Prior art keywords
bolt
angle steel
cast strip
post
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721198585.8U
Other languages
Chinese (zh)
Inventor
宋江汶
孙益领
刘玮
柴晋阳
季作扩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201721198585.8U priority Critical patent/CN207934462U/en
Application granted granted Critical
Publication of CN207934462U publication Critical patent/CN207934462U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to a kind of super plane earth post-cast strip flatness to accurately control tooling, it is characterized in that, the control tooling includes angle steel, band steel and bolt, roller, bolt hole is opened up on the angle steel, the bolt welding is on reinforcing bar for fixing, angle steel is placed in both sides after fixation, after angle steel is placed, centre is connected with band steel, and the aperture of the bolt hole is 12mm, a diameter of 12mm of bolt, the spacing between adjacent bolt hole are not less than 500mm.The Technical Design is a kind of controlling post-cast strip both sides absolute altitude within the scope of ± 1mm, ensure that entire mattess reaches a kind of terrace standard, and total advantages of simple, work efficiency is high, and accuracy is high, and construction is simple can have enough to meet the need reuse.

Description

Super plane earth post-cast strip flatness accurately controls tooling
Technical field
The utility model is related to a kind of toolings, and in particular to and a kind of super plane earth post-cast strip flatness accurately controls tooling, Belong to the super plane earth post-cast strip flatness precise control device technical field of concrete.
Background technology
Industrial premises installs the requirement of accurate flatness due to equipment, therefore the requirement to mattess is higher and higher, and one Class terrace requires every 2 meters of height difference to be no more than ± 3mm, but in terrace casting process, for post-cast strip it is secondary pour it is smooth It controls relatively difficult.First post-cast strip is usually arranged, needs to be separated when pouring ground, while separating both sides absolute altitude requirement one It causes;Second post-cast strip usually carries out after 28 days, and using the slightly expanded concrete for the concrete grade that is above the ground level, therefore to staying If both sides absolute altitude requires stringent when post-cast strip, the precision for large area concrete post-cast strip flatness is difficult control, therefore, is compeled A kind of device of needs for cutting solves above-mentioned technical problem.
Invention content
The utility model exactly for the technical problems in the prior art, it is smooth to provide a kind of super plane earth post-cast strip Degree accurately controls tooling, and the Technical Design is a kind of controlling post-cast strip both sides absolute altitude within the scope of ± 1mm, ensure whole A mattess reaches a kind of terrace standard, and total advantages of simple, work efficiency is high, and accuracy is high, construction is simple.
To achieve the goals above, the technical solution of the utility model is as follows, a kind of super plane earth post-cast strip flatness essence Really control tooling, which is characterized in that the control tooling includes angle steel, band steel and bolt, and bolt hole is opened up on the angle steel, The bolt welding is for fixing on reinforcing bar, and angle steel is placed in both sides after fixing, and after angle steel is placed, centre is connected with band steel, after It pours and removes screw rod and band iron before band pours, roller ground grading is used after dismounting
As a kind of improvement of the utility model, the aperture of the bolt hole is 12mm, a diameter of 12mm of bolt, adjacent Spacing between bolt hole is not less than 500mm.In order to improve the controllability of angle steel absolute altitude, bolt select it is longer can tighten or Loosen, ensures control post-cast strip both sides absolute altitude.
As a kind of improvement of the utility model, the width of the band steel is 40mm.In order to be poured after casting process prevents Angle steel with both sides is subjected to displacement or sideslip, and after for use bolt has controlled absolute altitude, with band steel by both sides Bolted angle connection, band steel is long Degree is consistent with post-cast strip width.The control tooling further includes cushion block, and the cushion block is arranged in stud base.The bolt It, can be in stud base's adjunction cushion block, to ensure bolt tune if bolt length falls short of when being welded to connect with ground reinforced mesh Save length.
Compared with the existing technology, the utility model has the following advantages that, 1)The technical solution global design is ingenious, structure is tight It gathers, 2)The technical solution is simple and practical in structure, and the super plane earth post-cast strip flatness described in the program accurately controls tooling, by In the template with angle steel as post-cast strip both sides, then it is subject to bolt up and down adjustment control angle steel absolute altitude, finally with band steel by both sides Angle steel is connected, and has simple and reasonable, and flatness is controllable, after the advantages that being poured onto straightness, be particularly suitable for all post-cast strips Accurate flatness control;3)The technical solution cost is relatively low, is promoted and applied convenient for further.
Description of the drawings
Fig. 1 is the utility model planar structure schematic diagram;
Fig. 2 is sectional view;
In figure:1, angle steel, 2, band steel, 3, bolt, 4, double nut, 5, parallels, 6, roller.
Specific implementation mode:
In order to deepen the understanding to the utility model, the present embodiment is described in detail below in conjunction with the accompanying drawings.
Embodiment 1:Referring to Fig. 1, Fig. 2, a kind of super plane earth post-cast strip flatness accurately controls tooling, the control tooling Including angle steel 1, band steel 2, bolt 3, double nut 4, parallels 5, roller 6, bolt hole is opened up on the angle steel, the bolt welding exists For fixing on reinforcing bar, angle steel is placed in both sides after fixing, and after angle steel is placed, centre is connected with band steel, the aperture of the bolt hole For 12mm, a diameter of 12mm of bolt, the spacing between adjacent bolt hole is not less than 500mm.It can in order to improve angle steel absolute altitude Control property, bolt select it is longer can tighten or loosen, ensure that control post-cast strip both sides absolute altitude, the width of the band steel are 40mm.In order to prevent the angle steel of post-cast strip both sides to be subjected to displacement or sideslip in casting process, after for use bolt has controlled absolute altitude, With band steel by both sides Bolted angle connection, band steel length is consistent with post-cast strip width, and screw rod and band iron are removed in post-cast strip before pouring, Roller ground grading is used after dismounting.
Application example:
Referring to attached drawing 1, which includes:Angle steel 1(50#), band steel 2(Width 40mm), bolt 3(Its diameter 12mm), it is double Nut 4(A diameter of 12mm), parallels 5, roller 6,50# angle steel is arranged in the post-cast strip both sides, and bolt hole is opened up on angle steel, Aperture 12mm, spacing are not less than 500mm, and bolt welding, for fixing, is placed on reinforcing bar after bolt is fixed with reinforcement welding Angle steel, both sides angle steel, which is placed, to be completed, and centre is connected with band steel, for controlling post-cast strip width in casting process, finally with making Use leveling apparatus(Accuracy ± 1mm/1.5m)It is accurately levelling by way of tightening nuts.
In order to ensure that this tooling does not shift in casting process, every 500mm, one group of bolt hole is set, it is described such as Shown in Fig. 2.In use, being first welded on bolt on the reinforced mesh of ground according to bolt hole position, angle steel is being passed through into bolt hole It is positioned in surfacing steel bar mesh sheet, staff adds laser leveling equipment, is measured once every 500mm, passes through regulating nut Entire angle steel surface level is controlled, the first preliminary adjusting adjusts completion and connects both sides angle steel with band steel, prevents position inside and outside angle steel Move, connected with band iron and ensure post-cast strip width, after the installation of last band iron, then carry out the accurate levelling flatness of last time reach ± 1mm, straightness reach ± 2mm.
It should be noted that above-described embodiment, is not used for limiting the scope of protection of the utility model, in above-mentioned technical side Made equivalents or replacement each fall within the range that the utility model claims are protected on the basis of case.

Claims (1)

1. a kind of super plane earth post-cast strip flatness accurately controls tooling, which is characterized in that the control tooling includes angle steel, flat Steel, bolt and roller, open up bolt hole on the angle steel, the bolt welding on reinforcing bar for fixing, it is fixed after both sides Angle steel is placed, after angle steel is placed, centre is connected with band steel, and the aperture of the bolt hole is 12mm, a diameter of 12mm of bolt, phase Spacing between adjacent bolt hole is not less than 500mm, and the width of the band steel is 40mm, and the control tooling includes cushion block 40* 40mm, the cushion block are arranged in stud base.
CN201721198585.8U 2017-09-19 2017-09-19 Super plane earth post-cast strip flatness accurately controls tooling Active CN207934462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721198585.8U CN207934462U (en) 2017-09-19 2017-09-19 Super plane earth post-cast strip flatness accurately controls tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721198585.8U CN207934462U (en) 2017-09-19 2017-09-19 Super plane earth post-cast strip flatness accurately controls tooling

Publications (1)

Publication Number Publication Date
CN207934462U true CN207934462U (en) 2018-10-02

Family

ID=63645192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721198585.8U Active CN207934462U (en) 2017-09-19 2017-09-19 Super plane earth post-cast strip flatness accurately controls tooling

Country Status (1)

Country Link
CN (1) CN207934462U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335656A (en) * 2020-03-31 2020-06-26 上海宝冶集团有限公司 Terrace screeding device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335656A (en) * 2020-03-31 2020-06-26 上海宝冶集团有限公司 Terrace screeding device

Similar Documents

Publication Publication Date Title
CN103397701B (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN203891058U (en) Built-in foundation bolt positioning tool for fixed type tower crane foundation
CN103388343A (en) Super-long and large horizontal embedded part reverse construction method
CN105507168A (en) Multi-span box girder integral ultrahigh alternate jacking construction system and method
CN103321111A (en) Tramcar track continuous-laying construction method
CN103276893A (en) Novel composite structure for supporting rigid building template and construction method
CN102286988A (en) Grouting shim plate construction method
CN207934462U (en) Super plane earth post-cast strip flatness accurately controls tooling
CN207314852U (en) Outer wall of basement one side steel form support system
CN208733666U (en) A kind of fixing bolt preformed hole template tool
CN106760014A (en) A kind of board-like adjustable damper embedded part of full assembled and installation method
CN103806426A (en) Adjustable position fixing installation device of soil pressure gauge
CN207110466U (en) Pulling-on piece formula aluminum alloy mould plate reinforcing member and pulling-on piece formula template system
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN203701066U (en) Soil pressure meter position-adjustable fixed installation device
CN103255716A (en) Hit-preventing wall template
CN201762981U (en) Adjustable pattern template for building
CN204876339U (en) A a superimposed sheet supporting beam for steel construction building
CN207538326U (en) A kind of steel structure column with micromatic setting
CN103821061A (en) Traction runway for automobile safety crash laboratory and layered construction method of the traction runway
CN108086689A (en) The control device and construction method of a kind of concrete layer thickness and flatness
CN205476528U (en) Precast pile device of taking one's place fast
CN107059913A (en) A kind of reactor built-in fitting supporting construction and method for embedding
CN108374425B (en) Bearing platform and foundation pit cushion layer construction structure and pouring method thereof
CN105155565B (en) The device and construction method of a kind of basis suspention pre-embedded bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 6 Wenlan Road, Qixia District, Nanjing, Jiangsu Province

Patentee after: China Construction Installation Group Co., Ltd.

Address before: 210046 Yaojia Road, Qixia District, Nanjing, Jiangsu Province

Patentee before: China Construction Industrial Equipment Installation Co., Ltd.

CP03 Change of name, title or address