CN202117074U - Foundation bed steel structure for positioning and mounting base of tower crane - Google Patents

Foundation bed steel structure for positioning and mounting base of tower crane Download PDF

Info

Publication number
CN202117074U
CN202117074U CN 201120215484 CN201120215484U CN202117074U CN 202117074 U CN202117074 U CN 202117074U CN 201120215484 CN201120215484 CN 201120215484 CN 201120215484 U CN201120215484 U CN 201120215484U CN 202117074 U CN202117074 U CN 202117074U
Authority
CN
China
Prior art keywords
tower crane
foundation
bolt
foundation bolt
straight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120215484
Other languages
Chinese (zh)
Inventor
郑华明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN 201120215484 priority Critical patent/CN202117074U/en
Application granted granted Critical
Publication of CN202117074U publication Critical patent/CN202117074U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a foundation bed steel structure for positioning and mounting a base of a tower crane, which comprises a foundation bolt positioning device, foundation bolts and a reinforcement net rack. The reinforcement net rack is laid on a foundation, the foundation bolt positioning device is disposed on the reinforcement net rack, tops of the foundation bolts are penetratingly arranged on the foundation bolt positioning device, and bottoms of the foundation bolts face vertically downwards and are welded on the reinforcement net rack. The foundation bed steel structure for positioning and mounting the base of the tower crane is provided with the foundation bolt positioning device, the foundation bolt positioning device consists of four circular plates, four straight rods and a middle diagonal supporting rod and is light, convenient and simple in structure, small in volume and convenient in transportation, and transportation cost is saved. The bolts on a foundation can be accurately positioned by the aid of the foundation bed steel structure for positioning and mounting the base of the tower crane, the base of the tower crane can be assuredly mounted in place, certain transportation and mounting expense and labor can also be reduced, and one-step leveling of the base of the tower crane can be realized.

Description

The pedestal steel work that is used for tower crane base location and installation
Technical field
The utility model relates to the positioning pedestal that a kind of tower crane base is installed, and relates in particular to a kind of pedestal steel work that is used for tower crane base location and installation.
Background technology
The installation levelness that tower crane is installed the tower crane base all has higher requirement, guarantee tower crane base level, at first will pre-buried good foundation bolt, the tower crane base is installed again and through after the disposable smoothing of parallels, but normal mounting tower crane just.Install the base of tower crane; The one, guarantee to accomplish that the pre-buried size of foundation bolt is identical with tower crane bolt of lower base hole; Guarantee that the tower crane base is in place, the 2nd, guarantee to accomplish the levelness after the tower crane base is installed that the vertical central lines that tower crane is installed is controlled within 4 ‰.
The installation of existing tower crane base is to utilize the tower crane base to locate, and at first is after treating that the reinforcement foundation colligation is good, to be placed on the base of tower crane on the parallels of bar frame; Reserve the topping of reinforcing bar; Be through each root bolt in the bolt hole of tower crane base again, behind level gauge smoothing tower crane base, adopt every bolt of electric weld handle to be weldingly fixed on the steel mesh reinforcement; Make it into as a whole, placing of concrete then.Treat concrete after curing time, before tower crane is installed, also will once check again that because basic when placing of concrete, the change of the level of tower crane base possibility can be installed tower crane so will carry out the secondary smoothing to the tower crane base to the tower crane base.This tower crane base that utilizes is located; Though can guarantee that tower crane bolt and tower crane base installing and locating are accurate; But there is following defective: though 1. foundation bolt is fixing, in the placing of concrete process, owing to concrete impact force, shaking force, operating personnel trample on steel mesh reinforcement; The capital makes the tower crane base produce horizontal error, so will carry out the secondary smoothing to the tower crane base again; 2. when placing of concrete, do not note just causing easily tower crane bed plate below the phenomenon in cavity to occur; 3. it is too high to occur mixing earth surfaces easily, encases four bed plates of tower crane base, is unfavorable for that the secondary smoothing and the base of tower seat removed; 4. when placing of concrete, be sprinkling upon concrete grout on the base easily, cause the tower crane base unclean.
The utility model content
To the above-mentioned deficiency that prior art exists, the utility model provides a kind of can guarantee accurate positioning, guarantees tower crane base installation in position, can realize the pedestal steel work that is used for tower crane base location and installation of the disposable smoothing of tower crane base simultaneously.
The pedestal steel work that is used for tower crane base location and installation that the utility model provides comprises foundation bolt positioner, foundation bolt and bar frame; Said bar frame is laid on the basis, and the foundation bolt positioner is arranged on the bar frame, and the top of foundation bolt is through on the foundation bolt positioner, and the bottom of foundation bolt and is welded on the bar frame straight down.
Further, said foundation bolt positioner comprises four blocks of plectanes, four straight-bars and a middle inclined support bar; Said four blocks of plectanes and four straight-bars are formed square; Four blocks of plectanes are distributed on foursquare four angles; Be equipped with on four blocks of plectanes with the tower crane base on corresponding four bolts hole in hole; Four straight-bars are distributed on the four edges, and middle inclined support bar tiltedly is pulled between two plectanes at diagonal angle, all is installed with foundation bolt in each bolt hole.
Further, at least one end of said straight-bar is dismountable to be connected on the plectane, dismountable being connected on the plectane of at least one end of middle inclined support bar.
Further; Four straight-bars are formed by connecting by two short straight rods; One end of a short straight rod is through the mode and the plectane welding of welding, and the other end is connected through bolt with an end of another root short straight rod, and the other end of another root short straight rod is connected with another plectane through bolt.
Further again, middle inclined support bar is formed by connecting two short inclined support bars, connects through bolt between two short inclined support bars, and the other end of two short inclined support bars is connected with two plectanes at diagonal angle respectively through bolt.
The pedestal steel work that is used for tower crane base location and installation of the utility model compared with prior art, has following advantage:
1, the pedestal steel work that is used for tower crane base location and installation has adopted a kind of foundation bolt positioner of being made up of inclined support bar in the middle of four blocks of plectanes, four straight-bars and, and this apparatus structure is light simple, and volume is little, is convenient to transport, and minimizes transport costs.
2, the pedestal steel work that is used for tower crane base location and installation can accurately be located the bolt on the basis, has both guaranteed tower crane base installation in position, can reduce certain transportation mounting cost and labour again, and has realized the disposable smoothing of tower crane base.
Description of drawings
Fig. 1 is the structural representation that is used for the pedestal steel work of tower crane base location and installation;
Fig. 2 is the front view of foundation bolt positioner;
Fig. 3 is the vertical view of foundation bolt positioner;
Fig. 4 is the front view after the straight-bar folding on the plectane;
Fig. 5 is the vertical view after the straight-bar folding on the plectane;
Fig. 6 is the front view after the middle inclined support bar folding;
Fig. 7 is the vertical view after the middle inclined support bar folding.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done to describe in further detail.
Fig. 1 is the structural representation that is used for the pedestal steel work of tower crane base location and installation, and is as shown in the figure.The pedestal steel work that is used for tower crane base location and installation comprises foundation bolt positioner, foundation bolt 5 and bar frame 6.Bar frame 6 is laid on the basis, and the foundation bolt positioner is arranged on the bar frame 6, and the top of foundation bolt 5 is through on the foundation bolt positioner, and the bottom of foundation bolt 5 and is welded on the bar frame 6 straight down.
Wherein, the foundation bolt positioner comprises inclined support bar 3 in the middle of four blocks of plectanes 1, four straight-bars 2 and, as shown in Figures 2 and 3.Four blocks of plectanes 1 and four straight-bars 2 are formed square, and four blocks of plectanes 1 are distributed on foursquare four angles, and four straight-bars 2 are distributed on the four edges.At least one end of straight-bar 2 is dismountable to be connected on the plectane 1 (in the present embodiment; One end of straight-bar 2 is connected with a plectane through bolt; The other end of straight-bar is fixedly connected with another plectane through the mode of welding), be equipped with on four blocks of plectanes 1 with the tower crane base on corresponding four bolts hole 4 in hole.Middle inclined support bar 3 tiltedly is pulled between two plectanes 1 at diagonal angle, and at least one end of middle inclined support bar 3 is dismountable to be connected (in the present embodiment, the two ends of middle inclined support bar 3 all are connected with plectane through bolt) on the plectane 1.
In the present embodiment, four straight-bars 2 are formed by connecting by two short straight rods, and an end of a short straight rod 21 is through the mode and the plectane welding of welding; The other end is connected through bolt with an end of another root short straight rod 22; The other end of another root short straight rod 22 is connected with another plectane through bolt, like this, when dismounting, only needs bolt is back-outed; Just can straight-bar 2 and plectane 1 be carried out folding, take up room (like Fig. 4 and shown in Figure 5) reduced in folding back.Middle inclined support bar 3 also is formed by connecting two short inclined support bars; Connect through bolt between two short inclined support bars, the other end of two short inclined support bars is connected with two plectanes 1 at diagonal angle respectively through bolt, when dismantling middle inclined support bar 3; Only need the bolt at two ends is back-outed; Will be wherein short inclined support bar Rotate 180 °, just can two short inclined support bars be overlaped (like Fig. 6 and shown in Figure 7), be convenient to put and transport.This pedestal steel work that is used for tower crane base location and installation is foldable positioner, is the field erected practical frock of tower crane bolt.
When using this pedestal steel work that is used for tower crane base location and installation, at first the foundation bolt positioner is removed; Placing of concrete need guarantee that when placing of concrete concrete casting is smooth; Ten six roots of sensation bolts are passed the bolt hole of tower crane base respectively; Behind the tower crane base installation in position, adjust disposable smoothing tower crane base through wedge; Gap below the tower crane base is carried out back-grouting with the mixed earth of rubble and is got final product at last.If bolt has the error of a little when passing the bolt hole of tower crane base, the nut of can screwing at the bolt top is proofreaied and correct with hammer.
Explanation is at last; Above embodiment is only unrestricted in order to the technical scheme of explanation the utility model; Although with reference to preferred embodiment the utility model is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement the technical scheme of the utility model; And not breaking away from the aim and the scope of the utility model technical scheme, it all should be encompassed in the middle of the claim scope of the utility model.

Claims (5)

1. a pedestal steel work that is used for tower crane base location and installation is characterized in that: comprise foundation bolt positioner, foundation bolt (5) and bar frame (6); Said bar frame (6) is laid on the basis; The foundation bolt positioner is arranged on the bar frame (6); The top of foundation bolt (5) is through on the foundation bolt positioner, and the bottom of foundation bolt (5) straight down and be welded on the bar frame (6).
2. the pedestal steel work that is used for tower crane base location and installation according to claim 1 is characterized in that: said foundation bolt positioner comprises four blocks of plectanes (1), four straight-bars (2) and a middle inclined support bar (3); Said four blocks of plectanes (1) and four straight-bars (2) are formed square; Four blocks of plectanes (1) are distributed on foursquare four angles; Be equipped with on four blocks of plectanes (1) with the tower crane base on corresponding four bolts hole in hole (4); Four straight-bars (2) are distributed on the four edges, and middle inclined support bar (3) tiltedly is pulled between two plectanes (1) at diagonal angle, all is installed with foundation bolt (5) in each bolt hole (4).
3. the pedestal steel work that is used for tower crane base location and installation according to claim 2; It is characterized in that: at least one end of said straight-bar (2) is dismountable to be connected on the plectane (1), and at least one end of middle inclined support bar (3) is dismountable to be connected on the plectane (1).
4. the pedestal steel work that is used for tower crane base location and installation according to claim 3; It is characterized in that: four straight-bars (2) are formed by connecting by two short straight rods; One end of a short straight rod is through the mode and the plectane welding of welding; The other end is connected through bolt with an end of another root short straight rod, and the other end of another root short straight rod is connected with another plectane through bolt.
5. the pedestal steel work that is used for tower crane base location and installation according to claim 3; It is characterized in that: middle inclined support bar (3) is formed by connecting two short inclined support bars; Connect through bolt between two short inclined support bars, the other end of two short inclined support bars is connected with two plectanes (1) at diagonal angle respectively through bolt.
CN 201120215484 2011-06-23 2011-06-23 Foundation bed steel structure for positioning and mounting base of tower crane Expired - Fee Related CN202117074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120215484 CN202117074U (en) 2011-06-23 2011-06-23 Foundation bed steel structure for positioning and mounting base of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120215484 CN202117074U (en) 2011-06-23 2011-06-23 Foundation bed steel structure for positioning and mounting base of tower crane

Publications (1)

Publication Number Publication Date
CN202117074U true CN202117074U (en) 2012-01-18

Family

ID=45458148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120215484 Expired - Fee Related CN202117074U (en) 2011-06-23 2011-06-23 Foundation bed steel structure for positioning and mounting base of tower crane

Country Status (1)

Country Link
CN (1) CN202117074U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303814A (en) * 2013-07-01 2013-09-18 张家港市天运建筑机械有限公司 Tower footing assembly
CN103485361A (en) * 2013-09-17 2014-01-01 中国十九冶集团有限公司 Integral embedded structure of groups of double-end foundation bolts and method for constructing integral embedded structure
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Installing and jacking method and structure for internal-climbing tower crane supported by structural beam
CN108118694A (en) * 2018-01-31 2018-06-05 深圳市奇见科技有限公司 The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage
CN109057350A (en) * 2018-09-30 2018-12-21 中铁六局集团广州工程有限公司 Concrete casting device and casting system
CN112663654A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembly type structure built-in fitting

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103303814A (en) * 2013-07-01 2013-09-18 张家港市天运建筑机械有限公司 Tower footing assembly
CN103485361A (en) * 2013-09-17 2014-01-01 中国十九冶集团有限公司 Integral embedded structure of groups of double-end foundation bolts and method for constructing integral embedded structure
CN105314548A (en) * 2014-07-28 2016-02-10 中建四局第六建筑工程有限公司 Installing and jacking method and structure for internal-climbing tower crane supported by structural beam
CN108118694A (en) * 2018-01-31 2018-06-05 深圳市奇见科技有限公司 The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage
CN109057350A (en) * 2018-09-30 2018-12-21 中铁六局集团广州工程有限公司 Concrete casting device and casting system
CN112663654A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembly type structure built-in fitting

Similar Documents

Publication Publication Date Title
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN202194244U (en) Positioning support for embedding of ultra-high steel-work pedestals
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN212534174U (en) Raft foundation steel bar supporting tool
CN203729319U (en) Locating steel frame of pre-buried annularly-distributed ground bolt group
CN212715972U (en) Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN113265950A (en) Support for large cantilever bent cap construction and construction method thereof
CN205419600U (en) A base steel construction for constructing tower crane base accurate positioning installation
CN211446999U (en) Foundation bolt positioning die
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN209874513U (en) Auxiliary device for accurately positioning embedded steel plate of support
CN202114437U (en) Positioning device for foundation bolts
CN201924284U (en) Screw rod seat pipe double-split Bailey bracket
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN102561383B (en) Tower crane base mounting method
CN206279783U (en) Assembled construction safety channel
CN212453686U (en) Auxiliary device for controlling installation distance of reinforcing steel bars
CN202830788U (en) Supporting structure with beam fulcrum below bridge cantilever
CN212000638U (en) Overhead cover beam type steel supporting structure
CN203755130U (en) Front beam and rear arch stacking device for steel arch bridge
CN214994000U (en) Supporting and positioning structure for installing large-scale foundation steel bars

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20140623

EXPY Termination of patent right or utility model