CN202430737U - Overall positioning and reinforcing device for equipment foundation row and group embedded bolt - Google Patents

Overall positioning and reinforcing device for equipment foundation row and group embedded bolt Download PDF

Info

Publication number
CN202430737U
CN202430737U CN2011205509433U CN201120550943U CN202430737U CN 202430737 U CN202430737 U CN 202430737U CN 2011205509433 U CN2011205509433 U CN 2011205509433U CN 201120550943 U CN201120550943 U CN 201120550943U CN 202430737 U CN202430737 U CN 202430737U
Authority
CN
China
Prior art keywords
embedded bolt
longeron
right sides
row
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205509433U
Other languages
Chinese (zh)
Inventor
匡恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2011205509433U priority Critical patent/CN202430737U/en
Application granted granted Critical
Publication of CN202430737U publication Critical patent/CN202430737U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to an overall positioning and reinforcing device for equipment foundation row and group embedded bolts, which is characterized in that an embedded bolt positioning ladder frame is erected above a foundation template framework, a supporting frame of the positioning ladder frame is arranged on foundations on the left external side and the right external side of the foundation template framework, the positioning ladder frame mainly comprises left and right main horizontal beams, left and right longitudinal beams I and left and right vertical beams I, row and group embedded bolt holes are arranged on the left and right main transverse beams, protection rings are embedded in the embedded bolt holes, embedded bolts are installed in the embedded bolt holes in a penetrating way, washers are respectively sheathed on the upper end section and the lower section of each embedded bolt, adjusting nuts and locking nuts are screwed, the supporting frame is respectively installed on the foundations on the left external side and the right external side of the foundation template framework from the front to the rear at positions corresponding to the left and right vertical beams I on the positioning ladder frame, the supporting frame mainly comprises a longitudinal beam II, left and right vertical beams II, left and right diagonal bracings and left and right fixed piles, the row and group embedded bolts are overall suspended between left and right templates, and the positioning ladder frame and the supporting frame can be detached and reused.

Description

Equipment Foundations become row, the integral body of pre-embedded bolt is located bracing means in groups
Technical field
The utility model belongs to the equipment installation auxiliary device, especially relates to a kind of location bracing means of equipment pre-embedded bolt.
Background technology
The installation of existing pre-embedded bolt is reinforced; Usually adopt that the pre-embedded bolt point is welded in reinforcement foundation is online; Or often adopt reinforcing bar, shaped steel in basic concrete, to weld and establish the tripod bracing reinforcement, but it is big that pre-embedded bolt is located the unwrapping wire difficulty one by one, welding capacity is big and be prone to the burn screw rod; The waste steel, and when concreting, be prone to cause the bolt off normal.
Summary of the invention
The purpose of the utility model is that a kind of Equipment Foundations of proposition become row, the integral body of pre-embedded bolt is located bracing means in groups, and is not only rational in infrastructure, uses reliably, improves pre-embedded bolt installation rate and precision effectively, and can reuse, and reduces construction cost.
The purpose of the utility model realizes like this: a kind of Equipment Foundations become row, the integral body of pre-embedded bolt is located bracing means in groups; Comprise equipment concrete foundation template framework; This foundation forms framework mainly is made up of left-right template, split bolt, template diagonal brace and gag lever post; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder, and the bracing frame of pre-embedded bolt location ladder is set on outside ground about equipment concrete foundation template framework, this pre-embedded bolt location ladder (see figure 2) mainly is made up of left and right sides main beam, longeron I and upright beam I; Left and right sides main beam all be before and after to and be symmetrical set; This left and right sides main beam can be processed by angle steel, on the lateral surface of left and right sides main beam symmetrically respectively by being uniformly distributed with the upright beam I of putting on being welded after going to, and about the corresponding inside line that is positioned at upright beam I about each group is welded respectively on the upper surface of left and right sides main beam or the soffit to the longeron I; Assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; This longeron I and all available steel pipe of upright beam I are processed, and simultaneously, on the main beam of the left and right sides, offer into row pre-embedded bolt hole in groups; And the spacing and the aperture of each pre-embedded bolt on the spacing in this pre-embedded bolt hole and aperture and the device designed are corresponding to the same; In addition, the equal mounting holes in the both ends of main beam in the left and right sides couples together each section main beam serial connection with strip junction plate and connecting bolt; Setting-in guard ring and correspondence install pre-embedded bolt in each pre-embedded bolt hole; On overhanging upper end section of each pre-embedded bolt and hypomere, be set with packing ring and correspondence is screwed adjusting nut and locking nut (seeing Fig. 1,2), this guard ring can be processed with India-rubber wire, in order to the screw thread of protection pre-embedded bolt;
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at IThe position bracing frame is installed respectively, this bracing frame is mainly by longeron II, about upright beam II, left and right sides diagonal brace and left and right sides spud pile form upright beam about each IIVertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam IIFore-and-aft clearance and Li Liang IFore-and-aft clearance consistent, upright beam about each group IIUpper end section on steel pipe cross snap fit longeron is installed II, and make each longeron II all be positioned at the top of Equipment Foundations template framework, about each, found beam IIUpper end section on fixedly mount left and right diagonal brace respectively with steel pipe cross buckle again, the lower end section of this each left and right diagonal brace respectively with ground on left and right sides spud pile be connected this longeron II, upright beam II, all available steel pipe of left and right diagonal brace processes this each longeron IIThe stage casing on steel pipe cross buckle respectively with each group about upright beam IBe fixedly connected, will become row each pre-embedded bolt while integral hanging in groups like this between left-right template.
Pre-embedded bolt adjustment location: suitably become flexible each steel pipe cross buckle that steel pipe longeron II is connected with upright beam I according to the location unwrapping wire; The location ladder is carried out integral level displacement adjustment; Axis centering is laggard fixes each steel pipe cross buckle fastening; Steel pipe cross buckle on the ladder of suitably loosening then location; To locate according to measuring control absolute altitude line that the ladder discrepancy in elevation is tentatively adjusted and fastening each steel pipe cross buckle, and utilize locking, adjusting nut on loosening and the fastening pre-embedded bolt that the absolute altitude of each pre-embedded bolt is accurately adjusted again, and check and locking nut screwing is fixed after qualified; Concreting then, treat concrete setting after, pull down location ladder and bracing frame, reusable.
The Equipment Foundations that the utility model proposed become row, the integral body of pre-embedded bolt is located bracing means in groups, and is rational in infrastructure, safe and reliable, improved pre-embedded bolt installation rate and precision effectively, and can reuse, and reduced construction cost.
Combine at present accompanying drawing and embodiment to the Equipment Foundations that the utility model proposed become row, the integral body location bracing means of pre-embedded bolt is described further in groups.
Description of drawings
Fig. 1 is that the Equipment Foundations that the utility model proposes become row, the main cross-sectional schematic when the integral body location bracing means of pre-embedded bolt uses in groups.
Fig. 2 is a part 1 among Fig. 1: upright beam I, part 5: longeron I, part 11: longeron IIBe assembled into the main cross-sectional schematic that pre-embedded bolt is located ladder with left and right sides main beam.
Fig. 3 is the schematic top plan view of Fig. 2.
Among Fig. 1-Fig. 3: 1, Li Liang I2, main beam 3, pre-embedded bolt hole 4, junction plate 5, longeron I6, steel pipe cross buckle 7, guard ring 8, packing ring 9, locking nut 10, pre-embedded bolt 11, longeron II12, Li Liang II13, adjusting nut 14, left diagonal brace 15, right diagonal brace 16, spud pile.
The specific embodiment
From Fig. 1, Fig. 2, can find out: a kind of Equipment Foundations become row, the integral body of pre-embedded bolt is located bracing means in groups; Comprise equipment concrete foundation template framework; This foundation forms framework mainly is made up of left-right template, split bolt, template diagonal brace and gag lever post; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder, and equipment concrete foundation template framework about the bracing frame of pre-embedded bolt location ladder is set on the ground of the outside, this pre-embedded bolt location ladder mainly is made up of left and right sides main beam 2, longeron I 5 and upright beam I 1; Left and right sides main beam 2 all be before and after to and be symmetrical set; This left and right sides main beam 2 can be processed by angle steel, on the lateral surface of left and right sides main beam 2 symmetrically respectively by being uniformly distributed with the upright beam I 1 of putting on being welded after going to, and about the corresponding inside line that is positioned at upright beam I 1 about each group is welded respectively on the upper surface of left and right sides main beam 2 or the soffit to longeron I 5; Assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; This longeron I 5 is processed with all available steel pipe of upright beam I 1, simultaneously, on left and right sides main beam 2, offers into row pre-embedded bolt hole 3 in groups; And the spacing and the aperture of each pre-embedded bolt on the spacing in this pre-embedded bolt hole 3 and aperture and the device designed are corresponding to the same; In addition, the equal mounting holes in the both ends of main beam 2 in the left and right sides couples together each section main beam 2 serial connections with strip junction plate 4 and connecting bolt; Setting-in guard ring 7 and correspondence install pre-embedded bolt 10 in each pre-embedded bolt hole 3; On overhanging upper end section of each pre-embedded bolt 10 and hypomere, be set with packing ring 8 and correspondence is screwed adjusting nut 13 and locking nut 9 (seeing Fig. 1,2), this guard ring 7 can be processed with India-rubber wire, in order to the screw thread of protection pre-embedded bolt 10;
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at IBracing frame is installed at 1 position respectively, and this bracing frame is mainly by longeron II 11, about upright beam II 12, left and right diagonal brace 14,15 and left and right sides spud pile 16 form upright beam about each II 12Vertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam II 12Fore-and-aft clearance and Li Liang I 1Fore-and-aft clearance consistent, upright beam about each group II 12Upper end section on steel pipe cross buckle 6 fixed installation longerons II 11, and make each longeron II 11 all be positioned at the top of Equipment Foundations template framework, about each, found beam II 12Upper end section on fixedly mount left and right diagonal brace 14,15 respectively with steel pipe cross buckle 6 again, the lower end section of this each left and right diagonal brace 14,15 respectively with ground on left and right sides spud pile 16 be connected this longeron II 11, upright beam II 12, left and right diagonal brace 14,15 all available steel pipes process this each longeron II 11The stage casing on steel pipe cross buckle 6 respectively with each group about upright beam I 1Be fixedly connected, so just will become row each 10 while of pre-embedded bolt integral hanging in groups between left-right template.
Pre-embedded bolt 10 adjustment location: suitably become flexible each steel pipe cross buckle 6 that steel pipe longeron II 11 is connected with upright beam I 1 according to the location unwrapping wire; The location ladder is carried out integral level displacement adjustment; After the axis centering each steel pipe cross buckle 6 fastening is fixed; Steel pipe cross buckle 6 on the ladder of suitably loosening then location; To locate according to measuring control absolute altitude line that the ladder discrepancy in elevation is tentatively adjusted and fastening each steel pipe cross buckle 6, and utilize locking nut 9 and the absolute altitude of 13 pairs of each pre-embedded bolts 10 of adjusting nut on loosening and the fastening pre-embedded bolt accurately to adjust again, and check and tighten locking nut 9 fixing after qualified; Concreting then, treat concrete setting after, pull down location ladder and bracing frame, reusable.

Claims (5)

1. Equipment Foundations become row, the integral body location bracing means of pre-embedded bolt in groups; Comprise equipment concrete foundation template framework; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder; And equipment concrete foundation template framework about the outside bracing frame of pre-embedded bolt location ladder is set on the ground; This pre-embedded bolt location ladder mainly is made up of left and right sides main beam (2), longeron I (5) and upright beam I (1); Left and right sides main beam (2) be before and after to and be symmetrical set; On the lateral surface of left and right sides main beam (2) symmetrically respectively by being uniformly distributed with the upright beam I (1) of putting on being welded after going to, and about the inside line that correspondence on the upper surface of left and right sides main beam (2) or the soffit is positioned at upright beam I (1) about each group is welded respectively to longeron I (5), assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; Simultaneously; On left and right sides main beam (2), offer into row pre-embedded bolt hole (3) in groups, and the spacing and the aperture of the spacing in this pre-embedded bolt hole (3) and each pre-embedded bolt on aperture and the device designed are corresponding to the same, in addition; The equal mounting holes in both ends of the main beam in the left and right sides (2); With strip junction plate (4) and connecting bolt each section main beam (2) serial connection is coupled together, setting-in guard ring (7) and correspondence install pre-embedded bolt (10) in each pre-embedded bolt hole (3), on overhanging upper end section of each pre-embedded bolt (10) and hypomere, are set with packing ring (8) and correspondence is screwed adjusting nut (13) and locking nut (9);
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at I (1) bracing frame is installed at position respectively, and this bracing frame is mainly by longeron II (11), about upright beam II (12), left and right diagonal brace (14,15) and left and right sides spud pile (16) form upright beam about each II (12)Vertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam II (12)Fore-and-aft clearance and Li Liang I (1)Fore-and-aft clearance consistent, upright beam about each group II (12)Upper end section on steel pipe cross buckle (6) fixed installation longeron II (11), and make each longeron II (11) all be positioned at the top of Equipment Foundations template framework, about each, found beam II (12)Upper end section on use steel pipe cross buckle (6) to fixedly mount left and right diagonal brace (14,15) respectively again, the lower end section of this each left and right diagonal brace (14,15) respectively with ground on left and right sides spud pile (16) be connected this each longeron II (11)The stage casing on steel pipe cross buckle (6) respectively with each group about upright beam I (1)Be fixedly connected, with becoming row each pre-embedded bolt (10) while integral hanging in groups between left-right template.
2. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this left and right sides main beam (2) processed by angle steel.
3. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this longeron I (5) and upright beam I (1) all process with steel pipe.
4. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this guard ring (7) processes with India-rubber wire.
5. Equipment Foundations according to claim 1 become row, the integral body of pre-embedded bolt is located bracing means in groups, it is characterized in that this longeron II (11), upright beam II (12), left and right diagonal brace (14,15) all processes with steel pipe.
CN2011205509433U 2011-12-26 2011-12-26 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt Expired - Lifetime CN202430737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205509433U CN202430737U (en) 2011-12-26 2011-12-26 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205509433U CN202430737U (en) 2011-12-26 2011-12-26 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt

Publications (1)

Publication Number Publication Date
CN202430737U true CN202430737U (en) 2012-09-12

Family

ID=46780198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205509433U Expired - Lifetime CN202430737U (en) 2011-12-26 2011-12-26 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt

Country Status (1)

Country Link
CN (1) CN202430737U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518145A (en) * 2011-12-26 2012-06-27 中国十七冶集团有限公司 Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations
CN103866865A (en) * 2012-12-17 2014-06-18 中冶天工集团有限公司 Pre-embedding and fixing method for foundation bolt with diameter of 48mm
CN104988941A (en) * 2015-05-21 2015-10-21 中国化学工程第三建设有限公司 Large bearing platform type foundation hanging formwork and construction method thereof
CN111809653A (en) * 2020-07-06 2020-10-23 中建八局第三建设有限公司 High-precision regularization installation method for foundation embedded part of special amusement equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518145A (en) * 2011-12-26 2012-06-27 中国十七冶集团有限公司 Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations
CN103866865A (en) * 2012-12-17 2014-06-18 中冶天工集团有限公司 Pre-embedding and fixing method for foundation bolt with diameter of 48mm
CN103866865B (en) * 2012-12-17 2016-12-28 中冶天工集团有限公司 The pre-buried fixing means of a diameter of 48mm foundation bolt
CN104988941A (en) * 2015-05-21 2015-10-21 中国化学工程第三建设有限公司 Large bearing platform type foundation hanging formwork and construction method thereof
CN104988941B (en) * 2015-05-21 2017-02-22 中国化学工程第三建设有限公司 Large bearing platform type foundation hanging formwork and construction method thereof
CN111809653A (en) * 2020-07-06 2020-10-23 中建八局第三建设有限公司 High-precision regularization installation method for foundation embedded part of special amusement equipment

Similar Documents

Publication Publication Date Title
CN202430737U (en) Overall positioning and reinforcing device for equipment foundation row and group embedded bolt
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN102518145A (en) Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations
CN105649213A (en) Construction method for large steel structural embedded part in dense reinforcement distribution region
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN212376021U (en) Steel corbel and support-free installation connecting node comprising same
CN211341789U (en) Wall form reinforcing tool
CN203429556U (en) System for quickly installing and positioning cable saddle
CN111350345A (en) Pull-rod-free template reinforcing system for outer wall of buried sewage treatment plant and installation method
CN110130391A (en) Isolated footing pre-embedded bolt mounting structure and method
CN203755167U (en) Assistant mounting device of V-shaped steel pipe frame of tower bridge
CN201265214Y (en) Steel plate anchorage block used for external pre-stress reinforcement structure
CN107700824A (en) Bar type wall-attached frame
CN204608824U (en) A kind of steam turbine foundation built-in bolt sleeve group fixed frame
CN205224073U (en) Mould is fixed to contact net
CN213174742U (en) Top bracing steel stand structure
CN204876084U (en) Steel column foot crab -bolt fixed bolster
CN213538700U (en) Supporting structure for concrete construction of cantilever end of steel-concrete composite beam bridge
CN202114437U (en) Positioning device for foundation bolts
CN109235483A (en) A kind of large equipment base foundation bolt positioning device and its application method
CN102561383B (en) Tower crane base mounting method
CN203640313U (en) Floor beam installing support
CN107938841A (en) A kind of positioning adjusting of steel column pairing and method of temporarily fixing
CN214935528U (en) Be applicable to cast-in-place floor tower crane of assembled outer wall attaches arm device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120912

CX01 Expiry of patent term