CN105155565B - The device and construction method of a kind of basis suspention pre-embedded bolt - Google Patents

The device and construction method of a kind of basis suspention pre-embedded bolt Download PDF

Info

Publication number
CN105155565B
CN105155565B CN201510646509.8A CN201510646509A CN105155565B CN 105155565 B CN105155565 B CN 105155565B CN 201510646509 A CN201510646509 A CN 201510646509A CN 105155565 B CN105155565 B CN 105155565B
Authority
CN
China
Prior art keywords
bolt
plate
shank
hanging beam
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510646509.8A
Other languages
Chinese (zh)
Other versions
CN105155565A (en
Inventor
茅志辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Masteel Design & Research Institute Co ltd
Original Assignee
Anhui Masteel Engineering and Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Masteel Engineering and Technology Group Co Ltd filed Critical Anhui Masteel Engineering and Technology Group Co Ltd
Priority to CN201510646509.8A priority Critical patent/CN105155565B/en
Publication of CN105155565A publication Critical patent/CN105155565A/en
Application granted granted Critical
Publication of CN105155565B publication Critical patent/CN105155565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of device of basis suspention pre-embedded bolt and construction method, belong to building foundation technique for fixing field.The device of the basis suspention pre-embedded bolt of the present invention, including hanging beam, shank of bolt, nut, one-level coaming plate and positioning correcting plate, one-level coaming plate is the square pond shape structure formed a circle with flat board, hanging beam has 2, one-level coaming plate upper surface centre position is flat in Parallel Symmetric state, positioning correcting plate is the positioning hole that mating connection shank of bolt is provided with square platy structure, hanging beam and positioning correcting plate;Nut includes upper cap nut and lower nut;The upper end of shank of bolt is provided with screw thread, sequentially pass through the positioning hole of hanging beam and positioning correcting plate, and the position between hanging beam and positioning correcting plate is fixed by upper cap nut and lower nut, upper cap nut is fixed on positioning correcting plate lower surface, and lower nut is fixed on the upper surface of hanging beam.The present invention realizes simple manufacture craft, easy construction, concerned process steps influence less, the easy to adjust, construction precision of inspection is high, efficiency high purpose.

