CN206189607U - Rag bolt location structure - Google Patents

Rag bolt location structure Download PDF

Info

Publication number
CN206189607U
CN206189607U CN201621096184.7U CN201621096184U CN206189607U CN 206189607 U CN206189607 U CN 206189607U CN 201621096184 U CN201621096184 U CN 201621096184U CN 206189607 U CN206189607 U CN 206189607U
Authority
CN
China
Prior art keywords
foundation bolt
locating template
mould
rag bolt
isolated footing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621096184.7U
Other languages
Chinese (zh)
Inventor
姜凯宁
郭红喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jingtong New Building Materials Co ltd
Original Assignee
Hebei Crystal Building Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Crystal Building Polytron Technologies Inc filed Critical Hebei Crystal Building Polytron Technologies Inc
Priority to CN201621096184.7U priority Critical patent/CN206189607U/en
Application granted granted Critical
Publication of CN206189607U publication Critical patent/CN206189607U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a rag bolt location structure belongs to the pre -buried technical field of rag bolt. The utility model discloses a rag bolt positioning die, isolated footing mould and assembling reinforcement, rag bolt positioning die places above the mould of isolated footing, rag bolt places in the mould of isolated footing, rag bolt positioning die includes parallel arrangement's last locating template and lower locating template, go up the locating template and be equipped with the brace rod down between the locating template, it is provided with the locating hole that is used for confirming the rag bolt position with lower locating template correspondence to go up the locating template, rag bolt upwards passes rag bolt positioning die's locating hole, the assembling reinforcement is arranged in the mould of isolated footing, the isolated footing mould is assembled, rag bolt and ligature reinforcement are in the same place. The utility model discloses can avoid rag bolt's position the deviation to appear to the rag bolt accurate positioning, improve construction quality, reduce the potential safety hazard.

Description

Foundation bolt location structure
Technical field
The utility model belongs to embedding anchor bolts technical field, more particularly to a kind of foundation bolt location structure.
Background technology
In steel-structure factory building work progress, foundation bolt is the heavy connection of connection basis and superstructure, thus The position control of foundation bolt is the key in foundation construction, if foundation bolt burial place deviation is excessive, foundation bolt hangs down There is deviation in straight degree, will have influence on the position accuracy of the steel construction for connecting above, influences integrally-built stability, and influence To the quality of postorder construction.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of foundation bolt location structure, can be to foundation bolt It is accurately positioned, it is to avoid deviation occurs in the position of foundation bolt, improves construction quality, reduces potential safety hazard.
In order to solve the above technical problems, technical solution adopted in the utility model is:A kind of foundation bolt location structure, Including foundation bolt jig, isolated footing mould and assembling reinforcement, foundation bolt jig is positioned over isolated footing mould Above tool, foundation bolt is placed in the mould of isolated footing, and foundation bolt jig includes the upper positioning mould be arrangeding in parallel Plate and lower locating template, are provided with brace rod, upper locating template and lower locating template pair between upper locating template and lower locating template The location hole for determining foundation bolt position should be provided with, foundation bolt is upward through the positioning of foundation bolt jig Hole, assembling reinforcement is placed in the mould of isolated footing, and isolated footing mould is assembly type, and foundation bolt is with assembling reinforcement colligation one Rise.
Further, the spacing between the upper locating template of the foundation bolt jig and lower locating template is adjustable, Adjustable structure is, described brace rod is screw rod, and screw rod is provided with adjusting nut, the lower end of described screw rod and lower locating template To be threadedly coupled or welding, described upper locating template is provided with the through hole that screw rod is passed through, and described upper locating template is supported on On described adjusting nut.
Further, described assembling reinforcement is the steel reinforcement cage of colligation.
Further, the inner chamber of described isolated footing mould is identical with the contour structures on basis, isolated footing mould Each face is made of steel plate, is connected as a single entity using bolt with angle steel or steel bar between each steel plate.
Further, the upper locating template of described foundation bolt jig and lower locating template are steel plate and are made.
It is using the beneficial effect produced by above-mentioned technical proposal:Lower margin spiral shell with two-layer template in the utility model Anchoring position mould can be accurately positioned the position of foundation bolt;Foundation bolt can be avoided together with assembling reinforcement colligation During cast concrete, the position that foundation bolt is glanced off and caused is inaccurate, it is possible to increase construction quality, reduces safety hidden Suffer from.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structure chart of the utility model foundation bolt jig embodiment one;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structure chart of the utility model foundation bolt jig embodiment two;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the structure chart of the utility model isolated footing mould;
In figure:1st, foundation bolt jig;2nd, isolated footing mould;3rd, assembling reinforcement;4th, foundation bolt;5th, upper positioning Template;6th, brace rod;7th, lower locating template;8th, location hole;9th, screw rod;10th, adjusting nut;11st, side plate.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
The utility model provides a kind of foundation bolt location structure, as shown in figure 1, including foundation bolt jig 1, only Vertical basis mould 2 and assembling reinforcement 3, foundation bolt jig 1 are positioned over above isolated footing mould 2, and foundation bolt 4 is put Put in isolated footing mould 2.Foundation bolt jig 1 as shown in Figure 2 and Figure 3, including the upper locating template 5 be arrangeding in parallel With lower locating template 7, brace rod 6, upper locating template 5 and lower locating template are provided between upper locating template 5 and lower locating template 7 7 are correspondingly arranged on the location hole 8 for determining foundation bolt position, and foundation bolt 4 is upward through foundation bolt jig 1 Location hole 8, assembling reinforcement 3 is placed in isolated footing mould 2, and isolated footing mould 2 is assembly type, foundation bolt and assembling reinforcement 3 colligations are together.The utility model determines the position of foundation bolt with foundation bolt jig 1 first, due to foundation bolt It is a straight roller, is about 1 meter, exposes the length about 30cm on basis, it is typically all very long, according to 2 points of principles for determining a line, Its position is positioned using one layer of template, equivalent to foundation bolt only one point and template contacts, thus can not be accurately true Determine the position of foundation bolt, the utility model can accurately be determined using the foundation bolt jig 1 with two-layer formwork structure The position of position foundation bolt.Further, since foundation bolt is very long and exposed parts are also long, and in cast, it is necessary to ground Foot bolt jig 1 is taken away, and foundation bolt is only simple pre-buried once with regard to cast concrete or the side using both sides supporting and retaining system The cast of concrete is carried out after formula, then the concrete punching that foundation bolt is easy to be poured into is inclined, therefore, the position meeting of foundation bolt Deviate predetermined position, positioning still can be caused inaccurate, therefore further safeguard is, with assembling reinforcement 3 with it is fixed The good foundation bolt in position is fixed together, and the periphery of youngster's assembling reinforcement 3 is the enclosing of isolated footing mould 2, therefore in cast coagulation When native, also will not be inclined by foundation bolt punching, it is ensured that foundation bolt position it is accurate.
As shown in Figure 4, Figure 5, as a kind of embodiment, the upper locating template 5 of the foundation bolt jig 1 and lower fixed Spacing between the template 7 of position is adjustable, and adjustable structure is that described brace rod 6 is screw rod 9, and screw rod 9 is provided with adjusting nut 10, With lower locating template 7 to be threadedly coupled or welding, described upper locating template 5 is provided with screw rod 9 and wears for the lower end of described screw rod 9 The through hole crossed, described upper locating template 5 is supported on described adjusting nut 10.
In order to improve the stability on basis, and the preferably guarantee of playing a part of to foundation bolt, described colligation steel Muscle 3 is the steel reinforcement cage of colligation.
As shown in fig. 6, the inner chamber of described isolated footing mould 2 is identical with the contour structures on basis, isolated footing mould 2 Each face be made of steel plate, be connected as a single entity using bolt with angle steel or steel bar between each steel plate, for example, figure can be removed Side plate 11 shown in 6, is easy to the foundation bolt in it together with reinforcing bar colligation, after the concrete has set, also can be quick Easily dismantle.
Because foundation bolt jig 1 needs to reuse, repeatedly utilize, and construction site is often to change, and by Topography and geomorphology in construction site is more complicated, to improve the mold use life-span, foundation bolt positioning described in the utility model The upper locating template 5 of mould 1 and lower locating template 7 are steel plate and are made.
The utility model when in use, is first placed in isolated footing mould on the ground cleared up, and assembling reinforcement is put into solely In vertical basis mould, foundation bolt is put into the mould of isolated footing, adjusts the position of foundation bolt, wears the upper end of foundation bolt The location hole crossed on foundation bolt jig, then removes one block of side plate therein on the mould of isolated footing, foundation bolt With reinforcing bar colligation or weld together, remove foundation bolt jig, carry out concrete cast, after after concrete setting, tear open Except isolated footing mould, just imbedded in isolated footing by pinpoint foundation bolt.
The technical scheme that the utility model is provided is described in detail above, for those skilled in the art For, on the premise of the utility model principle is not departed from, can also some improvement be carried out to the utility model, these improvement also fall Enter in the utility model scope of the claims.

Claims (5)

1. a kind of foundation bolt location structure, it is characterised in that including foundation bolt jig(1), isolated footing mould(2) And assembling reinforcement(3), foundation bolt jig(1)It is positioned over isolated footing mould(2)Above, foundation bolt is placed on solely Vertical basis mould(2)It is interior, foundation bolt jig(1)Including the upper locating template be arrangeding in parallel(5)With lower locating template (7), upper locating template(5)With lower locating template(7)Between be provided with brace rod(6), upper locating template(5)With lower locating template (7)It is correspondingly arranged on the location hole for determining foundation bolt position(8), foundation bolt is upward through foundation bolt jig (1)Location hole(8), assembling reinforcement(3)It is placed in isolated footing mould(2)It is interior, isolated footing mould(2)It is assembly type, lower margin Bolt and assembling reinforcement(3)Colligation is together.
2. foundation bolt location structure according to claim 1, it is characterised in that the foundation bolt jig(1) Upper locating template(5)With lower locating template(7)Between spacing it is adjustable, adjustable structure is, described brace rod(6)It is screw rod (9), screw rod(9)It is provided with adjusting nut(10), described screw rod(9)Lower end and lower locating template(7)For threaded connection or Welding, described upper locating template(5)It is provided with screw rod(9)The through hole for passing through, described upper locating template(5)It is supported on described Adjusting nut(10)On.
3. foundation bolt location structure according to claim 1, it is characterised in that described assembling reinforcement(3)It is colligation Steel reinforcement cage.
4. foundation bolt location structure according to claim 1, it is characterised in that described isolated footing mould(2)'s Inner chamber is identical with the contour structures on basis, isolated footing mould(2)Each face be made of steel plate, use angle between each steel plate Steel or steel bar are connected as a single entity using bolt.
5. the foundation bolt location structure according to any claim in claim 1-4, it is characterised in that described ground Foot bolt jig(1)Upper locating template(5)With lower locating template(7)Steel plate is to be made.
CN201621096184.7U 2016-09-30 2016-09-30 Rag bolt location structure Active CN206189607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621096184.7U CN206189607U (en) 2016-09-30 2016-09-30 Rag bolt location structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621096184.7U CN206189607U (en) 2016-09-30 2016-09-30 Rag bolt location structure

Publications (1)

Publication Number Publication Date
CN206189607U true CN206189607U (en) 2017-05-24

Family

ID=58731302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621096184.7U Active CN206189607U (en) 2016-09-30 2016-09-30 Rag bolt location structure

Country Status (1)

Country Link
CN (1) CN206189607U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173297A (en) * 2019-12-31 2020-05-19 中冶交通建设集团有限公司 Reinforcing steel bar mounting and positioning device and construction method thereof
CN111364684A (en) * 2020-03-06 2020-07-03 中冶交通建设集团有限公司 Steel bar positioning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173297A (en) * 2019-12-31 2020-05-19 中冶交通建设集团有限公司 Reinforcing steel bar mounting and positioning device and construction method thereof
CN111364684A (en) * 2020-03-06 2020-07-03 中冶交通建设集团有限公司 Steel bar positioning device

Similar Documents

Publication Publication Date Title
CN103938796B (en) Cast-in-situ reinforced concrete column construction
CN204781624U (en) Floor elevation and roughness controlling means
CN112049146A (en) Steel structure foundation embedded part and technological process thereof
CN1978838A (en) Construction method for combined V-shape steel pipe concrete pile
CN207144503U (en) A kind of thickness of concrete floor control device
CN105839985A (en) Hydropower station rectangular high tower hydraulic climb slip form system and construction method
CN106368183A (en) Pouring forming construction method for side water stopping embedded part of lower horizontal type steel gate
CN106150055A (en) Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting
CN206189607U (en) Rag bolt location structure
CN105317052A (en) Tower crane foundation bolt fixing method
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN107841954A (en) A kind of linear adjuster of track girder ball pivot and method
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN205907609U (en) Supplementary utensil in pre -buried hole of bridge supporting base stone location
CN109025275A (en) A kind of shear wall side regularization stair punching block and installation method
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN207144456U (en) Builder's jack I-steel built-in fitting
CN207314523U (en) A kind of Novel steel-mixed bean column node constructing structure
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN206233573U (en) A kind of beam die plate reinforcing device
CN205654082U (en) Half tunnel formwork
CN108098978A (en) A kind of assembled underground pipe gallery epimere producing device and production method
CN212249280U (en) Embedded part supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231028

Address after: Room 201, No. 11 Chuangye Street, Weixian Economic Development Zone, Handan City, Hebei Province, 056800

Patentee after: Hebei Jingtong new building materials Co.,Ltd.

Address before: 056800 11 Chuang Chuang street, Weixian Economic Development Zone, Handan, Hebei

Patentee before: HEBEI JINGTONG BUILDING TECHNOLOGY Corp.