CN109409850A - Assembled architecture concrete casting production method based on BIM technology - Google Patents
Assembled architecture concrete casting production method based on BIM technology Download PDFInfo
- Publication number
- CN109409850A CN109409850A CN201811494915.7A CN201811494915A CN109409850A CN 109409850 A CN109409850 A CN 109409850A CN 201811494915 A CN201811494915 A CN 201811494915A CN 109409850 A CN109409850 A CN 109409850A
- Authority
- CN
- China
- Prior art keywords
- bim
- concrete
- assembled architecture
- production method
- method based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 27
- 238000005266 casting Methods 0.000 title claims abstract description 22
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 22
- 238000007405 data analysis Methods 0.000 claims abstract description 12
- 238000004458 analytical method Methods 0.000 claims abstract description 8
- 238000009417 prefabrication Methods 0.000 claims abstract description 6
- 230000008676 import Effects 0.000 claims abstract description 4
- 238000012545 processing Methods 0.000 claims description 15
- 238000000034 method Methods 0.000 claims description 10
- 238000012986 modification Methods 0.000 claims description 7
- 230000004048 modification Effects 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 5
- 230000007547 defect Effects 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 3
- 238000013070 change management Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000010354 integration Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 230000015271 coagulation Effects 0.000 description 4
- 238000005345 coagulation Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000010146 3D printing Methods 0.000 description 1
- 238000013499 data model Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Computer Hardware Design (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Evolutionary Computation (AREA)
- Entrepreneurship & Innovation (AREA)
- Architecture (AREA)
- Computational Mathematics (AREA)
- Primary Health Care (AREA)
- Civil Engineering (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Structural Engineering (AREA)
- Quality & Reliability (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- General Factory Administration (AREA)
Abstract
The assembled architecture concrete casting production method based on BIM technology that the invention discloses a kind of, is related to technical field of building construction.The present invention is the following steps are included: SS01, establish BIM model: establishing the BIM model of prefabrication by BIM software, the BIM model is saved as IFC formatted file;SS02, model import and analysis: the BIM model file being imported in intelligent concrete control system and carries out data analysis.The present invention is by BIM technology in conjunction with intelligent concrete casting technology, make prefabrication on the basis of industrialized, with information-based depth integration, reach whole intelligence, compared with traditional construction operation, the maintenance time of concrete is substantially reduced, and shortens construction period, construction cost is greatly reduced, there is preferable economic benefit.
Description
Technical field
The invention belongs to technical field of building construction, more particularly to a kind of assembled architecture coagulation based on BIM technology
Soil casting production method.
Background technique
BIM technology is that intelligence is fertile " nerve center ", from fabricated design, produces to transport and installs, can not only show
Real collaborative design, and construction simulation may be implemented, collision detection is carried out, is provided in designing technique and administrative skill reliable
Technical support.As that studies BIM technology deepens continuously, in the construction process, BIM technology can realize design to project,
The information simulation of the various dimensions such as construction speed and cost, it is sufficient to meet the needs of concrete intelligence casting.And concrete is poured
Though manipulation technology is in the primary stage of development, study it and use oneself to obtain certain achievement, especially in building field
Intelligent concrete placingJi Shu, built currently, producing many villa classes by 3D printing technique, therefore, if logical
BIM technology is crossed to be combined with intelligent concrete casting technology, it can be achieved that intelligent production, improves the production effect of assembled architecture
Rate, and currently, then lacking the rational method of a kind of combination BIM technology and intelligent concrete casting technology.
Summary of the invention
The assembled architecture concrete casting production method based on BIM technology that the purpose of the present invention is to provide a kind of is fitted
For the intelligence production of assembled architecture, it is greatly improved production efficiency, saves manual labor, reduces production cost.
The present invention is achieved by the following technical solutions:
The present invention is a kind of assembled architecture concrete casting production method based on BIM technology, mainly includes following step
It is rapid:
SS01, it establishes BIM model: establishing the BIM model of prefabrication by BIM software, by the BIM model
Save as IFC formatted file;
SS02, model import and analysis: the BIM model file is imported in intelligent concrete control system and carried out
Data analysis;
SS03, establishment relative program: the intelligence concrete control system is worked out and is generated according to data analysis result
The Job Runner of mechanical arm, the concrete pump set and nozzle;
SS04, dummy model processing demonstration: operation program carries out virtual object in the intelligent concrete control system
Manage the processing demonstration of model;
SS05, physical treatment: sequence controlled machine arm, concrete pump are run by the intelligent concrete control system
Device and nozzle is sent to carry out the processing of assembled architecture material object;
SS06, finished product are checked and accepted: the assembled architecture after checking and accepting processing is in kind, if it exists unqualified defect, then manual modification
After subprogram, until carrying out step SS04 and subsequent step to acceptance(check);If qualified, complete to produce, and subsequent production
Directly repeat step SS05 and subsequent step.
Further, data analysis is to use to carry out based on STL algorithm in the step SS02.
Further, data analysis includes: analysis concrete casting basic principle, feature and existing in the step SS02
Technology type simultaneously calculates concrete amount;Shape, size, position and the X, Y of calculating machine arm of analysis each component of dummy model,
Z three-axis moving route, speed and the concrete pump set and nozzle start and stop sequence, time.
Further, further include checking process when carrying out processing demonstration in the step SS04: checking virtual manufacture step
Suddenly, mistake if it exists, then manual modification erroneous procedures, and re-start step SS04;Mistake if it does not exist then enters in next step
Suddenly.
Further, the mechanical arm is three axis lathe of planer-type.
Further, establishing in the SS01 after BIM model further includes document change management: using IFC as the information of standard
Acquisition and information transmitting, form the database hub of whole system, while to the real-time update of database.
The invention has the following advantages:
The present invention in conjunction with intelligent concrete casting technology, is industrializing prefabrication by BIM technology
On the basis of, with information-based depth integration, the intelligence for reaching whole substantially reduces coagulation compared with traditional construction operation
The maintenance time of soil, and construction period is shortened, construction cost is greatly reduced, there is preferable economic benefit.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is that the present invention is based on the schematic diagrames of the assembled architecture concrete casting production method of BIM technology.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
The present invention is a kind of assembled architecture concrete casting production method based on BIM technology, mainly includes following step
It is rapid:
SS01, it establishes BIM model: establishing the BIM model of prefabrication by BIM software, BIM model is saved
For IFC formatted file, is transmitted by the information collection of standard and information of IFC, form the database hub of whole system, while right
The real-time update of database;
SS02, model import and analysis: BIM model file being imported in intelligent concrete control system and using being based on
STL algorithm carries out data analysis, and to the processing of data model slice, data analysis includes: analysis concrete casting basic principle, spy
Point and prior art type simultaneously calculate concrete amount;It analyzes the shape of each component of dummy model, size, position and calculates gantry
X, Y, Z three-axis moving route, speed and the concrete pump set and nozzle start and stop sequence, time of three axis lathe of formula;
SS03, establishment relative program: intelligent concrete control system is worked out according to data analysis result and generates gantry
The Job Runner of three axis lathe of formula, the concrete pump set and nozzle;
SS04, dummy model processing demonstration: program is run in intelligent concrete control system and carries out physical vlan mould
The processing of type is demonstrated, and checks virtual manufacture step, if it exists mistake, then manual modification erroneous procedures, and re-start step
SS04;Mistake if it does not exist then enters next step;
SS05, physical treatment: three axis lathe of process control planer-type, coagulation are run by intelligent concrete control system
Native pumping installations and nozzle carry out the processing of assembled architecture material object, and nozzle is mounted on three axis lathe of planer-type, and is provided with seat
Positioning system is marked, coordinate positioning matches with operation program, to pass through X, Y, Z movement of three axis lathes of control, coagulation
The opening and closing of native pumping installations and nozzle is completed to cast;
SS06, finished product are checked and accepted: the assembled architecture after checking and accepting processing is in kind, if it exists unqualified defect, then manual modification
After subprogram, until carrying out step SS04 and subsequent step to acceptance(check);If qualified, complete to produce, and subsequent production
Directly repeat step SS05 and subsequent step.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close
Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention
Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only
It is limited by claims and its full scope and equivalent.
Claims (6)
1. a kind of assembled architecture concrete casting production method based on BIM technology, it is characterised in that: mainly include following step
It is rapid:
SS01, it establishes BIM model: establishing the BIM model of prefabrication by BIM software, the BIM model is saved
For IFC formatted file;
SS02, model import and analysis: the BIM model file being imported in intelligent concrete control system and carries out data
Analysis;
SS03, establishment relative program: the intelligence concrete control system is worked out according to data analysis result and generates machinery
The Job Runner of arm, the concrete pump set and nozzle;
SS04, dummy model processing demonstration: operation program carries out physical vlan mould in the intelligent concrete control system
The processing of type is demonstrated;
SS05, physical treatment: by the way that the intelligent concrete control system runs sequence controlled machine arm, concrete pumping fills
It sets and carries out the processing of assembled architecture material object with nozzle;
SS06, finished product are checked and accepted: the assembled architecture after checking and accepting processing is in kind, if it exists unqualified defect, then manual modification part
After program, until carrying out step SS04 and subsequent step to acceptance(check);If qualified, complete to produce, and subsequent production is direct
Repeat step SS05 and subsequent step.
2. a kind of assembled architecture concrete casting production method based on BIM technology according to claim 1, feature
It is, data analysis is to use to carry out based on STL algorithm in the step SS02.
3. a kind of assembled architecture concrete casting production method based on BIM technology according to claim 1, feature
It is, data analysis includes: analysis concrete casting basic principle, feature and prior art type and counts in the step SS02
Calculate concrete amount;Analyze X, Y, Z three-axis moving road of the shape of each component of dummy model, size, position and calculating machine arm
Line, speed and the concrete pump set and nozzle start and stop sequence, time.
4. a kind of assembled architecture concrete casting production method based on BIM technology according to claim 1, feature
It is, further includes checking process when carrying out processing demonstration in the step SS04: checking virtual manufacture step, if it exists mistake,
Then manual modification erroneous procedures, and re-start step SS04;Mistake if it does not exist then enters next step.
5. a kind of assembled architecture concrete casting production method based on BIM technology according to claim 1, feature
It is, the mechanical arm is three axis lathe of planer-type.
6. a kind of assembled architecture concrete casting production method based on BIM technology according to claim 1, feature
It is, being established after BIM model in the SS01 further includes document change management: is passed by the information collection of standard and information of IFC
It passs, forms the database hub of whole system, while to the real-time update of database.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811494915.7A CN109409850A (en) | 2018-12-07 | 2018-12-07 | Assembled architecture concrete casting production method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811494915.7A CN109409850A (en) | 2018-12-07 | 2018-12-07 | Assembled architecture concrete casting production method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109409850A true CN109409850A (en) | 2019-03-01 |
Family
ID=65457840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811494915.7A Pending CN109409850A (en) | 2018-12-07 | 2018-12-07 | Assembled architecture concrete casting production method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109409850A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110216672A (en) * | 2019-05-17 | 2019-09-10 | 广东博智林机器人有限公司 | Information interacting method, server and construction robot |
CN110434977A (en) * | 2019-08-15 | 2019-11-12 | 四川建筑职业技术学院 | A kind of production method of the 3D printing assembled architecture based on BIM |
CN110554699A (en) * | 2019-08-26 | 2019-12-10 | 广东博智林机器人有限公司 | Robot control system and control method |
CN110978204A (en) * | 2019-12-20 | 2020-04-10 | 万翼科技有限公司 | BIM-based intelligent concrete pouring method and related product |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774859A (en) * | 2014-01-17 | 2014-05-07 | 华中科技大学 | Automatic construction device of BIM (Building Information Model)-based cement mortar masonry and working method of automatic construction device |
CN111441586A (en) * | 2020-04-10 | 2020-07-24 | 中国建筑第八工程局有限公司 | Self-adaptive intelligent concrete distribution system and method |
-
2018
- 2018-12-07 CN CN201811494915.7A patent/CN109409850A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774859A (en) * | 2014-01-17 | 2014-05-07 | 华中科技大学 | Automatic construction device of BIM (Building Information Model)-based cement mortar masonry and working method of automatic construction device |
CN111441586A (en) * | 2020-04-10 | 2020-07-24 | 中国建筑第八工程局有限公司 | Self-adaptive intelligent concrete distribution system and method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110216672A (en) * | 2019-05-17 | 2019-09-10 | 广东博智林机器人有限公司 | Information interacting method, server and construction robot |
CN110434977A (en) * | 2019-08-15 | 2019-11-12 | 四川建筑职业技术学院 | A kind of production method of the 3D printing assembled architecture based on BIM |
CN110554699A (en) * | 2019-08-26 | 2019-12-10 | 广东博智林机器人有限公司 | Robot control system and control method |
CN110978204A (en) * | 2019-12-20 | 2020-04-10 | 万翼科技有限公司 | BIM-based intelligent concrete pouring method and related product |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109409850A (en) | Assembled architecture concrete casting production method based on BIM technology | |
CN107974945B (en) | BIM modeling method based on the construction of Section Rigid Surveillance of Continuous Beam cantilever pouring | |
CN109800536A (en) | One kind parameterizing tunnel model fast modeling method based on Revit and Dynamo | |
CN111062081A (en) | Underground continuous wall construction method based on BIM technology | |
CN106372293B (en) | Building BIM (building information modeling) model establishing method based on three-dimensional datum line | |
CN103774859B (en) | A kind of automatic constructing device of cement mortar masonry based on BIM building model and method of work thereof | |
CN108001614B (en) | It is a kind of large size anchor station and anchor lip lofting Design method | |
CN105279329A (en) | BIM (Building Information Modeling)-based sample plate guide quality management method | |
CN107885918A (en) | A kind of Architectural Structure Design method and apparatus based on BIM technology | |
CN104252558A (en) | BIM (Building Information Modeling) platform-based numerical control machining pretreatment method of non-standard building enclosure component | |
CN104978411B (en) | A kind of automobile development method and apparatus of bullet train | |
CN107092720A (en) | A kind of BIM model building methods that node repository is parameterized based on two-stage | |
CN107844677A (en) | Method for three-dimensional reinforcing bar editing and updating | |
CN107545080A (en) | A kind of virtual pre-assembly method of steel bridge based on BIM models | |
CN106837375B (en) | A kind of method for automatic modeling of shield tunnel concrete pipe sheet tectonic model | |
CN109919051A (en) | A kind of convolutional neural networks accelerated method for video image processing | |
CN106914969A (en) | A kind of 3D printing method of concrete component | |
CN102663194A (en) | Heading machine collaborative simulation method and model thereof | |
CN109635485A (en) | Tunnel Dynamic Construction information model component entity extended method based on IFC standard | |
CN105893655A (en) | Physical simulation method for petroleum reservoir architecture | |
CN103279603A (en) | Modeling method for showing machining process of part | |
CN109918760A (en) | Reinforcing bar modeling method based on Revit interoperability | |
CN113158303A (en) | BIM-based assembled steel bridge three-dimensional model construction method | |
CN104318030B (en) | Computational methods are automated based on equivalent Method of Arch Dam Foundation overall deformation modulus is deformed | |
CN104951595B (en) | A kind of skin part technical lug modeling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |
|
RJ01 | Rejection of invention patent application after publication |