06-18 2019-09-27 西安新视窗科技有限公司 The BIM fast modeling method driven based on parameterized units by design parameter
CN110472299A (en) * 2019-07-23 2019-11-19 天津大学 The three-dimensional parameterized Intelligentized design method of diversion works and system based on BIM
CN110502831A (en) * 2019-08-20 2019-11-26 安徽海螺建材设计研究院有限责任公司 A kind of blower blimp design method
CN111005483A (en) * 2019-06-20 2020-04-14 方传斌 Curtain wall production and processing method based on BIM technology
CN111008423A (en) * 2019-12-04 2020-04-14 中南建筑设计院股份有限公司 Optimal design method for double-curved-surface curtain wall
CN111737806A (en) * 2020-07-01 2020-10-02 山西省工业设备安装集团有限公司 BIM technology-based cantilever type double-clay-plate curtain wall dry hanging construction method
CN111753349A (en) * 2020-06-30 2020-10-09 广东天元建筑设计有限公司 Dimension modification method of structural member, Revit platform and storage medium
CN111950102A (en) * 2020-08-19 2020-11-17 中机中联工程有限公司 Dynamic detection method of super high-rise window cleaning machine through BIM technology
CN112149211A (en) * 2020-09-18 2020-12-29 杭州筑峰科技有限公司 Building Information Model (BIM) -based curtain wall modeling method and system
CN112182698A (en) * 2020-09-17 2021-01-05 中北大学 Depth extraction method based on revit wall body member
CN112395672A (en) * 2020-11-17 2021-02-23 中国电力工程顾问集团西南电力设计院有限公司 BIM technology-based substation engineering enclosure modeling method
CN112749431A (en) * 2020-12-28 2021-05-04 无锡市天宇民防建筑设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN113221217A (en) * 2021-05-07 2021-08-06 武汉凌云建筑装饰工程有限公司 Top-down modeling and information processing method for high-rise building curtain wall component
CN115510543A (en) * 2022-10-14 2022-12-23 苏州苏明装饰股份有限公司 Box body modular curtain wall design method and system based on BIM

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
AUTODESK软件公司: "浅谈"概念体量"设计", 《中国建设信息》 *
杨晓冬: "基于BIM模拟分析技术在慕墙方案比较选中的应用", 《土木建筑工程信息技术》 *
求真子: "BIM revit 2013 2014教程-体量结构建模", 《百度文库"HTTP://WENKU.BAIDU.COM/LINK?URL=HTTANGY_KEM4DH1AFVZZADXV8LOJX9QZWO2NEKA8OIB6PLXJ-P1ZJXO13PWCRXG0YHH4MWKKY--X0S963XWLSCZRHSXJHJDJN5P-N03HH4M"》 *
陈继良 等: "BIM相关技术在上海中心大厦的应用", 《建筑技艺》 *
龙玉峰 等: "BIM技术在住宅建筑工业化中的应用", 《住宅产业》 *

