- Publication number
- CN204781624U CN204781624U CN201520432700.8U CN201520432700U CN204781624U CN 204781624 U CN204781624 U CN 204781624U CN 201520432700 U CN201520432700 U CN 201520432700U CN 204781624 U CN204781624 U CN 204781624U
- Authority
- CN
- China
- Prior art keywords
- concrete
- split heads
- reinforcing bar
- floor
- concrete split
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 claims abstract description 52
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 19
- 239000003550 marker Substances 0.000 claims description 9
- 238000009415 formwork Methods 0.000 claims description 4
- 210000003128 head Anatomy 0.000 abstract description 26
- 238000003466 welding Methods 0.000 abstract description 8
- 230000001174 ascending effect Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 238000009408 flooring Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 235000013372 meat Nutrition 0.000 description 2
- 208000002193 Pain Diseases 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a floor elevation and roughness controlling means, pour the upper and lower atress reinforcing bar in the template including locating the concrete floor, the interval is equipped with a plurality of concrete split headss in its characterized in that template, and each concrete split heads top surface is equipped with and supports the ascending upper groove of notch of going up the atress reinforcing bar, and the bottom surface is equipped with the decurrent low groove of the notch that blocks down on the atress reinforcing bar, still is equipped with vertical sighting rod on the concrete split heads. Vertical sighting rod through on the concrete split heads carries out the height index, makes level, has solved the complex operation that welding reinforcing bar sighting rod brought, has influenced reinforcing bar quality scheduling problem, gives the operational environment of a no light pollution of constructor. With the traditional reinforcing bar split heads of concrete split heads replacement, both saved steel, can pass through its rigid support, the concrete cover thickness of atress reinforcing bar on the effective control again.
Description
Technical field
The utility model relates to a kind of control device, particularly a kind of floor absolute altitude and planeness control device, belongs to building surveying apparatus design and manufacturing technology field.
Background technology
In building engineering construction, control cast-in-situ steel reinforced concrete flooring absolute altitude is an important construction technology, and it will directly affect the qualitative problems of construction caused because slab thickness is not up to standard.Traditional construction welds vertical reinforcing rod on floor steel bar stress, then measure flooring absolute altitude with level gauge, and then on reinforcing rod, levelling draws elevation line.This practice construction is loaded down with trivial details, needs the artificial electric welding machine that uses to carry out Site Welding.And easily making floor steel bar stress occur stinging meat phenomenon during welding, the light pollution simultaneously produced during welding, also easily stimulates the eyes of constructor around.In addition; traditional steel bar horse-shaped bench is converted into " several " font with reinforcing bar; steel bar stress in floor inner support; but because " several " font steel bar horse-shaped bench rigidity is poor; easily be out of shape by External Force Acting and form surface of subsidence in concrete casting, being finally difficult to the thickness of concrete cover controlling steel bar stress.Therefore be necessary to be improved prior art.
Summary of the invention
For solve existing concrete flooring build time, use traditional Site Welding spacer bars, and bring complex operation step, and cause the problems such as harmful effect to surrounding people and reinforcing bar, the utility model provides a kind of floor absolute altitude and planeness control device.
The utility model is completed by following technical proposal: a kind of floor absolute altitude and planeness control device, comprise that to be located on concrete floor formwork for placing upper, lower stress reinforcing bar, it is characterized in that template being interval with multiple concrete split heads, each concrete split heads end face is provided with the notch upper groove upwards supporting upper steel bar stress, bottom surface is provided with the downward low groove of the notch blocked on lower stress reinforcing bar, concrete split heads is also provided with vertical marker post, to carry out concrete floor absolute altitude by the vertical marker post on concrete split heads to determine and levelling, without the need to carrying out Site Welding, simply, convenient, safety, simultaneously by the rigid support of concrete split heads, effectively can control the thickness of concrete cover of steel bar stress.
Described concrete split heads side arranges bar shaped keyway, to increase the adhesion with concrete floor, ensures concrete floor quality, prevents flooring from producing crack.
Described concrete split heads is set to the prismatoid that top is little, bottom is large, to increase stability.
Described vertical marker post is threaded rod, and the lower end of this threaded rod is placed in concrete split heads top, and upper end upwards extends, and on threaded rod, be provided with floor absolute altitude control mark, and marks with this and determine concrete building plate height.
The utility model has following advantages and effect: adopt such scheme, template easily before floor is built can place concrete split heads in interval, and support upper steel bar stress with the upper groove of concrete split heads end face, the low groove of bottom surface is stuck on lower stress reinforcing bar, and the vertical marker post upper end on concrete split heads upwards extends, to carry out the number of altitude, levelling when watering floor concrete by vertical marker post.Fundamentally solve traditional Site Welding reinforcing bar mark post to bring complex operation step, affect steel bar quality, cause reinforcing bar to sting the problems such as meat, create the working environment that does not have light pollution to constructor.Replace traditional steel bar horse-shaped bench with this concrete split heads, can not only save steel, what is more important to the rigid support of upper steel bar stress, effectively can control the thickness of concrete cover of steel bar stress by concrete split heads.The utility model is simple, convenient, safe, reliable, and saves steel, decreasing pollution, and construction civilization is a desirable mark for building in fact.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A-A figure of Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further, and the accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The floor absolute altitude that the utility model provides and planeness control device, comprise and be located at upper steel bar stress 4 on concrete floor formwork for placing 1 and lower stress reinforcing bar 3, concrete floor formwork for placing 1 is interval with multiple concrete split heads 2, the thickness of the height=slab thickness-upper steel bar stress concrete cover of each concrete split heads 2, bar shaped keyway 21 is provided with in each concrete split heads 2 two sides, to increase the adhesion with concrete floor 5, ensure concrete floor quality, prevent flooring from producing crack, each concrete split heads 2 end face is provided with the notch upper groove 23 upwards supporting upper steel bar stress 4, be used for controlling the thickness of concrete cover of steel bar stress 4, bottom surface is provided with the downward low groove 24 of the notch be stuck on lower stress reinforcing bar 3, each concrete split heads 2 is also provided with vertical marker post 22.Described concrete split heads 2 is set to the prismatoid that top is little, bottom is large, to increase stability; Described vertical marker post 22 is threaded rod, and the lower end of this threaded rod is placed in concrete split heads 2 top, and upper end upwards extends, and on threaded rod, be provided with floor absolute altitude control mark, and the height of the upper surface 6 determining concrete floor 5 is marked with this, facilitate levelling simultaneously, control flooring planeness.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all in spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.
Claims (4)
1. a floor absolute altitude and planeness control device, comprise the upper and lower steel bar stress be located on concrete floor formwork for placing, it is characterized in that template being interval with multiple concrete split heads, each concrete split heads end face is provided with the notch upper groove upwards supporting upper steel bar stress, bottom surface is provided with the downward low groove of the notch blocked on lower stress reinforcing bar, and concrete split heads is also provided with vertical marker post.
2. floor absolute altitude according to claim 1 and planeness control device, is characterized in that described concrete split heads side arranges bar shaped keyway.
3. floor absolute altitude according to claim 1 and planeness control device, is characterized in that described concrete split heads is set to the prismatoid that top is little, bottom is large.
4. floor absolute altitude according to claim 1 and planeness control device, is characterized in that described vertical marker post is threaded rod, and the lower end of this threaded rod is placed in concrete split heads top, and upper end upwards extends, and threaded rod is provided with floor absolute altitude control mark.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520432700.8U CN204781624U (en) | 2015-06-23 | 2015-06-23 | Floor elevation and roughness controlling means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520432700.8U CN204781624U (en) | 2015-06-23 | 2015-06-23 | Floor elevation and roughness controlling means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204781624U true CN204781624U (en) | 2015-11-18 |
Family
ID=54521696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520432700.8U Expired - Fee Related CN204781624U (en) | 2015-06-23 | 2015-06-23 | Floor elevation and roughness controlling means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204781624U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569276A (en) * | 2015-12-17 | 2016-05-11 | 江苏南通三建集团有限公司 | Construction method capable of achieving double control on thickness of cast-in-situ concrete plate |
CN107447923A (en) * | 2017-09-25 | 2017-12-08 | 广西建工集团联合建设有限公司 | The concrete construction cushion block and its application method of a kind of suitable for various size reinforcing bar |
CN107461005A (en) * | 2017-09-25 | 2017-12-12 | 广西建工集团联合建设有限公司 | A kind of adjustable for height concrete construction cushion block and its application method |
CN107700757A (en) * | 2017-09-25 | 2018-02-16 | 广西建工集团联合建设有限公司 | A kind of concrete construction spacer pad and its application method |
CN108661246A (en) * | 2017-03-29 | 2018-10-16 | 五冶集团上海有限公司 | A kind of multi-functional precast concrete block |
CN109025312A (en) * | 2018-08-02 | 2018-12-18 | 中国十七冶集团有限公司 | A kind of multi-functional floor leveling unit and construction method |
CN110541522A (en) * | 2019-07-26 | 2019-12-06 | 广西建工集团建筑工程总承包有限公司 | Construction method for monitoring thickness of floor slab negative reinforcement protective layer |
CN112344828A (en) * | 2020-10-30 | 2021-02-09 | 广西建工集团控股有限公司 | Method for measuring thickness and flatness of concrete layer and deformation of template |
-
2015
- 2015-06-23 CN CN201520432700.8U patent/CN204781624U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569276A (en) * | 2015-12-17 | 2016-05-11 | 江苏南通三建集团有限公司 | Construction method capable of achieving double control on thickness of cast-in-situ concrete plate |
CN108661246A (en) * | 2017-03-29 | 2018-10-16 | 五冶集团上海有限公司 | A kind of multi-functional precast concrete block |
CN107447923A (en) * | 2017-09-25 | 2017-12-08 | 广西建工集团联合建设有限公司 | The concrete construction cushion block and its application method of a kind of suitable for various size reinforcing bar |
CN107461005A (en) * | 2017-09-25 | 2017-12-12 | 广西建工集团联合建设有限公司 | A kind of adjustable for height concrete construction cushion block and its application method |
CN107700757A (en) * | 2017-09-25 | 2018-02-16 | 广西建工集团联合建设有限公司 | A kind of concrete construction spacer pad and its application method |
CN109025312A (en) * | 2018-08-02 | 2018-12-18 | 中国十七冶集团有限公司 | A kind of multi-functional floor leveling unit and construction method |
CN110541522A (en) * | 2019-07-26 | 2019-12-06 | 广西建工集团建筑工程总承包有限公司 | Construction method for monitoring thickness of floor slab negative reinforcement protective layer |
CN112344828A (en) * | 2020-10-30 | 2021-02-09 | 广西建工集团控股有限公司 | Method for measuring thickness and flatness of concrete layer and deformation of template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204781624U (en) | Floor elevation and roughness controlling means | |
CN102877418B (en) | Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof | |
CN103437291B (en) | Monolithic water tank precompressed construction technology | |
CN103993597B (en) | A kind of high accuracy vertical pillars stake construction method | |
CN106121236B (en) | Floor bar protective layer and structural elevation integrated control method | |
CN103758348B (en) | Profile steel framework structure concrete floor slab suspension mould pouring construction method | |
CN205839599U (en) | Pier stud reinforcing bar location auxiliary moulding bed | |
CN103967331B (en) | A kind of Liftable type enclosing dividing plate | |
CN109267493A (en) | Construction method for installing steel cover beam across river course | |
CN103603506B (en) | Inner support, Counter procedure verticality of stand column controller | |
CN206189607U (en) | Rag bolt location structure | |
CN202064281U (en) | Slip form frame | |
CN103669880B (en) | A kind of negative reinforcement hangs device and the construction method thereof of construction control topping | |
CN206800800U (en) | Horizontal reinforcement distance piece | |
CN210031484U (en) | High-pier sliding mold and multi-column high-pier sliding mold maintenance system with maintenance function | |
CN105040973A (en) | External decorative layer template of conical column of comprehensive gymnasium and construction method thereof | |
CN204059987U (en) | Bars In Poured Concrete Slab strip thickness control device | |
CN104074354A (en) | Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template | |
CN103921347B (en) | Precast T-Beam floor reinforcing bar, prestress pipe are fixed draw and insert-type and are installed mould bases | |
CN208456122U (en) | A kind of stair, which pour, uses steel form | |
CN103912127A (en) | Construction control method of floor formwork or floor slab and special calibration ruler | |
CN202393389U (en) | Wall column template perpendicularity measuring tool | |
CN215889394U (en) | Device for controlling elevation of cast large-area floor slab | |
CN106400687A (en) | Positioning assisting assembly jig for pier column reinforcing rib | |
CN205012621U (en) | Template is pour to outside decorative layer of toper post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 Termination date: 20200623 |