CN110287567A - The BIM fast modeling method driven based on parameterized units by design parameter - Google Patents

The BIM fast modeling method driven based on parameterized units by design parameter Download PDF

Info

Publication number
CN110287567A
CN110287567A CN201910523955.8A CN201910523955A CN110287567A CN 110287567 A CN110287567 A CN 110287567A CN 201910523955 A CN201910523955 A CN 201910523955A CN 110287567 A CN110287567 A CN 110287567A
Authority
CN
China
Prior art keywords
bim
model
hard spot
design
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910523955.8A
Other languages
Chinese (zh)
Inventor
米国兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an New Window Technology Co Ltd
Original Assignee
Xi'an New Window Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an New Window Technology Co Ltd filed Critical Xi'an New Window Technology Co Ltd
Priority to CN201910523955.8A priority Critical patent/CN110287567A/en
Publication of CN110287567A publication Critical patent/CN110287567A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/06Power analysis or power optimisation

Abstract

The invention discloses a kind of BIM fast modeling methods driven based on parameterized units by design parameter, comprising the following steps: S1, forms a revisable hard spot table;S2, a hard spot data configuration model is established;S3, parameterized treatment is carried out to resulting hard spot data configuration model;S4, according to hard spot data configuration BIM figure model;S5, BIM figure model is established;S6, the basic unit blocky model for establishing several parametrization;S7, the BIM model integration that errorless BIM model intersects profession with other will be assembled;S7, driving simulation analysis module carry out calculating solution for different parameters;The corresponding three-dimensional display platform of S8, later development carries out the displaying of BIM model management.The present invention can reduce the data volume of artificial live repetition measurement, raising modeling fineness and efficiency to the full extent, rationally utilize resource, solve to model brought various inconveniences by traditional BIM, to realize high-precision, efficient BIM modeling.

Description

The BIM fast modeling method driven based on parameterized units by design parameter
Technical field
It is specially a kind of to be driven based on parameterized units by design parameter the present invention relates to BIM modeling technique field BIM fast modeling method.
Background technique
Traditional BIM modeling is mostly used to be modeled referring to CAD electronic plane figure, due to not being field survey, cannot be reflected The actual conditions etc. of construction site, foundation is all idealized model, therefore tradition BIM modeling method mainly has the following to lack Point:
1), civil engineering structure is constructed since manual operation, the factors such as technical conditions level exist, and computer is caused to be established BIM model and the more inconsistent situation of live physical presence, error range are wide.
2) during, BIM modeling is checked, when with high precision instrument, time of measuring is long, inefficiency, causes live general Data precision is low when measurement, and review deviation is big.
3), error is more when site operation, and the data volume for needing to check is huge, and the activity duration is long, large labor intensity, to data Review proposes biggish challenge.
4), the uncertain factor of site operation causes error to be not easy to be found, and needs repeated measurement, time-consuming and laborious, many When be all just to be found in work progress, fully rely on the experience level of manager.
5), modeling engineering amount is big, and modeling efficiency is low, and profession is various, needs to model personnel and grasps the figure for understanding different majors Paper is easy to omit model component, has higher requirement to the integration capability level of modeling personnel.
Therefore, being badly in need of one kind in the industry can be improved modeling fineness and efficiency, rationally utilize the modeling method of resource.
Summary of the invention
The purpose of the present invention is to provide a kind of rapid modeling sides BIM driven based on parameterized units by design parameter Method, to solve the problems mentioned in the above background technology.
In order to solve the above technical problem, the present invention provides following technical solutions:
A kind of BIM fast modeling method driven based on parameterized units by design parameter, comprising the following steps:
S1, according to the data to be analyzed of input and its analyze parameter request, establish the dynamic of data to be analyzed using ADAMS Mechanical model obtains ADAMS hard spot file, reads the coordinate values of each hard spot in ADAMS hard spot file, and forming one can modify Hard spot table;
S2, according to resulting hard spot table, establish a hard spot data configuration model, include described in the data configuration model All hard spot coordinates in hard spot table;
S3, parameterized treatment is carried out to resulting hard spot data configuration model, makes the hard spot data configuration model and hard Point table establishes association, and issues associated each hard spot in hard spot data configuration model;
S4, according to hard spot data configuration BIM figure model, design the detailed digital-to-analogue of each area data;
S5, BIM figure model is established, and the detailed digital-to-analogue of each area data is decorated to data system BIM scale of construction mould On the corresponding dotted line of type, the parametrization BIM model of data to be analyzed is obtained;
S6, the basic unit blocky model for establishing several parametrization, each basic unit blocky model simulation are assembled to BIM Collision is checked after on figure model, and design scheme feasibility is judged according to assembly situation;
S7, the BIM model integration that errorless BIM model intersects profession with other will be assembled, and will check whether Integrated Models will rush It is prominent;
S7, insertion virtual parameter module and virtual parameter make dynamic model in the parametrization BIM model of gained data to be analyzed Block, the virtual parameter actuation module is for driving Parameters variation, with each element in the parametrization BIM model of data to be analyzed After opening relationships, parameter is changed in specified range, thus driving simulation analysis module for different parameters into Row, which calculates, to be solved;The virtual parameter module be inserted into the parametrization BIM model of data to be analyzed it is available corresponding Result or target information logic unit;
The corresponding three-dimensional display platform of S8, later development carries out the displaying of BIM model management, implements personnel for field engineering and mentions For easily issuing, sharing, communication management platform.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter With function, the building of the hard spot table: led using the coordinate values that Matlab reads each hard spot in the ADAMS hard spot file Enter in an EXCEL file, in the first list of the EXCEL file storage have each hard spot title, coordinate values and The distance between two neighboring coordinate;The EXCEL file the second list first row place hard spot fix name, second Column are linked to corresponding coordinate values in the first list, and third arranges between corresponding two coordinates being connected in the first list Distance, the EXCEL file are the revisable hard spot table.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter With function, the simulation analysis module can be decomposed into design variable, design object and the parameter of design constraint for inputting, All design variable, design object and design constraints have with coherent element in simulation analysis module direct or indirect Corresponding relationship.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter It with function, in the hard spot table include each hard spot fix name and the corresponding coordinate values of each hard spot and two neighboring In distance value between coordinate.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter With function, the step S5 is established in BIM software platform, includes the conceptual model and mark of building in figure model The control point element of height, axis net, outer profile size.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter With function, in the step S7, passes through the collision detection of BIM software platform or the technological means of 3D construction simulation, check immediately Unit plate size and structure node, to adapt to design function and processing, mounting process requirement.
In order to further increase a kind of making for BIM fast modeling method driven based on parameterized units by design parameter With function, the BIM model construction include BIM model foundation, the scene BIM threedimensional model it is automatic establish, model calibration and The automatic foundation of later period model.
Compared with prior art, the beneficial effects obtained by the present invention are as follows being:
1), the included modeling of system of the invention and analytic function, it is easy to use;By the way that the setting of hard spot table can be modified, When modifying model, can directly it be realized by modification hard spot coordinate, it is easy to use, when can reduce required for data model building Between, and the automatic building of dynamic model can be carried out according to the data inputted;Parameter model is used, so that data analysis result It more intuitive can be shown, and can according to need the simulation analysis for realizing data cases.
2) it, is modeled by BIM, realizes the Parametric designing of architectural engineering, overcome and utilize regular rectangular shape unit plate The problem of curved-surface building model, and set of the present invention parameterized sizes driving design and adjustment function are constructed, so as at any time The control size for modifying model unit makes it to effectively improve design efficiency, reduces error rate and construction delay risk;It borrows simultaneously The collision detection function of BIM technology is helped, change, monitoring and the dynamic of implementation model design manage.
As stated above, the BIM fast modeling method that the present invention is based on parameterized units to be driven by design parameter can quickly, Accurate BIM modeling can reduce the data volume of artificial live repetition measurement to the full extent, improve modeling fineness and efficiency, rationally benefit It with resource, solves to model brought various inconveniences by traditional BIM, to realize high-precision, efficient BIM modeling.
Specific embodiment
It is clearly and completely described below in conjunction with the technical solution in the embodiment of the present invention, it is clear that described reality Applying example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff every other embodiment obtained without making creative work belongs to what the present invention protected Range.
A kind of BIM fast modeling method driven based on parameterized units by design parameter, comprising the following steps:
S1, according to the data to be analyzed of input and its analyze parameter request, establish the dynamic of data to be analyzed using ADAMS Mechanical model obtains ADAMS hard spot file, reads the coordinate values of each hard spot in ADAMS hard spot file, and forming one can modify Hard spot table;
S2, according to resulting hard spot table, establish a hard spot data configuration model, include described in the data configuration model All hard spot coordinates in hard spot table;
S3, parameterized treatment is carried out to resulting hard spot data configuration model, makes the hard spot data configuration model and hard Point table establishes association, and issues associated each hard spot in hard spot data configuration model;
S4, according to hard spot data configuration BIM figure model, design the detailed digital-to-analogue of each area data;
S5, BIM figure model is established, and the detailed digital-to-analogue of each area data is decorated to data system BIM scale of construction mould On the corresponding dotted line of type, the parametrization BIM model of data to be analyzed is obtained;
S6, the basic unit blocky model for establishing several parametrization, each basic unit blocky model simulation are assembled to BIM Collision is checked after on figure model, and design scheme feasibility is judged according to assembly situation;
S7, the BIM model integration that errorless BIM model intersects profession with other will be assembled, and will check whether Integrated Models will rush It is prominent;
S7, insertion virtual parameter module and virtual parameter make dynamic model in the parametrization BIM model of gained data to be analyzed Block, the virtual parameter actuation module is for driving Parameters variation, with each element in the parametrization BIM model of data to be analyzed After opening relationships, parameter is changed in specified range, thus driving simulation analysis module for different parameters into Row, which calculates, to be solved;The virtual parameter module be inserted into the parametrization BIM model of data to be analyzed it is available corresponding Result or target information logic unit;
The corresponding three-dimensional display platform of S8, later development carries out the displaying of BIM model management, implements personnel for field engineering and mentions For easily issuing, sharing, communication management platform.
Wherein, the coordinate of each hard spot in the ADAMS hard spot file building of the hard spot table: is read using Matlab Numerical value imports in an EXCEL file, and storage has each hard spot title, number of coordinates in the first list of the EXCEL file The distance between value and two neighboring coordinate;Hard spot coordinate name is placed in the first row of the second list of the EXCEL file Claim, secondary series is linked to corresponding coordinate values in the first list, and third column are connected to corresponding two seats in the first list The distance between mark, the EXCEL file is the revisable hard spot table.
Wherein, the simulation analysis module can be decomposed into design variable, design object and design constraint for inputting Parameter, algorithm, and parameter, algorithm partition will be inputted as unit, characteristic and load;It the design variable, design object and sets Meter constraint has direct or indirect corresponding relationship with coherent element in simulation analysis module, so as to set up between element Corresponding relationship to break the estrangement of two intermodules, and can drive simulation analysis module, and therefrom directly obtain desired Data greatly promote the efficiency and the quality of data of data analysis;Element: broad sense list is equipped in the simulation analysis module Member is the real object of simulation analysis;Property: characteristic is shared attribute information static on some analysis objects;Load: Load is load external influence factors or condition in these analysis load;Analysis: it analyzes as all kinds of specific emulation point Analysis method and appraisal procedure;Result: the data and the table based on data processing, cloud atlas, report being calculated; Variable: design variable is the mark of variable in model;Target: design object is eventually for the quality for measuring model Or the processing result of rational index or index;Constraint: design constraint is that system needs to abide by when considering optimization Rule;OptAlgorithm: optimum design method is all kinds of specific algorithms optimized;OptResult: optimization knot The optimal value for the design variable that fruit is calculated by optimization.
It wherein, include each hard spot fix name and the corresponding coordinate values of each hard spot, Yi Jixiang in the hard spot table In distance value between adjacent two coordinates.
Wherein, the step S5 is established in BIM software platform, in figure model including building conceptual model with And the control point element of absolute altitude, axis net, outer profile size.
Wherein, in the step S7, by the collision detection of BIM software platform or the technological means of 3D construction simulation, i.e., When inspection unit plate size and structure node, to adapt to design function and processing, mounting process requirement.
Wherein, the BIM model construction includes BIM model foundation, the automatic foundation of the scene BIM threedimensional model, model The automatic foundation of calibration and later period model.
Specifically, data format conversion module, for according to the control command of input by human-machine operation module input to Analysis data are converted to unified data service metadata.
Specifically, transfering node module is arranged for changing position, the direction of transfering node, moves data model;Also Decomposition, cutting, amplification and the diminution of data model are carried out for control command based on the received.
The included modeling of system of the invention and analytic function, it is easy to use;By the way that the setting of hard spot table can be modified, modifying When model, can directly it be realized by modification hard spot coordinate, it is easy to use, the time required for data model constructs can be reduced, And the automatic building of dynamic model can be carried out according to the data inputted;Parameter model is used, so that data analysis result can It is shown with more intuitive, and can according to need the simulation analysis for realizing data cases;It is modeled, is realized by BIM The Parametric designing of architectural engineering overcomes the problem using regular rectangular shape unit plate building curved-surface building model, Er Qieben Parameterized sizes driving design has been gathered in invention and adjustment function makes it to modify the control size of model unit at any time It effectively improves design efficiency, reduce error rate and construction delay risk;Simultaneously by the collision detection function of BIM technology, realize Change, monitoring and the dynamic of modelling manage.
As stated above, the BIM fast modeling method that the present invention is based on parameterized units to be driven by design parameter can quickly, Accurate BIM modeling can reduce the data volume of artificial live repetition measurement to the full extent, improve modeling fineness and efficiency, rationally benefit It with resource, solves to model brought various inconveniences by traditional BIM, to realize high-precision, efficient BIM modeling.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (7)

1. a kind of BIM fast modeling method driven based on parameterized units by design parameter, which is characterized in that including following Step:
S1, according to the data to be analyzed of input and its analyze parameter request, the dynamics of data to be analyzed is established using ADAMS Model obtains ADAMS hard spot file, reads the coordinate values of each hard spot in ADAMS hard spot file, and formation one is revisable hard Point table;
S2, according to resulting hard spot table, establish a hard spot data configuration model, include the hard spot in the data configuration model All hard spot coordinates in table;
S3, parameterized treatment is carried out to resulting hard spot data configuration model, makes the hard spot data configuration model and hard spot table Association is established, and issues associated each hard spot in hard spot data configuration model;
S4, according to hard spot data configuration BIM figure model, design the detailed digital-to-analogue of each area data;
S5, BIM figure model is established, and the detailed digital-to-analogue of each area data is decorated to data system BIM figure model On corresponding dotted line, the parametrization BIM model of data to be analyzed is obtained;
S6, the basic unit blocky model for establishing several parametrization, each basic unit blocky model simulation are assembled to the BIM scale of construction Collision is checked after on model, and design scheme feasibility is judged according to assembly situation;
S7, the BIM model integration that errorless BIM model intersects profession with other will be assembled, and will check whether Integrated Models will conflict;
S7, virtual parameter module and virtual parameter actuation module, institute are inserted into the parametrization BIM model of gained data to be analyzed Virtual parameter actuation module is stated for driving Parameters variation, is established with each element in the parametrization BIM model of data to be analyzed After relationship, parameter is changed in specified range, so that driving simulation analysis module is counted for different parameters It calculates and solves;The virtual parameter module is the available corresponding knot being inserted into the parametrization BIM model of data to be analyzed The logic unit of fruit or target information;
The corresponding three-dimensional display platform of S8, later development carries out the displaying of BIM model management, implements personnel for field engineering and provides just Publication, the sharing, communication management platform of victory.
2. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, the building of the hard spot table: reading the number of coordinates of each hard spot in the ADAMS hard spot file using Matlab Value imports in an EXCEL file, and storage has each hard spot title, coordinate values in the first list of the EXCEL file And the distance between two neighboring coordinate;Hard spot fix name is placed in the first row of the second list of the EXCEL file, Secondary series is linked to corresponding coordinate values in the first list, corresponding two coordinates that third column are connected in the first list it Between distance, the EXCEL file is the revisable hard spot table.
3. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, the simulation analysis module can be decomposed into design variable, design object and design constraint for inputting Parameter, all design variables, design object and design constraint have with coherent element in simulation analysis module directly or Indirect corresponding relationship.
4. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, including each hard spot fix name and the corresponding coordinate values of each hard spot in the hard spot table and adjacent In distance value between two coordinates.
5. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, the step S5 is established in BIM software platform, conceptual model in figure model including building and The control point element of absolute altitude, axis net, outer profile size.
6. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, in the step S7, by the collision detection of BIM software platform or the technological means of 3D construction simulation, immediately Inspection unit plate size and structure node, to adapt to design function and processing, mounting process requirement.
7. a kind of BIM fast modeling method driven based on parameterized units by design parameter according to claim 1, It is characterized in that, the BIM model construction includes BIM model foundation, the automatic foundation of the scene BIM threedimensional model, model school Quasi- and later period model automatic foundation.
CN201910523955.8A 2019-06-18 2019-06-18 The BIM fast modeling method driven based on parameterized units by design parameter Pending CN110287567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910523955.8A CN110287567A (en) 2019-06-18 2019-06-18 The BIM fast modeling method driven based on parameterized units by design parameter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910523955.8A CN110287567A (en) 2019-06-18 2019-06-18 The BIM fast modeling method driven based on parameterized units by design parameter

Publications (1)

Publication Number Publication Date
CN110287567A true CN110287567A (en) 2019-09-27

Family

ID=68004535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910523955.8A Pending CN110287567A (en) 2019-06-18 2019-06-18 The BIM fast modeling method driven based on parameterized units by design parameter

Country Status (1)

Country Link
CN (1) CN110287567A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110706353A (en) * 2019-10-14 2020-01-17 周士奇 Parametric modeling method of device skin self-supporting structure
CN111143951A (en) * 2019-12-30 2020-05-12 山东大学 Parameterization design method and system for tracking main frame of shearing machine
CN111814270A (en) * 2020-06-30 2020-10-23 山东大学 Parameterization design method and system of static pressure modeling host
CN112395677A (en) * 2020-11-19 2021-02-23 温岭市第一建筑工程有限公司 Construction method of civil engineering BIM (building information modeling) engineering quantity model
CN112883470A (en) * 2021-02-04 2021-06-01 友谊国际工程咨询股份有限公司 BIM technology-based forward design system and method
CN113065182A (en) * 2021-02-19 2021-07-02 中铁第一勘察设计院集团有限公司 BIM-based urban rail transit platform door system engineering design method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104102765A (en) * 2014-06-23 2014-10-15 金刚幕墙集团有限公司 BIM (Building Information Modeling)-based curtain wall parametrization design method
CN106650069A (en) * 2016-12-12 2017-05-10 黄河科技学院 Analysis and design method for green building
CN107093206A (en) * 2017-04-20 2017-08-25 中铁十局集团电务工程有限公司 The method modeled using 3D laser scanner technique fast Bs IM
CN108052751A (en) * 2017-12-20 2018-05-18 东北电力大学 A kind of modeling method of Data Analysis Model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104102765A (en) * 2014-06-23 2014-10-15 金刚幕墙集团有限公司 BIM (Building Information Modeling)-based curtain wall parametrization design method
CN106650069A (en) * 2016-12-12 2017-05-10 黄河科技学院 Analysis and design method for green building
CN107093206A (en) * 2017-04-20 2017-08-25 中铁十局集团电务工程有限公司 The method modeled using 3D laser scanner technique fast Bs IM
CN108052751A (en) * 2017-12-20 2018-05-18 东北电力大学 A kind of modeling method of Data Analysis Model

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110706353A (en) * 2019-10-14 2020-01-17 周士奇 Parametric modeling method of device skin self-supporting structure
CN110706353B (en) * 2019-10-14 2023-02-03 同济大学 Parametric modeling method of device skin self-supporting structure
CN111143951A (en) * 2019-12-30 2020-05-12 山东大学 Parameterization design method and system for tracking main frame of shearing machine
CN111814270A (en) * 2020-06-30 2020-10-23 山东大学 Parameterization design method and system of static pressure modeling host
CN112395677A (en) * 2020-11-19 2021-02-23 温岭市第一建筑工程有限公司 Construction method of civil engineering BIM (building information modeling) engineering quantity model
CN112883470A (en) * 2021-02-04 2021-06-01 友谊国际工程咨询股份有限公司 BIM technology-based forward design system and method
CN112883470B (en) * 2021-02-04 2023-09-29 友谊国际工程咨询股份有限公司 System and method for forward design based on BIM technology
CN113065182A (en) * 2021-02-19 2021-07-02 中铁第一勘察设计院集团有限公司 BIM-based urban rail transit platform door system engineering design method

Similar Documents

Publication Publication Date Title
CN110287567A (en) The BIM fast modeling method driven based on parameterized units by design parameter
CN104091215B (en) A kind of project planning management system based on BIM
CN105888317B (en) Central refrigerating plant room modularization is prefabricated and prefabricated construction method
CN113033001B (en) Three-dimensional digital factory modeling method and system for digital twin application
CN108959694B (en) BIM geometric model construction method for large-volume complex building
CN114511202B (en) BIM-based full-period engineering project management method and platform
CN104102765A (en) BIM (Building Information Modeling)-based curtain wall parametrization design method
CN105844380A (en) BIM-based BIM project element management method and system
CN103500371A (en) Change control method based on BIM
CN110263456B (en) Tunnel dynamic feedback analysis system based on IFC standard
CN108595818B (en) Assembly type building management method and system based on BIM and cloud service
CN113360583A (en) Construction progress visualization method based on BIM model and monitoring image comparison
CN113761622B (en) Parameterized city modeling method and device, storage medium and terminal equipment
CN111651818A (en) BIM model rapid change method
CN106650069A (en) Analysis and design method for green building
CN113011832A (en) Engineering cost system based on BIM
CN103793578A (en) Design method for assembling meteorological satellite from top to bottom
CN115797568A (en) Modeling method and device based on three-dimensional GIS and BIM integration
CN110440950B (en) Large-volume concrete temperature monitoring visualization system and method based on optical fiber temperature measurement
CN108052751A (en) A kind of modeling method of Data Analysis Model
CN111241660A (en) Civil engineering experiment detection system and method based on cloud computing technology
CN116821223B (en) Industrial visual control platform and method based on digital twinning
CN114372301A (en) BIM technology-based unit type curtain wall parametric modeling method
CN109165399A (en) A kind of automatized three-dimensional Buildings Modeling method and system based on SketchUp API
CN106383956B (en) The converting system and method for thermal power plant civil engineering model data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination