CN105155565A - Device and construction method for preburying bolts through foundation overhanging - Google Patents

Device and construction method for preburying bolts through foundation overhanging Download PDF

Info

Publication number
CN105155565A
CN105155565A CN201510646509.8A CN201510646509A CN105155565A CN 105155565 A CN105155565 A CN 105155565A CN 201510646509 A CN201510646509 A CN 201510646509A CN 105155565 A CN105155565 A CN 105155565A
Authority
CN
China
Prior art keywords
bolt
plate
coaming plate
shank
hanging beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510646509.8A
Other languages
Chinese (zh)
Other versions
CN105155565B (en
Inventor
茅志辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Masteel Design & Research Institute Co ltd
Original Assignee
Anhui Masteel Engineering and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Masteel Engineering and Technology Group Co Ltd filed Critical Anhui Masteel Engineering and Technology Group Co Ltd
Priority to CN201510646509.8A priority Critical patent/CN105155565B/en
Publication of CN105155565A publication Critical patent/CN105155565A/en
Application granted granted Critical
Publication of CN105155565B publication Critical patent/CN105155565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a device and construction method for preburying bolts through foundation overhanging and belongs to the technical field of building foundation fixing. The device for preburying the bolts through foundation overhanging comprises hanging beams, bolt bars, nuts, primary enclosing plates and a position correction plate. The primary enclosing plates enclosed by flat plates in a circle are of a square-pond-shaped structure. The two hanging beams are in a parallel symmetrical state and horizontally arranged in the middle position of the upper surface of the primary enclosing plates. The position correction plate is of a square platy structure. The hanging beams and the position correction plate are provided with positioning holes connected with the bolt bars in a matched mode. The nuts comprise upper nuts and lower nuts. Threads are arranged at the upper end of each bolt bar. The bolt bars penetrate through the positioning holes of the hanging beams and position correction plate sequentially, and the position, between the hanging beams and the position correction plate, of the bolt bars are fixed through the upper nuts and the lower nuts. The upper nuts are fixed on the lower surface of the position correction plate, and the lower nuts are fixed on the upper surfaces of the hanging beams. According to the device and construction method for preburying the bolts through foundation overhanging, the aims of simple manufacturing process, convenient construction, small influence on relative working procedure, convenient inspection and adjustment, high construction precision and high efficiency are achieved.

Description

A kind of device of basis suspention pre-embedded bolt and construction method
Technical field
The invention belongs to building foundation technique for fixing field, is a kind of device and construction method of basis suspention pre-embedded bolt specifically.
Background technology
The installation of existing pre-embedded bolt is reinforced, it is online that pre-embedded bolt point is welded in reinforcement foundation by usual employing, or often adopt reinforcing bar, shaped steel to weld in foundation concrete to establish tripod bracing reinforcement, but to pre-embedded bolt, line setting difficulty is large one by one, welding capacity greatly and screw rod of easily burning, waste steel, and easily cause bolt off normal when concreting.
Current existing conventional steel-column foundation pre-embedded bolt construction method, usual way is:
1) first unified for many bolts being fixed on is held successfully on the location orifice plate in hole.
2) with welding such as reinforcing bar, steel scrap bar or angle steel, each bolt auxiliary steel member (reinforcing bar etc.) welding is interfixed, is welded into square stool.
3) the bolt square stool welded is hung in basis, on-the-spot centering in place, weld from bottom to support again and fix with foundation bottom reinforcement welding, top is fixed with side form spot welding again.
The steel-column foundation bolt embedment particular problem of being undertaken by this construction method has: construction centering adjusts difficulty, complexity again, inconvenient; Working procedure is many, and auxiliary consumable material used is many, makes complicated, the auxiliary material such as the support of required use and skeleton reinforcing steel bar waste not recycling, loss is many; Engineering time is long, consumable material is many, and cost is high, uneconomical.
China Patent Publication No.: CN102518145A, publication date: 2012.06.27 to patent document discloses a kind of equipment Foundations in column, the overall positioning reinforcing device of pre-embedded bolt in groups, it is characterized in that above foundation forms framework, set up pre-embedded bolt location ladder, ground is arranged the bracing frame of location ladder outside the left and right of foundation forms framework, this location ladder is primarily of left and right main beam, longeron I and vertical beam I form, left and right main beam is offered pre-embedded bolt hole in groups in column, setting-in guard ring in each pre-embedded bolt hole also installs pre-embedded bolt, each pre-embedded bolt upper end section and hypomere are set with packing ring and are screwed adjusting nut and locking nut, on the right lateral ground in a left side for foundation forms framework, bracing frame is installed respectively in the position of the corresponding each left and right vertical beam I be positioned on the ladder of location from front to back, this bracing frame is primarily of longeron II, left and right vertical beam II, left and right diagonal brace and left and right spud pile composition, by pre-embedded bolt integral hanging in groups in column between left-right template, location ladder and bracing frame can be pulled down and reuse.This invention employs crossbeam in batches, longeron and vertical beam and positions, and install complicated, the engineering time is longer.
Summary of the invention
1. the technical problem that will solve
Installation for pre-embedded bolt in prior art reinforce exist construction centering adjust again many, the auxiliary consumable material of difficulty, working procedure many, make the problem complicated, the engineering time is long, consumable material is many, the invention provides a kind of device and construction method of basis suspention pre-embedded bolt.It can realize that manufacture craft is simple, easy construction, concerned process steps impact less, check easy to adjust, that construction precision is high, efficiency is high object.
2. technical scheme
The present invention program carries out in the following manner:
A kind of device of basis suspention pre-embedded bolt, comprise hanging beam, shank of bolt, nut, one-level coaming plate and positioning correcting plate, wherein: one-level coaming plate is the square pond shape structure formed a circle with flat board, hanging beam has 2, for long strip-board shape, be flat on one-level coaming plate upper surface centre position in Parallel Symmetric state, positioning correcting plate is square platy structure, hanging beam and positioning correcting plate has the locating hole of the shank of bolt that is connected; Nut comprises upper cap nut and lower nut; The upper end of shank of bolt is provided with screw thread, pass the locating hole of hanging beam and positioning correcting plate successively, and the position between hanging beam and positioning correcting plate is fixed by upper cap nut and lower nut, upper cap nut is fixed on positioning correcting plate soffit, and lower nut is fixed on the upper surface of hanging beam.
Preferred version: shank of bolt is 6, the locating hole of corresponding hanging beam and positioning correcting plate is also 6.
Preferred version: the bottom of shank of bolt is fixedly connected with support, the base plate of support is fixedly connected with the bottom of shank of bolt, is also fixedly connected with the equally distributed reinforcing rib of taper between shank of bolt and base plate.
Preferred version: the bottom of one-level coaming plate is connected with the secondary coaming plate that area is greater than one-level coaming plate, and one-level coaming plate is positioned at the position of secondary coaming plate geometric center, and the bottom of the secondary coaming plate of one-level coaming plate is provided with steel grid.
Preferred version: the bottom of secondary coaming plate is connected with three grades of coaming plates that area is greater than secondary coaming plate, and secondary coaming plate is positioned at the position of three grades of coaming plate geometric centers.
Further scheme: positioning correcting plate is marked with the position line in length and breadth of " ten " font distribution.
A construction method for the device of basis suspention pre-embedded bolt, the steps include:
A, in foundation ditch, lay steel grid;
B, on steel grid, fix 1 ~ 3 layer of coaming plate, the superiors' coaming plate is one-level coaming plate;
C, be that Parallel Symmetric state is flat on one-level coaming plate upper surface centre position by 2 hanging beams;
D, by shank of bolt successively through the locating hole of hanging beam and positioning correcting plate;
E, position between hanging beam and positioning correcting plate are fixed by upper cap nut and lower nut, and upper cap nut is fixed on positioning correcting plate soffit, lower nut is fixed on the upper surface of hanging beam;
F, by rotating upper cap nut and lower nut adjusting bolt bar height;
G, by measuring the axis absolute altitude of shank of bolt and verticality, rotating lower nut adjustment hanging beam, rotating upper cap nut adjustment positioning correcting plate, final set bolt bar also controls verticality and the positioning precision of shank of bolt.
Further constructure scheme: in step G, the position line in length and breadth of " ten " font be marked with along positioning correcting plate distribution carries out the detection of the verticality of shank of bolt.
Further constructure scheme: in step B, at the corner location of coaming plate at different levels, is fixed with stiffener between the side plate of two coaming plates.
Further constructure scheme: in step D, the diameter of the locating hole of hanging beam and positioning correcting plate is greater than the diameter of shank of bolt.
3. beneficial effect
Adopt technical scheme provided by the invention, compared with existing known technology, there is following remarkable result:
(1) device of a kind of basis suspention pre-embedded bolt of the present invention, by simple combination and the collocation of hanging beam, nut and positioning correcting plate, namely after foundation ditch is installed and is fixedly completed, hanging beam is installed, plane positioning shank of bolt, to sling shank of bolt (absolute altitude adjustable) with lower nut, upper cap nut adjustment stationary positioned correcting plate, hanging beam Hanging bolt bar is after measurement and positioning, centering, preliminary fixing, fixed by positioning correcting plate secondary, repetition measurement, Dual-layer stationary positioned pre-embedded bolt bar, ensures the verticality of shank of bolt; Achieve that manufacture craft is simple, easy construction, concerned process steps impact less, check easy to adjust, that construction precision is high, efficiency is high object; And hanging beam, coaming plate, nut and positioning correcting plate can both reuse, easy to make, cost-saving;
(2) device of a kind of basis suspention pre-embedded bolt of the present invention, the locating hole of shank of bolt and corresponding hanging beam and positioning correcting plate is 6, is equipped with, 6 shank of bolt synergies, and construction precision is higher;
(3) device of a kind of basis suspention pre-embedded bolt of the present invention, the setting of support, improves the stability of shank of bolt in concrete; The setting of reinforcing rib, improves the stability that support is connected with shank of bolt;
(4) device of a kind of basis suspention pre-embedded bolt of the present invention, the setting of two-stage coaming plate, the concrete of making is that two-stage is step-like, is applicable to the concrete foundation that continuing surface is large;
(5) device of a kind of basis suspention pre-embedded bolt of the present invention, the setting of three grades of coaming plates, is applicable to the concrete foundation that continuing surface is little, improves the versatility of whole device;
(6) device of a kind of basis suspention pre-embedded bolt of the present invention, the setting of position line in length and breadth, when being convenient to measure, the location in survey mark and face, improves the accuracy measured;
(7) construction method of the device of a kind of basis suspention pre-embedded bolt of the present invention, step is easy, easy construction, and bolt suspention is embedded in after coaming plate has been constructed to be carried out, and once adjust in place, precision is high, and efficiency of construction is high;
(8) construction method of the device of a kind of basis suspention pre-embedded bolt of the present invention, the setting of stiffener, improves the stability that coaming plate side plate connects;
(9) construction method of the device of a kind of basis suspention pre-embedded bolt of the present invention, the diameter of the locating hole of hanging beam and positioning correcting plate is greater than the diameter of shank of bolt, facilitates interting of shank of bolt.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is top view of the present invention;
Fig. 3 is stereogram of the present invention.
In figure: 1, hanging beam; 2, upper cap nut; 3, lower nut; 4, positioning correcting plate; 5, shank of bolt; 6, support; 7, locating hole; 8, one-level coaming plate; 9, secondary coaming plate; 10, position line in length and breadth; 61, base plate; 62, reinforcing rib.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.
Embodiment 1
The device of the basis suspention pre-embedded bolt of the present embodiment, as shown in Figure 1, comprise hanging beam 1, shank of bolt 5, nut, one-level coaming plate 8 and positioning correcting plate 4, wherein: as shown in Figures 2 and 3, one-level coaming plate 8 is the square pond shape structure formed a circle with flat board, specification is 60mm*60mm, hanging beam 1 has 2, for splat, thickness is 35mm, width 120mm, length 1200mm, one-level coaming plate 8 upper surface centre position is flat in Parallel Symmetric state, positioning correcting plate 4 is square platy structure, specification is 50mm*40mm, hanging beam 1 and positioning correcting plate 4 have the locating hole 7 of the shank of bolt 5 that is connected, diameter is 5mm, nut comprises upper cap nut 2 and lower nut 3, the upper end of shank of bolt 5 is provided with screw thread, diameter is 3mm, pass the locating hole 7 of hanging beam 1 and positioning correcting plate 4 successively, and the position between hanging beam 1 and positioning correcting plate 4 is fixed by upper cap nut 2 and lower nut 3, upper cap nut 2 is fixed on positioning correcting plate 4 soffit, and lower nut 3 is fixed on the upper surface of hanging beam 1.
The construction method of the device of the basis suspention pre-embedded bolt of the present embodiment, the steps include:
A, in foundation ditch, lay steel grid;
B, on steel grid, fix 2 layers of coaming plate, the superiors' coaming plate is one-level coaming plate 8;
C, 2 hanging beams 1 are flat on one-level coaming plate 8 upper surface centre position in Parallel Symmetric state;
D, by shank of bolt 5 successively through the locating hole 7 of hanging beam 1 and positioning correcting plate 4;
E, position between hanging beam 1 and positioning correcting plate 4 are fixed by upper cap nut 2 and lower nut 3, and upper cap nut 2 is fixed on positioning correcting plate 4 soffit, lower nut 3 is fixed on the upper surface of hanging beam 1;
F, by rotate upper cap nut 2 and lower nut 3 adjusting bolt bar 5 height;
G, by measuring the axis absolute altitude of shank of bolt 5 and verticality, rotating lower nut 3 and adjusting hanging beam 1, rotating upper cap nut 2 and adjust positioning correcting plate 4, final set bolt bar 5 also controls verticality and the positioning precision of shank of bolt 5.
The device of the basis suspention pre-embedded bolt of the present embodiment and construction method, by simple combination and the collocation of hanging beam 1, nut and positioning correcting plate 4, namely after foundation ditch is installed and is fixedly completed, hanging beam 1 is installed, plane positioning shank of bolt 5, to sling shank of bolt 5 (absolute altitude adjustable) with lower nut 3, upper cap nut 2 adjusts stationary positioned correcting plate 4, hanging beam 1 Hanging bolt bar 5, after measurement and positioning, centering, tentatively fixing, by positioning correcting plate 4 two fixing, repetition measurements, Dual-layer stationary positioned pre-embedded bolt bar 5, ensures the verticality of shank of bolt 5; Achieve that manufacture craft is simple, easy construction, concerned process steps impact less, check easy to adjust, that construction precision is high, efficiency is high object; And hanging beam 1, coaming plate, nut and positioning correcting plate 4 can both reuse, easy to make, cost-saving.
Embodiment 2
The device of the basis suspention pre-embedded bolt of the present embodiment, basic structure is with embodiment 1, and improvements are: shank of bolt 5 is 6, the locating hole 7 of corresponding hanging beam 1 and positioning correcting plate 4 is also 6, be equipped with, 6 shanks of bolt 5 act synergistically, and construction precision is higher; The bottom of shank of bolt 5 is fixedly connected with support 6, the base plate 61 of support 6 is fixedly connected with the bottom of shank of bolt 5, improve the stability of shank of bolt 5 in concrete, also be fixedly connected with the equally distributed reinforcing rib 62 of taper between shank of bolt 5 and base plate 61, raising support 6 and shank of bolt connect 5 stability connect; The bottom of one-level coaming plate 8 is connected with the secondary coaming plate 9 that area is greater than one-level coaming plate 8, and one-level coaming plate 8 is positioned at the position of secondary coaming plate 9 geometric center, and the bottom of the secondary coaming plate 9 of one-level coaming plate 8 is provided with steel grid; The bottom of secondary coaming plate 9 is connected with three grades of coaming plates that area is greater than secondary coaming plate 9, and secondary coaming plate 9 is positioned at the position of three grades of coaming plate geometric centers, for the concrete foundation that continuing surface is little, improves the versatility of whole device; Positioning correcting plate 4 is marked with the position line in length and breadth 10 of " ten " font distribution, and when being convenient to measure, the location in survey mark and face, improves the accuracy measured; The diameter of the locating hole 7 of hanging beam 1 and positioning correcting plate 4 is greater than the diameter of shank of bolt 5, facilitates shank of bolt 5 interting in locating hole 7.
The construction method of device of the basis suspention pre-embedded bolt of the present embodiment, basic step is with embodiment 1, and difference is: in step G, and the position line in length and breadth 10 of " ten " font distribution be marked with along positioning correcting plate 4 carries out the detection of the verticality of shank of bolt 5.
Embodiment 3
The construction method of the device of a kind of basis suspention pre-embedded bolt of the present embodiment, its basic step is with embodiment 2, and difference is: in step B, at the corner location of coaming plate at different levels, be fixed with stiffener between the side plate of two coaming plates, improve the stability that coaming plate side plate connects.
Below be schematically described the invention and embodiment thereof, this description is not restricted.So, if those of ordinary skill in the art enlightens by it, when not departing from this creation aim, designing the frame mode similar to this technical scheme and embodiment without creationary, the protection domain of this patent all should be belonged to.

Claims (10)

1. a device for basis suspention pre-embedded bolt, comprises hanging beam (1), shank of bolt (5), nut and one-level coaming plate (8), it is characterized in that: also comprise positioning correcting plate (4), wherein:
Described one-level coaming plate (8) is the square pond shape structure formed a circle with flat board, described hanging beam (1) has 2, for long strip-board shape, one-level coaming plate (8) upper surface centre position is flat in Parallel Symmetric state, described positioning correcting plate (4) is square platy structure, hanging beam (1) and positioning correcting plate (4) has the locating hole (7) of the shank of bolt that is connected (5);
Described nut comprises upper cap nut (2) and lower nut (3);
The upper end of described shank of bolt (5) is provided with screw thread, pass the locating hole (7) of hanging beam (1) and positioning correcting plate (4) successively, and the position between hanging beam (1) and positioning correcting plate (4) is fixed by upper cap nut (2) and lower nut (3), upper cap nut (2) is fixed on positioning correcting plate (4) soffit, and lower nut (3) is fixed on the upper surface of hanging beam (1).
2. the device of a kind of basis suspention pre-embedded bolt according to claim 1, it is characterized in that: described shank of bolt (5) is 6, the locating hole (7) of corresponding hanging beam (1) and positioning correcting plate (4) is also 6.
3. the device of a kind of basis suspention pre-embedded bolt according to claim 1, it is characterized in that: the bottom of described shank of bolt (5) is fixedly connected with support (6), the base plate (61) of support (6) is fixedly connected with the bottom of shank of bolt (5), is also fixedly connected with the equally distributed reinforcing rib of taper (62) between shank of bolt (5) and base plate (61).
4. the device of a kind of basis suspention pre-embedded bolt according to claim 1 or 2 or 3, it is characterized in that: the bottom of described one-level coaming plate (8) is connected with the secondary coaming plate (9) that area is greater than one-level coaming plate (8), one-level coaming plate (8) is positioned at the position of secondary coaming plate (9) geometric center, and the bottom of the secondary coaming plate (9) of one-level coaming plate (8) is provided with steel grid.
5. the device of a kind of basis suspention pre-embedded bolt according to claim 4, it is characterized in that: the bottom of described secondary coaming plate (9) is connected with three grades of coaming plates that area is greater than secondary coaming plate (9), and secondary coaming plate (9) is positioned at the position of three grades of coaming plate geometric centers.
6. the device of a kind of basis suspention pre-embedded bolt according to claim 4, is characterized in that: described positioning correcting plate (4) is marked with the position line in length and breadth (10) of " ten " font distribution.
7. a construction method for the device of suspention pre-embedded bolt in basis according to claim 1, the steps include:
A, in foundation ditch, lay steel grid;
B, on steel grid, fix 1 ~ 3 layer of coaming plate, the superiors' coaming plate is one-level coaming plate (8);
C, 2 hanging beams (1) are flat on one-level coaming plate (8) upper surface centre position in Parallel Symmetric state;
D, by shank of bolt (5) successively through the locating hole (7) of hanging beam (1) and positioning correcting plate (4);
E, position between hanging beam (1) and positioning correcting plate (4) by upper cap nut (2) and lower nut (3) fixing, upper cap nut (2) is fixed on positioning correcting plate (4) soffit, and lower nut (3) is fixed on the upper surface of hanging beam (1);
F, by rotate upper cap nut (2) and lower nut (3) adjusting bolt bar (5) highly;
G, the axis absolute altitude passing through measurement shank of bolt (5) and verticality, rotate lower nut (3) adjustment hanging beam (1), rotate upper cap nut (2) adjustment positioning correcting plate (4), final set bolt bar (5) also controls verticality and the positioning precision of shank of bolt (5).
8. the construction method of the device of a kind of basis suspention pre-embedded bolt according to claim 7, it is characterized in that: in step G, the position line in length and breadth (10) of " ten " font distribution be marked with along positioning correcting plate (4) carries out the detection of the verticality of shank of bolt (5).
9. the construction method of the device of a kind of basis suspention pre-embedded bolt according to claim 8, is characterized in that: in step B, at the corner location of coaming plate at different levels, is fixed with stiffener between the side plate of two coaming plates.
10. the construction method of the device of a kind of basis suspention pre-embedded bolt according to claim 8, it is characterized in that: in step D, the diameter of the locating hole (7) of hanging beam (1) and positioning correcting plate (4) is greater than the diameter of shank of bolt (5).
CN201510646509.8A 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt Active CN105155565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510646509.8A CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510646509.8A CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Publications (2)

Publication Number Publication Date
CN105155565A true CN105155565A (en) 2015-12-16
CN105155565B CN105155565B (en) 2017-10-17

Family

ID=54796583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510646509.8A Active CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Country Status (1)

Country Link
CN (1) CN105155565B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106006361A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Pre-buried bolt assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012107423A (en) * 2010-11-17 2012-06-07 Toshiba Corp Method for adjusting level of foundation base, and method for fixing foundation base
CN103174166A (en) * 2013-03-27 2013-06-26 中国京冶工程技术有限公司 Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN204225145U (en) * 2014-10-20 2015-03-25 中国建筑第六工程局有限公司 A kind of simple and easy orientation tool for basic embedding anchor bolts
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing
CN205024709U (en) * 2015-09-30 2016-02-10 安徽马钢工程技术集团有限公司 Buried bolt's device is in advance suspended in midair on basis

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012107423A (en) * 2010-11-17 2012-06-07 Toshiba Corp Method for adjusting level of foundation base, and method for fixing foundation base
CN103174166A (en) * 2013-03-27 2013-06-26 中国京冶工程技术有限公司 Recreation facility embedded part integrally arranged in complete-set mode and installation method thereof
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts
CN204225145U (en) * 2014-10-20 2015-03-25 中国建筑第六工程局有限公司 A kind of simple and easy orientation tool for basic embedding anchor bolts
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing
CN205024709U (en) * 2015-09-30 2016-02-10 安徽马钢工程技术集团有限公司 Buried bolt's device is in advance suspended in midair on basis

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106006361A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Pre-buried bolt assembly

Also Published As

Publication number Publication date
CN105155565B (en) 2017-10-17

Similar Documents

Publication Publication Date Title
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN101691815B (en) Fast hoisting-aligning method for Large-sized steel frames, and steel frame base structure
CN203270600U (en) Fixed support for installing embedded bolts of high-precision equipment
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN103352476B (en) Large-scale bolt high-precision pre-burying construction method
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN205024709U (en) Buried bolt's device is in advance suspended in midair on basis
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN202611258U (en) Large-diameter foundation bolt assembly bracket
CN204552141U (en) A kind of braced structures for beam stanchion construction of replacing
CN215802680U (en) Steel reinforced column mounting structure
CN105155565A (en) Device and construction method for preburying bolts through foundation overhanging
CN103603503A (en) Anchor bolt installing method
CN205822792U (en) A kind of regulation support for masonry direct-burried
CN202430737U (en) Overall positioning and reinforcing device for equipment foundation row and group embedded bolt
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN207047889U (en) A kind of device for installing forging machine main frame embedded part
CN206189607U (en) Rag bolt location structure
CN204608824U (en) A kind of steam turbine foundation built-in bolt sleeve group fixed frame
CN215290247U (en) Easily build reinforced structure of formula tower crane foundation
CN108843115A (en) The construction method that Fast Installation tower crane stabilizer blade accurately levels
CN202114437U (en) Positioning device for foundation bolts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240122

Address after: 243000 No. 1889 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee after: MASTEEL DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Country or region after: China

Address before: 243000 No. 1889 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee before: ANHUI MASTEEL ENGINEERING & TECHNOLOGY GROUP Co.,Ltd.

Country or region before: China