- CN106836198A CN106836198A CN201610974835.6A CN201610974835A CN106836198A CN 106836198 A CN106836198 A CN 106836198A CN 201610974835 A CN201610974835 A CN 201610974835A CN 106836198 A CN106836198 A CN 106836198A
- Authority
- CN
- China
- Prior art keywords
- positioner
- steel
- locating support
- construction method
- steel form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A kind of positioner combined steel formwork bored concrete pile and construction method, the bored concrete pile include pile foundation positioner and connection steel form on the positioning device, and bored concrete pile casting concrete and vibrating from steel form is molded with, and positioner includes:Locating support, locating support includes framework, and bolt positioning hole is provided with framework;Adjusting screw, one end of adjusting screw fixes on the ground, and the other end is connected with framework;Adjustment silk braid, adjustment silk braid is fixed on locating support, and the internal thread matched with external screw thread on adjusting screw is provided with silk braid;The fixed steel form bolt coordinated with die plate locating holes on steel form.Pile foundation accurate positioning of the present invention:This positioner is directly shaped the relative size between each stake according to design requirement, so as to solve the problems, such as spacing deviation around adjacent pile foundation.
Description
Technical field
The present invention relates to a kind of construction technology of cast-in-place bored field, more particularly, to a kind of positioner combined steel formwork
Cast-in-place pile construction method, more particularly, to the construction of a kind of two rows above positioner gang form bored concrete pile and the bored concrete pile
Method.
Background technology
In photovoltaic plant construction, directly the perforate on designed stake position, places steel reinforcement cage in hole after pore-forming, and perfusion is mixed
The bored concrete pile foundation of solidifying soil is occupied an leading position in all kinds of patterns in assembly support basis.Found in construction, because tradition is applied
Work method be bored concrete pile using the PVC template that individually installs, and by hanging wire control room away from and absolute altitude, thus in the presence of stake spacing and
The unmanageable problem of built-in fitting absolute altitude.
The content of the invention
It is an object of the invention to overcome shortcoming present in prior art, a kind of positioner combined steel is provided first
Plate bored concrete pile, the bored concrete pile locating support solves the problems, such as the spacing deviation between pile foundation, while built-in fitting absolute altitude is easy to control
System, next additionally provides a kind of cast-in-place pile construction method, and the construction method reduces the error for manually operating and causing, and quality is more
Easily controllable, the technical scheme of use is:A kind of positioner combined steel formwork bored concrete pile, including pile foundation positioner and company
It is connected on the steel form on the positioner, bored concrete pile casting concrete and vibrating from steel form is molded with, its feature
It is:The positioner includes:Locating support, the locating support includes framework, and die plate locating holes are provided with the framework;
Adjusting screw, one end of the adjusting screw fixes on the ground, and the other end is threaded;Adjustment silk braid, the adjustment silk
Set is fixed on the locating support, and the internal thread matched with external screw thread on adjusting screw is provided with the silk braid;The steel
The steel form bolt coordinated with the die plate locating holes is fixed in template.
Technical characteristic of the invention also has:The hole of fixed built-in fitting is also provided with the locating support.
Technical characteristic of the invention also has:The locating support includes vertical support and stull, and two are at least connected with the stull
The individual steel form.
Technical scheme also has:A kind of construction method of positioner combined steel formwork bored concrete pile, its feature exists
In:The construction method is comprised the following steps:
1)Line setting;
2)Drilling and borehole cleaning:Drill bit is aligned the centre of location point of each bored concrete pile during drilling, to ensure drilling rod perpendicularity, drilling
And reaming is in place;
3)Make built-in fitting;
4)Built-in fitting is installed;
5)Pile foundation positioner is installed, the positioner includes:Locating support, the locating support includes framework, described
Die plate locating holes are provided with positioning framework;Adjusting screw, one end of the adjusting screw fixes on the ground, the other end and framework
Connection;Adjustment silk braid, the adjustment silk braid is fixed on the locating support, is provided with the silk braid and outer spiral shell on adjusting screw
The internal thread that line matches;
6)Steel form is connected on the pile foundation positioner through steel form bolt;
7)Casting concrete;
8)The dismounting of pile foundation positioner and the maintenance of concrete.
Technical characteristic of the invention also has:The built-in fitting is U-bolt.
Technical characteristic of the invention also has:The operating method of the line setting is:The control net of whole place is first set up,
Set up the control net of each sub- square formation respectively again, finally survey the axial line control point for setting each group, it is desirable to which every group is carried out with two timbers
Control stake, the central point of each is marked according to every group of control stake again.
Technical characteristic of the invention also has:Install thick using following methods control steel reinforcement cage cover to reinforcement during steel reinforcement cage
Degree, specially:Ensure that steel reinforcement cage is located at the center of steel form using the steel reinforcement cage card for being fixed on steel form center.
Technical characteristic of the invention also has:The steel reinforcement cage card has the endoporus being adapted with steel reinforcement cage external diameter size.
Technical characteristic of the invention also has:During casting concrete, vibrating spear is slowly pulled out quickly even to pile foundation bottom
Rise.
Technical characteristic of the invention also has:During casting concrete, perdurabgility of vibrating should be concrete and no longer up steam
Bubble, untill concrete surface is presented when laitance and laitance no longer sink.
The beneficial effects of the present invention are:1)Pile foundation accurate positioning:This positioner according to design requirement, directly by each stake it
Between relative size sizing, so as to solve the problems, such as spacing deviation around adjacent pile foundation;2)The basis mark per pack support
Height control is good, by adjusting screw, within 10mm, can be easy to follow-up the deviation control high per pack support foundation pile top mark
Support is installed;3)Built-in fitting accurate positioning, its absolute altitude and misalignment of axe are controllable;4)Steel form is fixed using fastener, is greatly decreased
The generation of the mould phenomenon that rises.
Brief description of the drawings
Accompanying drawing 1 is positioner combined steel formwork filling pile structure schematic diagram of the present invention, and accompanying drawing 2 is the top view of accompanying drawing 1,
Accompanying drawing 3 is steel reinforcement cage card structure schematic diagram, and accompanying drawing 4 is the I-I schematic diagrames of accompanying drawing 3, and 1 is locating support, and 2 is adjusting screw, and 3 are
Steel form, 31 is die plate locating holes, and 4 is adjustment silk braid, and 5 is installation of embedded parts hole.
Specific embodiment
Below in conjunction with the accompanying drawings, specific embodiment of the invention is illustrated.
The present invention discloses a kind of positioner combined steel formwork bored concrete pile, including pile foundation positioner and connection first
Steel form 3 on the positioning device, bored concrete pile casting concrete and vibrating from steel form is molded with.Positioner bag
Include:Locating support 1, locating support includes framework, and die plate locating holes 31 are provided with framework;Adjusting screw 2, the one of adjusting screw 2
End fixes on the ground, and the other end is connected with framework;Adjustment silk braid 4, adjustment silk braid 4 is fixed on locating support 1, adjusts silk braid
The internal thread matched with external screw thread on adjusting screw 2 is provided with 4.After adjusting screw and adjustment silk braid coordinate, positioning is can adjust
The height of support 1.The fixed steel form bolt coordinated with die plate locating holes 31 on steel form 3.Also it is provided with locating support 1
Installation of embedded parts hole 5.
In the present embodiment, locating support 1 includes vertical support and stull, and two steel forms are at least connected with stull, if connection
Steel form be two, double positioner combined steel formwork bored concrete pile is formed, because the steel form of two bored concrete piles connects
It is connected in same stull, therefore spacing is uniform between two bored concrete piles and meets the requirements.
In the present embodiment, built-in fitting is U-bolt, and U-bolt passes through installation of embedded parts hole by being bolted in stull,
Therefore built-in fitting absolute altitude is impartial.
The invention also discloses a kind of construction method of positioner combined steel formwork bored concrete pile, the construction method include with
Lower step:
1)Line setting:Follow " by overall to part " principle, it is to avoid the accumulation of setting-out error.First set up the control of whole place
Net, then the control net of each sub- square formation is set up respectively.Finally, survey and set each group of axial line control point, it is desirable to which every group with two timbers
Carry out control stake.The central point of each is marked according to every group of control stake again.Points for attention:Live many appearance are straight over long distances
Connect and use tape measure positioning phenomenon, this way easily causes deviation accumulation, so positioned with tape measure being difficult more than one group.
2)Drilling and borehole cleaning:Machine drilling is selected, drilling key control point is to be accurately positioned, borehole perpendicularity, drilling are deep
Degree and diameter.
Each stake has centre of location point, and drill bit is aligned the centre of location point of each bored concrete pile during drilling, to ensure to bore
Bar perpendicularity;After starting drilling, drilling machine installs protective cap, for controlling drilling rod perpendicularity;Keyhole machine balance in itself
And it is smooth, it is to avoid there is inclined hole, inclined hole.After the completion of drilling, there is surface dust to drop in hole during because of drilling, typically also need to artificial two
Secondary borehole cleaning.During borehole cleaning, if discovery has inclined hole, inclined hole phenomenon, hole is repaired and arrived by the mode that need to be expanded bore dia with special instrument
Position, if deviation is excessive, should tamp rear redrilling by hole.
3)Make steel reinforcement cage:Fabrication of reinforcing cage and the key control point of installation:Reinforcing cage stirrup encrypted area and non-confidential are interval
Away from control;The fastness of steel reinforcement cage colligation.
The characteristics of fabrication of reinforcing cage is that quantities is big, repetitive operation, weakening of quality controlling consciousness.Steel reinforcement cage is made by oneself and has added in scene
Work platform for making.There are hoop reinforcement and non-encrypted area spaced scale on the scaffold tubes chosen on this platform, colligation workman is direct
Directly colligation, both improves operating efficiency after according to scale, stirrup is corresponded, and it also avoid the random colligation of stirrup, causes
The undesirable problem of spacing.Steel reinforcement cage processes the scene of being transported in steel bar meter area, steel reinforcement cage deformation, loose often occurs
Phenomenon.This improvement of problem main points is that colligation point must not leak and tie up, be should be noted that during colligation adjacent colligation point steel wire buckle will into splayed,
To avoid steel reinforcement cage diagonal distortion.
4)Steel reinforcement cage is installed:Steel reinforcement cage installs main key control point is how to ensure steel reinforcement cage thickness of protection tier.
The method generally taken is, during casting concrete, it is found that steel reinforcement cage is attached on template or hole wall, manually goes to correct steel again
Muscle cage location, this method is difficult supervision with control.According to bored concrete pile feature, the steel for ensureing thickness of protection tier has been made
Muscle cage card, steel reinforcement cage card has the endoporus being adapted with steel reinforcement cage external diameter size.This cage card by by steel reinforcement cage card in a template
Heart position, it is ensured that protective layer thickness, also improves operating efficiency.
5)Install pile foundation positioner:Positioner includes:Locating support, locating support includes framework, positioning framework
On be provided with die plate locating holes;Adjusting screw, one end of adjusting screw fixes on the ground, and the other end is threaded;Adjustment silk
Set, adjustment silk braid is fixed on locating support, and the internal thread matched with external screw thread on adjusting screw is provided with adjustment silk braid.
6)Steel form is connected on the pile foundation positioner through steel form bolt:Locating support is according to setting
Meter is required to fix spacing between each pile foundation and formed, and the hole of fixed form and built-in fitting is reserved on locating support.Apply
In man-hour, first support can be fixed in pre-drilled stake holes by adjusting screw and flitch, then by steel shutterings mounted in positioning
On support, if find that indivedual stake holes are corresponding with steel form not going up, this hole You Pian holes phenomenon is can determine that substantially, after the completion of need to repairing,
Next procedure is carried out again.After model sheetinstallat is finished, pre-embedded bolt is installed, should be noted that bolt leakage size should be unified and meet design
And code requirement.Finally, whole group absolute altitude is adjusted.According to two control lines, by way of adjusting screw, it is ensured that corner and centre
Unified absolute altitude is all kept with line, adjusting screw is just fixed.
7)Casting concrete:Under the premise of concrete raw material quality in itself is controlled, scene is focused on for concreting
Emphasize vibrating for concrete.
After pile foundation form removal, honeycomb, pitted skin substantial majority because vibrate it is not in place caused by.Concrete vibrating one is
GPRS vibrating method, vibrating spear is quickly stretched pile foundation bottom, is slowly pulled up.Two is control vibrating time;Vibrate continuity
Time, should make concrete not in up effervescent, surface is presented laitance and not untill when sinking.
8)The dismounting of pile foundation positioner and the maintenance of concrete:Form removable principle:Concrete strength ensures its table
Face, corner angle are not damaged because of form removal, just dismountable.Concrete curing is typically conserved using cover film, it is desirable to be its outer surface
Parcel should all be covered tight, and answer and have condensate in protective film.Curing time is divided into according to the difference using cement type
Less than 7 days and must not must not be less than 14 days.
Certainly, described above not limitation of the present invention, the present invention is also not limited to the example above, the art
Change, remodeling, addition or replacement that those of ordinary skill is made in essential scope of the invention, fall within guarantor of the invention
Shield scope.
Claims (10)
1. a kind of positioner combined steel formwork bored concrete pile, including pile foundation positioner and it is connected on the positioner
Steel form, bored concrete pile casting concrete and vibrating from steel form is molded with, it is characterised in that:The positioner bag
Include:Locating support, the locating support includes framework, and die plate locating holes are provided with the framework;Adjusting screw, the adjustment silk
One end of thick stick fixes on the ground, and the other end is connected with framework;Adjustment silk braid, the adjustment silk braid is fixed on the locating support
On, the internal thread matched with external screw thread on adjusting screw is provided with the silk braid;Fixed and the template on the steel form
The steel form bolt that location hole coordinates.
2. according to the bored concrete pile described in claim 1, it is characterised in that:Fixed built-in fitting is also provided with the locating support
Hole.
3. according to the bored concrete pile described in claim 1, it is characterised in that:The locating support includes vertical support and stull, the horizontal stroke
Two steel forms are at least connected with support.
4. a kind of construction method of positioner combined steel formwork bored concrete pile, it is characterised in that:The construction method includes following
Step:
1)Line setting;
2)Drilling and borehole cleaning:Drill bit is aligned the centre of location point of each bored concrete pile during drilling, to ensure drilling rod perpendicularity, drilling
And reaming is in place;
3)Make built-in fitting;
4)Built-in fitting is installed;
5)Pile foundation positioner is installed, the positioner includes:Locating support, the locating support includes framework, described
Bolt positioning hole is provided with positioning framework;Adjusting screw, one end of the adjusting screw fixes on the ground, the other end and framework
Connection;Adjustment silk braid, the adjustment silk braid is fixed on the locating support, is provided with the silk braid and outer spiral shell on adjusting screw
The internal thread that line matches;
6)Steel form is connected on the pile foundation positioner through steel form bolt;
7)Casting concrete;
8)The dismounting of pile foundation positioner and the maintenance of concrete.
5. according to the construction method described in claim 4, it is characterised in that:The built-in fitting is U-bolt.
6. according to the construction method described in claim 5, it is characterised in that:The operating method of the line setting is:First set up
The control net of whole place, then the control net of each sub- square formation is set up respectively, finally survey the axial line control point for setting each group, it is desirable to every
Group carries out control stake with two timbers, and the central point of each is marked again according to every group of control stake.
7. according to the construction method described in claim 5, it is characterised in that:When steel reinforcement cage is installed reinforcing bar is controlled using following methods
Cage thickness of protection tier, specially:Ensure that steel reinforcement cage is located at steel form using the steel reinforcement cage card for being fixed on steel form center
Center.
8. according to the construction method described in claim 7, it is characterised in that:The steel reinforcement cage card has and steel reinforcement cage external diameter size
Adaptable endoporus.
9. according to the construction method described in claim 5, it is characterised in that:During casting concrete, vibrating spear is quickly even to stake
Foundation bottom, and slowly pull up.
10. according to the construction method described in claim 9, it is characterised in that:During casting concrete, perdurabgility of vibrating should be mixed
Solidifying soil no longer up effervescent, when concrete surface is presented laitance and laitance no longer sinks untill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610974835.6A CN106836198B (en) | 2016-11-07 | 2016-11-07 | Positioning device combined steel formwork bored concrete pile and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610974835.6A CN106836198B (en) | 2016-11-07 | 2016-11-07 | Positioning device combined steel formwork bored concrete pile and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106836198A true CN106836198A (en) | 2017-06-13 |
CN106836198B CN106836198B (en) | 2019-01-08 |
Family
ID=59145658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610974835.6A Active CN106836198B (en) | 2016-11-07 | 2016-11-07 | Positioning device combined steel formwork bored concrete pile and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836198B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708369A (en) * | 2018-05-31 | 2018-10-26 | 中交公局第工程有限公司 | A kind of networking measures the positioning construction method and its device of control stake |
CN109162270A (en) * | 2018-10-26 | 2019-01-08 | 中铁二十局集团第工程有限公司 | A kind of soft soil foundation reinforcing method based on the concrete-cored stake of cement concrete |
CN112376439A (en) * | 2020-10-22 | 2021-02-19 | 娄菊叶 | Construction method of pier for building bridge |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202913420U (en) * | 2012-11-20 | 2013-05-01 | 中国十七冶集团有限公司 | Reusable positioning device for installing foundation bolts |
CN203334279U (en) * | 2013-07-05 | 2013-12-11 | 大同泰瑞集团建设有限公司 | Positioning device of pile heads of bored concrete pile combined foundations |
CN203622615U (en) * | 2013-11-27 | 2014-06-04 | 吉林省电力勘测设计院 | Photovoltaic power generation assembly support bored concrete pile basis mould |
CN105821835A (en) * | 2016-03-28 | 2016-08-03 | 中国冶集团有限公司 | Water injection type rotary drilling construction method for cast-in-situ bored pile |
CN205475204U (en) * | 2016-02-23 | 2016-08-17 | 宏润建设集团股份有限公司 | Locator for steel reinforcement cage is transferred to drilling bored concrete pile |
JP6247065B2 (en) * | 2013-09-26 | 2017-12-13 | 大和ハウス工業株式会社 | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile |
-
2016
- 2016-11-07 CN CN201610974835.6A patent/CN106836198B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202913420U (en) * | 2012-11-20 | 2013-05-01 | 中国十七冶集团有限公司 | Reusable positioning device for installing foundation bolts |
CN203334279U (en) * | 2013-07-05 | 2013-12-11 | 大同泰瑞集团建设有限公司 | Positioning device of pile heads of bored concrete pile combined foundations |
JP6247065B2 (en) * | 2013-09-26 | 2017-12-13 | 大和ハウス工業株式会社 | Excavation blade mounting steel pipe for construction of cast-in-place concrete pile and construction method of cast-in-place concrete pile |
CN203622615U (en) * | 2013-11-27 | 2014-06-04 | 吉林省电力勘测设计院 | Photovoltaic power generation assembly support bored concrete pile basis mould |
CN205475204U (en) * | 2016-02-23 | 2016-08-17 | 宏润建设集团股份有限公司 | Locator for steel reinforcement cage is transferred to drilling bored concrete pile |
CN105821835A (en) * | 2016-03-28 | 2016-08-03 | 中国冶集团有限公司 | Water injection type rotary drilling construction method for cast-in-situ bored pile |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708369A (en) * | 2018-05-31 | 2018-10-26 | 中交公局第工程有限公司 | A kind of networking measures the positioning construction method and its device of control stake |
CN108708369B (en) * | 2018-05-31 | 2024-01-26 | 中交一公局第一工程有限公司 | Positioning construction method and device for construction net measurement control pile |
CN109162270A (en) * | 2018-10-26 | 2019-01-08 | 中铁二十局集团第工程有限公司 | A kind of soft soil foundation reinforcing method based on the concrete-cored stake of cement concrete |
CN112376439A (en) * | 2020-10-22 | 2021-02-19 | 娄菊叶 | Construction method of pier for building bridge |
Also Published As
Publication number | Publication date |
---|---|
CN106836198B (en) | 2019-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105220874A (en) | The construction method of basement superelevation exterior wall self-supporting single side formwork system | |
CN207829306U (en) | Assemble concrete structure prefabricated post reserved joint bar positioning sleeve board mold and vertical connection structure | |
CN106836198A (en) | Positioner combined steel formwork bored concrete pile and construction method | |
CN206438500U (en) | A kind of bridge pile foundation steel reinforcement cage space positioning system | |
CN111236217A (en) | Pile foundation reinforcement cage elevation and centering positioning device and method | |
CN105696800A (en) | Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts | |
CN109706954A (en) | The segmentation of cup-shaped foundation unitary mould pours a monolithic molding structure and manufacturing process | |
CN106808578A (en) | A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating | |
CN107246026B (en) | Tower equipment foundation bolt embedding construction mold and embedding method thereof | |
CN106087991B (en) | Stake top absolute altitude is in natural ground dug pile construction method below | |
CN106245770B (en) | Expanded letter variable cross-section annular stiffness beam construction method | |
CN209585294U (en) | A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction | |
CN103161313A (en) | Connection method of main reinforcement of constructional column of infilled wall and framed girder | |
CN105040973B (en) | Construction method of outer decorating layer formwork for conical columns of comprehensive gym | |
CN109296138B (en) | Positioning device for post-planting steel bars of constructional column and construction method | |
CN103850513B (en) | A kind of outdoor body of rod construction method | |
CN204959798U (en) | Basement superelevation outer wall self -supporting unilateral component die body system | |
CN107217790A (en) | A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method | |
CN106403996A (en) | Production method of forced centering observation mark stake for precision engineering measurement | |
CN111549815A (en) | Steel structure foundation bolt pre-embedding construction method | |
CN206859018U (en) | The Combined formwork structure being exclusively used in airport pavement concrete construction | |
CN206815854U (en) | A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor | |
CN106836593B (en) | Anti-sagging pouring and tamping method for large-gradient cast-in-place concrete roof | |
CN109201971A (en) | For making the positioning device and its construction method of pile foundation steel bar cage | |
CN111963053B (en) | Positioning system-based hole forming control method and system for cast-in-place pile machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 266100 No. 882-1 Tong'an Road, Laoshan District, Qingdao City, Shandong Province Applicant after: Shandong Power Construction Third Engineering Co., Ltd. Address before: 266100 No. 882-1 Tong'an Road, Laoshan District, Qingdao City, Shandong Province Applicant before: Shangdong Electric Power Construction No.3 Engineering Co. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |