CN105133502B - Bridge pier column concrete curing controls device - Google Patents

Bridge pier column concrete curing controls device Download PDF

Info

Publication number
CN105133502B
CN105133502B CN201510582094.2A CN201510582094A CN105133502B CN 105133502 B CN105133502 B CN 105133502B CN 201510582094 A CN201510582094 A CN 201510582094A CN 105133502 B CN105133502 B CN 105133502B
Authority
CN
China
Prior art keywords
maintenance
switch
tank
bridge pier
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510582094.2A
Other languages
Chinese (zh)
Other versions
CN105133502A (en
Inventor
游兴荣
徐书龙
张德新
游靓
唐建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201510582094.2A priority Critical patent/CN105133502B/en
Publication of CN105133502A publication Critical patent/CN105133502A/en
Application granted granted Critical
Publication of CN105133502B publication Critical patent/CN105133502B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of bridge pier column concrete curing and control device, including tank, water inlet switch, control switch, effluent switch and maintenance sparge pipe;Tank is gas-tight container, the top of tank is provided with the inlet channel and water inlet switch connected with pressure water source, the top of tank is provided with the control pipeline communicated with air and controls switch, and the bottom of tank is provided with the effluent switch being connected with maintenance sparge pipe;Tank is placed in the end face of bridge pier column, and maintenance sparge pipe is looped around the surrounding of bridge pier column end face, and maintenance sparge pipe is along the uniform a plurality of hole for water sprayings of length.Present configuration is simple, easy to manufacture, easy to operate, it is possible to save the water resource used and cost of labor in bridge pier column concrete curing in a large number.

Description

Bridge pier column concrete curing controls device
Technical field
The present invention relates to a kind of bridge pier column concrete curing and control device.
Background technology
The high speed development of China's economic, traffic transporting facility is difficult to satisfy social needs, government building city, various places Political affairs, the investment of road and bridge engineering are increasing year by year, and municipal administration, road and bridge engineering are built in a large number and improved friendship Certainly will consume substantial amounts of resource and the energy while logical Ferry Status, country is sustainable in order to protect environment to realize Development, advocates five joint one environmental protection energetically, i.e. saves land, economizes on water, economizes on electricity, material-saving, energy-conservation and protection environment.
At present for municipal administration, the method for the performance of concrete column confined artificial water seasoning of many employings of road and bridge engineering. Owing to the performance of concrete column confined of municipal administration, road and bridge engineering is the highest, artificial water seasoning to consume substantial amounts of Valuable water resource, and the expenditure of the highest labor wage cost.
China is that the country of a poor-water is very big, due to mixed concrete in construction to using water wisely meaning Needing to use a large amount of water, concrete curing is also required to substantial amounts of water and is artificial water seasoning, therefore in construction In reduce the consumption of water resource as far as possible.
We are summed up by field practice and study successfully a kind of bridge pier column concrete curing control device, solve Substantial amounts of while bridge pier column concrete curing save water consumption and human resources.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of can conserving water in a large number and the bridge of cost of labor Beam pier stud concrete curing controls device.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is: bridge pier column concrete curing Control device, including tank, water inlet switch, control switch, effluent switch and maintenance sparge pipe;Storage Water receptacle is gas-tight container, and the top of tank is provided with the inlet channel connected with pressure water source and opens with water inlet Closing, the top of tank is provided with the control pipeline communicated with air and controls switch, the bottom of tank It is provided with the effluent switch being connected with maintenance sparge pipe;Tank is placed in the end face of bridge pier column, and maintenance is sprayed water Pipe ring is wound on the surrounding of bridge pier column end face, and maintenance sparge pipe is along the uniform a plurality of hole for water sprayings of length.
As preferably, maintenance sparge pipe is flexible pipe;One end of flexible pipe is connected with effluent switch, the end of the other end Head is closed.
As preferably, maintenance sparge pipe divides both sides around the surrounding of bridge pier column end face.
As preferably, control switch and can control the water flow size of maintenance sparge pipe.
Use above-mentioned bridge pier column concrete curing to control device and carry out bridge pier column concrete curing method, bag Include following steps:
(1) form removal after pier stud concreting;
(2) with plastic sheeting, pier stud body is wrapped up;
(3) pier stud end face lays concrete curing control device;
(4) opening control switch makes tank communicate with air, opens water inlet switch and passes through inlet channel Add water in tank designated water level;
(5) close inlet channel and keep effluent switch unimpeded with maintenance sparge pipe, opening control switch and make Maintenance water pipeline automatic watering function is to bridge pier column end face and pier stud facade maintenance, adjustable by controlling switch Maintenance sparge pipe uninterrupted, rainy day closedown;
(6) maintenance removes curing means the most afterwards no less than 7 continuously;
(7) forward next pier stud maintenance week to use.
The invention has the beneficial effects as follows:
Simple in construction, easy to manufacture, easy to operate, it is possible to save in a large number in bridge pier column concrete curing The water resource used and cost of labor.
Accompanying drawing explanation
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is the front view that bridge pier column concrete curing of the present invention controls device embodiment.
Fig. 2 is the top view that bridge pier column concrete curing of the present invention controls device embodiment.
Fig. 3 is the tank structural representation that bridge pier column concrete curing of the present invention controls device embodiment Figure.
Marking in figure, 1-tank, 2-inlet channel, 3-water inlet switch, 4-controls pipeline, and 5-controls Switch, 6-effluent switch, 7-connects flexible pipe, 8-maintenance sparge pipe, 9-pier stud, 10-pier stud end face.
Detailed description of the invention
Fig. 1 is that a kind of bridge pier column concrete curing controls device, by tank 1, water inlet switch 3, Control switch 5, effluent switch 6 and maintenance sparge pipe 8 to form.
In fig. 2, tank 1 is gas-tight container, and tank top is connected with inlet channel 2, and Inlet channel is provided with water inlet switch 3, is provided with control pipeline 4 at tank top and controls switch 5, storage The bottom of water receptacle is provided with effluent switch 6, and effluent switch is connected with maintenance sparge pipe 8 by connecting flexible pipe 7. Tank 1 is placed in the pier stud end face 10 of bridge pier column 9.Maintenance sparge pipe 8 is also flexible pipe, its one end Being connected with effluent switch 6 by connecting flexible pipe 7, the termination of the other end is closed.8 points of both sides of maintenance sparge pipe It is looped around the surrounding of bridge pier column end face 10, and maintenance sparge pipe is provided with several hole for water sprayings along uniform length.
Tank 1 inlet channel 2 and control pipeline 4 are routed to the ground of bridge pier column, Qi Zhongjin always Waterpipe 2 is connected with pressure water source (such as tap water supply pipe network) by water inlet switch 3, controls pipeline and leads to Cross control switch 5 and atmosphere, water inlet switch and control switch and be each provided at ground, in order to operation.Water storage Container is is tightly connected with interconnective pipeline and corresponding switch.
The present embodiment is for the maintenance processes of bridge pier column:
Form removal after pier stud concreting → pier stud body is wrapped up → pier stud end face with plastic sheeting Lay concrete curing and control tank topped up with water → unlatching control switch automatic watering function of device → maintenance Maintenance, night on daytime adjustable sparge pipe uninterrupted, the rainy day closes → after continuously maintenance is no less than 7 round the clock Remove and forward next pier stud maintenance use curing means → week to.
Using method:
Owing to tank is gas-tight container, it is possible to use control pipeline 4 and control switch 5 is stored up by control Air pressure in water receptacle regulates current size.First open control switch 5 when adding water and make tank 1 Top communicate with air, then open water inlet switch 3 and in tank, add water one by inlet channel 2 Determine water level, and make tank inner top retain certain air.It is then shut off water inlet switch 3 and keeps Effluent switch 6 is unimpeded to maintenance sparge pipe 8, only opens and controls switch 5 and atmosphere.Controlled by control System switches on size, it is possible to control to enter the air capacity within tank how many, also the most corresponding control Make tank and flow out to the uninterrupted of maintenance sparge pipe.
To control when temperature is higher by day switch open a certain size so that tank is from maintenance sparge pipe Flow out water at the uniform velocity drip and keep pier stud face moisture state to carry out maintenance, when nocturnal temperature is relatively low, control is opened Pass is turned down, reduces air pressure in tank, reduces water at the uniform velocity drip speed in tank, keeps pier Cylinder moisture state carries out maintenance, and in rainy day then closing control switch stops container, water droplet drops down.
During design, consider by the maintenance water yield of bridge pier column to design amount of capacity and the water filling of tank Flow, the water yield and the water level of 7 drip amounts round the clock under the normal temperature of basic guarantee, dislikes if running into high temperature The water yield the most inadequate 7 used time round the clock in bad weather tank, control switch can be opened on ground and enter Taps adds water in tank, and people need not climb up.
Invention described above embodiment, is not intended that limiting the scope of the present invention.Any Amendment, equivalent and the improvement etc. made within the spirit and principles in the present invention, should be included in the present invention Claims within.

Claims (5)

1. bridge pier column concrete curing controls device, it is characterised in that: include that tank, water inlet are opened Close, control switch, effluent switch and maintenance sparge pipe;Described tank is gas-tight container, tank Top be provided with the inlet channel and water inlet switch connected with pressure water source, the top of tank be provided with greatly Control pipeline and control that gas phase is logical switch, and the bottom of tank is provided with the water outlet being connected with maintenance sparge pipe Switch;Described tank is placed in the end face of bridge pier column, and described maintenance sparge pipe is looped around bridge pier capital The surrounding in face, described maintenance sparge pipe is along the uniform a plurality of hole for water sprayings of length.
Bridge pier column concrete curing the most according to claim 1 controls device, it is characterised in that: Described maintenance sparge pipe is flexible pipe;One end of described flexible pipe is connected with effluent switch, and the termination of the other end is closed.
Bridge pier column concrete curing the most according to claim 1 controls device, it is characterised in that: Described maintenance sparge pipe divides both sides around the surrounding of bridge pier column end face.
Bridge pier column concrete curing the most according to claim 1 controls device, it is characterised in that: The described switch that controls can control the water flow size of maintenance sparge pipe.
5. use bridge pier column concrete curing as claimed in claim 1 to control device and carry out bridge pier column Concrete curing method, it is characterised in that comprise the following steps:
(1) form removal after pier stud concreting;
(2) with plastic sheeting, pier stud body is wrapped up;
(3) pier stud end face lays concrete curing control device;
(4) opening control switch makes tank communicate with air, opens water inlet switch and passes through inlet channel Add water in tank designated water level;
(5) close inlet channel and keep effluent switch unimpeded with maintenance sparge pipe, opening control switch and make Maintenance water pipeline automatic watering function is to bridge pier column end face and pier stud facade maintenance, adjustable by controlling switch Maintenance sparge pipe uninterrupted, rainy day closedown;
(6) maintenance removes curing means the most afterwards no less than 7 continuously;
(7) forward next pier stud maintenance week to use.
CN201510582094.2A 2015-09-11 2015-09-11 Bridge pier column concrete curing controls device Expired - Fee Related CN105133502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510582094.2A CN105133502B (en) 2015-09-11 2015-09-11 Bridge pier column concrete curing controls device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510582094.2A CN105133502B (en) 2015-09-11 2015-09-11 Bridge pier column concrete curing controls device

Publications (2)

Publication Number Publication Date
CN105133502A CN105133502A (en) 2015-12-09
CN105133502B true CN105133502B (en) 2016-09-07

Family

ID=54719052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510582094.2A Expired - Fee Related CN105133502B (en) 2015-09-11 2015-09-11 Bridge pier column concrete curing controls device

Country Status (1)

