CN106087749B - Maintenance method and maintenance device for water-saving bridge pier column - Google Patents
Maintenance method and maintenance device for water-saving bridge pier column Download PDFInfo
- Publication number
- CN106087749B CN106087749B CN201610446920.5A CN201610446920A CN106087749B CN 106087749 B CN106087749 B CN 106087749B CN 201610446920 A CN201610446920 A CN 201610446920A CN 106087749 B CN106087749 B CN 106087749B
- Authority
- CN
- China
- Prior art keywords
- pier stud
- water
- clothing
- pier
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 60
- 238000000034 method Methods 0.000 title claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 231
- 230000000694 effects Effects 0.000 claims abstract description 12
- 238000004064 recycling Methods 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 40
- 239000010959 steel Substances 0.000 claims description 40
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 15
- 239000004677 Nylon Substances 0.000 claims description 11
- 229920001778 nylon Polymers 0.000 claims description 11
- 230000001351 cycling effect Effects 0.000 claims description 8
- 238000001914 filtration Methods 0.000 claims description 7
- 230000005484 gravity Effects 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 7
- 230000002745 absorbent Effects 0.000 claims description 6
- 239000002250 absorbent Substances 0.000 claims description 6
- 230000017525 heat dissipation Effects 0.000 claims description 6
- 230000003020 moisturizing effect Effects 0.000 claims description 6
- 230000035515 penetration Effects 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 6
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 239000011449 brick Substances 0.000 claims description 3
- 239000011083 cement mortar Substances 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 13
- 230000007613 environmental effect Effects 0.000 abstract description 4
- 238000005086 pumping Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 230000018044 dehydration Effects 0.000 description 2
- 238000006297 dehydration reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000001704 evaporation Methods 0.000 description 2
- 230000008020 evaporation Effects 0.000 description 2
- 238000001727 in vivo Methods 0.000 description 2
- 230000008595 infiltration Effects 0.000 description 2
- 238000001764 infiltration Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009288 screen filtration Methods 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 230000008602 contraction Effects 0.000 description 1
- 239000013078 crystal Substances 0.000 description 1
- 238000010410 dusting Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000010902 straw Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B40/00—Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
- C04B40/02—Selection of the hardening environment
- C04B40/0277—Hardening promoted by using additional water, e.g. by spraying water on the green concrete element
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Toxicology (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention belongs to a maintenance method and a maintenance device of a water-saving bridge pier stud. The maintenance device is composed of a cofferdam for recycling the maintenance water of the pier body after being filtered, a water storage pool for storing the maintenance water, a pier column clothes for maintaining the pier body, a water equalizing ring for enabling the maintenance water entering the upper end of the pier column body to uniformly enter a water containing layer of the pier column clothes at the upper end, and a water pump for pumping the maintenance water in the water storage pool into the upper end face of the pier column body. The invention can realize the water-saving maintenance of the pier stud of the bridge, the pier stud body can be uniformly moisturized and radiated, and the invention has the advantages of economy, practicality, safety, reliability, water saving, environmental protection, less manpower, good maintenance quality and strength of the pier stud body, high construction efficiency, good safety and good use effect.
Description
Technical field
Maintenance process and its curing means the present invention relates to a kind of water-saving type bridge pier column.
Background technology
As country is to the continuous input of infrastructure, urban viaduct and rural area, the construction of highway bridge in mountainous area are continuous
Development, bridge depth of beam are also constantly increasing.The pier stud of bridge plays supporting role in bridge, and the quality of pier stud quality is to bridge
Girder construction plays a very important role, and concrete strength is the important indicator for evaluating pier stud quality.Concrete strength is not only
It is related with raw material and construction technology, also there is direct relation with the maintenance of concrete.Pier stud body after the completion of concreting,
If concrete is in dry environment, moisture evaporation is too fast in concrete, concrete dehydration, and sheet decortication dusting then occurs in surface
Or the situation that powdery comes off;Meanwhile when concrete not yet possesses enough intensity, the premature evaporation of moisture can also generate larger
Contraction distortion, there is cup shake;The hydration of inside concrete causes crystal structure loose because dehydration cannot be carried out fully
It relaxes, strength reduction.Therefore, after the completion of concreting, pier stud body should be given as early as possible and covered and moisture-keeping maintaining of sprinkling water.Entirely
It is mulching straw seat on it after the completion of the concreting in face, moisture-keeping maintaining of sprinkling water.
But at present, for most of bridge pier column height at 10 meters or more, watering maintenance is extremely difficult, and the maintenance of pier stud body is mainly adopted
It is wrapped up with polybag, then watering is conserved manually.Since pier stud body is generally higher, artificial water application is difficult, and work is strong
Degree is high, and lower channel need to be set up by mechanical equipment or separately, causes the waste of the resources such as machinery, material, while also increases and support
The risk of shield personnel's personal safety, and nourishment's work watering amount is big, causes water resource serious waste.After curing period,
Quality is mostly undesirable, the reason is that curing time is inadequate, not in time, the surface watering of pier stud is uneven, causes pier for watering maintenance
Column intensity cannot reach design requirement, and the situation that pier stud body is done over again often occur.
China Patent No. 2008200300701 describes a kind of water injector of Bridge High-pier dripping water-curing concrete, adopts
Water is pumped into Bridge High-pier top with pump, water is sprayed into lower maintenance from Bridge High-pier from up to down from sparge pipe with holes.The water spray fills
Though putting better than artificial watering moisture-keeping maintaining, due to Bridge High-pier and the non-burnishing surface of pier damaged surface, water is from up to down from bridge
Under high pier spray during maintenance, under wind and external influence, water is not evenly distributed with pier stud dignity, and heat distributes in the concrete of pier stud body
It is too fast, water resource serious waste, it is impossible to be applicable in the construction on mountain area water shortage ground, after curing period, quality is also undesirable, it is difficult to push away
It is wide to use.
The content of the invention
Maintenance process and its curing means the object of the present invention is to provide a kind of water-saving type bridge pier column, can realize water-saving
Formula bridge pier column conserves, and pier stud body moisturizing heat dissipation is uniform, has economical and practical, and securely and reliably, water-saving and environmental protection, employment is few, pier stud
The advantages of body maintenance quality and intensity are good, and construction efficiency is high, security and good using effect.
For this purpose, the maintenance process of the present invention, includes the following steps:
(1)Cofferdam is prepared in the lower end of the pier stud body of maintenance, cofferdam is used to recycle the maintenance of pier stud body with water after filtering
Cycling and reutilization, away from the ground at 30~100cm of pier stud body lower end periphery wall, with the external wall in brick cofferdam, cofferdam it is outer
A height of 20~the 50cm of wall, the periphery wall of the interior walls low coverage pier stud body lower end in cofferdam, with the smooth cofferdam external wall of cement mortar
With away from the cofferdam bottom surface between pier stud body lower end periphery wall, preventing water penetration cofferdam bottom surface, water being set out on the external wall in cofferdam
Hole, apopore are communicated by filter screen with tank;
(2)Pier stud clothing is prepared, pier stud clothing is wrapped on the periphery wall of pier stud body, for the maintenance to pier stud body, can make pier
Cylinder moisturizing heat dissipation is uniform, and pier stud clothing is rectangle, a length of 2~5m of pier stud clothing, and width is 2~3m, and pier stud clothing is from inside to outside successively
To put water layer, nylon supporting layer, steel wire and waterproof layer, put water layer and be made of absorbent material, nylon supporting layer, which is used to support, to be put
Water layer, steel wire are used to be connected and support pier stud clothing with adjacent pier stud clothing, and the upper end of steel wire is equipped with lacing wire in spacing distance
Hook.The side end edge that the both sides end edge of steel wire is equipped with hook hole or steel wire in spacing distance is equipped with lacing wire hook, steel wire
Another side end edge is equipped with hook hole.The pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface, adjacent pier
Column clothing is connected with hook hole by lacing wire hook and is covered on the periphery wall of pier stud body, and the periphery wall for putting water layer and pier stud body pastes
It closes, the lower end edge of pier stud clothing is located in the upper end edge of its adjacent lower end pier stud clothing;
(3)Equal water ring is prepared, makes curing water the putting in water layer even into upper end pier stud clothing into pier stud body upper end,
And infiltration downwards under the effect of gravity, equal water ring are annular trough body, the front end wall surface of annular trough body is arc, front end wall surface
Lower part is equipped with leakage hole in spacing distance, and the upper back of annular trough body rear end wall surface is equipped with sealing ring, annular trough body aft bulkhead
Tight loop is equipped with, equal water ring is put on the periphery wall of pier stud body upper end, and tight loop is passed through by equal water ring and pier by iron wire
The bar connecting of cylinder upper surface, the upper surface for making annular trough body aft bulkhead are horizontal plane;
(4)Prepare before maintenance, after pier stud body form removable, connect each pier stud clothing from top to bottom on pier stud body immediately, wrap
It is rolled on the periphery wall of pier stud body, the pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface, the pier on top
The upper end of column clothing is located at the lower end of equal water ring, and the adjacent each pier stud clothing in left and right is connected by lacing wire hook and hook hole, and each
Water layer of putting in pier stud clothing fits.Neighbouring each pier stud clothing is connected by lacing wire hook and hook hole, pier stud clothing
Lower end edge is located in the upper end edge of its adjacent lower end pier stud clothing, and the water inlet of water pump is communicated tank bottom surface, the water outlet of water pump
Mouth communicates the upper surface of pier stud body by conduit;
(5)The maintenance of pier stud body injects external water source in tank, and opening water pump makes curing water injection pier stud body upper end
Face is entered back into equal water ring, equal water ring make curing water by leakage hole putting in water layer even into the pier stud clothing on top, moistening
The external peripheral wall of pier stud being in contact with it, the curing water put in water layer of each pier stud clothing is uniformly distributed mutually and drips downwards under the effect of gravity
Stream, makes pier damaged surface be in uniform moisture state.The waterproof layer of pier stud clothing outer layer can prevent the humidity when outside air enters
Reducing and uniformly dissipate temperature, the curing water that each pier stud clothing puts downward drip in water layer is flowed into cofferdam, then through apopore and filter screen
Filtering sundries enters in tank, as curing water cycling and reutilization.
The cofferdam is air filling rubber dam or is to enclose water baffle.The upper end edge of the pier stud clothing on the top is packaged in
On the periphery wall of equal water ring, the water layer of putting of top pier stud clothing is contacted with leakage hole.
It realizes the device of the maintenance process, is made of water pump and tank, wherein:
Cofferdam, for recycling the curing water of pier stud body cycling and reutilization after filtering, the external wall in cofferdam is in away from pier stud
On the ground of 30~100cm of body lower end periphery wall, a height of 20~50cm of external wall in cofferdam, the interior walls low coverage pier stud body in cofferdam
The periphery wall of lower end, cofferdam external wall and be the cofferdam bottom to prevent water penetration away from the cofferdam bottom surface between pier stud body lower end periphery wall
Face sets out water hole on the external wall in cofferdam, and apopore is communicated by filter screen with tank;
Tank, for storing curing water, the bottom surface side wall of tank is communicated by apopore with cofferdam inner end, water outlet
Filter screen is equipped in hole;
Pier stud clothing, for the maintenance to pier stud body, pier stud clothing is rectangle, and pier stud clothing is followed successively by from inside to outside puts water layer, Buddhist nun
Imperial supporting layer, steel wire and waterproof layer are put water layer and are made of absorbent material, and the upper end of steel wire is equipped with lacing wire in spacing distance
Hook, the both sides end edge of steel wire are equipped with hook hole in spacing distance;
Equal water ring, for making curing water the putting in water layer even into upper end pier stud clothing into pier stud body upper end, equal water
Ring is annular trough body, and the front end wall surface of annular trough body is arc, and the lower part of front end wall surface is equipped with leakage hole, ring in spacing distance
The upper back of shape groove body rear end wall surface is equipped with sealing ring, and annular trough body aft bulkhead is equipped with tight loop;
Water pump, for, into pier stud body upper surface, the water inlet of water pump to communicate tank bottom by the maintenance water pump in tank
Face, the water outlet of water pump communicate the upper surface of pier stud body by conduit.
Described water layer of putting is sponge layer or is felt layer or is lousiness layer.The lower end of the lacing wire hook and corresponding portion
Steel wire connection, the upper end hook portion of lacing wire hook is located at outside the upper end edge of pier stud clothing.The hook hole is annular iron ring body, ring
The lower part of shape iron ring body is connected with the steel wire edge in corresponding portion, and the top of annular iron ring body passes through waterproof layer and the position in correspondence portion
In outside waterproof layer.The waterproof layer is waterproof nylon layer or is synthetic plastic layer or is waterproof layer of cloth.The equal water ring
Annular trough body lower end wall surface be arc.A diameter of 1.5~3mm of the leakage hole of the equal water ring, adjacent leakage hole
Spacing be 2~5cm.
The above method and structure design realize the purpose of the present invention.
The present invention can realize that water-saving type bridge pier column conserves, and pier stud body moisturizing heat dissipation is uniform, have economical and practical, safely may be used
It leans on, water-saving and environmental protection, employment is few, and pier stud body maintenance quality and intensity are good, and construction efficiency is high, security and good excellent of using effect
Point.
The invention has the following advantages that compared with prior art and good effect:
1st, pier damaged surface can be made to be in uniform moisture state and uniform preserving heat and radiating heat state, especially construction is supported in autumn and winter
Shield effect is more preferable, and the intensity of energy concrete ensure that the body formed quality of pier stud with age steady-state growth.
2nd, full-time staff's maintenance is not required, a large amount of manpowers can be saved, when more pier studs of progress conserve simultaneously, effect is outstanding
To be apparent.
3rd, the generation that working at height causes security incident is avoided.
4th, conserved using the method, rationally make use of water resource, saved construction water, meet wanting for environment-friendly water-saving construction
It asks.
5th, present inventive concept is unique, simple in structure, compact and reasonable, reliable working performance, operation are flexibly laborsaving, and it is suitable to have
Construction usage, is applicable in the construction and maintenance on mountain area water shortage ground, and the maintenance that can be not only applicable in pier stud body is also suitable vertical walls and plane
Maintenance, and be convenient for promoting.
Description of the drawings
Fig. 1 is the structure diagram of the use state of the present invention.
Fig. 2 is the structure diagram of the equal water ring of the present invention.
Fig. 3 is the structure diagram of the pier stud clothing of the present invention.
Specific embodiment
As shown in Figure 1, the maintenance process of the maintenance process present invention of water-saving type bridge pier column a kind of, includes the following steps:
(1)Cofferdam 19 is prepared in the lower end of the pier stud body of maintenance.The maintenance water that cofferdam is used to recycle pier stud body 2 is filtered
Posterior circle recycles.Away from the ground at 30~100cm of pier stud body lower end periphery wall, with the external wall in brick cofferdam, cofferdam
A height of 20~the 50cm of external wall, the periphery wall of the interior walls low coverage pier stud body lower end in cofferdam.With the smooth cofferdam exterior wall of cement mortar
Wall and away from the cofferdam bottom surface between pier stud body lower end periphery wall, prevents water penetration cofferdam bottom surface.It is set out on the external wall in cofferdam
Water hole 16, apopore are communicated by filter screen 15 with tank 17.Tank is located at the low-lying place outside cofferdam.
(2)Pier stud clothing 7 is prepared, pier stud clothing is wrapped on the periphery wall of pier stud body.For the maintenance to pier stud body, pier can be made
Cylinder moisturizing heat dissipation is uniform.Pier stud clothing is rectangle.A length of 2~5m of pier stud clothing, width are 2~3m.Pier stud clothing is from inside to outside successively
To put water layer 1, nylon supporting layer 10, steel wire 9 and waterproof layer 11.It is fusion together or be bonded into one between each layer.Put water layer
It is made of absorbent material, excessive curing water is transferred for uniform.Nylon supporting layer, which is used to support, puts water layer.
Steel wire is used to be connected and support pier stud clothing with adjacent pier stud clothing, to strengthen the intensity of pier stud clothing.Steel wire
Upper end is equipped with lacing wire hook 3 in spacing distance, and the both sides end edge of steel wire is equipped with the one of hook hole 8 or steel wire in spacing distance
Side end edge is equipped with lacing wire hook, and another side end edge of steel wire is equipped with hook hole.Obviously, also lacing wire can be set in the steel wire selvage in left side
Hook 12, the steel wire selvage on right side set hook hole, are fastened each other with facilitating.The pier stud clothing on top passes through lacing wire hook and pier stud body upper end
The reinforcing bar 5 in face connects, and adjacent pier stud clothing is connected by lacing wire hook with hook hole to be covered on the periphery wall of pier stud body, and puts water
Layer is bonded with the periphery wall of pier stud body.The lower end edge of pier stud clothing is located in the upper end edge of its adjacent lower end pier stud clothing, is put with facilitating
Extra curing water in water layer into lower end pier stud clothing put water layer conduction and also can uniform curing water each other.
(3)Equal water ring 6 is prepared, equal water ring can make curing water the putting even into upper end pier stud clothing into pier stud body upper end
In water layer, and infiltration downwards under the effect of gravity.Equal water ring is annular trough body.The front end wall surface of annular trough body is arc, this
Sample can ensure the water into annular trough body 63 even into putting in water layer in the pier stud clothing of lower end.
The lower part of front end wall surface in spacing distance be equipped with leakage hole 61, can also make into the in vivo water of annular groove even into
Putting in water layer in the pier stud clothing of lower end.The upper back of annular trough body rear end wall surface is equipped with sealing ring 64, to seal annular trough body
Rear end wall surface and corresponding pier stud body upper end periphery wall, so that curing water enters in annular trough body.
Annular trough body aft bulkhead is equipped with tight loop 62, to facilitate fixed equal water ring.Equal water ring is put in pier stud body upper end
On periphery wall, the bar connecting of equal water ring and pier stud body upper surface is made by annular trough body aft bulkhead through tight loop by iron wire
Upper surface for horizontal plane so that into the in vivo water of annular groove even into putting in water layer in the pier stud clothing of lower end.
(4)Prepare before maintenance, after pier stud body form removable, connect each pier stud clothing from top to bottom on pier stud body immediately, wrap
It is rolled on the periphery wall of pier stud body.The pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface.The pier on top
The upper end of column clothing is located at the lower end of equal water ring, and the adjacent each pier stud clothing in left and right is connected by lacing wire hook 12 and hook hole, and
Water layer of putting in each pier stud clothing fits.Neighbouring each pier stud clothing is connected by lacing wire hook and hook hole.Pier stud clothing
Lower end edge be located in the upper end edge of its adjacent lower end pier stud clothing.The water inlet 18 of water pump 14 is communicated into tank bottom surface, water pump
Water outlet 13 upper surface of pier stud body is communicated by conduit 4.
(5)The maintenance of pier stud body.External water source is injected in tank, opening water pump makes curing water injection pier stud body upper end
Face.Enter back into equal water ring, equal water ring make curing water by leakage hole putting in water layer even into the pier stud clothing on top.Moistening
The external peripheral wall of pier stud being in contact with it, the curing water put in water layer of each pier stud clothing is uniformly distributed mutually and drips downwards under the effect of gravity
Stream, makes entire pier damaged surface be in uniform moisture state.The waterproof layer of pier stud clothing outer layer can prevent from entering because of outside air
And humidity reduces and uniformly dissipates temperature, to ensure maintenance quality.The curing water that each pier stud clothing puts downward drip in water layer flows into cofferdam
It is interior, then enter through apopore and filter screen filtration sundries in tank, as curing water cycling and reutilization.
The cofferdam is air filling rubber dam or is to enclose water baffle.The upper end edge of the pier stud clothing on the top is packaged in
On the periphery wall of equal water ring, the water layer of putting of top pier stud clothing is contacted with leakage hole.
As shown in Figures 2 and 3, realize the device of the maintenance process, be made of water pump and tank, wherein:
Cofferdam, for recycling the curing water of pier stud body cycling and reutilization after filtering, the external wall in cofferdam is in away from pier stud
On the ground of 30~100cm of body lower end periphery wall, a height of 20~50cm of external wall in cofferdam, the interior walls low coverage pier stud body in cofferdam
The periphery wall of lower end, cofferdam external wall and be the cofferdam bottom to prevent water penetration away from the cofferdam bottom surface between pier stud body lower end periphery wall
Face sets out water hole on the external wall in cofferdam, and apopore is communicated by filter screen with tank.Filter screen is used to filter out into water storage
Recirculated water in pond.
Tank, for storing curing water, the bottom surface side wall of tank is communicated by apopore with cofferdam inner end, water outlet
Filter screen is equipped in hole.
Pier stud clothing, for the maintenance to pier stud body, pier stud clothing is rectangle, and a length of 2~5m of pier stud clothing, width is 2~3m.Pier
Column clothing is followed successively by from inside to outside puts water layer, nylon supporting layer, steel wire and waterproof layer, puts water layer and is made of absorbent material, steel wire
The upper end of net is equipped with lacing wire hook in spacing distance, and the both sides end edge of steel wire is equipped with hook hole in spacing distance.Steel wire is used for
Pier stud clothing is connected and supports with adjacent pier stud clothing, to strengthen the intensity of pier stud clothing.The upper end of steel wire is equipped in spacing distance
Lacing wire hook 3, the both sides end edge of steel wire are equipped with hook hole 8 in spacing distance.Obviously, also lacing wire can be set in the steel wire selvage in left side
Hook 12, the steel wire selvage on right side set hook hole, are fastened each other with facilitating.The pier stud clothing on top passes through lacing wire hook and pier stud body upper end
The reinforcing bar 5 in face connects, and adjacent pier stud clothing is connected by lacing wire hook with hook hole to be covered on the periphery wall of pier stud body, and puts water
Layer is bonded with the periphery wall of pier stud body.The lower end edge of pier stud clothing is located in the upper end edge of its adjacent lower end pier stud clothing, is put with facilitating
Extra curing water in water layer into lower end pier stud clothing put water layer conduction and also can uniform curing water each other.
Equal water ring, for making curing water the putting in water layer even into upper end pier stud clothing into pier stud body upper end, equal water
Ring is annular trough body, and the front end wall surface of annular trough body is arc, and the lower part of front end wall surface is equipped with leakage hole, ring in spacing distance
The upper back of shape groove body rear end wall surface is equipped with sealing ring, and annular trough body aft bulkhead is equipped with tight loop.
Water pump, for, into pier stud body upper surface, the water inlet of water pump to communicate tank bottom by the maintenance water pump in tank
Face, the water outlet of water pump communicate the upper surface of pier stud body by conduit.
Described water layer of putting is sponge layer or is felt layer or is lousiness layer.The lower end of the lacing wire hook and corresponding portion
Steel wire connection, the upper end hook portion of lacing wire hook is located at outside the upper end edge of pier stud clothing.The hook hole is annular iron ring body, ring
The lower part of shape iron ring body is connected with the steel wire edge in corresponding portion, and the top of annular iron ring body passes through waterproof layer and the position in correspondence portion
In outside waterproof layer.The waterproof layer is waterproof nylon layer or is synthetic plastic layer or is waterproof layer of cloth.The equal water ring
Annular trough body lower end wall surface be arc.A diameter of 1.5~3mm of the leakage hole of the equal water ring, adjacent leakage hole
Spacing be 2~5cm.
After maintenance is pier stud body form removable, connects each pier stud clothing from top to bottom on pier stud body immediately, be wrapped in pier stud
On the periphery wall of body.The pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface.The pier stud clothing on top it is upper
End is positioned at the lower end of equal water ring, and the adjacent each pier stud clothing in left and right is connected by lacing wire hook 12 and hook hole, and each pier stud clothing
Interior water layer of putting fits.Neighbouring each pier stud clothing is connected by lacing wire hook and hook hole.The lower end edge of pier stud clothing
In the upper end edge of its adjacent lower end pier stud clothing.The water inlet 18 of water pump 14 is communicated into tank bottom surface, the water outlet of water pump
13 communicate the upper surface of pier stud body by conduit 4.External water source is injected in tank, opening water pump makes curing water inject pier stud
Body upper surface.It enters back into equal water ring, equal water ring makes curing water put water layer even into the pier stud clothing on top by leakage hole
It is interior.The external peripheral wall of pier stud being in contact with it is moistened, the curing water put in water layer of each pier stud clothing is uniformly distributed mutually and in gravity
Downward drip down makes entire pier damaged surface be in uniform moisture state.The waterproof layer of pier stud clothing outer layer can be prevented because of the external world
Air enters and humidity reduces and uniformly dissipates temperature, to ensure maintenance quality.Each pier stud clothing puts the curing water of downward drip in water layer
It flows into cofferdam, then enters through apopore and filter screen filtration sundries in tank, as curing water cycling and reutilization.
For the present invention in the concrete curing of vertical walls and plane, it is straight tube with holes that pier stud clothing and equal water ring, which need to only be unfolded,
.
In short, the present invention can realize that water-saving type bridge pier column conserves, pier stud body moisturizing heat dissipation is uniform, have it is economical and practical,
Securely and reliably, water-saving and environmental protection, employment is few, and pier stud body maintenance quality and intensity are good, and construction efficiency is high, and security and using effect are good
The advantages of.
Claims (10)
1. a kind of maintenance process of water-saving type bridge pier column, it is characterized in that:Include the following steps,
(1)Cofferdam is prepared in the lower end of the pier stud body of maintenance, the maintenance that cofferdam is used to recycle pier stud body is cycled after filtering with water
It recycles, away from the ground at 30~100cm of pier stud body lower end periphery wall, with the external wall in brick cofferdam, the external wall in cofferdam
A height of 20~50cm, the periphery wall of the interior walls low coverage pier stud body lower end in cofferdam, with the smooth cofferdam external wall of cement mortar with away from
Cofferdam bottom surface between pier stud body lower end periphery wall, prevents water penetration cofferdam bottom surface, sets out water hole on the external wall in cofferdam, go out
Water hole is communicated by filter screen with tank;
(2)Pier stud clothing is prepared, pier stud clothing is wrapped on the periphery wall of pier stud body, for the maintenance to pier stud body, can make pier stud body
Moisturizing heat dissipation is uniform, and pier stud clothing is rectangle, and a length of 2~5m of pier stud clothing, width is 2~3m, and pier stud clothing is followed successively by from inside to outside to be put
Water layer, nylon supporting layer, steel wire and waterproof layer, put water layer and are made of absorbent material, and nylon supporting layer, which is used to support, puts water layer,
Steel wire is used to be connected and support pier stud clothing with adjacent pier stud clothing, and the upper end of steel wire is equipped with lacing wire hook, steel in spacing distance
The side end edge that the both sides end edge of silk screen is equipped with hook hole or steel wire in spacing distance is equipped with lacing wire hook, steel wire it is another
Side end edge is equipped with hook hole, and the pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface, adjacent pier stud clothing
It is connected and is covered on the periphery wall of pier stud body with hook hole by lacing wire hook, and put water layer and be bonded with the periphery wall of pier stud body, pier
The lower end edge of column clothing is located in the upper end edge of its adjacent lower end pier stud clothing;
(3)Equal water ring is prepared, makes curing water the putting in water layer even into upper end pier stud clothing into pier stud body upper end, and
It is permeated downwards under gravity, equal water ring is annular trough body, and the front end wall surface of annular trough body is arc, the lower part of front end wall surface
Leakage hole is equipped in spacing distance, the upper back of annular trough body rear end wall surface is equipped with sealing ring, is set on annular trough body aft bulkhead
There is tight loop, equal water ring is put on the periphery wall of pier stud body upper end, and tight loop is passed through by equal water ring and pier stud body by iron wire
The bar connecting of upper surface, the upper surface for making annular trough body aft bulkhead are horizontal plane;
(4)Prepare before maintenance, after pier stud body form removable, connect each pier stud clothing from top to bottom on pier stud body immediately, be wrapped in
On the periphery wall of pier stud body, the pier stud clothing on top passes through lacing wire hook and the bar connecting of pier stud body upper surface, the pier stud clothing on top
Upper end be located at the lower end of equal water ring, the adjacent each pier stud clothing in left and right is connected by lacing wire hook and hook hole, and each pier stud
Water layer of putting in clothing fits, and neighbouring each pier stud clothing is connected by lacing wire hook and hook hole, the lower end of pier stud clothing
Side is located in the upper end edge of its adjacent lower end pier stud clothing, the water inlet of water pump is communicated tank bottom surface, the water outlet of water pump leads to
Cross the upper surface that conduit communicates pier stud body;
(5)The maintenance of pier stud body injects external water source in tank, and opening water pump makes curing water injection pier stud body upper surface,
Enter back into equal water ring, equal water ring make curing water by leakage hole putting in water layer even into the pier stud clothing on top, moistening with
Its external peripheral wall of pier stud contacted, the curing water put in water layer of each pier stud clothing is uniformly distributed mutually and drips downwards under the effect of gravity
Stream makes pier damaged surface be in uniform moisture state, and the waterproof layer of pier stud clothing outer layer can prevent the humidity when outside air enters
Reducing and uniformly dissipate temperature, the curing water that each pier stud clothing puts downward drip in water layer is flowed into cofferdam, then through apopore and filter screen
Filtering sundries enters in tank, as curing water cycling and reutilization.
2. a kind of maintenance process of water-saving type bridge pier column according to claim 1, it is characterized in that:The cofferdam is to fill
Gas rubber dam is to enclose water baffle.
3. a kind of maintenance process of water-saving type bridge pier column according to claim 1, it is characterized in that:The pier on the top
The upper end edge of column clothing is packaged on the periphery wall of equal water ring, and the water layer of putting of top pier stud clothing is contacted with leakage hole.
4. a kind of device for realizing maintenance process as described in claim 1, is made of water pump and tank, it is characterized in that:
Cofferdam, for recycling the curing water of pier stud body cycling and reutilization after filtering, the external wall in cofferdam is in away under pier stud body
On the ground for holding 30~100cm of periphery wall, a height of 20~50cm of external wall in cofferdam, the interior walls low coverage pier stud body lower end in cofferdam
Periphery wall, cofferdam external wall and be the cofferdam bottom surface to prevent water penetration away from the cofferdam bottom surface between pier stud body lower end periphery wall encloses
Water hole is set out on the external wall on weir, apopore is communicated by filter screen with tank;
Tank, for storing curing water, the bottom surface side wall of tank is communicated by apopore with cofferdam inner end, in apopore
Equipped with filter screen;
Pier stud clothing, for the maintenance to pier stud body, pier stud clothing is rectangle, and pier stud clothing is followed successively by from inside to outside puts water layer, nylon branch
Layer, steel wire and waterproof layer are supportted, water layer is put and is made of absorbent material, the upper end of steel wire is equipped with lacing wire hook, steel in spacing distance
The both sides end edge of silk screen is equipped with hook hole in spacing distance;
Equal water ring, for making curing water the putting in water layer even into upper end pier stud clothing into pier stud body upper end, equal water ring is
Annular trough body, the front end wall surface of annular trough body is arc, and the lower part of front end wall surface is equipped with leakage hole, annular groove in spacing distance
The upper back of body rear end wall surface is equipped with sealing ring, and annular trough body aft bulkhead is equipped with tight loop;
Water pump, for, into pier stud body upper surface, the water inlet of water pump to communicate tank bottom surface, water by the maintenance water pump in tank
The water outlet of pump communicates the upper surface of pier stud body by conduit.
5. device according to claim 4, it is characterized in that:Described water layer of putting is sponge layer or is felt layer or is hair
Silk layer.
6. device according to claim 4, it is characterized in that:The lower end of the lacing wire hook connects with the steel wire in corresponding portion
It connects, the upper end hook portion of lacing wire hook is located at outside the upper end edge of pier stud clothing.
7. device according to claim 4, it is characterized in that:The hook hole is annular iron ring body, annular iron ring body
Lower part is connected with the steel wire edge in corresponding portion, and the top of annular iron ring body passes through the waterproof layer in correspondence portion and positioned at waterproof layer
Outside.
8. device according to claim 4, it is characterized in that:The waterproof layer is waterproof nylon layer or is synthetic plastic
Layer is waterproof layer of cloth.
9. device according to claim 4, it is characterized in that:The lower end wall surface of the annular trough body of the equal water ring is arc
Shape.
10. device according to claim 4, it is characterized in that:A diameter of 1.5~3mm of the leakage hole of the equal water ring,
The spacing of adjacent leakage hole is 2~5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610446920.5A CN106087749B (en) | 2016-06-21 | 2016-06-21 | Maintenance method and maintenance device for water-saving bridge pier column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610446920.5A CN106087749B (en) | 2016-06-21 | 2016-06-21 | Maintenance method and maintenance device for water-saving bridge pier column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106087749A CN106087749A (en) | 2016-11-09 |
CN106087749B true CN106087749B (en) | 2018-05-18 |
Family
ID=57237234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610446920.5A Active CN106087749B (en) | 2016-06-21 | 2016-06-21 | Maintenance method and maintenance device for water-saving bridge pier column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106087749B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108999094A (en) * | 2018-10-17 | 2018-12-14 | 中铁六局集团广州工程有限公司 | Bridge pier conservation layer and bridge pier pier shaft insured's cloth conserve engineering method |
CN109629423B (en) * | 2018-12-04 | 2020-08-25 | 康松超 | Maintenance system and maintenance method for large-volume concrete building |
CN112195790A (en) * | 2020-10-12 | 2021-01-08 | 宋京周 | Automatic spraying and maintaining device for high pier of bridge |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09221760A (en) * | 1996-02-15 | 1997-08-26 | Sumikin Kozai Kogyo Kk | Temporary coffering structure and method of construction thereof |
CN103912130A (en) * | 2014-03-26 | 2014-07-09 | 东莞市建之都建设工程有限公司 | Environment-friendly tend-free concrete column maintaining method and device |
CN203904846U (en) * | 2014-06-25 | 2014-10-29 | 广东省长大公路工程有限公司 | Bridge high pier concrete curing device |
CN204849598U (en) * | 2015-07-26 | 2015-12-09 | 中铁十一局集团第一工程有限公司 | Maintenance system is driped irrigation in circulation of hollow mound of railway thin wall |
CN105133502A (en) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | Bridge pier stud concrete curing control device |
CN205012228U (en) * | 2015-06-24 | 2016-02-03 | 商丘工学院 | Be applied to curing means of vase formula pier concrete |
-
2016
- 2016-06-21 CN CN201610446920.5A patent/CN106087749B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09221760A (en) * | 1996-02-15 | 1997-08-26 | Sumikin Kozai Kogyo Kk | Temporary coffering structure and method of construction thereof |
CN103912130A (en) * | 2014-03-26 | 2014-07-09 | 东莞市建之都建设工程有限公司 | Environment-friendly tend-free concrete column maintaining method and device |
CN203904846U (en) * | 2014-06-25 | 2014-10-29 | 广东省长大公路工程有限公司 | Bridge high pier concrete curing device |
CN205012228U (en) * | 2015-06-24 | 2016-02-03 | 商丘工学院 | Be applied to curing means of vase formula pier concrete |
CN204849598U (en) * | 2015-07-26 | 2015-12-09 | 中铁十一局集团第一工程有限公司 | Maintenance system is driped irrigation in circulation of hollow mound of railway thin wall |
CN105133502A (en) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | Bridge pier stud concrete curing control device |
Also Published As
Publication number | Publication date |
---|---|
CN106087749A (en) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106087749B (en) | Maintenance method and maintenance device for water-saving bridge pier column | |
CN205893924U (en) | Full automatic spray maintenance system of pier concrete | |
CN101182709A (en) | Method of composite electroosmosis, vacuum precipitation and vacuum preload reinforcement foundation and device thereof | |
CN113179864A (en) | Slope greening ecological management system | |
CN204335474U (en) | For the energy-saving environmental-protection roots infiltrating irrigation blanket of roof greening | |
CN213897834U (en) | Sponge city green roof structure | |
CN109551621A (en) | Water-saving maintenance method and maintenance device for precast beam | |
CN206043005U (en) | It is a kind of to ooze pipe for green area irrigation | |
CN210113885U (en) | Water-saving irrigation system | |
CN107455186A (en) | A kind of automated greenhouse drip-irrigation equipment | |
CN207332894U (en) | A kind of tunnel-liner spraying health promotion equipment and a kind of towed trolley | |
CN211547762U (en) | A ecological blanket structure for ecological bank protection | |
CN210641683U (en) | Double-layer net ecological slope protection structure suitable for vegetation restoration of high and steep side slope | |
CN209602914U (en) | A kind of fabricated permeable pavement structure | |
CN203080940U (en) | Water-saving maintenance device for concrete building | |
CN207519245U (en) | A kind of roof greening water feeding and draining device | |
CN206127140U (en) | Concrete automatic pumping curing means | |
CN207598289U (en) | A kind of underground rock cavern antiseepage discharge structure | |
CN214508567U (en) | Slope greening drainage circulation structure | |
CN212534006U (en) | Drainage device for agricultural water conservancy project | |
CN212743172U (en) | Vegetation concrete green ecological planting roofing | |
CN108203929A (en) | Cast-in-place concrete bent cap maintenance process | |
CN203795405U (en) | Water storage and soil fixation micro moistening protection grating | |
CN208917852U (en) | Environment protection ecologic rebuilds repair system | |
CN208874915U (en) | A kind of mounting structure of vertical planting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |