CN105201204B - 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 - Google Patents
一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 Download PDFInfo
- Publication number
- CN105201204B CN105201204B CN201410486542.4A CN201410486542A CN105201204B CN 105201204 B CN105201204 B CN 105201204B CN 201410486542 A CN201410486542 A CN 201410486542A CN 105201204 B CN105201204 B CN 105201204B
- Authority
- CN
- China
- Prior art keywords
- column
- concrete
- suspension column
- reinforced
- falsework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构,该方法采用与现有技术施工工序相反的施工方法,即把楼地面梁和板的钢筋绑扎时,同时将对应层的钢筋混凝土柱的柱脚钢筋绑扎完成并于楼地面梁和板的钢筋连接,先浇筑对应层钢筋混凝土柱柱脚混凝土,然后再浇筑钢筋混凝土楼地面的混凝土,从而彻底防止钢筋混凝土柱柱脚烂根,本发明具有极强的适用优势,施工简单、快捷、经济、易于操作,不仅可解决柱脚烂根的难题,还能提高砼柱的成型质量,也能更好的控制楼地面结构的厚度,提高施工效率。
Description
技术领域
本发明涉及一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构,属于建筑工程施工技术领域。
背景技术
在建筑工程主体结构施工过程中,由于施工工艺、材料、操作人员技术熟练程度等原因,结构柱的混凝土浇筑经常出现烂根这一质量通病,就其质量缺陷产生的原因分析,除了材料和人的因素外,主要原因是现有技术中在施工完楼地面混凝土后再通过钢筋混凝土柱柱脚模板浇筑钢筋混凝土柱柱脚时,钢筋混凝土柱柱脚模与楼地面混凝土接触不好,容易产生间隙,不但造成大量的漏浆现象,而且在此处的混凝土浇筑强度很难保证,既增加后期补修和清理的难度,又造成质量很好满足设计强度。
发明内容
本发明的目的是:提供一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构,该方法可以从施工工艺上杜绝柱混凝土出现烂根现象,保证结构成型质量。避免因柱脚烂根造成反复修补及返工等人力、物力的浪费,从而提高施工效率、节约施工成本,以克服现有技术的不足。
本发明的技术方案
一种防止浇筑钢筋混凝土柱柱脚时烂根的方法,该方法采用与现有技术施工工序相反的施工方法,即把楼地面梁和板的钢筋绑扎时,同时将对应层的钢筋混凝土柱的柱脚钢筋绑扎完成并与楼地面梁和板的钢筋连接,先浇筑对应层钢筋混凝土柱柱脚混凝土,然后再浇筑钢筋混凝土楼地面的混凝土,从而彻底防止钢筋混凝土柱柱脚烂根;具体施工步骤如下:
步骤一、将楼地面梁、板和对应层的钢筋混凝土柱柱脚的钢筋同时绑扎完成并相互连接;
步骤二、钢筋绑扎完时,同时在钢筋混凝土柱柱脚与楼地面连接处安置模板支架;
步骤三、在模板支架下方竖直设有实现混凝土柱脚混凝土与楼地面混凝土相互隔离的快易收口网;
步骤四、将钢筋混凝土柱柱脚模板安装在模板支架上实现浇筑钢筋混凝土柱柱脚混凝土;
步骤五、待钢筋混凝土柱柱脚的混凝土凝固后拆除模板,再浇筑楼地面混凝土;
所述模板支架为框型结构,在模板支架底部设有支撑在楼面模板上的支腿,在模板支架上设有实现控制钢筋混凝土柱柱脚模板尺寸的卡台,模板支架的高度与楼地面混凝土厚度一致;
所述快易收口网所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网分别与钢筋混凝土柱柱脚模板和楼面模板接触。
一种防止浇筑钢筋混凝土柱柱脚时烂根的结构,包括钢筋混凝土柱柱脚模板,钢筋混凝土柱柱脚模板放置在模板支架上并与设置在模板支架上的卡台相互顶紧,模板支架的支腿支撑在楼面模板上,在模板支架下方设有竖直放置的快易收口网。
前述的防止浇筑钢筋混凝土柱柱脚时烂根的结构中,所述模板支架为框型结构,模板支架的高度与楼地面混凝土厚度a一致。
前述的防止浇筑钢筋混凝土柱柱脚时烂根的结构中,所述快易收口网所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网分别与钢筋混凝土柱柱脚模板和楼面模板接触
由于采用了上述技术方案,与现有技术相比,本发明通过施工工序的反转,即先浇筑钢筋混凝土柱柱脚混凝土,再施工楼地面混凝土,完全解决了现有技术工序中必然才是烂根的现象,且通过设置高度与楼底板厚度一致的模板支架和快易收口网,并把钢筋混凝土柱柱脚模板放置模板支架上,实现钢筋混凝土柱柱脚的快速准确浇筑,通过设置模板支架,可使得钢筋混凝土柱柱脚模板的安装方便(若不设置此结构,在楼地面钢筋与钢筋混凝土柱柱脚钢筋同时绑扎情况下,该模板的放置不能实现,若楼地面钢筋与钢筋混凝土柱柱脚钢筋不同时绑扎,即是先绑扎钢筋混凝土柱柱脚钢筋,然后把钢筋混凝土柱柱脚模板直接放置在楼地面模板上先浇筑钢筋混凝土柱柱脚混凝土,此工序虽然能解决烂根现象,但是施工工序太复杂,要分别绑扎钢筋,再分别浇筑混凝土,经济性太差,且强度也很难保证),通过设置快易收口网可使得在浇筑钢筋混凝土柱柱脚混凝土时,钢筋混凝土柱柱脚混凝土不会流入到楼地面上,保证钢筋混凝土柱柱脚与楼地面连接混凝土的浇筑质量,本发明具有极强的适用优势,施工简单、快捷、经济、易于操作,不仅可解决柱脚烂根的难题,还能提高砼柱的成型质量,也能更好的控制楼地面结构的厚度,提高施工效率。
附图说明
附图1为本发明的结构示意图;
附图2为附图1的A-A剖视图;
附图3为实施例一中模板支架结构示意图。
附图中的标记为:1-模板支架、2-快易收口网、3-胶合板、4-木方、5-对拉螺杆组件、6-钢管、7-钢筋保护层控制垫块、8-支腿、9-卡台、a-楼地面混凝土厚度。
具体实施方式
下面结合附图对本发明进一步的详细说明,但不作为对本发明的任何限制。
本发明实施例:一种防止浇筑钢筋混凝土柱柱脚时烂根的方法,该方法采用与现有技术施工工序相反的施工方法,即把楼地面梁和板的钢筋绑扎时,同时将对应层的钢筋混凝土柱的柱脚钢筋绑扎完成并与楼地面梁和板的钢筋连接,先浇筑对应层钢筋混凝土柱柱脚混凝土,然后再浇筑钢筋混凝土楼地面的混凝土,从而彻底防止钢筋混凝土柱柱脚烂根。
具体施工步骤如下:
步骤一、将楼地面梁、板和对应层的钢筋混凝土柱柱脚的钢筋同时绑扎完成并相互连接;
步骤二、钢筋绑扎完时,同时在钢筋混凝土柱柱脚与楼地面连接处安置模板支架,该模板支架采用现场所用的钢筋制作,且模板支架为与模板支架为钢筋混凝土柱柱脚外形一致的方框型结构(本实施例中钢筋混凝土柱柱脚为方形结构,若钢筋混凝土柱柱脚为圆形或其他形状,模板支架也应为同一形状的框型结构,主要目的是实现对对应钢筋混凝土柱柱脚模板的支撑),在模板支架底部设有可以支撑在楼面模板上的支腿,在模板支架上设有实现控制钢筋混凝土柱柱脚模板尺寸的卡台,模板支架的高度与楼地面混凝土厚度一致;
步骤三、在模板支架下方竖直设有实现混凝土柱脚混凝土与楼地面混凝土相互隔离的快易收口网,快易收口网为现有技术产品,快易收口网所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网可分别与钢筋混凝土柱柱脚模板和楼面模板接触,达到作为钢筋混泥土柱柱脚和楼地面混凝土隔离网的目的,并使得彼此浇筑时保证混凝土不会泄漏和该处混凝土的浇筑质量;
步骤四、将钢筋混凝土柱柱脚模板安装在模板支架上实现浇筑钢筋混凝土柱柱脚混凝土,该钢筋混凝土柱柱脚模板具体安装方法为,将厚度不小于15mm的柱脚模板胶合板置于已固定好的模板支架上,胶合板外侧竖向采用50x100mm木方作背楞,水平向用Φ48双钢管通过对拉螺杆组件和模板支架上部钢筋头和钢筋保护层控制垫块相互作用,扭紧固定,检查扭紧固定后,浇筑柱脚混凝土,形成导柱,柱脚高度≥300mm;
步骤五、待钢筋混凝土柱柱脚的混凝土凝固后拆除模板,再浇筑楼地面混凝土。
根据上述方法所构建的一种防止浇筑钢筋混凝土柱柱脚时烂根的结构,如附图所示,包括钢筋混凝土柱柱脚模板,钢筋混凝土柱柱脚模板放置在模板支架1上并与设置在模板支架1上的卡台9相互顶紧,模板支架1的支腿8支撑在楼面模板上,在模板支架1下方设有竖直放置的快易收口网2,该模板支架1为框型结构,模板支架1的高度与楼地面混凝土厚度a一致,该快易收口网2所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网2可分别与钢筋混凝土柱柱脚模板和楼面模板接触。
其中钢筋混凝土柱柱脚模板安装方法为:将柱脚模板胶合板3置于固定的模板支架1上,竖向采用木方4作背楞,水平向用双钢管6通过对拉螺杆5和上部钢筋头和钢筋保护层控制垫块7相互作用,扭紧固定,完成钢筋混凝土柱柱脚模板安装,检查扭紧固定后浇筑柱脚混凝土,形成导柱,柱脚高度≥300mm;楼地面混凝土施工。
Claims (4)
1.一种防止浇筑钢筋混凝土柱柱脚时烂根的方法,其特征在于:该方法采用与现有技术施工工序相反的施工方法,即把楼地面梁和板的钢筋绑扎时,同时将对应层的钢筋混凝土柱的柱脚钢筋绑扎完成并与楼地面梁和板的钢筋连接,先浇筑对应层钢筋混凝土柱柱脚混凝土,然后再浇筑钢筋混凝土楼地面的混凝土,从而彻底防止钢筋混凝土柱柱脚烂根;具体施工步骤如下:
步骤一、将楼地面梁、板和对应层的钢筋混凝土柱柱脚的钢筋同时绑扎完成并相互连接;
步骤二、钢筋绑扎完时,同时在钢筋混凝土柱柱脚与楼地面连接处安置模板支架;
步骤三、在模板支架下方竖直设有实现混凝土柱脚混凝土与楼地面混凝土相互隔离的快易收口网;
步骤四、将钢筋混凝土柱柱脚模板安装在模板支架上实现浇筑钢筋混凝土柱柱脚混凝土;
步骤五、待钢筋混凝土柱柱脚的混凝土凝固后拆除模板,再浇筑楼地面混凝土;
所述模板支架为框型结构,在模板支架底部设有支撑在楼面模板上的支腿,在模板支架上设有实现控制钢筋混凝土柱柱脚模板尺寸的卡台,模板支架的高度与楼地面混凝土厚度一致;
所述快易收口网所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网分别与钢筋混凝土柱柱脚模板和楼面模板接触。
2.一种防止浇筑钢筋混凝土柱柱脚时烂根的结构,包括钢筋混凝土柱柱脚模板,其特征在于:钢筋混凝土柱柱脚模板放置在模板支架(1)上并与设置在模板支架(1)上的卡台(9)相互顶紧,模板支架(1)的支腿(8)支撑在楼面模板上,在模板支架(1)下方设有竖直放置的快易收口网(2)。
3.根据权利要求2所述的防止浇筑钢筋混凝土柱柱脚时烂根的结构,其特征在于:所述模板支架(1)为框型结构,模板支架(1)的高度与楼地面混凝土厚度a一致。
4.根据权利要求2所述的防止浇筑钢筋混凝土柱柱脚时烂根的结构,其特征在于:所述快易收口网(2)所围成的内径尺寸与钢筋混凝土柱柱脚的外径尺寸一致,且快易收口网(2)分别与钢筋混凝土柱柱脚模板和楼面模板接触。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410486542.4A CN105201204B (zh) | 2014-09-23 | 2014-09-23 | 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410486542.4A CN105201204B (zh) | 2014-09-23 | 2014-09-23 | 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105201204A CN105201204A (zh) | 2015-12-30 |
CN105201204B true CN105201204B (zh) | 2018-07-06 |
Family
ID=54949130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410486542.4A Active CN105201204B (zh) | 2014-09-23 | 2014-09-23 | 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105201204B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760508B (zh) * | 2017-01-20 | 2022-03-25 | 桂林电子科技大学 | 一种现浇混凝土柱吊模及现浇混凝土柱方法 |
CN110005197B (zh) * | 2019-04-12 | 2020-08-28 | 广东电白二建集团有限公司 | 一种墙柱清扫口的施工方法 |
CN111519840A (zh) * | 2020-05-08 | 2020-08-11 | 中国电建集团四川工程有限公司 | 高大混凝土框架柱浇筑方法 |
CN112343332B (zh) * | 2020-10-24 | 2021-11-23 | 广东冠雄建设集团有限公司 | 一种混凝土矩形柱模板的固紧系统及混凝土柱的施工方法 |
CN115058979B (zh) * | 2022-07-05 | 2024-05-17 | 中建八局第一建设有限公司 | 一种高大墩柱混凝土一次性浇筑骨架及其一次性浇筑方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09317172A (ja) * | 1996-05-27 | 1997-12-09 | Shinyou:Kk | 住宅用コンクリート躯体の製造方法 |
WO2010074680A1 (en) * | 2008-12-22 | 2010-07-01 | Blayde Penza | Concrete forming system |
CN102373803A (zh) * | 2011-11-15 | 2012-03-14 | 天津大学 | 一种新型预制混凝土管模及其施工方法 |
CN202441060U (zh) * | 2012-03-22 | 2012-09-19 | 广东中城建设集团有限公司 | 钢筋混凝土框架梁柱施工结构 |
CN103821361A (zh) * | 2014-03-03 | 2014-05-28 | 永升建设集团有限公司 | 改进的分次浇筑楼梯间柱支模施工方法 |
CN204081483U (zh) * | 2014-09-23 | 2015-01-07 | 中建四局第三建筑工程有限公司 | 一种防止浇筑钢筋混凝土柱柱脚时烂根的结构 |
-
2014
- 2014-09-23 CN CN201410486542.4A patent/CN105201204B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09317172A (ja) * | 1996-05-27 | 1997-12-09 | Shinyou:Kk | 住宅用コンクリート躯体の製造方法 |
WO2010074680A1 (en) * | 2008-12-22 | 2010-07-01 | Blayde Penza | Concrete forming system |
CN102373803A (zh) * | 2011-11-15 | 2012-03-14 | 天津大学 | 一种新型预制混凝土管模及其施工方法 |
CN202441060U (zh) * | 2012-03-22 | 2012-09-19 | 广东中城建设集团有限公司 | 钢筋混凝土框架梁柱施工结构 |
CN103821361A (zh) * | 2014-03-03 | 2014-05-28 | 永升建设集团有限公司 | 改进的分次浇筑楼梯间柱支模施工方法 |
CN204081483U (zh) * | 2014-09-23 | 2015-01-07 | 中建四局第三建筑工程有限公司 | 一种防止浇筑钢筋混凝土柱柱脚时烂根的结构 |
Non-Patent Citations (1)
Title |
---|
框架柱烂根处理方案;刘涛爱闫军丽;《百度文库》;20140430;第1-4页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105201204A (zh) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201204B (zh) | 一种防止浇筑钢筋混凝土柱柱脚时烂根的方法及结构 | |
CN104594500B (zh) | 一体化梁板柱模板结构体系及施工方法 | |
CN106013455B (zh) | 一种预制组合钢筋笼构件制造装配方法、钢筋混凝土结构体建造方法 | |
CN107724680A (zh) | 一种高层建筑框架结构梁柱节点施工方法 | |
CN105275209A (zh) | 一种异形空间曲面清水混凝土施工方法 | |
CN106401207A (zh) | 用于既有建筑增设柱子基础的叠合连接结构及其施工方法 | |
CN106351445B (zh) | 一种劲性混凝土斜墙模板组合支撑加固系统及安装施工方法 | |
CN106320704A (zh) | 型钢混凝土结构模板套筒螺杆拉结施工方法 | |
CN105649213B (zh) | 一种密集布筋区大型钢结构预埋件的施工方法 | |
CN204571288U (zh) | 楼板预留洞模 | |
CN110130534A (zh) | 一种新型耗能预制剪力墙及其加工安装方法 | |
CN104831932A (zh) | 一种高标号混凝土柱脚的施工工艺 | |
CN102787684A (zh) | 钢丝网架免拆模体系及其制造方法 | |
CN103938649B (zh) | 一种超高层建筑空腔基础的施工方法 | |
CN102002953A (zh) | 一种基坑围护肋板换撑的方法 | |
CN101614039B (zh) | 现浇剪力墙结构体系模板工程逆序施工方法 | |
CN106285002A (zh) | 现浇楼面高低差工具式吊模施工方法 | |
CN207436503U (zh) | 高效预制楼板施工的吊模组件 | |
CN104153573A (zh) | V型圆柱混凝土的浇筑模具及施工方法 | |
CN205804745U (zh) | 一种预制混凝土剪力墙构件 | |
CN204081483U (zh) | 一种防止浇筑钢筋混凝土柱柱脚时烂根的结构 | |
CN104947853B (zh) | 一种内置支架式现浇钢筋混凝土柱子及施工方法 | |
CN104453235B (zh) | 换流站防火墙施工工艺 | |
CN207672389U (zh) | 路基混凝土路肩现浇模具 | |
CN207405882U (zh) | 一种钢筋定位架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Beijing road 563000 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee after: The Third Construction Co., Ltd. of China Construction Fourth Engineering Bureau Address before: Beijing road 563003 in Guizhou province Zunyi city Honghuagang District No. 57 Patentee before: THE THIRD CONSTRUCTION & ENGINEERING CO. OF CCFED |