Cited By (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104765904A (en) * 2015-02-13 2015-07-08 上海同筑信息科技有限公司 BIM (Building Information Modeling) technology adopted multi-specialty combination and transparent visualization method and system
CN104680578A (en) * 2015-02-13 2015-06-03 上海同筑信息科技有限公司 BIM-based axis labeling method and system
CN106284764A (en) * 2015-05-18 2017-01-04 万达商业规划研究院有限公司 Use the manufacture method of the outer curtain wall of building printing porcelain plate, aluminium sheet
CN106285028A (en) * 2015-05-28 2017-01-04 中国二十冶集团有限公司 Reinforcement of factory building construction method in long-span heavy type crane girder based on BIM technology dismounting
CN105447226A (en) * 2015-11-11 2016-03-30 深圳市华阳国际工程设计股份有限公司 BIM based house type parameterized design control method and system
CN105608294B (en) * 2016-01-28 2018-10-12 武汉凌云建筑装饰工程有限公司 A kind of method of Curtain Wall Design structure single curved arc plate fitting hyperbolic moulding
CN105608294A (en) * 2016-01-28 2016-05-25 武汉凌云建筑装饰工程有限公司 Single-curved plate fitting hyperbolic modeling method for curtain wall design and construction
CN106436991B (en) * 2016-08-15 2019-02-22 江河创建集团股份有限公司 A kind of high-rise, super high-rise building curtain wall construction Optimization Design Method
CN106436991A (en) * 2016-08-15 2017-02-22 江河创建集团股份有限公司 Optimizing design method for curtain wall structure of high level and super high level building
CN107780585A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The prefabricated construction method of installation of concrete panel based on BIM systems
CN106339558A (en) * 2016-08-30 2017-01-18 江苏国泰新点软件有限公司 Inspection method and device of building model
CN106339558B (en) * 2016-08-30 2019-10-25 江苏国泰新点软件有限公司 The method of inspection and device of buildings model
CN106484944B (en) * 2016-08-31 2019-04-05 浙江亚厦幕墙有限公司 A kind of Curtain Wall Design method based on BIM
CN106484944A (en) * 2016-08-31 2017-03-08 浙江亚厦幕墙有限公司 A kind of Curtain Wall Design method based on BIM
WO2018121686A1 (en) * 2016-12-29 2018-07-05 天津市建筑设计院 Parameterized design method for fan coil unit module based on bim
CN106642347A (en) * 2016-12-29 2017-05-10 天津市建筑设计院 Fan coil module parametric design method based on BIM
CN107368618A (en) * 2017-06-01 2017-11-21 中国建筑第八工程局有限公司 A kind of hyperbolic curtain wall construction method based on BIM technology
CN107169231A (en) * 2017-06-09 2017-09-15 东风设计研究院有限公司 The Deepen Design method of structural metal containment system based on BIM
CN107169231B (en) * 2017-06-09 2020-08-14 东风设计研究院有限公司 BIM-based deep design method for building metal enclosure system
CN107558642A (en) * 2017-08-22 2018-01-09 中国十七冶集团有限公司 A kind of method in the large-scale open stone curtain wall installation based on BIM
CN108427440A (en) * 2018-04-02 2018-08-21 武汉凌云建筑装饰工程有限公司 The method of the special-shaped unit plate machining accuracy of parametric data control
CN108537519A (en) * 2018-05-03 2018-09-14 陕西理工大学 A kind of architectural design method based on BIM
CN108683848A (en) * 2018-05-15 2018-10-19 中国十七冶集团有限公司 A kind of 720 ° of panorama construction methods based on BIM+MR
CN108763685B (en) * 2018-05-17 2022-04-26 上海宝冶集团有限公司 Construction method of space special-shaped curved surface curtain wall system
CN108763685A (en) * 2018-05-17 2018-11-06 上海宝冶集团有限公司 A kind of construction method of spacial special-shaped curved surface curtain wall system
CN108915136A (en) * 2018-07-09 2018-11-30 中国十七冶集团有限公司 A kind of construction method of open stone curtain wall
CN109440987A (en) * 2018-09-29 2019-03-08 中铁二局集团有限公司 A kind of construction method of the element type curtain wall of super high-rise building
CN109583033A (en) * 2018-11-02 2019-04-05 广东省水利水电第三工程局有限公司 Application method and system of the BIM adaptive model in special-shaped curtain wall construction
CN109583033B (en) * 2018-11-02 2020-09-15 广东省水利水电第三工程局有限公司 Application method and system of BIM self-adaptive model in construction of special-shaped curtain wall
CN109740206A (en) * 2018-12-19 2019-05-10 金刚幕墙集团有限公司 A kind of element type curtain wall parametric modeling and project amount statistical method based on BIM
CN110287567A (en) * 2019-06-18 2019-09-27 西安新视窗科技有限公司 The BIM fast modeling method driven based on parameterized units by design parameter
CN111005483A (en) * 2019-06-20 2020-04-14 方传斌 Curtain wall production and processing method based on BIM technology
CN110472299A (en) * 2019-07-23 2019-11-19 天津大学 The three-dimensional parameterized Intelligentized design method of diversion works and system based on BIM
CN110502831A (en) * 2019-08-20 2019-11-26 安徽海螺建材设计研究院有限责任公司 A kind of blower blimp design method
CN111008423A (en) * 2019-12-04 2020-04-14 中南建筑设计院股份有限公司 Optimal design method for double-curved-surface curtain wall
CN111008423B (en) * 2019-12-04 2022-06-10 中南建筑设计院股份有限公司 Optimal design method for double-curved-surface curtain wall
CN111753349B (en) * 2020-06-30 2024-03-08 广东天元建筑设计有限公司 Method for modifying size of structural member, revit platform and storage medium
CN111753349A (en) * 2020-06-30 2020-10-09 广东天元建筑设计有限公司 Dimension modification method of structural member, Revit platform and storage medium
CN111737806A (en) * 2020-07-01 2020-10-02 山西省工业设备安装集团有限公司 BIM technology-based cantilever type double-clay-plate curtain wall dry hanging construction method
CN111950102A (en) * 2020-08-19 2020-11-17 中机中联工程有限公司 Dynamic detection method of super high-rise window cleaning machine through BIM technology
CN111950102B (en) * 2020-08-19 2023-02-28 中机中联工程有限公司 Dynamic detection method of super high-rise window cleaning machine through BIM technology
CN112182698A (en) * 2020-09-17 2021-01-05 中北大学 Depth extraction method based on revit wall body member
CN112182698B (en) * 2020-09-17 2022-08-16 中北大学 Depth extraction method based on revit wall body component
CN112149211A (en) * 2020-09-18 2020-12-29 杭州筑峰科技有限公司 Building Information Model (BIM) -based curtain wall modeling method and system
CN112149211B (en) * 2020-09-18 2022-10-11 杭州筑峰科技有限公司 Building Information Model (BIM) -based curtain wall modeling method and system
CN112395672B (en) * 2020-11-17 2022-10-04 中国电力工程顾问集团西南电力设计院有限公司 BIM technology-based substation engineering enclosure modeling method
CN112395672A (en) * 2020-11-17 2021-02-23 中国电力工程顾问集团西南电力设计院有限公司 BIM technology-based substation engineering enclosure modeling method
CN112749431A (en) * 2020-12-28 2021-05-04 无锡市天宇民防建筑设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN112749431B (en) * 2020-12-28 2024-02-20 江苏天宇设计研究院有限公司 Wafer floor rapid arrangement method based on BIM technology
CN113221217A (en) * 2021-05-07 2021-08-06 武汉凌云建筑装饰工程有限公司 Top-down modeling and information processing method for high-rise building curtain wall component
CN115510543A (en) * 2022-10-14 2022-12-23 苏州苏明装饰股份有限公司 Box body modular curtain wall design method and system based on BIM
CN115510543B (en) * 2022-10-14 2023-08-15 苏州苏明装饰股份有限公司 BIM-based box modular curtain wall design method and system

Similar Documents

Publication Publication Date Title
CN104102765A (en) BIM (Building Information Modeling)-based curtain wall parametrization design method
CN104123412B (en) A kind of curtain wall collision checking method by BIM technology
CN106013535A (en) BIM-based pre-assembling method for double-curved glass curtain wall
CN111400812A (en) BIM-based method for designing machining drawing of assembled structure shear wall
CN105888248A (en) Construction method of guiding informationization prefabricated member based on BIM (Building Information Modeling)) technology
CN105844380A (en) BIM-based BIM project element management method and system
CN104200026A (en) Method and system for formwork matching of three-dimension space software
CN108427782A (en) A kind of three-dimensional building model treatment method and device based on BIM
KR101227723B1 (en) Development method of korean-style design support information system by using parametric design process
CN101546349A (en) A method to generate a springback compensation surface based on mesh mapping of the edge lines or section lines of curved surfaces
CN111005483A (en) Curtain wall production and processing method based on BIM technology
CN104063529A (en) Simulation method of layout planning of digital automobile plant
CN110287567A (en) The BIM fast modeling method driven based on parameterized units by design parameter
CN104217056A (en) Rapid design and management method for spacecraft device installation fasteners
CN111191996A (en) BIM-based dynamic cost management method for whole process of power transmission and transformation project
CN104750892A (en) Three-dimensional modeling method for thickness-variable curved-surface part inner shape surface
CN105499447A (en) Steel net bending and assembling positioning clamp and construction method thereof
CN104504227A (en) Hydraulic forging press multi-dimensional virtual prototype collaborative simulation method and system
CN102479257A (en) Design and implementation method of intelligent numerical control machine tool
CN108416076A (en) A kind of assembled architecture design method based on BIM technology
CN108647468A (en) A kind of row's of building by laying bricks or stones brick method based on BIM technology
CN111985034A (en) Method and system for constructing school civil engineering Building Information Model (BIM)
CN109558606A (en) BIM Tender System
CN110795784A (en) Electromechanical modeling method and system
CN110700583A (en) Aluminum template pre-assembly system and method based on three-dimensional BIM technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141015

RJ01 Rejection of invention patent application after publication