Country Link
CN (1) CN105133502B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105906374A (en) * 2016-06-04 2016-08-31 中铁十九局集团第五工程有限公司 Automatic spraying maintenance device and method for railroad bridge large pier
CN106087749B (en) * 2016-06-21 2018-05-18 中建市政工程有限公司 Maintenance method and maintenance device for water-saving bridge pier column
CN108589773B (en) * 2018-05-03 2021-03-12 上海宝冶集团有限公司 Construction system and construction method for piping lane engineering
CN109356033A (en) * 2018-11-20 2019-02-19 中国二冶集团有限公司 Bridge pier drips curing means

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3606796B2 (en) * 2000-09-20 2005-01-05 株式会社ボイラエンジニアリング Concrete curing equipment
JP5711896B2 (en) * 2010-03-30 2015-05-07 株式会社フジタ Wet curing method for concrete structures
CN201738247U (en) * 2010-08-21 2011-02-09 中铁十七局集团第五工程有限公司 Air-pressure type pier watering and curing device
CN202271431U (en) * 2011-05-17 2012-06-13 韩永阳 Automatic maintenance device of concrete
CN202273180U (en) * 2011-10-13 2012-06-13 中铁四局集团第一工程有限公司 Self-automatic spray curing system for thin-walled high piers
CN202846674U (en) * 2012-09-14 2013-04-03 中铁八局集团建筑工程有限公司 High bridge pier concrete curing device
CN202766981U (en) * 2012-09-28 2013-03-06 中铁二十局集团第三工程有限公司 Automatic concrete pier spraying and maintaining system
CN203668830U (en) * 2013-11-08 2014-06-25 杭州宇航交通工程有限公司 Maintaining and water sprinkling system for bridge pier
CN203639834U (en) * 2013-12-24 2014-06-11 中铁十九局集团第三工程有限公司 Automatic maintenance device of high pier stud concrete surface
CN103912130A (en) * 2014-03-26 2014-07-09 东莞市建之都建设工程有限公司 Environment-friendly tend-free concrete column maintaining method and device
CN203765774U (en) * 2014-04-14 2014-08-13 南京化工职业技术学院 Winter maintenance device for small component
CN204163000U (en) * 2014-10-16 2015-02-18 中交二航局第四工程有限公司 The automatic pier stud of SECO or king-post sprinkling curing system
CN204492195U (en) * 2015-01-15 2015-07-22 中铁十局集团建筑工程有限公司 Concrete pier shaft curing system

Also Published As

Publication number Publication date
CN105133502A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105133502B (en) Bridge pier column concrete curing controls device
JP3173075U (en) Equipment for collecting and storing rainwater and snow for irrigation
CN104871939B (en) A kind of Water saving type watering arrangement for improveing salt-soda soil
CN201571388U (en) Tree planting device with root irrigation function
CN203340578U (en) Automatic irrigation management system of urban road green belt
CN109555275A (en) A kind of roof garden Intelligent rain Collection utilization system
CN105875357A (en) Rainwater irrigation system
CN205742768U (en) A kind of new energy source energy-saving environment protection architecture thing
CN105746239A (en) Vegetable planting boat
CN206346150U (en) A kind of water conservancy construction protective slope structure
CN210959771U (en) Gardens irrigation equipment
CN203105240U (en) Automatic irrigation system for green belts on flyover
CN109629627A (en) A kind of municipal middle water reuse ecology system for facilitating pollution treatment and subtracting haze
CN208597474U (en) A kind of photovoltaic infiltration irrigation system
CN206078391U (en) Drip irrigation system for apple planting
CN105527385A (en) Plant water submerging test facility and construction method
CN203537827U (en) Irrigation system
CN206078379U (en) Water installation is protected in sprinkling irrigation of cascaded gardens
CN206611880U (en) A kind of environmentally friendly agricultural planting greenhouse
CN107747352A (en) A kind of environmental protection is watered flowers water sprinkling pool
CN203884349U (en) Landscaping water-saving irrigation system
CN106815794A (en) A kind of comprehensive sponge urban ecological planning managing device
CN205143085U (en) Greenbelt irrigator
CN206233332U (en) A kind of drought and waterlogging racing equipment based on sponge city
CN206547536U (en) Landscape water-saving irrigation device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907