CN202430737U - Overall positioning and reinforcing device for equipment foundation row and group embedded bolt - Google Patents
Overall positioning and reinforcing device for equipment foundation row and group embedded bolt Download PDFInfo
- Publication number
- CN202430737U CN202430737U CN2011205509433U CN201120550943U CN202430737U CN 202430737 U CN202430737 U CN 202430737U CN 2011205509433 U CN2011205509433 U CN 2011205509433U CN 201120550943 U CN201120550943 U CN 201120550943U CN 202430737 U CN202430737 U CN 202430737U
- Authority
- CN
- China
- Prior art keywords
- embedded bolt
- longeron
- right sides
- row
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to an overall positioning and reinforcing device for equipment foundation row and group embedded bolts, which is characterized in that an embedded bolt positioning ladder frame is erected above a foundation template framework, a supporting frame of the positioning ladder frame is arranged on foundations on the left external side and the right external side of the foundation template framework, the positioning ladder frame mainly comprises left and right main horizontal beams, left and right longitudinal beams I and left and right vertical beams I, row and group embedded bolt holes are arranged on the left and right main transverse beams, protection rings are embedded in the embedded bolt holes, embedded bolts are installed in the embedded bolt holes in a penetrating way, washers are respectively sheathed on the upper end section and the lower section of each embedded bolt, adjusting nuts and locking nuts are screwed, the supporting frame is respectively installed on the foundations on the left external side and the right external side of the foundation template framework from the front to the rear at positions corresponding to the left and right vertical beams I on the positioning ladder frame, the supporting frame mainly comprises a longitudinal beam II, left and right vertical beams II, left and right diagonal bracings and left and right fixed piles, the row and group embedded bolts are overall suspended between left and right templates, and the positioning ladder frame and the supporting frame can be detached and reused.
Description
Technical field
The utility model belongs to the equipment installation auxiliary device, especially relates to a kind of location bracing means of equipment pre-embedded bolt.
Background technology
The installation of existing pre-embedded bolt is reinforced; Usually adopt that the pre-embedded bolt point is welded in reinforcement foundation is online; Or often adopt reinforcing bar, shaped steel in basic concrete, to weld and establish the tripod bracing reinforcement, but it is big that pre-embedded bolt is located the unwrapping wire difficulty one by one, welding capacity is big and be prone to the burn screw rod; The waste steel, and when concreting, be prone to cause the bolt off normal.
Summary of the invention
The purpose of the utility model is that a kind of Equipment Foundations of proposition become row, the integral body of pre-embedded bolt is located bracing means in groups, and is not only rational in infrastructure, uses reliably, improves pre-embedded bolt installation rate and precision effectively, and can reuse, and reduces construction cost.
The purpose of the utility model realizes like this: a kind of Equipment Foundations become row, the integral body of pre-embedded bolt is located bracing means in groups; Comprise equipment concrete foundation template framework; This foundation forms framework mainly is made up of left-right template, split bolt, template diagonal brace and gag lever post; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder, and the bracing frame of pre-embedded bolt location ladder is set on outside ground about equipment concrete foundation template framework, this pre-embedded bolt location ladder (see figure 2) mainly is made up of left and right sides main beam, longeron I and upright beam I; Left and right sides main beam all be before and after to and be symmetrical set; This left and right sides main beam can be processed by angle steel, on the lateral surface of left and right sides main beam symmetrically respectively by being uniformly distributed with the upright beam I of putting on being welded after going to, and about the corresponding inside line that is positioned at upright beam I about each group is welded respectively on the upper surface of left and right sides main beam or the soffit to the longeron I; Assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; This longeron I and all available steel pipe of upright beam I are processed, and simultaneously, on the main beam of the left and right sides, offer into row pre-embedded bolt hole in groups; And the spacing and the aperture of each pre-embedded bolt on the spacing in this pre-embedded bolt hole and aperture and the device designed are corresponding to the same; In addition, the equal mounting holes in the both ends of main beam in the left and right sides couples together each section main beam serial connection with strip junction plate and connecting bolt; Setting-in guard ring and correspondence install pre-embedded bolt in each pre-embedded bolt hole; On overhanging upper end section of each pre-embedded bolt and hypomere, be set with packing ring and correspondence is screwed adjusting nut and locking nut (seeing Fig. 1,2), this guard ring can be processed with India-rubber wire, in order to the screw thread of protection pre-embedded bolt;
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at
IThe position bracing frame is installed respectively, this bracing frame is mainly by longeron
II, about upright beam
II, left and right sides diagonal brace and left and right sides spud pile form upright beam about each
IIVertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam
IIFore-and-aft clearance and Li Liang
IFore-and-aft clearance consistent, upright beam about each group
IIUpper end section on steel pipe cross snap fit longeron is installed
II, and make each longeron II all be positioned at the top of Equipment Foundations template framework, about each, found beam
IIUpper end section on fixedly mount left and right diagonal brace respectively with steel pipe cross buckle again, the lower end section of this each left and right diagonal brace respectively with ground on left and right sides spud pile be connected this longeron
II, upright beam
II, all available steel pipe of left and right diagonal brace processes this each longeron
IIThe stage casing on steel pipe cross buckle respectively with each group about upright beam
IBe fixedly connected, will become row each pre-embedded bolt while integral hanging in groups like this between left-right template.
Pre-embedded bolt adjustment location: suitably become flexible each steel pipe cross buckle that steel pipe longeron II is connected with upright beam I according to the location unwrapping wire; The location ladder is carried out integral level displacement adjustment; Axis centering is laggard fixes each steel pipe cross buckle fastening; Steel pipe cross buckle on the ladder of suitably loosening then location; To locate according to measuring control absolute altitude line that the ladder discrepancy in elevation is tentatively adjusted and fastening each steel pipe cross buckle, and utilize locking, adjusting nut on loosening and the fastening pre-embedded bolt that the absolute altitude of each pre-embedded bolt is accurately adjusted again, and check and locking nut screwing is fixed after qualified; Concreting then, treat concrete setting after, pull down location ladder and bracing frame, reusable.
The Equipment Foundations that the utility model proposed become row, the integral body of pre-embedded bolt is located bracing means in groups, and is rational in infrastructure, safe and reliable, improved pre-embedded bolt installation rate and precision effectively, and can reuse, and reduced construction cost.
Combine at present accompanying drawing and embodiment to the Equipment Foundations that the utility model proposed become row, the integral body location bracing means of pre-embedded bolt is described further in groups.
Description of drawings
Fig. 1 is that the Equipment Foundations that the utility model proposes become row, the main cross-sectional schematic when the integral body location bracing means of pre-embedded bolt uses in groups.
Fig. 2 is a part 1 among Fig. 1: upright beam
I, part 5: longeron
I, part 11: longeron
IIBe assembled into the main cross-sectional schematic that pre-embedded bolt is located ladder with left and right sides main beam.
Fig. 3 is the schematic top plan view of Fig. 2.
Among Fig. 1-Fig. 3: 1, Li Liang
I2, main beam 3, pre-embedded bolt hole 4, junction plate 5, longeron
I6, steel pipe cross buckle 7, guard ring 8, packing ring 9, locking nut 10, pre-embedded bolt 11, longeron
II12, Li Liang
II13, adjusting nut 14, left diagonal brace 15, right diagonal brace 16, spud pile.
The specific embodiment
From Fig. 1, Fig. 2, can find out: a kind of Equipment Foundations become row, the integral body of pre-embedded bolt is located bracing means in groups; Comprise equipment concrete foundation template framework; This foundation forms framework mainly is made up of left-right template, split bolt, template diagonal brace and gag lever post; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder, and equipment concrete foundation template framework about the bracing frame of pre-embedded bolt location ladder is set on the ground of the outside, this pre-embedded bolt location ladder mainly is made up of left and right sides main beam 2, longeron I 5 and upright beam I 1; Left and right sides main beam 2 all be before and after to and be symmetrical set; This left and right sides main beam 2 can be processed by angle steel, on the lateral surface of left and right sides main beam 2 symmetrically respectively by being uniformly distributed with the upright beam I 1 of putting on being welded after going to, and about the corresponding inside line that is positioned at upright beam I 1 about each group is welded respectively on the upper surface of left and right sides main beam 2 or the soffit to longeron I 5; Assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; This longeron I 5 is processed with all available steel pipe of upright beam I 1, simultaneously, on left and right sides main beam 2, offers into row pre-embedded bolt hole 3 in groups; And the spacing and the aperture of each pre-embedded bolt on the spacing in this pre-embedded bolt hole 3 and aperture and the device designed are corresponding to the same; In addition, the equal mounting holes in the both ends of main beam 2 in the left and right sides couples together each section main beam 2 serial connections with strip junction plate 4 and connecting bolt; Setting-in guard ring 7 and correspondence install pre-embedded bolt 10 in each pre-embedded bolt hole 3; On overhanging upper end section of each pre-embedded bolt 10 and hypomere, be set with packing ring 8 and correspondence is screwed adjusting nut 13 and locking nut 9 (seeing Fig. 1,2), this guard ring 7 can be processed with India-rubber wire, in order to the screw thread of protection pre-embedded bolt 10;
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at
IBracing frame is installed at 1 position respectively, and this bracing frame is mainly by longeron
II 11, about upright beam
II 12, left and right diagonal brace 14,15 and left and right sides spud pile 16 form upright beam about each
II 12Vertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam
II 12Fore-and-aft clearance and Li Liang
I 1Fore-and-aft clearance consistent, upright beam about each group
II 12Upper end section on steel pipe cross buckle 6 fixed installation longerons
II 11, and make each longeron II 11 all be positioned at the top of Equipment Foundations template framework, about each, found beam
II 12Upper end section on fixedly mount left and right diagonal brace 14,15 respectively with steel pipe cross buckle 6 again, the lower end section of this each left and right diagonal brace 14,15 respectively with ground on left and right sides spud pile 16 be connected this longeron
II 11, upright beam
II 12, left and right diagonal brace 14,15 all available steel pipes process this each longeron
II 11The stage casing on steel pipe cross buckle 6 respectively with each group about upright beam
I 1Be fixedly connected, so just will become row each 10 while of pre-embedded bolt integral hanging in groups between left-right template.
Claims (5)
1. Equipment Foundations become row, the integral body location bracing means of pre-embedded bolt in groups; Comprise equipment concrete foundation template framework; It is characterized in that: above equipment concrete foundation template framework, set up pre-embedded bolt location ladder; And equipment concrete foundation template framework about the outside bracing frame of pre-embedded bolt location ladder is set on the ground; This pre-embedded bolt location ladder mainly is made up of left and right sides main beam (2), longeron I (5) and upright beam I (1); Left and right sides main beam (2) be before and after to and be symmetrical set; On the lateral surface of left and right sides main beam (2) symmetrically respectively by being uniformly distributed with the upright beam I (1) of putting on being welded after going to, and about the inside line that correspondence on the upper surface of left and right sides main beam (2) or the soffit is positioned at upright beam I (1) about each group is welded respectively to longeron I (5), assembly welding becomes the steel structure frame of ladder shape promptly to locate ladder; Simultaneously; On left and right sides main beam (2), offer into row pre-embedded bolt hole (3) in groups, and the spacing and the aperture of the spacing in this pre-embedded bolt hole (3) and each pre-embedded bolt on aperture and the device designed are corresponding to the same, in addition; The equal mounting holes in both ends of the main beam in the left and right sides (2); With strip junction plate (4) and connecting bolt each section main beam (2) serial connection is coupled together, setting-in guard ring (7) and correspondence install pre-embedded bolt (10) in each pre-embedded bolt hole (3), on overhanging upper end section of each pre-embedded bolt (10) and hypomere, are set with packing ring (8) and correspondence is screwed adjusting nut (13) and locking nut (9);
In addition, on the ground in the outside about the Equipment Foundations template framework, found beam about each of locating on the ladder by preceding backwardly corresponding being positioned at
I (1) bracing frame is installed at position respectively, and this bracing frame is mainly by longeron
II (11), about upright beam
II (12), left and right diagonal brace (14,15) and left and right sides spud pile (16) form upright beam about each
II (12)Vertically be fixedly mounted in the ground in two outsides about Equipment Foundations by preceding symmetry backwardly, and each upright beam
II (12)Fore-and-aft clearance and Li Liang
I (1)Fore-and-aft clearance consistent, upright beam about each group
II (12)Upper end section on steel pipe cross buckle (6) fixed installation longeron
II (11), and make each longeron II (11) all be positioned at the top of Equipment Foundations template framework, about each, found beam
II (12)Upper end section on use steel pipe cross buckle (6) to fixedly mount left and right diagonal brace (14,15) respectively again, the lower end section of this each left and right diagonal brace (14,15) respectively with ground on left and right sides spud pile (16) be connected this each longeron
II (11)The stage casing on steel pipe cross buckle (6) respectively with each group about upright beam
I (1)Be fixedly connected, with becoming row each pre-embedded bolt (10) while integral hanging in groups between left-right template.
2. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this left and right sides main beam (2) processed by angle steel.
3. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this longeron I (5) and upright beam I (1) all process with steel pipe.
4. Equipment Foundations according to claim 1 become row, the integral body location bracing means of pre-embedded bolt in groups, it is characterized in that this guard ring (7) processes with India-rubber wire.
5. Equipment Foundations according to claim 1 become row, the integral body of pre-embedded bolt is located bracing means in groups, it is characterized in that this longeron
II (11), upright beam
II (12), left and right diagonal brace (14,15) all processes with steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205509433U CN202430737U (en) | 2011-12-26 | 2011-12-26 | Overall positioning and reinforcing device for equipment foundation row and group embedded bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205509433U CN202430737U (en) | 2011-12-26 | 2011-12-26 | Overall positioning and reinforcing device for equipment foundation row and group embedded bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202430737U true CN202430737U (en) | 2012-09-12 |
Family
ID=46780198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205509433U Expired - Lifetime CN202430737U (en) | 2011-12-26 | 2011-12-26 | Overall positioning and reinforcing device for equipment foundation row and group embedded bolt |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202430737U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102518145A (en) * | 2011-12-26 | 2012-06-27 | 中国十七冶集团有限公司 | Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations |
CN103866865A (en) * | 2012-12-17 | 2014-06-18 | 中冶天工集团有限公司 | Pre-embedding and fixing method for foundation bolt with diameter of 48mm |
CN104988941A (en) * | 2015-05-21 | 2015-10-21 | 中国化学工程第三建设有限公司 | Large bearing platform type foundation hanging formwork and construction method thereof |
CN111809653A (en) * | 2020-07-06 | 2020-10-23 | 中建八局第三建设有限公司 | High-precision regularization installation method for foundation embedded part of special amusement equipment |
-
2011
- 2011-12-26 CN CN2011205509433U patent/CN202430737U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102518145A (en) * | 2011-12-26 | 2012-06-27 | 中国十七冶集团有限公司 | Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations |
CN103866865A (en) * | 2012-12-17 | 2014-06-18 | 中冶天工集团有限公司 | Pre-embedding and fixing method for foundation bolt with diameter of 48mm |
CN103866865B (en) * | 2012-12-17 | 2016-12-28 | 中冶天工集团有限公司 | The pre-buried fixing means of a diameter of 48mm foundation bolt |
CN104988941A (en) * | 2015-05-21 | 2015-10-21 | 中国化学工程第三建设有限公司 | Large bearing platform type foundation hanging formwork and construction method thereof |
CN104988941B (en) * | 2015-05-21 | 2017-02-22 | 中国化学工程第三建设有限公司 | Large bearing platform type foundation hanging formwork and construction method thereof |
CN111809653A (en) * | 2020-07-06 | 2020-10-23 | 中建八局第三建设有限公司 | High-precision regularization installation method for foundation embedded part of special amusement equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202430737U (en) | Overall positioning and reinforcing device for equipment foundation row and group embedded bolt | |
CN202913420U (en) | Reusable positioning device for installing foundation bolts | |
CN102518145A (en) | Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations | |
CN105649213A (en) | Construction method for large steel structural embedded part in dense reinforcement distribution region | |
CN201817814U (en) | Adjustable fixed support of vertical surface sheet steel form | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN211341789U (en) | Wall form reinforcing tool | |
CN203429556U (en) | System for quickly installing and positioning cable saddle | |
CN111350345A (en) | Pull-rod-free template reinforcing system for outer wall of buried sewage treatment plant and installation method | |
CN110130391A (en) | Isolated footing pre-embedded bolt mounting structure and method | |
CN203755167U (en) | Assistant mounting device of V-shaped steel pipe frame of tower bridge | |
CN201265214Y (en) | Steel plate anchorage block used for external pre-stress reinforcement structure | |
CN107700824A (en) | Bar type wall-attached frame | |
CN204608824U (en) | A kind of steam turbine foundation built-in bolt sleeve group fixed frame | |
CN205224073U (en) | Mould is fixed to contact net | |
CN213174742U (en) | Top bracing steel stand structure | |
CN204876084U (en) | Steel column foot crab -bolt fixed bolster | |
CN213538700U (en) | Supporting structure for concrete construction of cantilever end of steel-concrete composite beam bridge | |
CN202114437U (en) | Positioning device for foundation bolts | |
CN109235483A (en) | A kind of large equipment base foundation bolt positioning device and its application method | |
CN102561383B (en) | Tower crane base mounting method | |
CN203640313U (en) | Floor beam installing support | |
CN107938841A (en) | A kind of positioning adjusting of steel column pairing and method of temporarily fixing | |
CN214935528U (en) | Be applicable to cast-in-place floor tower crane of assembled outer wall attaches arm device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120912 |
|
CX01 | Expiry of patent term |