Description

The device and construction method of a kind of basis suspention pre-embedded bolt
Technical field
The invention belongs to building foundation technique for fixing field, specifically a kind of basis is suspended the device of pre-embedded bolt in midair and applied Work method.
Background technology
The installation of existing pre-embedded bolt is reinforced, and is generally welded in reinforcement foundation on the net using by pre-embedded bolt point, or frequently with Reinforcing bar, shaped steel are welded in foundation concrete sets tripod bracing reinforcement, but line setting difficulty is big one by one to pre-embedded bolt, and welding capacity is big And screw rod of easily burning, steel are wasted, and easily cause in concreting bolt off normal.
Current existing conventional steel-column foundation pre-embedded bolt construction method, usual way is:
1) many bolts are uniformly fixed on the positioning orifice plate for holding hole successfully first.
2) with the welding such as reinforcing bar, steel scrap bar or angle steel, each bolt auxiliary steel member (reinforcing bar etc.) welding is interfixed, welded It is connected into square stool.
3) the bolt square stool welded is hung in into basis, scene centering in place welds support and foundation bottom reinforcing bar from bottom again It is welded and fixed, top is fixed with side form spot welding again.
The steel-column foundation bolt embedment particular problem carried out with the construction method has:Construction centering adjusts difficult, complicated again, It is inconvenient;Working procedure is more, and auxiliary loss material used is more, makes complicated, the required support used and skeleton reinforcing steel bar etc. are auxiliary Help waste of material it is non-reusable, be lost it is many;Engineering time length, loss material are more, and cost is high, uneconomical.
China Patent Publication No.:CN102518145A, publication date:2012.06.27 patent document disclose a kind of equipment Basis in column, the overall positioning reinforcing device of pre-embedded bolt in groups, it is characterized in that setting up pre-buried in the top of foundation forms framework Bolt positions ladder, is setting the support frame of positioning ladder, positioning ladder master on the outside of the left and right of foundation forms framework on ground To be made up of left and right main beam, longeron I and vertical beam I, groups of pre-embedded bolt hole in column be opened up on the main beam of left and right, each pre- Bury and guard ring is embedded in bolt hole and pre-embedded bolt is installed, be set with packing ring in each pre-embedded bolt upper end section and hypomere and be screwed Adjusting nut and locking nut, correspondence is located at positioning ladder from front to back on the left right lateral ground of foundation forms framework On the position of each left and right vertical beam I be respectively mounted support frame, the support frame is main by longeron II, left and right vertical beam II, left and right diagonal brace With left and right spud pile composition, between left-right template, ladder and support frame will be positioned by groups of pre-embedded bolt integral hanging in column Reuse can be pulled down.The invention has used the crossbeam, longeron and vertical beam of batch to be positioned, and installs complicated, the engineering time compared with It is long.
The content of the invention
1. the technical problem to be solved
Installation for pre-embedded bolt in the prior art is reinforced and there is construction centering to adjust difficult, working procedure again more, auxiliary The problem of helping many loss materials, making complexity, engineering time length, many loss materials, the invention provides a kind of basis suspention in advance Bury the device and construction method of bolt.It can realize that simple manufacture craft, easy construction, concerned process steps influence less, check and adjust Perfect square is just, construction precision is high, the purpose of efficiency high.
2. technical scheme
The present invention program is carried out in the following manner:
A kind of device of basis suspention pre-embedded bolt, including hanging beam, shank of bolt, nut, one-level coaming plate and positioning correcting plate, Wherein:One-level coaming plate is the square pond shape structure formed a circle with flat board, and hanging beam has 2, is long strip-board shape, in Parallel Symmetric state One-level coaming plate upper surface centre position is flat on, positioning correcting plate is to be provided with square platy structure, hanging beam and positioning correcting plate The positioning hole of mating connection shank of bolt;Nut includes upper cap nut and lower nut;The upper end of shank of bolt is provided with screw thread, sequentially passes through and hangs The positioning hole of beam and positioning correcting plate, and position between hanging beam and positioning correcting plate fixed by upper cap nut and lower nut, Upper cap nut is fixed on positioning correcting plate lower surface, and lower nut is fixed on the upper surface of hanging beam.
Preferred scheme:Shank of bolt is 6, and the positioning hole of corresponding hanging beam and positioning correcting plate is also 6.
Preferred scheme:The bottom of shank of bolt is fixedly connected with support, and the bottom plate of support is fixedly connected with the bottom of shank of bolt, The equally distributed reinforcement of taper is also fixedly connected between shank of bolt and bottom plate.
Preferred scheme:The bottom of one-level coaming plate is connected with two grades of coaming plates that area is more than one-level coaming plate, and one-level coaming plate is located at The position of two grades of coaming plate geometric centers, the bottom of two grades of coaming plates of one-level coaming plate is provided with steel grid.
Preferred scheme:The bottom of two grades of coaming plates is connected with three-level coaming plate of the area more than two grades of coaming plates, and two grades of coaming plates are located at The position of three-level coaming plate geometric center.
Further scheme:Positioning correcting plate is marked with the position line in length and breadth of " ten " font distribution.
The construction method of the device of pre-embedded bolt is suspended on a kind of basis in midair, and its step is:
A, steel grid is laid in foundation ditch;
B, fix 1~3 layer of coaming plate on steel grid, the superiors' coaming plate is one-level coaming plate;
C, 2 hanging beams in Parallel Symmetric state are flat on one-level coaming plate upper surface centre position;
D, the positioning hole that shank of bolt is sequentially passed through to hanging beam and positioning correcting plate;
E, the position between hanging beam and positioning correcting plate are fixed by upper cap nut and lower nut, and upper cap nut is scheduled on into positioning Correcting plate lower surface, lower nut is fixed on the upper surface of hanging beam;
F, by rotate upper cap nut and lower nut regulating bolt bar height;
G, the axis absolute altitude by measuring shank of bolt and perpendicularity, rotate lower nut adjustment hanging beam, rotate upper cap nut adjustment Positioning correcting plate, final fixing bolt bar and the perpendicularity and positioning precision for controlling shank of bolt.
Further arrangement and method for construction:In step G, the position line in length and breadth for " ten " font distribution being marked with along positioning correcting plate Carry out the detection of the perpendicularity of shank of bolt.
Further arrangement and method for construction:It is fixed between the corner location of coaming plates at different levels, the side plate of two coaming plates in step B There is reinforcing plate.
Further arrangement and method for construction:In step D, the diameter of the positioning hole of hanging beam and positioning correcting plate is more than the straight of shank of bolt Footpath.
3. beneficial effect
The technical scheme provided using the present invention, compared with existing known technology, with following remarkable result:
(1) a kind of device of basis suspention pre-embedded bolt of the invention, passes through the simple of hanging beam, nut and positioning correcting plate After the completion of combination and collocation, i.e. foundation ditch installation are fixed, hanging beam is installed, plane positioning shank of bolt slings shank of bolt (mark with lower nut Height is adjustable), upper cap nut adjustment stationary positioned correcting plate, hanging beam Hanging bolt bar is preliminary fixed after measurement and positioning, centering, Pass through the secondary fixation of positioning correcting plate, repetition measurement, Dual-layer stationary positioned pre-embedded bolt bar, it is ensured that the perpendicularity of shank of bolt;It is real Simple manufacture craft, easy construction are showed, concerned process steps influence less, the easy to adjust, construction precision of inspection is high, efficiency high mesh 's;Moreover, hanging beam, coaming plate, nut and positioning correcting plate can be reused, it is easy to make, cost-effective;
(2) device of a kind of basis suspention pre-embedded bolt of the invention, shank of bolt and corresponding hanging beam and positioning correcting plate Positioning hole be 6, be equipped with, 6 shanks of bolt synergy, construction precision is higher;
(3) a kind of device of basis suspention pre-embedded bolt of the invention, the setting of support improves shank of bolt in concrete Stability;The setting of reinforcement, improves the stability of support and shank of bolt connection;
(4) a kind of device of basis suspention pre-embedded bolt of the invention, the setting of two-stage coaming plate, the concrete of making is in two Level is step-like, it is adaptable to the big concrete foundation of continuing surface;
(5) a kind of device of basis suspention pre-embedded bolt of the invention, the setting of three-level coaming plate, it is adaptable to which continuing surface is small Concrete foundation, improves the versatility of whole device;
(6) setting of the device, in length and breadth position line of a kind of basis suspention pre-embedded bolt of the invention, is easy to measure during measurement Point and the positioning in face, improve the accuracy of measurement;
(7) a kind of construction method of the device of basis suspention pre-embedded bolt of the invention, step is easy, easy construction, spiral shell Bolt suspention is carried out after the completion of being embedded in coaming plate construction, once adjusts in place, precision is high, efficiency of construction is high;
(8) a kind of construction method of the device of basis suspention pre-embedded bolt of the invention, the setting of reinforcing plate improves coaming plate The stability of side plate connection;
(9) construction method of the device of a kind of basis suspention pre-embedded bolt of the invention, hanging beam and positioning correcting plate are determined The diameter in position hole is more than the diameter of shank of bolt, facilitates the interspersed of shank of bolt.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is top view of the present invention;
Fig. 3 is stereogram of the present invention.
In figure:1st, hanging beam;2nd, upper cap nut;3rd, lower nut;4th, positioning correcting plate;5th, shank of bolt;6th, support;7th, positioning hole; 8th, one-level coaming plate;9th, two grades of coaming plates;10th, position line in length and breadth;61st, bottom plate;62nd, reinforcement.
Embodiment
With reference to specific embodiment, the present invention is described in detail.
Embodiment 1
The device of the basis suspention pre-embedded bolt of the present embodiment, as shown in figure 1, including hanging beam 1, shank of bolt 5, nut, one Level coaming plate 8 and positioning correcting plate 4, wherein:As shown in Figures 2 and 3, one-level coaming plate 8 is the square pond shape structure formed a circle with flat board, Specification is 60mm*60mm, and hanging beam 1 has 2, is splat, and thickness is 35mm, width 120mm, length 1200mm, in parallel Symmetry status is flat on the upper surface centre position of one-level coaming plate 8, and positioning correcting plate 4 is square platy structure, and specification is 50mm* The positioning hole 7 of mating connection shank of bolt 5, a diameter of 5mm are provided with 40mm, hanging beam 1 and positioning correcting plate 4;Nut includes upper spiral shell Cap 2 and lower nut 3;The upper end of shank of bolt 5 is provided with screw thread, and a diameter of 3mm sequentially passes through the positioning of hanging beam 1 and positioning correcting plate 4 Hole 7, and position between hanging beam 1 and positioning correcting plate 4 fixed by upper cap nut 2 and lower nut 3, upper cap nut 2 is fixed on fixed The lower surface of bit correction plate 4, lower nut 3 is fixed on the upper surface of hanging beam 1.
The construction method of the device of pre-embedded bolt is suspended on the basis of the present embodiment in midair, and its step is:
A, steel grid is laid in foundation ditch;
B, fix 2 layers of coaming plate on steel grid, the superiors' coaming plate is one-level coaming plate 8;
C, 2 hanging beams 1 in Parallel Symmetric state are flat on the upper surface centre position of one-level coaming plate 8;
D, the positioning hole 7 that shank of bolt 5 is sequentially passed through to hanging beam 1 and positioning correcting plate 4;
E, the position between hanging beam 1 and positioning correcting plate 4 are fixed by upper cap nut 2 and lower nut 3, and upper cap nut 2 is consolidated The lower surface of positioning correcting plate 4 is scheduled on, lower nut 3 is fixed on the upper surface of hanging beam 1;
F, by rotating upper cap nut 2 and the height of lower 3 regulating bolt bar of nut 5;
G, the axis absolute altitude by measuring shank of bolt 5 and perpendicularity, rotate the lower adjustment hanging beam 1 of nut 3, rotate upper cap nut 2 Adjust positioning correcting plate 4, final fixing bolt bar 5 and the perpendicularity and positioning precision for controlling shank of bolt 5.
The device and construction method of the basis suspention pre-embedded bolt of the present embodiment, pass through hanging beam 1, nut and positioning correcting plate After the completion of 4 simple combination and collocation, i.e. foundation ditch installation are fixed, hanging beam 1 is installed, plane positioning shank of bolt 5 is hung with lower nut 3 Play shank of bolt 5 (absolute altitude can adjust), the adjustment stationary positioned of upper cap nut 2 correcting plate 4, the Hanging bolt bar 5 of hanging beam 1, measurement and positioning, It is preliminary fixed after centering, pass through positioning correcting plate 4 two fixations, repetition measurements, Dual-layer stationary positioned pre-embedded bolt bar 5, it is ensured that The perpendicularity of shank of bolt 5;Realize simple manufacture craft, easy construction, concerned process steps influence less, inspection is easy to adjust, construction Precision is high, the purpose of efficiency high;Moreover, hanging beam 1, coaming plate, nut and positioning correcting plate 4 can be reused, easy to make, It is cost-effective.
Embodiment 2
The device of the basis suspention pre-embedded bolt of the present embodiment, basic structure be the same as Example 1 is theed improvement is that:Bolt Bar 5 is 6, and the positioning hole 7 of corresponding hanging beam 1 and positioning correcting plate 4 is also 6, is equipped with, and 6 collaborations of shank of bolt 5 are made With construction precision is higher;The bottom of shank of bolt 5 is fixedly connected with support 6, and the bottom plate 61 of support 6 and the bottom of shank of bolt 5 are fixed Connection, improves stability of the shank of bolt 5 in concrete, taper is also fixedly connected between shank of bolt 5 and bottom plate 61 and is uniformly divided The reinforcement 62 of cloth, improves support 6 and shank of bolt connects 5 stability connect;The bottom of one-level coaming plate 8 is connected with area more than one-level Two grades of coaming plates 9 of coaming plate 8, one-level coaming plate 8 is located at the position of two grades of geometric centers of coaming plate 9, two grades of coaming plates 9 of one-level coaming plate 8 Bottom is provided with steel grid;The bottom of two grades of coaming plates 9 is connected with three-level coaming plate of the area more than two grades of coaming plates 9, two grades of coaming plates 9 Positioned at the position of three-level coaming plate geometric center, the concrete foundation small for continuing surface improves the versatility of whole device;It is fixed Bit correction plate 4 is marked with position line 10 in length and breadth of " ten " font distribution, the positioning in measurement point and face when being easy to measure, and improves measurement Accuracy;The diameter of the positioning hole 7 of hanging beam 1 and positioning correcting plate 4 is more than the diameter of shank of bolt 5, facilitates shank of bolt 5 in positioning It is interspersed in hole 7.
The construction method of the device of the basis suspention pre-embedded bolt of the present embodiment, basic step be the same as Example 1, difference It is:In step G, the position line in length and breadth 10 for " ten " font distribution being marked with along positioning correcting plate 4 carries out the vertical of shank of bolt 5 The detection of degree.
Embodiment 3
A kind of construction method of the device of the basis suspention pre-embedded bolt of the present embodiment, its basic step be the same as Example 2, no It is with part:In step B, reinforcing plate is fixed between the corner location of coaming plates at different levels, the side plate of two coaming plates, raising is enclosed The stability of plate side plate connection.
Schematically the invention and embodiments thereof are described above, the description is not restricted.So, If one of ordinary skill in the art is enlightened by it, in the case where not departing from this creation objective, without creative design Go out the frame mode similar to the technical scheme and embodiment, the protection domain of this patent all should be belonged to.

Claims (2)

1. it is a kind of basis suspention pre-embedded bolt device, including hanging beam (1), shank of bolt (5), nut, one-level coaming plate (8), two grades Coaming plate (9) and three-level coaming plate, it is characterised in that:Also include positioning correcting plate (4), wherein:
The one-level coaming plate (8) is the square pond shape structure formed a circle with flat board, and the hanging beam (1) has 2, is long strip-board shape, One-level coaming plate (8) upper surface centre position is flat in Parallel Symmetric state, the positioning correcting plate (4) is square tabular knot The positioning hole (7) of mating connection shank of bolt (5) is provided with structure, hanging beam (1) and positioning correcting plate (4);
The nut includes upper cap nut (2) and lower nut (3);
The upper end of the shank of bolt (5) is provided with screw thread, sequentially passes through the positioning hole (7) of hanging beam (1) and positioning correcting plate (4), and Position between hanging beam (1) and positioning correcting plate (4) is fixed by upper cap nut (2) and lower nut (3), and upper cap nut (2) is fixed In positioning correcting plate (4) lower surface, lower nut (3) is fixed on the upper surface of hanging beam (1);
The shank of bolt (5) is 6, and the positioning hole (7) of corresponding hanging beam (1) and positioning correcting plate (4) is also 6;
The bottom of the shank of bolt (5) is fixedly connected with support (6), and the bottom plate (61) of support (6) and the bottom of shank of bolt (5) are solid Fixed connection, is also fixedly connected with the equally distributed reinforcement of taper (62) between shank of bolt (5) and bottom plate (61);
The diameter of the positioning hole (7) of the hanging beam (1) and positioning correcting plate (4) is more than the diameter of shank of bolt (5);
The bottom of the one-level coaming plate (8) is connected with two grades of coaming plates (9) that area is more than one-level coaming plate (8), one-level coaming plate (8) position In the position of two grades of coaming plate (9) geometric centers, the bottom of two grades of coaming plates (9) of one-level coaming plate (8) is provided with steel grid;
The bottom of two grades of coaming plates (9) is connected with three-level coaming plate of the area more than two grades of coaming plates (9), and two grades of coaming plates (9) are located at The position of three-level coaming plate geometric center;
The positioning correcting plate (4) is marked with the position line in length and breadth (10) of " ten " font distribution;
Reinforcing plate is fixed between the corner location of coaming plates at different levels, the side plate of two coaming plates.
2. the construction method of the device of pre-embedded bolt is suspended on a kind of basis according to claim 1 in midair, its step is:
A, steel grid is laid in foundation ditch;
B, fix three layers of coaming plate on steel grid, the superiors' coaming plate is one-level coaming plate (8);
C, 2 hanging beams (1) in Parallel Symmetric state are flat on one-level coaming plate (8) upper surface centre position;
D, the positioning hole (7) that shank of bolt (5) is sequentially passed through to hanging beam (1) and positioning correcting plate (4);
E, the position between hanging beam (1) and positioning correcting plate (4) are fixed by upper cap nut (2) and lower nut (3), by upper cap nut (2) positioning correcting plate (4) lower surface is fixed on, lower nut (3) is fixed on the upper surface of hanging beam (1);
F, by rotate upper cap nut (2) and lower nut (3) regulating bolt bar (5) height;
G, the axis absolute altitude by measuring shank of bolt (5) and perpendicularity, rotate lower nut (3) adjustment hanging beam (1), rotate upper cap nut (2) adjustment positioning correcting plate (4), final fixing bolt bar (5) and the perpendicularity and positioning precision for controlling shank of bolt (5); In step G, the position line in length and breadth (10) for " ten " font distribution being marked with along positioning correcting plate (4) carries out hanging down for shank of bolt (5) The detection directly spent.
CN201510646509.8A 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt Active CN105155565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510646509.8A CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510646509.8A CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Publications (2)

Publication Number Publication Date
CN105155565A CN105155565A (en) 2015-12-16
CN105155565B true CN105155565B (en) 2017-10-17

Family

ID=54796583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510646509.8A Active CN105155565B (en) 2015-09-30 2015-09-30 The device and construction method of a kind of basis suspention pre-embedded bolt

Country Status (1)

Country Link
CN (1) CN105155565B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106006361A (en) * 2016-06-30 2016-10-12 中国五冶集团有限公司 Pre-buried bolt assembly

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5526001B2 (en) * 2010-11-17 2014-06-18 株式会社東芝 Foundation-based level adjustment method and foundation-base fixing method
CN103174166B (en) * 2013-03-27 2015-09-16 中国京冶工程技术有限公司 A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof
CN103590416B (en) * 2013-11-01 2016-03-16 浙江水利水电学院 Foot bolt Embedment Construction engineering method accurately
CN204225145U (en) * 2014-10-20 2015-03-25 中国建筑第六工程局有限公司 A kind of simple and easy orientation tool for basic embedding anchor bolts
CN204475363U (en) * 2014-12-15 2015-07-15 中国十七冶集团有限公司 A kind of major diameter pre-embedded bolt fixing device for installing
CN205024709U (en) * 2015-09-30 2016-02-10 安徽马钢工程技术集团有限公司 Buried bolt's device is in advance suspended in midair on basis

Also Published As

Publication number Publication date
CN105155565A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN103993597B (en) A kind of high accuracy vertical pillars stake construction method
CN103866697B (en) A kind of bridge pier and straining beam calf support method for synchronously constructing
CN104358262A (en) Detachable tool type deep foundation pit inner support guide pillar and construction method
CN105586833A (en) Construction method for integrally forming large cast-in-place thin-wall high pier through stiff skeleton reinforcement cage
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN204552141U (en) A kind of braced structures for beam stanchion construction of replacing
CN105155565B (en) The device and construction method of a kind of basis suspention pre-embedded bolt
CN205024709U (en) Buried bolt's device is in advance suspended in midair on basis
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN207685855U (en) A kind of anti-anti-floating large steel moulding plate device that inclines of cast-in-place concrete retaining wall
CN106836198A (en) Positioner combined steel formwork bored concrete pile and construction method
CN104164889B (en) Demountable tower crane foundation
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN206189607U (en) Rag bolt location structure
CN211313434U (en) Positioner of independent basis embedded column base crab-bolt
CN104878926B (en) One kind hangs template system construction method and can have enough to meet the need rest
CN208088326U (en) A kind of lag pile formula bearing being used to support pile framing
CN102561383B (en) Tower crane base mounting method
CN103321406B (en) A kind of support system of tall and big floor template
CN202114437U (en) Positioning device for foundation bolts
CN207934462U (en) Super plane earth post-cast strip flatness accurately controls tooling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240122

Address after: 243000 No. 1889 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee after: MASTEEL DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Country or region after: China

Address before: 243000 No. 1889 Taibai Road, Ma'anshan economic and Technological Development Zone, Anhui

Patentee before: ANHUI MASTEEL ENGINEERING & TECHNOLOGY GROUP Co.,Ltd.

Country or region before: China