CN203765774U - Winter maintenance device for small component - Google Patents
Winter maintenance device for small component Download PDFInfo
- Publication number
- CN203765774U CN203765774U CN201420180247.1U CN201420180247U CN203765774U CN 203765774 U CN203765774 U CN 203765774U CN 201420180247 U CN201420180247 U CN 201420180247U CN 203765774 U CN203765774 U CN 203765774U
- Authority
- CN
- China
- Prior art keywords
- magnetic valve
- structural component
- steam
- primary structural
- maintenance
- Prior art date
Links
- 239000011901 water Substances 0.000 claims abstract description 37
- 238000005485 electric heating Methods 0.000 claims abstract description 10
- 239000011521 glasses Substances 0.000 claims abstract description 6
- 239000010410 layers Substances 0.000 claims abstract description 4
- 239000003897 fog Substances 0.000 claims description 25
- RYGMFSIKBFXOCR-UHFFFAOYSA-N copper Chemical compound data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nMzAwcHgnIGhlaWdodD0nMzAwcHgnIHZpZXdCb3g9JzAgMCAzMDAgMzAwJz4KPCEtLSBFTkQgT0YgSEVBREVSIC0tPgo8cmVjdCBzdHlsZT0nb3BhY2l0eToxLjA7ZmlsbDojRkZGRkZGO3N0cm9rZTpub25lJyB3aWR0aD0nMzAwJyBoZWlnaHQ9JzMwMCcgeD0nMCcgeT0nMCc+IDwvcmVjdD4KPHRleHQgZG9taW5hbnQtYmFzZWxpbmU9ImNlbnRyYWwiIHRleHQtYW5jaG9yPSJzdGFydCIgeD0nMTIzLjMxNicgeT0nMTU2JyBzdHlsZT0nZm9udC1zaXplOjQwcHg7Zm9udC1zdHlsZTpub3JtYWw7Zm9udC13ZWlnaHQ6bm9ybWFsO2ZpbGwtb3BhY2l0eToxO3N0cm9rZTpub25lO2ZvbnQtZmFtaWx5OnNhbnMtc2VyaWY7ZmlsbDojM0I0MTQzJyA+PHRzcGFuPkN1PC90c3Bhbj48L3RleHQ+Cjwvc3ZnPgo= data:image/svg+xml;base64,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 [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 22
- 229910052802 copper Inorganic materials 0.000 claims description 22
- 239000010949 copper Substances 0.000 claims description 22
- 239000007921 sprays Substances 0.000 abstract description 6
- 238000010438 heat treatment Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reactions Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 238000000034 methods Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Abstract
Description
Technical field
The utility model relates to the Maintenance in Winter equipment technical field of concrete component, particularly relates to a kind of primary structural component Maintenance in Winter equipment.
Background technology
Concrete curing method is divided into two kinds of natural curing and heating curings: cast-in-place concrete adopts natural curing under normal operation conventionally, and in the winter time in construction conventional maintenance process be outside heating method, with steam, concrete is hardened under wet heat condition; This outside heating method is more easy to control, and heating-up temperature is even, but because it needs special boiler plant, ordinary disbursements is higher, and in the time carrying out primary structural component maintenance, cost is too large especially, easily causes the wasting of resources.
Utility model content
For solving the problems of the technologies described above, the utility model provides a kind of maintenance cost, primary structural component Maintenance in Winter equipment economizing on resources of effectively reducing.
Primary structural component Maintenance in Winter equipment of the present utility model, comprise primary structural component fog room and steam raising plant, described primary structural component fog room is double layer glass greenhouse structure, the bottom of described primary structural component fog room is communicated with draft fan, and be arranged at intervals with shower nozzle at top, described steam raising plant comprises steam copper, be arranged on the electric heating sheets of steam copper bottom, and storage tank, one end of described steam copper is connected with described storage tank by water inlet pipe, the other end of described steam copper communicates with described primary structural component fog room by escape pipe, the top of described steam copper is also communicated with blast pipe, described shower nozzle communicates with described storage tank by shower, on described shower, be provided with the first water pump, in described primary structural component fog room, be provided with electronic thermometer and hygrometer, on described shower, water inlet pipe, escape pipe and blast pipe, be respectively arranged with the first magnetic valve, the second magnetic valve, the 3rd magnetic valve and the 4th magnetic valve, described electronic thermometer is connected by controller with draft fan with described the first magnetic valve, the second magnetic valve, the 3rd magnetic valve, the 4th magnetic valve, electric heating sheets, the first water pump with hygrometer.
Further, described shower is also connected with described steam copper by hot-water line, is provided with the second water pump and the 5th magnetic valve on described hot-water line, and described electronic thermometer is connected by controller with the 5th magnetic valve with described the second water pump with hygrometer.
Further, the inside bottom of described primary structural component fog room is also provided with member base, on described member base, is provided with gutter.
Compared with prior art the beneficial effects of the utility model are: when use, owing to adopting the steam copper of small volume and adopting electrically heated mode, can greatly reduce power consumption, adopt the primary structural component fog room of the good glass booth of light transmission and heat insulating ability form simultaneously, can utilize natural sunlight for primary structural component fog room provides heat, effectively reduce maintenance cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is described in further detail.Following examples are used for illustrating the utility model, but are not used for limiting scope of the present utility model.
As shown in Figure 1, primary structural component Maintenance in Winter equipment of the present utility model, comprise primary structural component fog room 1 and steam raising plant, primary structural component fog room 1 is double layer glass greenhouse structure, the bottom of primary structural component fog room 1 is communicated with draft fan 2, and be arranged at intervals with shower nozzle 3 at top, steam raising plant comprises steam copper 4, be arranged on the electric heating sheets 5 of steam copper bottom, and storage tank 6, one end of steam copper 4 is connected with storage tank 6 by water inlet pipe 7, the other end of steam copper 4 communicates with primary structural component fog room 1 by escape pipe 8, the top of steam copper 4 is also communicated with blast pipe 9, shower nozzle 3 communicates with storage tank 6 by shower 10, on shower 10, be provided with the first water pump 11, in primary structural component fog room 1, be provided with electronic thermometer 12 and hygrometer 13, on shower 10, water inlet pipe 7, escape pipe 8 and blast pipe 9, be respectively arranged with the first magnetic valve 14, the second magnetic valve 15, the 3rd magnetic valve 16 and the 4th magnetic valve 17, electronic thermometer 12 is connected by controller with draft fan 2 with the first magnetic valve 14, the second magnetic valve 15, the 3rd magnetic valve 16, the 4th magnetic valve 17, electric heating sheets 5, the first water pump 11 with hygrometer 13, when use, owing to adopting the steam copper of small volume and adopting electrically heated mode, can greatly reduce power consumption, adopt the primary structural component fog room of the good glass booth of light transmission and heat insulating ability form simultaneously, can utilize natural sunlight for primary structural component fog room provides heat, effectively reduce maintenance cost, in the time that the temperature and humidity in primary structural component fog room is higher, can be by opening draft fan, close electric heating sheets and the 3rd magnetic valve is realized cooling and wet down, in the time that the temperature and humidity in primary structural component fog room is lower, can realizes and heating and humidification by opening electric heating sheets and the 3rd magnetic valve, close after electric heating sheets and the 3rd magnetic valve, need to open the 4th magnetic valve and come for steam copper pressure release, in the time that the water in steam copper is less, can add water by opening the second magnetic valve, water in storage tank need keep certain water level.
In the time there is difference requirements in the humidity and temperature in primary structural component fog room, adjust for convenient, primary structural component Maintenance in Winter equipment of the present utility model, shower 10 is also connected with steam copper 4 by hot-water line 18, on hot-water line 18, be provided with the second water pump 19 and the 5th magnetic valve 20, electronic thermometer 12 is connected by controller with the 5th magnetic valve 20 with the second water pump 19 with hygrometer 13; Like this, in the time that needs improve humidity and reduce temperature, open the first magnetic valve 14, use cold water spray, in the time that needs improve temperature and reduce humidity, open the 5th magnetic valve and use heat water-spraying.
In order effectively to discharge residual water, prevent that primary structural component is immersed in water, primary structural component Maintenance in Winter equipment of the present utility model, the inside bottom of primary structural component fog room 1 is also provided with member base 21, is provided with gutter 22 on member base 21.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; do not departing under the prerequisite of the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420180247.1U CN203765774U (en) | 2014-04-14 | 2014-04-14 | Winter maintenance device for small component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420180247.1U CN203765774U (en) | 2014-04-14 | 2014-04-14 | Winter maintenance device for small component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203765774U true CN203765774U (en) | 2014-08-13 |
Family
ID=51283015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420180247.1U CN203765774U (en) | 2014-04-14 | 2014-04-14 | Winter maintenance device for small component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203765774U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133502A (en) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | Bridge pier stud concrete curing control device |
CN105437361A (en) * | 2015-12-22 | 2016-03-30 | 湖南三一快而居住宅工业有限公司 | Precast concrete component curing forming device |
CN105643784A (en) * | 2016-03-25 | 2016-06-08 | 山东明达建筑科技有限公司 | Curing warehouse for special-shaped component |
CN106182377A (en) * | 2016-07-21 | 2016-12-07 | 安徽望湖建筑产业发展有限公司 | A kind of PC component conservation system for building |
CN107457893A (en) * | 2017-08-28 | 2017-12-12 | 肇庆高新区格兰新材料科技有限公司 | A kind of maintaining process and its equipment of environment-friendly waterproof sheet material |
-
2014
- 2014-04-14 CN CN201420180247.1U patent/CN203765774U/en not_active IP Right Cessation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133502A (en) * | 2015-09-11 | 2015-12-09 | 中建七局第二建筑有限公司 | Bridge pier stud concrete curing control device |
CN105437361A (en) * | 2015-12-22 | 2016-03-30 | 湖南三一快而居住宅工业有限公司 | Precast concrete component curing forming device |
CN105643784A (en) * | 2016-03-25 | 2016-06-08 | 山东明达建筑科技有限公司 | Curing warehouse for special-shaped component |
CN106182377A (en) * | 2016-07-21 | 2016-12-07 | 安徽望湖建筑产业发展有限公司 | A kind of PC component conservation system for building |
CN107457893A (en) * | 2017-08-28 | 2017-12-12 | 肇庆高新区格兰新材料科技有限公司 | A kind of maintaining process and its equipment of environment-friendly waterproof sheet material |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203375751U (en) | Device allowing solar energy centralized heating engineering scale to be adjusted | |
CN104567022A (en) | Double-thermoelectric power generation device for solar water heater | |
CN201450609U (en) | immersion heater | |
CN204100576U (en) | A kind of air-source water heater water system | |
CN204460146U (en) | A kind of solar heat-preservation steam raising plant | |
CN206683157U (en) | The controllable temperature board house that a kind of construction site uses | |
CN201926135U (en) | Hot water supply system adopting solar energy as primary heat source | |
CN205255212U (en) | Carbomorphism equipment of carbomorphism is carried out bamboo strip | |
CN203097323U (en) | Temperature control bathing insulating room | |
CN201818954U (en) | Oil pipeline of externally-wrapped internally-heated thermal insulation device | |
CN204944059U (en) | A kind of chrysanthemum drying unit based on solar energy techniques | |
CN204141697U (en) | The heating plant of a kind of temperature controller and boiler coordinated signals | |
CN204313505U (en) | The two temperature difference electricity generation device of a kind of solar water heater | |
CN203776665U (en) | Water liner and purging system of gas-fired steam box | |
CN204880771U (en) | Solar water heater | |
CN203741339U (en) | Methane fermentation device | |
CN203614179U (en) | Gas electrical generation waste heat recovery device | |
CN201823665U (en) | Solar painting and baking varnish room | |
CN201731548U (en) | Solar and electrical energy combined heating facility | |
CN203857448U (en) | Steam generator | |
WO2016000467A1 (en) | Single-household double-circulation heating system | |
CN205985864U (en) | Heat radiation cabinet type transformer station | |
CN205717939U (en) | Water-saving device for gas water heater | |
CN104633951A (en) | Environment-friendly water heater | |
CN205777167U (en) | A kind of thawing purifier of green building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EXPY | Termination of patent right or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140813 Termination date: 20150414 |