CN106150055A - Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting - Google Patents

Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting Download PDF

Info

Publication number
CN106150055A
CN106150055A CN201610708483.XA CN201610708483A CN106150055A CN 106150055 A CN106150055 A CN 106150055A CN 201610708483 A CN201610708483 A CN 201610708483A CN 106150055 A CN106150055 A CN 106150055A
Authority
CN
China
Prior art keywords
steel pipe
support
hanger bolt
fitting
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610708483.XA
Other languages
Chinese (zh)
Other versions
CN106150055B (en
Inventor
穆瑞刚
刘会铁
王志
魏彤
沈华勇
邢光杰
王斌
马亮
冉隆林
路树峰
白月海
崔凯
侯文洪
钱伟龙
王家欢
胡月增
戴罡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin No2 Construction Engineering Co Ltd
Original Assignee
Tianjin No2 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin No2 Construction Engineering Co Ltd filed Critical Tianjin No2 Construction Engineering Co Ltd
Priority to CN201610708483.XA priority Critical patent/CN106150055B/en
Publication of CN106150055A publication Critical patent/CN106150055A/en
Application granted granted Critical
Publication of CN106150055B publication Critical patent/CN106150055B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/40Separate connecting elements
    • E04B1/41Connecting devices specially adapted for embedding in concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Abstract

The present invention relates to architectural furniture technical field, particularly relate to a kind of concrete embedded part essence flat hanging installment work stand, including support, locking regulating part, horizontal steel pipe, longitudinal steel pipe, hanger bolt, the two ends of described horizontal steel pipe are separately fixed on described support, the two ends up and down of described hanger bolt are respectively provided with screw thread, described longitudinal steel pipe is connected with described hanger bolt by described locking regulating part, and described longitudinal steel tube lapping is on the top of described horizontal steel pipe.The invention have the advantages that and the 1st, protect positive built-in fitting absolute altitude error within 1mm, flatness zero deflection;2nd, ensure that built-in fitting, in work progress, is not subjected to displacement because concrete cast, template or reinforcing bar vibrate;3rd, the hard frame of steel of shaping consolidates, indeformable, can set up precision instrument.

Description

Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting
Technical field
The present invention relates to architectural furniture technical field, particularly relate to a kind of concrete embedded part essence flat hanging erector Make the installation method of stand and built-in fitting.
Background technology
At present, when concreting built-in fitting, traditional form of construction work cannot ensure the flatness of built-in fitting, in construction During, usually owing to the vibration of concrete cast, template or reinforcing bar is subjected to displacement, cause built-in fitting error bigger, it is impossible to after Continuous installation.
Content of the invention
It is an object of the invention to overcome the deficiency of above-mentioned technology, and provide the flat hanging of a kind of concrete embedded part essence to install Working gantry, protects positive built-in fitting absolute altitude error within 1mm, flatness zero deflection.
The present invention for achieving the above object, by the following technical solutions:
A kind of concrete embedded part essence flat hanging installment work stand, it is characterised in that: include support, locking regulating part, laterally Steel pipe, longitudinal steel pipe, hanger bolt, the two ends of described horizontal steel pipe are separately fixed on described support, described hanger bolt Upper and lower two ends are respectively provided with screw thread, and described longitudinal steel pipe is connected with described hanger bolt by described locking regulating part, described vertical To steel tube lapping on the top of described horizontal steel pipe.
Preferably, described locking regulating part is made up of top nut and lower nut, the longitudinal steel pipe of upper and lower nut clamping, hanging The upper end of bolt is connected with described upper and lower nut thread respectively.
Preferably, described support is provided with wood scaffold board.
A kind of installation method of built-in fitting, it is characterised in that: comprise the following steps:
Steel plate is processed into required specification shape by step one, steel plate cutting processing;
Step 2, boring, process circular hole on described steel plate;
Step 3, welding dowel, at the bottom welding dowel of described steel plate;
Step 4, welded nut, at the position welded nut of described circular hole;
The lower end of bolt is fixed by step 5, fixing hanger bolt with the nut thread in step 4;
Step 6, set up support, support is ridden upon the both sides of walling body to be poured;
Step 7, steel plate handling are in place, by steel plate handling above support etc. to be installed;
Step 8, installation upper lateral, vertical steel pipe, by horizontal stroke, vertical penstock installation on support;
The top of hanger bolt is arranged on longitudinal lever by step 9, locking hanger bolt by locking regulating part;
Step 10, comparison absolute altitude, fine setting hanger bolt transfers steel plate to designed elevation;
Step 11, casting concrete;
Embedded part absolute altitude is again calibrated before step 12, initial set;
Step 13, maintenance are to form removal.
Preferably, before step 7, also include the step setting up interim reinforcing bar shoulder pole.
Preferably, before step 10, also include the step removing interim reinforcing bar shoulder pole.
Preferably, in described step 2, the quantity of circular hole is four, and the circle center line connecting of four circular holes is square, square Central point is positioned at the center of steel plate.
The invention has the beneficial effects as follows: relative to prior art, the present invention is applicable to have high to built-in fitting embedding precision The concrete wall requiring gets on the right track installation.Have the advantage that and the 1st, protect positive built-in fitting absolute altitude error within 1mm, smooth Degree zero deflection;2nd, ensure that built-in fitting, in work progress, is not subjected to displacement because concrete cast, template or reinforcing bar vibrate;3、 The sizing hard frame of steel consolidates, indeformable, can set up precision instrument.
Brief description
Fig. 1 is the structural representation in the present invention;
Fig. 2 is partial enlarged drawing in the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings and preferred embodiment describe in detail the present invention detailed description of the invention.As depicted in figs. 1 and 2, A kind of concrete embedded part essence flat hanging installment work stand, including the 1st, support lock regulating part, horizontal steel pipe the 3rd, longitudinal direction steel pipe 4th, hanger bolt 5, the two ends of described horizontal steel pipe are separately fixed on described support, and the two ends up and down of described hanger bolt are respectively Being threaded, described longitudinal steel pipe is connected with described hanger bolt by described locking regulating part, and described longitudinal steel tube lapping exists The top of described horizontal steel pipe.
In the present invention, described locking regulating part is made up of top nut 6 and lower nut 7, the longitudinal steel of upper and lower nut clamping Pipe, the upper end of hanger bolt is connected with described upper and lower nut thread respectively.
For the ease of operative, described support is provided with wood scaffold board 8.
Present invention also offers the installation method of a kind of built-in fitting, comprise the following steps: step one, steel plate 9 blanking processing, Steel plate is processed into required specification shape;Step 2, boring, process circular hole 10 on described steel plate;Step 3, weld anchor Muscle 11, at the bottom welding dowel of described steel plate;Step 4, welded nut 12, at the position welded nut of described circular hole;Step 5th, fix hanger bolt, the lower end of bolt is fixed with the nut thread in step 4;Step 6, set up support, support is taken It is located at the both sides of walling body to be poured;Step 7, steel plate handling are in place, by steel plate handling above support etc. to be installed;Step The 8th, upper lateral, vertical steel pipe are installed, by horizontal stroke, vertical penstock installation on support;Step 9, locking hanger bolt, by hanger bolt Top is arranged on longitudinal lever by locking regulating part;Step 10, comparison absolute altitude, fine setting hanger bolt transfers steel plate to design Absolute altitude;Step 11, casting concrete 13;Embedded part absolute altitude is again calibrated before step 12, initial set;Step 13, maintenance are to tearing open Mould.
The step setting up interim reinforcing bar shoulder pole was also included before step 7.Also included removing temporary steel before step 10 The step of muscle shoulder pole.First can carry out a preliminary support by arranging reinforcing bar shoulder pole to steel plate, when horizontal, vertical steel pipe has been set up Cheng Houzai removes.
In order to make steel plate keep balance, in described step 2, the quantity of circular hole is four, and the center of circle of four circular holes is even Line is square, and square central point is positioned at the center of steel plate.The levelness of steel plate can be entered by regulating four hanger bolts Row regulation.
The present invention is applicable to have built-in fitting embedding precision the concrete wall of high requirement to get on the right track installation.Have with Lower advantage: the 1st, protect positive built-in fitting absolute altitude error within 1mm, flatness zero deflection;2nd, ensure that built-in fitting in work progress, Not because concrete cast, template or reinforcing bar vibration are subjected to displacement;3rd, the hard frame of steel of shaping consolidates, indeformable, can set up precision instrument.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

1. a concrete embedded part essence flat hanging installment work stand, it is characterised in that: include support, locking regulating part, horizontal stroke To steel pipe, longitudinal steel pipe, hanger bolt, the two ends of described horizontal steel pipe are separately fixed on described support, described hanger bolt Two ends up and down be respectively provided with screw thread, described longitudinal steel pipe by described locking regulating part be connected with described hanger bolt, described Longitudinal steel tube lapping is on the top of described horizontal steel pipe.
2. concrete embedded part according to claim 1 essence flat hanging installment work stand, it is characterised in that: described locking Regulating part is made up of top nut and lower nut, the longitudinal steel pipe of upper and lower nut clamping, the upper end of hanger bolt respectively with described upper, Lower nut is threaded.
3. concrete embedded part according to claim 1 essence flat hanging installment work stand, it is characterised in that: described support It is provided with wood scaffold board.
4. the installation method of a built-in fitting, it is characterised in that: comprise the following steps:
Steel plate is processed into required specification shape by step one, steel plate cutting processing;
Step 2, boring, process circular hole on described steel plate;
Step 3, welding dowel, at the bottom welding dowel of described steel plate;
Step 4, welded nut, at the position welded nut of described circular hole;
The lower end of bolt is fixed by step 5, fixing hanger bolt with the nut thread in step 4;
Step 6, set up support, support is ridden upon the both sides of walling body to be poured;
Step 7, steel plate handling are in place, by steel plate handling above support etc. to be installed;
Step 8, installation upper lateral, vertical steel pipe, by horizontal stroke, vertical penstock installation on support;
The top of hanger bolt is arranged on longitudinal lever by step 9, locking hanger bolt by locking regulating part;
Step 10, comparison absolute altitude, fine setting hanger bolt transfers steel plate to designed elevation;
Step 11, casting concrete;
Embedded part absolute altitude is again calibrated before step 12, initial set;
Step 13, maintenance are to form removal.
5. the installation method of built-in fitting according to claim 4, it is characterised in that: also included setting up facing before step 7 When reinforcing bar shoulder pole step.
6. the installation method of built-in fitting according to claim 4, it is characterised in that: before step 10, also include that dismounting is faced When reinforcing bar shoulder pole step.
7. the installation method of built-in fitting according to claim 4, it is characterised in that: in described step 2, the quantity of circular hole Being four, the circle center line connecting of four circular holes is square, and square central point is positioned at the center of steel plate.
CN201610708483.XA 2016-08-23 2016-08-23 The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting Active CN106150055B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610708483.XA CN106150055B (en) 2016-08-23 2016-08-23 The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610708483.XA CN106150055B (en) 2016-08-23 2016-08-23 The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting

Publications (2)

Publication Number Publication Date
CN106150055A true CN106150055A (en) 2016-11-23
CN106150055B CN106150055B (en) 2019-02-05

Family

ID=57342478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610708483.XA Active CN106150055B (en) 2016-08-23 2016-08-23 The installation method of the flat hanging installment work rack of concrete embedded part essence and built-in fitting

Country Status (1)

Country Link
CN (1) CN106150055B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059913A (en) * 2017-05-22 2017-08-18 中国五冶集团有限公司 A kind of reactor built-in fitting supporting construction and method for embedding
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN109914820A (en) * 2019-03-25 2019-06-21 中国核工业华兴建设有限公司 Portable high-accuracy absolute altitude installation of embedded parts tool
CN110206166A (en) * 2019-06-06 2019-09-06 广东建星建造集团有限公司 A kind of steel column suspension column and its construction method of installation
CN111218991A (en) * 2020-01-19 2020-06-02 中国化学工程第十一建设有限公司 Installation method of large embedded part
WO2021103895A1 (en) * 2019-11-29 2021-06-03 中建三局第二建设工程有限责任公司 Pre-embedded assembly type expansion joint ultra-long installation suspension leveling positioning system and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268659A (en) * 1996-04-02 1997-10-14 Hitachi Metals Ltd Fixing structure of anchor bolt
JPH09302674A (en) * 1996-05-20 1997-11-25 Sumitomo Forestry Co Ltd Anchor bolt positioning tool and its method
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202611261U (en) * 2012-04-17 2012-12-19 中国建筑第五工程局有限公司 Preset embedded bolt support of concrete foundation
CN204252284U (en) * 2014-11-21 2015-04-08 中冶天工集团有限公司 Built-in fitting bracing means
CN205976407U (en) * 2016-08-23 2017-02-22 天津二建建筑工程有限公司 Smart flat installation work rack of hanging of concrete built -in fitting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268659A (en) * 1996-04-02 1997-10-14 Hitachi Metals Ltd Fixing structure of anchor bolt
JPH09302674A (en) * 1996-05-20 1997-11-25 Sumitomo Forestry Co Ltd Anchor bolt positioning tool and its method
CN202031179U (en) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 Centre line aligning and elevation adjusting device of basic embedded bolts
CN202611261U (en) * 2012-04-17 2012-12-19 中国建筑第五工程局有限公司 Preset embedded bolt support of concrete foundation
CN204252284U (en) * 2014-11-21 2015-04-08 中冶天工集团有限公司 Built-in fitting bracing means
CN205976407U (en) * 2016-08-23 2017-02-22 天津二建建筑工程有限公司 Smart flat installation work rack of hanging of concrete built -in fitting

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059913A (en) * 2017-05-22 2017-08-18 中国五冶集团有限公司 A kind of reactor built-in fitting supporting construction and method for embedding
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN109914820A (en) * 2019-03-25 2019-06-21 中国核工业华兴建设有限公司 Portable high-accuracy absolute altitude installation of embedded parts tool
CN110206166A (en) * 2019-06-06 2019-09-06 广东建星建造集团有限公司 A kind of steel column suspension column and its construction method of installation
WO2021103895A1 (en) * 2019-11-29 2021-06-03 中建三局第二建设工程有限责任公司 Pre-embedded assembly type expansion joint ultra-long installation suspension leveling positioning system and construction method
CN111218991A (en) * 2020-01-19 2020-06-02 中国化学工程第十一建设有限公司 Installation method of large embedded part

Also Published As

Publication number Publication date
CN106150055B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN106150055A (en) Concrete embedded part essence flat hanging installment work stand and the installation method of built-in fitting
CN206091299U (en) A floor buried sleeve fixing device for aluminum alloy template
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN107859058A (en) A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method
CN204626966U (en) A kind of deformation joint formwork erection device
CN106759457A (en) The installation method of cantilever design high-accuracy built-in fitting
CN104481167A (en) High-formwork construction method for miscellaneous fill ground
CN205976407U (en) Smart flat installation work rack of hanging of concrete built -in fitting
CN206071044U (en) A kind of constructional column plate device
CN206971769U (en) A kind of rubber support installation positioning special purpose device
CN206189607U (en) Rag bolt location structure
CN105952002A (en) Large-scale terrace steel plate embedding device and construction method
CN207685855U (en) A kind of anti-anti-floating large steel moulding plate device that inclines of cast-in-place concrete retaining wall
CN109208790B (en) Single-side formwork erecting construction method for arc shear wall
CN207727982U (en) A kind of building wall corner Constructional Col-umn Construction template
CN105781131A (en) Assembled building wall plate mounting support system and construction method thereof
CN203361633U (en) Template regulating system of sliding form system
CN206902702U (en) Mixed mud built pile
CN102409850A (en) Construction method for template for building
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN206495329U (en) Adjustable accurately foot bolt reinforces mould and hardened system
CN205935706U (en) A elevation controlling means for terrace construction
CN204826220U (en) Location built -in fitting with U type groove
CN214995802U (en) Outrigger structure at corner of outer frame
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant