JPH09221760A - Temporary coffering structure and method of construction thereof - Google Patents

Temporary coffering structure and method of construction thereof

Info

Publication number
JPH09221760A
JPH09221760A JP8027948A JP2794896A JPH09221760A JP H09221760 A JPH09221760 A JP H09221760A JP 8027948 A JP8027948 A JP 8027948A JP 2794896 A JP2794896 A JP 2794896A JP H09221760 A JPH09221760 A JP H09221760A
Authority
JP
Japan
Prior art keywords
temporary
water
tubular
anchor
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8027948A
Other languages
Japanese (ja)
Inventor
Hirotsugu Miyoshi
博嗣 三好
Yoshinori Motohara
好則 元原
Masaki Matsuda
正樹 松田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiken Co Ltd
Sumikin Kozai Kogyo KK
Original Assignee
Daiken Co Ltd
Sumikin Kozai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiken Co Ltd, Sumikin Kozai Kogyo KK filed Critical Daiken Co Ltd
Priority to JP8027948A priority Critical patent/JPH09221760A/en
Publication of JPH09221760A publication Critical patent/JPH09221760A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a temporary coffering structure, by which the labor of the execution of works can be saved, the term of works be shortened and economical execution, etc., be carried out, and a method of construction thereof. SOLUTION: This temporary coffering structure is constituted by providing a cylindrical temporary body 1 being constructed around a pier 2 built in water so as to surround the pier 2, intercepting water and ensuring a working space in the periphery of the pier 2 and anchor bodies 3 being installed at the lower end section of the cylindrical temporary body 1, being fixed onto the footing section 2a of the pier 2 and fastening the cylindrical temporary body 1 onto a footing section 2a. The cylindrical temporary body 1 is constructed cylindrically in such a manner that a plurality of liner plates are connected and mounted mutually in the periphery and height direction of the pier 2 and water-expansive water stops are interposed to the mutual joining sections of the liner plates.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、主に河川などの
水中に構築された既設の橋脚などの補修工事に使用され
る水中仮設構造物(以下「仮締切り構造物」という)お
よびその構築工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underwater temporary structure (hereinafter referred to as "temporary cut-off structure") mainly used for repair work of an existing bridge pier constructed in water such as a river and its construction method. Regarding

【0002】[0002]

【従来の技術】河川などの水中に構築され、永年の経過
と共に痛みのひどくなった橋脚を補修する場合、橋脚の
周囲に河川の流れを堰き止めて所定の作業空間を確保す
るための仮囲いとして仮締切り構造物を構築する必要が
ある。
2. Description of the Related Art When repairing a pier that has been built in water such as a river and has become painful over the years, a temporary enclosure for blocking the flow of the river around the pier to secure a prescribed work space. As a result, it is necessary to construct a temporary deadline structure.

【0003】図7は、この種の仮締切り構造物の従来例
の一例を示し、図において、符号20は橋脚21の周囲に橋
脚21を取り囲むように円筒形に構築された内側仮設物、
22は橋脚21の周囲に内側仮設物20の外側に位置して橋脚
21を取り囲むように円筒形に構築された外側仮設物、そ
して、符号23は内側仮設物20と外側仮設物22との間に充
填された中詰め材である。また、符号20a は橋脚21の周
囲に互いに連結しながら設置され、内側仮設物20をなす
ライナープレート、22a は橋脚21の周囲に互いに連結し
ながら設置され、外側仮設物22をなすコルゲートシート
である。
FIG. 7 shows an example of a conventional example of this kind of temporary shut-off structure. In the figure, reference numeral 20 is an inner temporary structure constructed around the pier 21 in a cylindrical shape so as to surround the pier 21,
22 is a pier located inside the temporary structure 20 around the pier 21
An outer temporary structure constructed in a cylindrical shape so as to surround 21 and a reference numeral 23 is a filling material filled between the inner temporary structure 20 and the outer temporary structure 22. Reference numeral 20a is a liner plate that is installed around the bridge pier 21 while being connected to each other, and forms a liner plate that forms the inner temporary structure 20, and 22a is a corrugated sheet that is installed while being connected to each other around the bridge pier 21, that is the outer temporary structure 22. .

【0004】[0004]

【発明が解決しようとする課題】従来の仮締切り構造物
はこのように構築されており、ライナープレート20a ど
うしおよびコルゲートシート22a どうしは、ともにボル
トナットで接合されているだけで、これらの接合部に特
に止水対策は講じられていない。このため、内側仮設物
20と外側仮設物22との間に中詰め材23を充填してはじめ
て河川を堰止めることが可能なため、多くの仮設資材を
必要とするだけでなく、三重構造になって工事の複雑
化、大規模化が避けられず、また、多くの労力を必要と
し、工期の長期化も免れないなどの課題があった。
The conventional temporary cut-off structure is constructed in this way, and the liner plates 20a and the corrugated seats 22a are joined together only by bolts and nuts. No particular measures have been taken to stop water. For this reason, the inner temporary structure
Since it is possible to block the river only after filling the filling material 23 between the 20 and the outer temporary structure 22, not only a lot of temporary materials are needed, but also a triple structure complicates the construction. However, there were problems such as inevitably increasing the scale, requiring a lot of labor, and unavoidable extension of the construction period.

【0005】さらに、この種の仮締切り構造物は橋脚21
の補修工事の終了と同時に撤去されるものであるが、構
造的に撤去作業が面倒なだけでなく、資材の再利用も面
倒であるなどの課題もあった。
Further, this type of temporary shut-off structure is a pier 21.
Although it will be removed at the same time as the completion of the repair work, there was a problem that not only the removal work was structurally troublesome, but also the reuse of materials was troublesome.

【0006】この発明は、以上の課題を解決するために
なされたもので、施工の省力化、工期の短縮化、経済施
工などを可能にした仮締切り構造物およびその構築工法
を提供することを目的とする。
The present invention has been made in order to solve the above problems, and provides a temporary cut-off structure and a construction method thereof, which enables labor saving in construction, shortening of construction period, economical construction and the like. To aim.

【0007】[0007]

【課題を解決するための手段】この発明に係る仮締切り
構造物は、水中に構築された構造物の周囲にこの構造物
を取り囲むように構築され、水を堰止めて前記構造物の
周囲に作業空間を確保する筒状仮設体と、この筒状仮設
体の下端部に取り付けられ、かつ、前記構造物のフーチ
ング部に固定されて前記筒状仮設体を前記フーチング部
に固定するアンカー体とを備えて構築されている。
A temporary cutoff structure according to the present invention is constructed around a structure constructed in water so as to surround this structure, and water is dammed to surround the structure. A tubular temporary body that secures a work space, and an anchor body that is attached to the lower end portion of the tubular temporary body and that is fixed to the footing portion of the structure to fix the tubular temporary body to the footing portion. Is built with.

【0008】筒状仮設体は複数枚の鋼製セグメント、P
Cセグメント又はライナープレートを構造物の周方向お
よび高さ方向に互いに連結して設置し、かつ、前記鋼製
セグメント、PCセグメント又はライナープレートどう
しの接合部に水膨張性止水材を介在して筒状に構築さ
れ、また、アンカー体の下端部に取り付けられ、このア
ンカー体とフーチング部との間に介在されて筒状仮設体
と前記フーチング部との間を止水する止水体を備えて構
成されている。
The tubular temporary body is composed of a plurality of steel segments, P
The C segment or the liner plate is connected to each other in the circumferential direction and the height direction of the structure, and the water swelling water blocking material is interposed at the joint between the steel segment, the PC segment or the liner plate. The water blocking body is constructed in a tubular shape and is attached to the lower end portion of the anchor body, and is interposed between the anchor body and the footing portion to stop water between the tubular temporary body and the footing portion. It is configured.

【0009】さらに、止水体は複数本のガイドライナー
と、このガイドライナー間に充填された水膨張性止水材
とを有して構成され、かつ、筒状仮設体の重みによって
前記ガイドライナーが圧壊して前記水膨張性止水材とと
もにフーチング部に密着するように構成されている。
Further, the water blocking body is constituted by a plurality of guide liners and a water-expandable water blocking material filled between the guide liners, and the guide liner is formed by the weight of the tubular temporary body. It is configured to be crushed and come into close contact with the footing portion together with the water-swellable water blocking material.

【0010】この発明に係る仮締切り構造物の構築工法
は、水中に構築された構造物の周囲に設置される筒状仮
設体を、水面上で前記構造物を取り囲むように構築し、
この筒状仮設体の下端部にアンカー体と止水体とを取り
付け、次に前記筒状仮設体を前記アンカー体および前記
止水体とともに、水中に降ろして前記構造物のフーチン
グ部の上に設置し、次に、前記アンカー体を前記フーチ
ング部の上に複数本のアンカーボルトによって固定する
ことを特徴とする。
In the construction method for a temporary cut-off structure according to the present invention, a cylindrical temporary structure installed around a structure constructed in water is constructed so as to surround the structure on the water surface,
An anchor body and a water stop body are attached to the lower end portion of the tubular temporary body, and then the tubular temporary body together with the anchor body and the water stop body is lowered into water and installed on the footing portion of the structure. Next, the anchor body is fixed on the footing portion by a plurality of anchor bolts.

【0011】[0011]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

発明の実施の形態1.図1〜図5は、この発明に係る請
求項第1項記載の仮締切り構造物の一例を示し、図にお
いて、符号1は所定径大の筒状に構築され、かつ、橋脚
2の周囲に設置されて橋脚2の周囲に河川の流れを堰止
めて所定スペースの作業空間を確保する筒状仮設体、3
はこの筒状仮設体1の下端部に取り付けられ、かつ、橋
脚2のフーチング部2aの上に固定されて筒状仮設体1を
橋脚2のフーチング部2aの上に固定するアンカー体、そ
して、符号4はアンカー体3の下端部に取り付けられ、
かつ、アンカー体3と橋脚2のフーチング部2aとの間に
介在されてフーチング部2aとアンカー体3との間を止水
する止水体である。
First Embodiment of the Invention 1 to 5 show an example of the temporary cut-off structure according to claim 1 of the present invention. In the drawings, reference numeral 1 is constructed in a tubular shape having a predetermined diameter and around the pier 2. A tubular temporary body that is installed to block the flow of the river around the pier 2 and secure a working space in a predetermined space.
Is an anchor body attached to the lower end of the tubular temporary body 1 and fixed on the footing portion 2a of the pier 2 to fix the tubular temporary body 1 on the footing portion 2a of the pier 2, and Reference numeral 4 is attached to the lower end of the anchor body 3,
In addition, the water blocking body is interposed between the anchor body 3 and the footing portion 2a of the pier 2 to stop the water between the footing portion 2a and the anchor body 3.

【0012】筒状仮設体1は、鋼板又はPC板などから
平板状又は所定の曲率を有して円弧状に形成された複数
枚の鋼製セグメント、PCセグメント、あるいはライナ
ープレート5(以下「ライナープレート5」という)を
複数本の接合ボルト6とこの接合ボルト6に螺合される
接合ナット10とによって橋脚2の周方向および高さ方向
に互いに連結して橋脚2を取り囲むように円筒状、楕円
筒状、又は矩形筒状に構築されている(図2(a),(b),
(c) 参照)。
The tubular temporary body 1 is composed of a plurality of steel segments, PC segments, or liner plates 5 (hereinafter referred to as "liner") formed from a steel plate or a PC plate into a flat plate shape or an arc shape having a predetermined curvature. A plate 5 ") is connected to each other in the circumferential direction and the height direction of the pier 2 by a plurality of joining bolts 6 and a joining nut 10 screwed to the joining bolts 6 so as to surround the pier 2, It is constructed in the shape of an elliptic cylinder or a rectangular cylinder (Figs. 2 (a), (b),
(c)).

【0013】鋼板からなるライナープレート5には水圧
に対する剛性を確保するための波付けがなされている
(図4参照)。また、隣接するライナープレート5どう
しの接合部には水膨張性の止水材7が介在されてライナ
ープレート5どうしの接合部の止水処理が確実になされ
ている。止水材7はライナープレート5の周縁部に突設
された連結リブ5aに塗着したり、テープ状に形成された
ものを連結リブ5aに張り付けるなどして簡単に取り付け
られている。
The liner plate 5 made of a steel plate is corrugated to ensure rigidity against water pressure (see FIG. 4). Further, the water-swellable water blocking material 7 is interposed between the joints between the liner plates 5 adjacent to each other, so that the waterproof treatment of the joints between the liner plates 5 is surely performed. The water blocking material 7 is easily attached by applying it to the connecting ribs 5a protruding from the peripheral edge of the liner plate 5 or sticking a tape-shaped one to the connecting ribs 5a.

【0014】なお、筒状仮設体1の径がきわめて大きい
などの理由により、筒状仮設体1のみでは水圧に対する
剛性を十分に確保できないおそれがある場合には、上下
に隣接するライナープレート5,5 間にH形鋼などの形鋼
からリング状に構成された複数本の補強リング8を筒状
仮設体1の高さ方向に所定間隔おきに回し(図3(a)参
照)、それでも強度が不足する場合には筒状仮設体1の
周方向に隣接するライナープレート5,5 間にH形鋼など
の形鋼からなる複数本の補強支柱9を所定間隔おきに建
て付けることにより補強されている(図3(b) 参照)。
If there is a risk that the tubular temporary body 1 cannot sufficiently secure the rigidity against water pressure due to the reason that the diameter of the tubular temporary body 1 is extremely large, etc., the liner plates 5, 8 5 A plurality of ring-shaped reinforcing rings 8 made of shaped steel such as H-shaped steel are rotated in the height direction of the tubular temporary body 1 at predetermined intervals (see Fig. 3 (a)), and the strength is still increased. If there is a shortage, it is reinforced by installing a plurality of reinforcing columns 9 made of shaped steel such as H-shaped steel at predetermined intervals between the liner plates 5 and 5 adjacent to each other in the circumferential direction of the tubular temporary body 1. (See Figure 3 (b)).

【0015】この場合、補強リング8および補強支柱9
は、ともに隣接するライナープレート5,5 間に介在さ
れ、かつ、ライナープレート5の縁端部に突設された連
結リブ5aと補強リング8および補強支柱9とを複数本の
接合ボルト6と接合ナット10とによってそれぞれ接合す
ることにより筒状仮設体1に固定されている。
In this case, the reinforcing ring 8 and the reinforcing column 9
Are connected between the liner plates 5 and 5 that are adjacent to each other, and connect the connecting rib 5a protruding from the edge of the liner plate 5, the reinforcing ring 8 and the reinforcing column 9 to the plurality of connecting bolts 6. It is fixed to the tubular temporary body 1 by joining them with the nut 10.

【0016】また、連結リブ5aと補強リング8との当接
部、および連結リブ5aと補強支柱9との当接部に水膨張
性の止水部材7を介在することによりこれらの接合部の
止水処理が確実になされている。
Further, by interposing a water-expandable water blocking member 7 at the abutting portion between the connecting rib 5a and the reinforcing ring 8 and at the abutting portion between the connecting rib 5a and the reinforcing strut 9, these joints are joined together. Water stop treatment is surely done.

【0017】アンカー体3は溝形鋼などの形鋼から筒状
仮設体1と略同径のリング状に形成され、筒状仮設体1
の下端部に取り付けられるアンカーライナー3aと、この
アンカーライナー3aの両側部に水平に突設され、橋脚2
のフーチング部2aの上に固定される固定フランジ3bと、
アンカーライナー3aと固定フランジ3bとのコーナ部に垂
直に取り付けられ、固定フランジ3bを補強する複数枚の
スチフナー3cと、アンカーライナー3aの上にアンカーラ
イナー3aの長手方向に所定間隔おきに突設された複数本
のアンカーボルト3dとを有して構成されている(図5
(a) 参照)。
The anchor body 3 is formed of a shaped steel such as a channel steel into a ring shape having substantially the same diameter as that of the tubular temporary body 1.
Anchor liner 3a attached to the lower end of the anchor pier and horizontal projections on both sides of the anchor liner 3a.
A fixing flange 3b fixed on the footing portion 2a of
A plurality of stiffeners 3c that are vertically attached to the corners of the anchor liner 3a and the fixed flange 3b and reinforce the fixed flange 3b, and are projected on the anchor liner 3a at predetermined intervals in the longitudinal direction of the anchor liner 3a. And a plurality of anchor bolts 3d (FIG. 5).
(a)).

【0018】そして、アンカー体3はアンカーボルト3d
を筒状仮設体1の下端部に突設された連結リブ(ライナ
ープレート5の連結リブ5a) のボルト孔に貫通させ、そ
の先端部に固定ナット11を螺合することにより筒状仮設
体1の下端部に取り付けられている。また、アンカー体
3は固定フランジ3bを橋脚2のフーチング2aの上に複数
本のアンカーボルト12によってボルト止めすることによ
り固定されている(図5(a) 参照)。さらに、アンカー
ライナー3aと連結リブ5aとの間に水膨張性の止水材7を
介在することによりこの部分の止水処理がなされてい
る。
The anchor body 3 is an anchor bolt 3d.
Through the bolt holes of the connecting ribs (the connecting ribs 5a of the liner plate 5) projecting from the lower end of the tubular temporary body 1, and the fixing nut 11 is screwed into the tip portion of the tubular temporary body 1. It is attached to the lower end of the. The anchor body 3 is fixed by bolting the fixing flange 3b onto the footing 2a of the pier 2 with a plurality of anchor bolts 12 (see FIG. 5 (a)). Further, a water-swelling water blocking material 7 is interposed between the anchor liner 3a and the connecting rib 5a to perform the water blocking treatment of this portion.

【0019】なお、固定フランジ3bはアンカーライナー
3aの長手方向に連続して、あるいはアンカーライナー3a
の長手方向に所定間隔おきに突設されていてもよく、ま
た、垂直スチフナー3cはアンカーライナー3aの長手方向
に所定間隔おきに取り付けられている。また、アンカー
ボルト12には、例えばケミカルアンカーなどが使用さ
れ、かつ、アンカーボルト12は筒状仮設体1が波力や水
流などによって転倒、滑動などを起こさないように本
数、設置間隔などを適宜決めて使用されている。
The fixed flange 3b is an anchor liner.
Continuously in the longitudinal direction of 3a, or anchor liner 3a
The vertical stiffeners 3c may be installed at predetermined intervals in the longitudinal direction of the anchor liner 3a. In addition, for example, a chemical anchor is used for the anchor bolts 12, and the anchor bolts 12 have an appropriate number and installation intervals so that the tubular temporary body 1 does not fall or slide due to wave force or water flow. It is decided and used.

【0020】止水体4はアンカーライナー3aの下端部に
アンカーライナー3aの長手方向に沿って取り付けられた
2本のガイドライナー4a,4a と、このガイドライナー4
a,4a間に充填された水膨張性の止水材4bとを有して構成
されている。そして、止水体4はアンカーライナー3aと
フーチング部2aとの間に介在され、かつ、止水材4bが水
を吸い込んで膨張することにより、アンカー体3とフー
チング部2aとの間の止水処理が確実になされている。
The waterproof body 4 includes two guide liners 4a and 4a attached to the lower end of the anchor liner 3a along the longitudinal direction of the anchor liner 3a, and the guide liner 4
It is configured to have a water-swellable water blocking material 4b filled between a and 4a. The water blocking body 4 is interposed between the anchor liner 3a and the footing portion 2a, and the water blocking material 4b absorbs water and expands, so that the water blocking treatment between the anchor body 3 and the footing portion 2a is performed. Is surely done.

【0021】また、ガイドライナー4aが筒状仮設体1の
重量およびアンカーボルト12の締め付けによって比較的
容易に変形し易いような形材から形成され、このため、
筒状仮設体1の重量およびアンカーボルト12の締め付け
によってガイドライナー4a,4a が潰れて変形し、フーチ
ング部2aの上に止水材4bと共に密着することにより止水
性がさらに確実になされる。
Further, the guide liner 4a is formed of a shape member which is relatively easily deformed by the weight of the tubular temporary body 1 and the tightening of the anchor bolts 12, and therefore,
The guide liners 4a, 4a are crushed and deformed due to the weight of the tubular temporary body 1 and the tightening of the anchor bolts 12, and the water blocking material 4b is brought into close contact with the footing portion 2a to further ensure water blocking.

【0022】図5(b) はフーチング部2aの設置面が傾斜
している場合の止水体4の構造を示し、左右ガイドライ
ナー4aとして設置面の傾きに応じてサイズの異なるもの
が使用されている。
FIG. 5 (b) shows the structure of the water blocking body 4 when the installation surface of the footing portion 2a is inclined. As the left and right guide liners 4a, different sizes are used depending on the inclination of the installation surface. There is.

【0023】発明の実施の形態2.次に、この発明に係
る請求項第5項記載の仮締切り構造物の構築工法を順を
おって説明する(図6(a) 〜(e) 参照)。
Embodiment 2 of the Invention Next, the construction method of the temporary shutoff structure according to the fifth aspect of the present invention will be described in order (see FIGS. 6 (a) to 6 (e)).

【0024】 最初に、橋脚2の周囲に作業台13を組
み立てる。作業台13は橋脚2のフーチング部2aの上に複
数本の支柱13a を建て付け、この支柱13a の水面上に足
場板13b を架け渡すなどして組み立てる(図6(a) 参
照)。
First, the workbench 13 is assembled around the pier 2. The work platform 13 is assembled by building a plurality of columns 13a on the footing portion 2a of the pier 2 and straddling a scaffolding plate 13b on the water surface of the columns 13a (see FIG. 6 (a)).

【0025】また、作業台13の上のほうに、据え付けら
れる前の筒状仮設体1を吊る吊り架台14を取り付ける。
吊り架台14にはウィンチ14a を装備し、また、吊り架台
14は橋脚2に固定する(図6(a) 参照)。
A suspension stand 14 for suspending the tubular temporary body 1 before being installed is attached to the upper side of the work table 13.
The suspension base 14 is equipped with a winch 14a, and
14 is fixed to the pier 2 (see Fig. 6 (a)).

【0026】 次に、作業台13の上で筒状仮設体1を
吊り架台14のウィンチ14a で吊った状態で組み立て、そ
して、筒状仮設体1の下端部にアンカー体3を取り付
け、かつ、このアンカー体3の下端部に止水体4を取り
付けて仮締切り構造物を完成させる(図6(b) 参照)。
Next, the tubular temporary body 1 is assembled on the workbench 13 in a state of being suspended by the winch 14a of the suspension base 14, and the anchor body 3 is attached to the lower end portion of the tubular temporary body 1 and The water blocking body 4 is attached to the lower end of the anchor body 3 to complete the temporary cut-off structure (see FIG. 6 (b)).

【0027】 次に、このように構築された仮締切り
構造物を水中に徐々に降ろしてフーチング部2aの上に設
置する(図6(c) 参照)。そして、アンカー体3をフー
チング部2aの上に複数本のアンカーボルト12によって固
定する(図6(d) 参照)。
Next, the temporary cut-off structure constructed in this way is gradually lowered into water and installed on the footing portion 2a (see FIG. 6 (c)). Then, the anchor body 3 is fixed onto the footing portion 2a by a plurality of anchor bolts 12 (see FIG. 6 (d)).

【0028】また、仮締切り構造物内の水をポンプ排水
して橋脚2の周囲に作業空間を確保する(図6(e) 参
照)。
Further, the water in the temporary cutoff structure is pumped out to secure a working space around the pier 2 (see FIG. 6 (e)).

【0029】 橋脚2の補修工事が完了したら、仮締
切り構造物の中に給水して内外の水圧を同じにし、そし
て、アンカーボルト12を切断して仮締切り構造物をウィ
ンチ14a で一気に引き上げて撤去するか、あるいは水中
において筒状仮設体1を解体し、ライナープレート5を
一枚一枚ウィンチ14a で引き上げて撤去する。
After the repair work of the bridge pier 2 is completed, water is supplied into the temporary shut-off structure to make the water pressure inside and outside the same, and the anchor bolt 12 is cut to pull up the temporary shut-off structure at once with the winch 14a to remove it. Alternatively, the tubular temporary body 1 is disassembled in water, and the liner plates 5 are individually pulled up by the winches 14a and removed.

【0030】なお、いずれの撤去方法においても、ライ
ナープレート5を特に切断したりしないので、全てのラ
イナープレート5を再利用することができる。
In any of the removing methods, since the liner plate 5 is not particularly cut, all the liner plates 5 can be reused.

【0031】[0031]

【発明の効果】この発明に係る仮締切り構造物は以上の
構成からなり、水中に構築された構造物の周囲にこの構
造物を取り囲むように構築され、水を堰止めて前記構造
物の周囲に作業空間を確保する筒状仮設体と、この筒状
仮設体の下端部に取り付けられ、かつ、前記構造物のフ
ーチング部に固定されて前記筒状仮設体を前記フーチン
グ部に固定するアンカー体とを備えて構築され、特に、
筒状仮設体は複数枚の鋼製セグメント、PCセグメント
又はライナープレートを構造物の周方向および高さ方向
に互いに連結して設置し、かつ、前記鋼製セグメント、
PCセグメント又はライナープレートどうしの接合部に
水膨張性止水材を介在して筒状に構築され、かつ、アン
カー体とフーチング部との間に介在されて筒状仮設体と
前記フーチング部との間を止水する止水体を備え、さら
に、前記止水体は複数本のガイドライナーと、このガイ
ドライナー間に充填された水膨張性止水材とを有して構
成され、かつ、筒状仮設体の重みによって前記ガイドラ
イナーが圧壊して前記水膨張性止水材とともにフーチン
グ部に密着するように構成されているので、止水性のき
わめて高い仮締切り構造物を短期間のうちに容易に構築
できるとともに、大幅なコストダウンが図れるなどの効
果がある。
EFFECTS OF THE INVENTION The temporary cutoff structure according to the present invention is constructed as described above, and is constructed so as to surround the structure constructed in water and to surround the structure by blocking water. A tubular temporary body for ensuring a working space, and an anchor body attached to the lower end of the tubular temporary body and fixed to the footing portion of the structure to fix the tubular temporary body to the footing portion. Built with and, in particular,
The tubular temporary body has a plurality of steel segments, PC segments or liner plates connected to each other in the circumferential direction and the height direction of the structure, and the steel segment,
It is constructed in a tubular shape by interposing a water-expandable water blocking material at the joint between the PC segments or the liner plates, and is interposed between the anchor body and the footing portion so as to connect the tubular temporary body and the footing portion. And a water-expandable water-blocking material filled between the guide liners, and a tubular temporary structure. Since the guide liner is crushed by the weight of the body and is brought into close contact with the footing part together with the water-swellable water blocking material, a temporary cutoff structure having an extremely high water blocking property can be easily constructed in a short period of time. In addition to being able to do so, there is an effect that the cost can be significantly reduced.

【0032】また、この発明に係る仮締切り構造物の構
築工法は、水中に構築された構造物の周囲に設置される
筒状仮設体を、水面上で前記構造物を取り囲むように構
築し、この筒状仮設体の下端部にアンカー体と止水体と
を取り付け、次に前記筒状仮設体を前記アンカー体およ
び前記止水体とともに、水中に降ろして前記構造物のフ
ーチング部の上に設置し、次に、前記アンカー体を前記
フーチング部の上に複数本のアンカーボルトによって固
定するので、特に、筒状仮設体の組み立て、アンカー体
および止水体の取り付けは全て水面上で行うので、施工
の安全性がきわめて高く、また、施工精度がきわめて高
いなどの効果がある。
In the construction method for a temporary shut-off structure according to the present invention, a cylindrical temporary body installed around a structure constructed in water is constructed so as to surround the structure on the water surface, An anchor body and a water stop body are attached to the lower end portion of the tubular temporary body, and then the tubular temporary body together with the anchor body and the water stop body is lowered into water and installed on the footing portion of the structure. , Next, since the anchor body is fixed on the footing portion by a plurality of anchor bolts, in particular, since the assembly of the tubular temporary body and the attachment of the anchor body and the water blocking body are all performed on the water surface, It has the advantages of extremely high safety and extremely high construction accuracy.

【図面の簡単な説明】[Brief description of drawings]

【図1】仮締切り構造物の縦断面図である。FIG. 1 is a vertical cross-sectional view of a temporary cutoff structure.

【図2】(a),(b),(c) は仮締切り構造物の平面図であ
る。
2 (a), (b), (c) are plan views of a temporary shut-off structure.

【図3】(a) は筒状仮設体の上下方向に隣接するライナ
ープレートの連結部の構造を示す図1におけるA部拡大
図、(b) は筒状仮設体の円周方向に隣接するライナープ
レートの連結部の構造を示す図2(a) におけるB部拡大
図である。
FIG. 3 (a) is an enlarged view of a portion A in FIG. 1 showing the structure of a connecting portion of liner plates adjacent to each other in the vertical direction of the tubular temporary body, and (b) is adjacent to the tubular temporary body in the circumferential direction. FIG. 3 is an enlarged view of a B portion in FIG. 2 (a) showing the structure of the connection portion of the liner plate.

【図4】ライナープレートの縦断面図である。FIG. 4 is a vertical sectional view of a liner plate.

【図5】(a) はアンカー体および止水体の構造を示す図
1におけるC部拡大図、(b) は止水体の構造を示す縦断
面図である。
5 (a) is an enlarged view of a portion C in FIG. 1 showing the structures of the anchor body and the water blocking body, and FIG. 5 (b) is a longitudinal sectional view showing the structure of the water blocking body.

【図6】(a),(b),(c),(d),(e) は仮締切り構造物の構築
方法を示す工程図である。
6 (a), (b), (c), (d) and (e) are process drawings showing a method for constructing a temporary cut-off structure.

【図7】仮締切り構造物の従来例の横断面図である。FIG. 7 is a cross-sectional view of a conventional example of a temporary cutoff structure.

【符号の説明】[Explanation of symbols]

1…筒状仮設体、2…橋脚、3…アンカー体、4…止水
体、5…ライナープレート(鋼製セグメント、PCセグ
メント、ライナープレート) 6…接合ボルト、7…止水材、8…補強リング、9…補
強支柱、10…接合ナット、11…固定ナット、12…アンカ
ーボルト、13…作業台、14…吊り架台。
1 ... Cylindrical temporary body, 2 ... Bridge pier, 3 ... Anchor body, 4 ... Water stop body, 5 ... Liner plate (steel segment, PC segment, liner plate) 6 ... Joining bolt, 7 ... Water stop material, 8 ... Reinforcement Rings, 9 ... Reinforcing columns, 10 ... Joining nuts, 11 ... Fixing nuts, 12 ... Anchor bolts, 13 ... Workbench, 14 ... Suspension stand.

フロントページの続き (72)発明者 元原 好則 大阪府大阪市中央区北浜4丁目7番19号 住友ビル第3号館 住金鋼材工業株式会社 内 (72)発明者 松田 正樹 大阪府大阪市西区新町3丁目2番2号 ダ イケン株式会社内Front page continued (72) Inventor Yoshinori Motohara 4-7-19 Kitahama Chuo-ku, Osaka-shi, Osaka Sumitomo Building No. 3 Sumikin Steel Products Co., Ltd. (72) Masaki Matsuda Shinmachi, Nishi-ku, Osaka-shi, Osaka 3-2-2 Daiken Co., Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 水中に構築された構造物の周囲にこの構
造物を取り囲むように構築され、水を堰止めて前記構造
物の周囲に作業空間を確保する筒状仮設体と、この筒状
仮設体の下端部に取り付けられ、かつ、前記構造物のフ
ーチング部に固定されて前記筒状仮設体を前記フーチン
グ部に固定するアンカー体とを備えてなることを特徴と
する仮締切り構造物。
1. A tubular temporary structure, which is constructed around a structure constructed in water so as to surround the structure and blocks a water to secure a working space around the structure, and the tubular structure. A temporary cut-off structure, comprising: an anchor body attached to a lower end of the temporary body and fixed to a footing portion of the structure to fix the tubular temporary body to the footing portion.
【請求項2】 筒状仮設体は複数枚の鋼製セグメント、
PCセグメント又はライナープレートを構造物の周方向
および高さ方向に互いに連結して設置し、かつ、前記鋼
製セグメント、PCセグメント又はライナープレートど
うしの接合部に水膨張性止水材を介在して筒状に構成し
てなることを特徴とする請求項第1項記載の仮締切り構
造物。
2. The tubular temporary body comprises a plurality of steel segments,
The PC segment or liner plate is installed by being connected to each other in the circumferential direction and the height direction of the structure, and the water-expandable water blocking material is interposed at the joint between the steel segment, PC segment or liner plate. The temporary cutoff structure according to claim 1, wherein the temporary cutoff structure is formed in a tubular shape.
【請求項3】 アンカー体の下端部に取り付けられ、こ
のアンカー体とフーチング部との間に介在されて筒状仮
設体と前記フーチング部との間を止水する止水体を備え
てなることを特徴とする請求項第1項又は第2項記載の
仮締切り構造物。
3. A water stop body attached to the lower end portion of the anchor body and interposed between the anchor body and the footing portion to stop water between the tubular temporary body and the footing portion. The temporary cut-off structure according to claim 1 or 2, which is characterized.
【請求項4】 止水体は複数本のガイドライナーと、こ
のガイドライナー間に充填された水膨張性止水材とを有
して構成され、かつ、筒状仮設体の重みによって前記ガ
イドライナーが圧壊して前記水膨張性止水材とともにフ
ーチング部に密着するように構成してあることを特徴と
する請求項第3項記載の仮締切り構造物。
4. The water blocking body is configured to have a plurality of guide liners and a water-expandable water blocking material filled between the guide liners, and the guide liner is formed by the weight of the tubular temporary body. The temporary cut-off structure according to claim 3, wherein the temporary cut-off structure is constructed so as to be crushed and come into close contact with the footing portion together with the water-expandable water blocking material.
【請求項5】 水中に構築された構造物の周囲に設置さ
れる筒状仮設体を、水面上で前記構造物を取り囲むよう
に構築し、この筒状仮設体の下端部にアンカー体と止水
体とを取り付け、次に前記筒状仮設体を前記アンカー体
および前記止水体とともに、水中に降ろして前記構造物
のフーチング部の上に設置し、次に、前記アンカー体を
前記フーチング部の上に複数本のアンカーボルトによっ
て固定することを特徴とする仮締切り構造物の構築工
法。
5. A tubular temporary body installed around a structure constructed in water is constructed so as to surround the structure above the water surface, and an anchor body and a stopper are attached to the lower end of the tubular temporary structure. A water body, and then the tubular temporary body, together with the anchor body and the water stop body, is lowered into water and placed on the footing portion of the structure, and then the anchor body is placed on the footing portion. A method of constructing a temporary shut-off structure, which is characterized in that it is fixed to a plurality of anchor bolts.
JP8027948A 1996-02-15 1996-02-15 Temporary coffering structure and method of construction thereof Pending JPH09221760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8027948A JPH09221760A (en) 1996-02-15 1996-02-15 Temporary coffering structure and method of construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8027948A JPH09221760A (en) 1996-02-15 1996-02-15 Temporary coffering structure and method of construction thereof

Publications (1)

Publication Number Publication Date
JPH09221760A true JPH09221760A (en) 1997-08-26

Family

ID=12235125

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8027948A Pending JPH09221760A (en) 1996-02-15 1996-02-15 Temporary coffering structure and method of construction thereof

Country Status (1)

Country Link
JP (1) JPH09221760A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100368604B1 (en) * 1999-11-20 2003-01-24 주식회사 다산이엔씨 Watertight Caisson for Pier Repair
JP2007120470A (en) * 2005-10-31 2007-05-17 Ohbayashi Corp Substructure for ocean wind power generation device and construction method of substructure for ocean wind power generation device
JP2007327244A (en) * 2006-06-08 2007-12-20 Kajima Corp Method and structure for temporarily coffering underwater structure
JP2009019449A (en) * 2007-07-13 2009-01-29 Hirose & Co Ltd Water cut-off structure for cofferdam and water cut-off method
JP2009180018A (en) * 2008-01-31 2009-08-13 Jfe Engineering Corp Method of constructing cofferdam for underwater structure and structure for cofferdam
JP2011208389A (en) * 2010-03-29 2011-10-20 Nippon Steel & Sumikin Metal Products Co Ltd Self-standing cofferdam structure and self-standing cofferdam method
JP2013108316A (en) * 2011-11-24 2013-06-06 Daiho Constr Co Ltd Water cutoff wall body for cutoff and cutoff method using the same
JP2016023429A (en) * 2014-07-17 2016-02-08 五洋建設株式会社 Working box and water cut-off method for the working box
CN106087749A (en) * 2016-06-21 2016-11-09 中建市政工程有限公司 The maintenance process of a kind of water-saving type bridge pier column and curing means thereof
CN107761752A (en) * 2017-09-27 2018-03-06 中铁二十局集团有限公司 A kind of steel cofferdam sinks and anchoring process
CN107905112A (en) * 2017-11-30 2018-04-13 中铁大桥局集团第二工程有限公司 A kind of not contour steel suspended box cofferdam base arrangement
JP2018138726A (en) * 2017-02-24 2018-09-06 Jfe建材株式会社 Hollow segment, annular structure, and cut-off wall structure
JP2019210663A (en) * 2018-06-01 2019-12-12 Jfe建材株式会社 Method for constructing water blocking wall structure, hollow segment for constructing water blocking wall structure, scaffold attached to hollow segment, and water blocking wall structure with scaffold
JP2019210664A (en) * 2018-06-01 2019-12-12 Jfe建材株式会社 Water blocking plate and water blocking wall structure
CN111926838A (en) * 2020-08-31 2020-11-13 河南传衡建设工程有限公司 River channel multi-span arch-connected slope supporting gallery type quick dismounting combined cofferdam
CN111926838B (en) * 2020-08-31 2024-04-26 河南传衡建设工程有限公司 River channel multi-span joint arch slope supporting corridor type rapid dismounting combined cofferdam

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100368604B1 (en) * 1999-11-20 2003-01-24 주식회사 다산이엔씨 Watertight Caisson for Pier Repair
JP2007120470A (en) * 2005-10-31 2007-05-17 Ohbayashi Corp Substructure for ocean wind power generation device and construction method of substructure for ocean wind power generation device
JP4696854B2 (en) * 2005-10-31 2011-06-08 株式会社大林組 Foundation structure of offshore wind power generator and construction method of foundation structure of offshore wind power generator
JP2007327244A (en) * 2006-06-08 2007-12-20 Kajima Corp Method and structure for temporarily coffering underwater structure
JP4698491B2 (en) * 2006-06-08 2011-06-08 鹿島建設株式会社 Temporary closing method and structure of underwater structure
JP2009019449A (en) * 2007-07-13 2009-01-29 Hirose & Co Ltd Water cut-off structure for cofferdam and water cut-off method
JP2009180018A (en) * 2008-01-31 2009-08-13 Jfe Engineering Corp Method of constructing cofferdam for underwater structure and structure for cofferdam
JP2011208389A (en) * 2010-03-29 2011-10-20 Nippon Steel & Sumikin Metal Products Co Ltd Self-standing cofferdam structure and self-standing cofferdam method
JP2013108316A (en) * 2011-11-24 2013-06-06 Daiho Constr Co Ltd Water cutoff wall body for cutoff and cutoff method using the same
JP2016023429A (en) * 2014-07-17 2016-02-08 五洋建設株式会社 Working box and water cut-off method for the working box
CN106087749A (en) * 2016-06-21 2016-11-09 中建市政工程有限公司 The maintenance process of a kind of water-saving type bridge pier column and curing means thereof
CN106087749B (en) * 2016-06-21 2018-05-18 中建市政工程有限公司 A kind of maintenance process of water-saving type bridge pier column and its curing means
JP2018138726A (en) * 2017-02-24 2018-09-06 Jfe建材株式会社 Hollow segment, annular structure, and cut-off wall structure
CN107761752A (en) * 2017-09-27 2018-03-06 中铁二十局集团有限公司 A kind of steel cofferdam sinks and anchoring process
CN107761752B (en) * 2017-09-27 2019-10-18 中铁二十局集团有限公司 A kind of steel cofferdam sinks and anchoring process
CN107905112A (en) * 2017-11-30 2018-04-13 中铁大桥局集团第二工程有限公司 A kind of not contour steel suspended box cofferdam base arrangement
CN107905112B (en) * 2017-11-30 2024-03-01 中铁大桥局集团第二工程有限公司 Unequal-height steel hanging box cofferdam bottom plate structure
JP2019210663A (en) * 2018-06-01 2019-12-12 Jfe建材株式会社 Method for constructing water blocking wall structure, hollow segment for constructing water blocking wall structure, scaffold attached to hollow segment, and water blocking wall structure with scaffold
JP2019210664A (en) * 2018-06-01 2019-12-12 Jfe建材株式会社 Water blocking plate and water blocking wall structure
CN111926838A (en) * 2020-08-31 2020-11-13 河南传衡建设工程有限公司 River channel multi-span arch-connected slope supporting gallery type quick dismounting combined cofferdam
CN111926838B (en) * 2020-08-31 2024-04-26 河南传衡建设工程有限公司 River channel multi-span joint arch slope supporting corridor type rapid dismounting combined cofferdam

Similar Documents

Publication Publication Date Title
JPH09221760A (en) Temporary coffering structure and method of construction thereof
RU2375523C1 (en) Formwork for constructing reinforcing covering of construction made from corrugated steel plates
JP3799367B2 (en) Reinforcing structure and method of reinforcing structure using the same
CN214328887U (en) Assembled foundation pit inner supporting structure convenient to disassemble
JP2006233509A (en) Joining structure of column and beam and disassembling method of its structure
JP2920851B2 (en) Repair method of concrete wall
JP2019120056A (en) Waterproof structure for suspended scaffolding
JPH1088524A (en) Reinforcement construction method for base of bridge pier and base reinforced bridge pier
CN106089249A (en) A kind of Quick-detachable adjustable lining cutting plug punching block and installation and application
CN112302035A (en) Prefabricated hollow steel pipe concrete supporting member, inner supporting system and construction method
CN112323811A (en) Adjustable-length inner supporting structure of fabricated foundation pit and construction method of adjustable-length inner supporting structure
CN107558733B (en) The construction method of post-concreted expansion strip lower die frame system dismounting synchronous with periphery support for shuttering
CN214301761U (en) Staple bolt-bolt hybrid node and foundation pit inner support structure
JP3908416B2 (en) Underwater joint for high water pressure
CN214301760U (en) Adjustable length inner supporting structure of assembled foundation pit
CN214460438U (en) Foundation pit inner supporting structure capable of being vertically positioned and adjusted
CN214460439U (en) Steel-concrete combined inner support prefabricated part and connecting node structure
JPH05501B2 (en)
JPH11280266A (en) Construction method for base isolation of existing building
CN217870495U (en) Platform unearths temporarily
CN214301762U (en) Side node structure in assembled foundation ditch
JP3622100B2 (en) How to reinforce existing beams
KR100433991B1 (en) Wall Maintenance and Reinforce Engineering Method of Wall On the Water
CN210712856U (en) Assembled foundation pit prestress supporting system
CN218911136U (en) Bridge panel cantilever cast-in-situ supporting system structure