CN103866865A CN201210547708.XA CN201210547708A CN103866865A CN 103866865 A CN103866865 A CN 103866865A CN 201210547708 A CN201210547708 A CN 201210547708A CN 103866865 A CN103866865 A CN 103866865A
Authority
CN
China
Prior art keywords
diameter
foundation
load
embedding
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210547708.XA
Other languages
Chinese (zh)
Other versions
CN103866865B (en
Inventor
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201210547708.XA priority Critical patent/CN103866865B/en
Publication of CN103866865A publication Critical patent/CN103866865A/en
Application granted granted Critical
Publication of CN103866865B publication Critical patent/CN103866865B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to an pre-embedding and fixing method for a foundation bolt with a diameter of 48mm. the pre-embedding and fixing method comprises the steps of: 1, making a foundation bed on a soil layer with an pre-embedding position of the foundation bolt; 2, assembling a casting mold with a concrete foundation on the foundation bed; 3, symmetrically mounting stabilizing bars on the soil layer on two sides of the foundation bed with the pre-embedding position of the foundation bolt in an inserting manner; 4, symmetrically and fixedly mounting bearing columns on the foundation bed on the outer side of the casting mold with the concrete foundation corresponding to the pre-embedding position, wherein the bearing columns are fixed with aslant stay bars, at the same side with the bearing columns, fixedly mounted on the stabilizing bar; 5, fixedly mounting a bearing crossbar between the symmetric bearing columns; 6, finding the pre-embedding position of the foundation bolt on the bearing cross bar, and pre-embedding and fixing the foundation bolt accurately. According to the pre-embedding and fixing method for the foundation bolt with the diameter of 48mm, a common fastener type steel tube scaffolding is used as the material of a foundation bolt fixed mount, so that mounting is simple and rapid, operation is convenient, and time and labor are saved; the foundation bolt fixed mount is arranged outside the base so as to be capable of being used repeatedly, and thus the usage amount of steel is saved, and construction cost is reduced.

Description

Diameter is the pre-buried fixing means of 48mm stone bolt
Technical field
The invention belongs to the realm of building construction, especially a kind of diameter is the pre-buried fixing means of 48mm stone bolt.
Background technology
At the realm of building construction, the ground main part of large stadium or industrial premises is in most cases designed to steel structural form, it is a kind of method often adopting that the suspension column of steel work or bearing are connected by stone bolt with basis, and diameter is that the bolt of φ 48mm is wherein one of common stone bolt specification.Because this kind of diameter of bolt is larger, before base concrete cast, the pre-buried of bolt is fixedly the critical process of construction.In construction in the past, the pre-buried employing shaped steel bolt fixed mount of this bolt is first buried ironware underground on foundation pad, on ironware, weld column, bearing diagonal is set between column, column top install crossbeam, by stone bolt with shaped steel frame be located on crossbeam, complete fixing.This method, in the most of disposable buried foundation concrete of bolt fixed mount, can not reuse, and causes waste of material.And construction is comparatively complicated, and time-consuming taking a lot of work, has strengthened construction cost, has reduced production efficiency.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, it is the pre-buried fixing means of 48mm stone bolt that a kind of diameter is provided, and the method is scientific and reasonable, simple, convenient fast, installation is accurate, improved efficiency of construction, has reduced construction cost.
The present invention solves its technical problem and is achieved through the following technical solutions:
Diameter is a pre-buried fixing means for 48mm stone bolt, and the step of its pre-buried fixing means is as follows:
(1), on being the soil layer of 48mm embedding anchor bolts position, diameter makes foundation pad;
(2), assembling concrete basis casting mold on foundation pad;
(3) be, the firm bar of symmetrical plug-in mounting on the soil layer of foundation pad both sides of 48mm embedding anchor bolts position at corresponding diameter;
, be that on the foundation pad in concrete foundation casting mold outside of 48mm embedding anchor bolts position, symmetry is fixedly mounted with load-bearing vertical rod at corresponding diameter, this load-bearing vertical rod is fixed by the hound being fixedly mounted with firm bar of homonymy;
(5), be fixedly mounted with load-bearing cross bar between symmetrical load-bearing vertical rod, the two ends of this load-bearing cross bar are packed in respectively load-bearing vertical rod top;
(6), on load-bearing cross bar, to find diameter accurately be 48mm embedding anchor bolts position, is that 48mm stone bolt correct embedment is fixed by diameter.
And, between load-bearing cross bar and load-bearing vertical rod, be fixedly mounted with diagonal member.
And described diameter is that 48mm stone bolt is packed on load-bearing cross bar by scaffold clasp.
Advantage of the present invention and beneficial effect are:
This diameter is that the pre-buried fixing means of 48mm stone bolt has adopted common fastener type steel pipe scaffold as anchor bolt fixing bracket material, simple and fast is installed, easy to operate, time saving and energy saving, anchor bolt fixing bracket is arranged on outside basis, can reuse, the use amount of saving steel, has reduced construction cost.
Accompanying drawing explanation
Fig. 1 is the installment state figure that the present invention installs one group of stone bolt.
The specific embodiment
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
Diameter is a pre-buried fixing means for 48mm stone bolt, and the step of its pre-buried fixing means is as follows:
(1), on being the soil layer 10 of 48mm embedding anchor bolts position, diameter makes foundation pad 8;
(2), the casting mold on assembling concrete basis 9 on foundation pad;
(3) be, the firm bar 1 of symmetrical plug-in mounting on the soil layer of foundation pad both sides of 48mm embedding anchor bolts position at corresponding diameter;
, be that on the foundation pad in concrete foundation casting mold outside of 48mm embedding anchor bolts position, symmetry is fixedly mounted with load-bearing vertical rod 3 at corresponding diameter, this load-bearing vertical rod is fixing by the hound 2 being fixedly mounted with firm bar of homonymy;
(5), be fixedly mounted with load-bearing cross bar 5 between symmetrical load-bearing vertical rod, the two ends of this load-bearing cross bar are packed in respectively load-bearing vertical rod top, between load-bearing cross bar and load-bearing vertical rod, are fixedly mounted with diagonal member 4; This diagonal member effectively prevents the downwarp of load-bearing cross bar, diameter is that 48mm stone bolt 6 is packed on load-bearing cross bar by scaffold clasp 7, while fills some cottons between stone bolt and fastener or rubber protects bolt not to be damaged, firm bar, load-bearing vertical rod, hound and load-bearing cross bar composition anchor bolt fixing bracket;
(6), on load-bearing cross bar, to find diameter accurately be 48mm embedding anchor bolts position, is that 48mm stone bolt correct embedment is fixed by diameter.Multiple stone bolt in concrete foundation adopt anchor bolt fixing bracket separately, can adopt connecting rod to be fixedly mounted with between anchor bolt fixing bracket.After adopting connecting rod to be fixedly mounted with, multiple stone bolt geometrical clamps connect into a stable entirety, guarantee that bolt fixed mount is indeformable during pouring concrete, reach bolt embedment accuracy.

Claims (3)

1. diameter is a pre-buried fixing means for 48mm stone bolt, it is characterized in that: the step of this pre-buried fixing means is as follows:
(1), on being the soil layer of 48mm embedding anchor bolts position, diameter makes foundation pad;
(2), the casting mold on assembling concrete basis on foundation pad;
(3) be, the firm bar of symmetrical plug-in mounting on the soil layer of foundation pad both sides of 48mm embedding anchor bolts position at corresponding diameter;
, be that on the foundation pad in concrete foundation casting mold outside of 48mm embedding anchor bolts position, symmetry is fixedly mounted with load-bearing vertical rod at corresponding diameter, this load-bearing vertical rod is fixed by the hound being fixedly mounted with firm bar of homonymy;
(5), be fixedly mounted with load-bearing cross bar between symmetrical load-bearing vertical rod, the two ends of this load-bearing cross bar are packed in respectively load-bearing vertical rod top;
(6), on load-bearing cross bar, to find diameter accurately be 48mm embedding anchor bolts position, is that 48mm stone bolt correct embedment is fixed by diameter.
2. diameter according to claim 1 is the pre-buried fixing means of 48mm stone bolt, it is characterized in that: between load-bearing cross bar and load-bearing vertical rod, be fixedly mounted with diagonal member.
3. diameter according to claim 1 is the pre-buried fixing means of 48mm stone bolt, it is characterized in that: described diameter is that 48mm stone bolt is packed on load-bearing cross bar by scaffold clasp.
CN201210547708.XA 2012-12-17 2012-12-17 The pre-buried fixing means of a diameter of 48mm foundation bolt Active CN103866865B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210547708.XA CN103866865B (en) 2012-12-17 2012-12-17 The pre-buried fixing means of a diameter of 48mm foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210547708.XA CN103866865B (en) 2012-12-17 2012-12-17 The pre-buried fixing means of a diameter of 48mm foundation bolt

Publications (2)

Publication Number Publication Date
CN103866865A true CN103866865A (en) 2014-06-18
CN103866865B CN103866865B (en) 2016-12-28

Family

ID=50905845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210547708.XA Active CN103866865B (en) 2012-12-17 2012-12-17 The pre-buried fixing means of a diameter of 48mm foundation bolt

Country Status (1)

Country Link
CN (1) CN103866865B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965575A (en) * 2019-11-25 2020-04-07 中国十九冶集团有限公司 Foundation bolt mounting and fixing tool and method for equipment foundation
CN112726824A (en) * 2020-12-30 2021-04-30 湖南鸿云杭萧绿建科技有限公司 Mounting and hoisting method for assembled steel structure building steel column node

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184203A (en) * 1995-10-31 1997-07-15 Motoomi Ogata Method and device for fixing metal member to concrete, and anchor bolt and shear bearing ring
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101266011A (en) * 2008-04-22 2008-09-17 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
CN101338566A (en) * 2008-08-29 2009-01-07 河北省第四建筑工程公司 Integral built-in process for groups of anchor bolts
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN202430737U (en) * 2011-12-26 2012-09-12 中国十七冶集团有限公司 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184203A (en) * 1995-10-31 1997-07-15 Motoomi Ogata Method and device for fixing metal member to concrete, and anchor bolt and shear bearing ring
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN101266011A (en) * 2008-04-22 2008-09-17 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN101307603A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 Column base anchor bolt moving-out type fixing rack construction method
CN101338566A (en) * 2008-08-29 2009-01-07 河北省第四建筑工程公司 Integral built-in process for groups of anchor bolts
CN101666100A (en) * 2009-09-15 2010-03-10 中冶实久建设有限公司 Method for accurately installing large foundation bolt of industrial equipment foundation
CN202430737U (en) * 2011-12-26 2012-09-12 中国十七冶集团有限公司 Overall positioning and reinforcing device for equipment foundation row and group embedded bolt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965575A (en) * 2019-11-25 2020-04-07 中国十九冶集团有限公司 Foundation bolt mounting and fixing tool and method for equipment foundation
CN112726824A (en) * 2020-12-30 2021-04-30 湖南鸿云杭萧绿建科技有限公司 Mounting and hoisting method for assembled steel structure building steel column node
CN112726824B (en) * 2020-12-30 2022-06-28 湖南鸿云杭萧绿建科技有限公司 Assembled steel structure building steel column joint structure and installation method

Also Published As

Publication number Publication date
CN103866865B (en) 2016-12-28

Similar Documents

Publication Publication Date Title
CN204174935U (en) A kind of outer wall of basement one side formwork supporting and protection structure
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN201310072Y (en) Supporting bracket of bridge construction
CN103866865A (en) Pre-embedding and fixing method for foundation bolt with diameter of 48mm
CN203583859U (en) Embedded bolt anchoring device for fixing cantilever I-shaped steel in building construction
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN201891171U (en) Integral bolt assembling frame
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN204609295U (en) A kind of square column template anchor ear encloses purlin
CN103552911A (en) Movable hoisting apparatus and construction installation method used by same
CN203514323U (en) Connection component
CN203307931U (en) Embedded part positioning screw connecting structure
CN102619328B (en) Tool type mounting clamp for ring beam mold plates and lintel mold plates
CN103452119A (en) Prestress loading device of internal support system for foundation pit supporting
CN201605595U (en) Equipment anchor bolt installation device
CN203420274U (en) Prestress loading device of pit supporting and protecting inner support system
CN203668971U (en) Waterproof formwork system for open trench tunnel
CN110805141B (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN203247718U (en) Steel column butt-joint mounting device
CN210975822U (en) Lattice column loose end structure capable of circularly applying prestress
CN203699741U (en) Assembled type wall attaching device of tower crane
CN204174936U (en) A kind of template support structure of outer wall of basement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant