CN105114102B CN201510554404.XA CN201510554404A CN105114102B CN 105114102 B CN105114102 B CN 105114102B CN 201510554404 A CN201510554404 A CN 201510554404A CN 105114102 B CN105114102 B CN 105114102B
Authority
CN
China
Prior art keywords
steel
steel pipe
formwork jumbo
expansion link
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510554404.XA
Other languages
Chinese (zh)
Other versions
CN105114102A (en
Inventor
张阳波
张阳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Wanqiao Heavy Industry Technology Co.,Ltd.
Original Assignee
Dongguan Wanqiao Steel Mould Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Wanqiao Steel Mould Co Ltd filed Critical Dongguan Wanqiao Steel Mould Co Ltd
Priority to CN201510554404.XA priority Critical patent/CN105114102B/en
Publication of CN105114102A publication Critical patent/CN105114102A/en
Application granted granted Critical
Publication of CN105114102B publication Critical patent/CN105114102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to the subway station formwork jumbo of tunnel construction apparatus field,It includes supporting mechanism、Facing and walking mechanism,Facing is installed on the top of supporting mechanism,Supporting mechanism includes the steel frame component being arranged side by side more than two,The steel frame component is by least one set standard steel pipe frame、Oil gear and lowering or hoisting gear are constituted,Lowering or hoisting gear is fixedly mounted on the top of standard steel pipe frame,Lowering or hoisting gear is by expansion bracket、The horizontal even channel-section steel of the expansion link of more than two and top is constituted,Facing includes panel body、Steel form and the regulation strut that telescopic length can be carried out,Overall structure is simple,It is stable firm,It is easy for installation,It is provided with lowering or hoisting gear,Compared with traditional structure,Same set of formwork jumbo is suitable for the subway tunnel of differing heights,The standard component for only needing to manufacture a set of formwork jumbo when therefore producing is i.e. generally applicable,Production cost can be saved,The waste of material caused by the formwork jumbo because of the various different sizes of manufacture can be avoided simultaneously.

Description

Subway station formwork jumbo
Technical field
The present invention relates to tunnel construction apparatus field, and in particular to subway station formwork jumbo.
Background technology
Subway station formwork jumbo is a kind of large-scale nonstandard machine equipments in constructing metro tunnel for casting concrete, its Agent structure is the steel construction that plate-girder is combined.
Traditional subway station formwork jumbo does not possess elevating function, needs according to the specification of subway tunnel come by given size Had made to order, be required to coordinate the size of subway tunnel to carry out Aided design including the height and width of subway station formwork jumbo, Therefore, construction party needs to carry out producing new equipment according to new dimensional structure requirement producer, so, can not only increase and apply Work cost, and the subway station formwork jumbo of different size specification can not be general, it will cause substantial amounts of waste of material.
In addition, when using subway station formwork jumbo, being required to dismantle a part of part before normal forward state so as to drop As little as certain altitude rear is controllable moves ahead, and then needs to be re-assemblied again, integrated operation inconvenience, and increases and can construct Time and difficulty of construction.
The content of the invention
Present invention aim to address disadvantages described above, there is provided subway station formwork jumbo, which can carry out lift adjustment, to adapt to The subway tunnel building of differing heights is used.
The purpose of the present invention is achieved in the following ways:
Subway station formwork jumbo, it includes supporting mechanism, facing and walking mechanism, and facing is installed on support machine The top of structure.
Supporting mechanism includes the steel frame component being arranged side by side more than two, and walking mechanism is installed on the bottom of each group steel frame component Portion, the steel frame component are made up of least one set standard steel pipe frame, oil gear and lowering or hoisting gear, and lowering or hoisting gear is fixedly mounted on mark The top of quasi- steel pipe frame, lowering or hoisting gear are made up of the horizontal even channel-section steel in expansion bracket, the expansion link of more than two and top, push up horizontal even channel-section steel solid It is scheduled on the top of expansion link and is fixedly connected with facing, is provided with and can enter along expansion link between adjacent two expansion links The shrinking connecting-rod of row oscilaltion, is fixedly connected at the top of the bottom of expansion bracket and standard steel pipe frame, the top of expansion bracket It is, for the location division for penetrating and fixing expansion link, several location holes being mutually paired to be provided with location division and expansion link, And be provided with for matching the alignment pin in insertion location hole, so as to lock connection expansion link and expansion bracket, oil gear includes solid Dingan County is mounted in the oil pressure fixed seat at the top of standard steel pipe frame and vertically-mounted oil hydraulic cylinder, the expansion link of oil hydraulic cylinder upwardly extend and It is fixedly connected with horizontal even channel-section steel is pushed up.
Facing includes panel body, steel form and can carry out the regulation strut of telescopic length, and panel body tiling is solid The top of the horizontal even channel-section steel in top is scheduled on, adjusting strut includes the left regulation strut of structure identical and right regulation strut, and steel form includes Steel form and right side steel form on the left of structure identical, the right-hand member of left side steel form is by active connection and a left side for panel body End is attached, and the right end of the left end of right side steel form also by active connection with panel body is attached, left side The left end of steel form is attached with the left top for adjusting strut, and the left bottom for adjusting strut is connected with the left end of shrinking connecting-rod Connect, by controlling the left angle of inclination for adjusting steel form on the left of strut scalable, the right-hand member of right side steel form and right regulation strut Top be attached, it is right adjust strut bottom be attached with the right-hand member of shrinking connecting-rod, by control it is right adjust strut can Adjust the angle of inclination of right side steel form.
In described above, used as preferred scheme, the two ends of the shrinking connecting-rod are provided with and penetrate and be fixed on for pairing Locating sleeve on expansion link, is additionally provided with the locking hole corresponding with the position of positioning hole of expansion link, and is provided with locating sleeve For matching the alignment pin inserted in the locking hole, so as to lock connection expansion link and shrinking connecting-rod.
In described above, used as preferred scheme, the two ends of the regulation strut are equipped with threaded rod, adjust in strut End is provided with and carries out matching the threaded sleeve being spirally connected with threaded rod, carries out flexible tune by screw thread between threaded rod and threaded sleeve Section.
In described above, as preferred scheme, the active connection is hinge arrangement.
In described above, as preferred scheme, the walking mechanism includes universal wheel, the double flute for installing universal wheel Steel underframe and for contacting with ground and telescopically adjustable support base, the top of double flute steel underframe and the bottom of standard steel pipe frame Portion is fixedly connected, and universal wheel is arranged on the bottom of double flute steel underframe, upwardly extends and penetrate double flute steel at the top of support base Underframe and it is fixed on the bottom of standard steel pipe frame.
In described above, as preferred scheme, entered by least two horizontal steel pipes between two adjacent groups steel frame component Row is connected, and horizontal steel pipe is each passed through and is fixed on every group of steel frame component.
In described above, as preferred scheme, it is additionally provided with for increasing support force below the oil pressure fixed seat Lower scissors are supportted, and lower scissors support is fixedly mounted on standard steel pipe frame.
In described above, as preferred scheme, two or more is additionally provided with the lowering or hoisting gear for increasing support force Upper bridging, the upper end of upper bridging is fixed on the upper end of expansion link, and the lower end of upper bridging is fixed on the upper end of expansion bracket.
In described above, as preferred scheme, the standard steel pipe frame by horizontal rectangular steel pipe, longitudinal rectangular steel pipe and Oblique rectangular steel pipe combination is constituted.
Having the beneficial effect that produced by the present invention:
1)Overall structure is simple, stable firm, easy for installation, is provided with lowering or hoisting gear, and during working condition, scalable rises To height and position is adapted to, make at the top of facing, to be adjacent to subway tunnel roof, during normal forward state, scalable is reduced to suitable Highly formwork jumbo should be made just can usually to walk along railway, compared with traditional structure, same set of formwork jumbo is suitable for difference The subway tunnel of height, thus produce when only need to manufacture a set of formwork jumbo standard component it is i.e. generally applicable, can save and produce into This, while the waste of material caused by the formwork jumbo because of the various different sizes of manufacture can be avoided;
2)The formwork jumbo of the present invention can carry out also carrying out transverse combination and installing additional while oscilaltion is adjusted, chassis Size arbitrarily can be adjusted, and during use be arranged side by side multiple stage formwork jumbo, and be attached fixation, installation side by horizontal steel pipe Just, it is connected rear stability strong, can be installed additional according to the different width of subway tunnel, mobile installation process motility is strong;
3)Integrally-regulated lifting process is simple and convenient, has additional telescopically adjustable regulation strut and movable regulation in addition Steel form, make the top surface of facing can adapt to the subway tunnel top surface of differing tilt angles, freely adjust angle inclination Angle so as to which connection is more close to.
4)Transverse combination can also be carried out while oscilaltion regulation can be carried out due to subway chassis to install additional, same set of subway The subway tunnel of the applicable various different sizes of chassis, the component of subway chassis is repeatable to be utilized, and after entire combination, intensity is good, and And convenient disassembly, it is convenient to assemble, practical.
Description of the drawings
Fig. 1 is subway station formwork jumbo normal operating conditions schematic diagram in the subway tunnel in the embodiment of the present invention;
Fig. 2 is Fig. 1 and close-up schematic view;
Fig. 3 is subway station formwork jumbo normal forward view in the subway tunnel in the embodiment of the present invention;
Fig. 4 is the side view of subway station formwork jumbo in the embodiment of the present invention;
In figure, 1 is standard steel pipe frame, and 2 is expansion bracket, and 3 is expansion link, and 4 is shrinking connecting-rod, and 5 is locating sleeve, and 6 is fixed Position hole, 7 is alignment pin, and 8 is oil pressure fixed seat, and 9 is oil hydraulic cylinder, and 10 is panel body, and 11 is left regulation strut, and 12 is right regulation Strut, 13 is left side steel form, and 14 is right side steel form, and 15 is universal wheel, and 16 is double flute steel underframe, and 17 is support base, 18 For horizontal steel pipe.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
The present embodiment, with reference to Fig. 1~Fig. 4, the subway station formwork jumbo which is embodied as includes supporting mechanism, facing And walking mechanism, facing is installed on the top of supporting mechanism.
In figure, supporting mechanism includes two groups of steel frame components being arranged side by side, by least between two adjacent groups steel frame component Two horizontal steel pipes 18 are attached fixation, and horizontal steel pipe 18 is each passed through and is fixed on every group of steel frame component, walking mechanism The bottom of each group steel frame component is installed on, steel frame component is by one group of standard steel pipe frame 1, oil gear and lifting dress in the present embodiment Composition is put, standard steel pipe frame 1 is combined and constituted by horizontal rectangular steel pipe, longitudinal rectangular steel pipe and oblique rectangular steel pipe, the present embodiment Standard steel pipe frame 1 be provided with six groups of horizontal frame structures of structure identical altogether, can be arranged according to the height of subway tunnel Two groups or standard steel pipe frame 1 more than two, are directly fixed by superposition.
Lowering or hoisting gear is fixedly mounted on the top of standard steel pipe frame 1, and lowering or hoisting gear is flexible by expansion bracket more than 2, two The horizontal even channel-section steel of bar 3 and top is constituted, and is additionally provided with two or more for increasing the upper bridging of support force, upper bridging on lowering or hoisting gear Upper end be fixed on the upper end of expansion link 3, the lower end of upper bridging is fixed on the upper end of expansion bracket 2, pushes up horizontal even channel-section steel and is fixed on The top of expansion link 3 and it is fixedly connected with facing, is provided with to enter along expansion link 3 between adjacent two expansion links 3 The shrinking connecting-rod 4 of row oscilaltion, shrinking connecting-rod 4 can carry out lift adjustment, while can play a part of to reinforce stable expansion link 3, The two ends of shrinking connecting-rod 4 are provided with and penetrate and be fixed on the locating sleeve 5 on expansion link 3 for pairing, are additionally provided with locating sleeve 5 The locking hole corresponding with 6 position of location hole of expansion link 3, and be provided with for matching the alignment pin 7 inserted in the locking hole, from And connection expansion link 3 and shrinking connecting-rod 4 are locked, adjust the mode phase of mode when shrinking connecting-rod 4 is lifted and adjustable telescopic rod 3 Together, first alignment pin 7 is disassembled, is then adjusted after rising or dropping to adaptation position, it is ensured that the location hole 6 of expansion link 3 Reinsert alignment pin 7 after corresponding with locking hole again so as to carry out reconnect fixation.
The bottom of expansion bracket 2 is fixedly connected with the top of standard steel pipe frame 1, and the top of expansion bracket 2 is for penetrating And the location division of fixed expansion link 3, several location holes 6 being mutually paired are provided with location division and expansion link 3, and are provided with use Alignment pin 7 in pairing insertion location hole 6, so as to lock connection expansion link 3 and expansion bracket 2, when lift adjustment is carried out, first Alignment pin 7 is disassembled, is then adjusted after rising or dropping to adaptation position, while being weighed after guaranteeing the correspondence of location hole 6 again New insertion alignment pin 7 so as to carry out reconnect fixation.
For providing stable support force to facing, oil gear includes being fixedly mounted on standard steel pipe oil gear Oil pressure fixed seat 8 and vertically-mounted oil hydraulic cylinder 9 at the top of frame 1, the expansion link of oil hydraulic cylinder 9 are upwardly extended and even channel-section steel horizontal with top It is fixedly connected, the lower section of oil pressure fixed seat 8 is additionally provided with supports for the lower scissors for increasing support force, lower scissors support fixed installation On standard steel pipe frame 1.
Facing includes panel body 10, steel form and can carry out the regulation strut of telescopic length, adjusts the two of strut End is equipped with threaded rod, and the middle-end of regulation strut is provided with and carries out matching the threaded sleeve being spirally connected, threaded rod and screw thread with threaded rod Telescopic adjustment is carried out by screw thread between sleeve pipe.The tiling of panel body 10 is fixed on the top of the horizontal even channel-section steel in top, during working condition For with subway tunnel at the top of be in close contact, adjust strut and include that structure identical is left and adjust strut 11 and right regulation strut 12, steel form includes steel form 13 and right side steel form 14 on the left of structure identical, and the right-hand member of left side steel form 13 passes through hinge It is attached with the left-end point of panel body 10, the left end of right side steel form 14 is also by hinge and the right end of panel body 10 Be attached, the left end of left side steel form 13 with it is left adjust strut 11 top be attached, it is left adjust strut 11 bottom with The left end of shrinking connecting-rod 4 is attached, by controlling the left angle of inclination for adjusting steel form 13 on the left of 11 scalable of strut, right side The right-hand member of steel form 14 is attached with the right top for adjusting strut 12, the right side of the right bottom for adjusting strut 12 and shrinking connecting-rod 4 End is attached, by controlling the right angle of inclination for adjusting steel form 14 on the right side of 12 scalable of strut, as shown in figure 1, normal work When making state, by adjusting left regulation strut 11 and right regulation strut 12, left side steel form 13 is made to distinguish with right side steel form 14 The inclined plane of subway tunnel top is adjacent to, the inclined plane of different angles is suitable for;Shown in Fig. 3, after the completion of pouring, need to move ahead To subsequent processing position, during normal forward state, first passing through lowering or hoisting gear makes panel body 10 arrange decline with steel form, while The angle of inclination of adjustment left side steel form 13 and right side steel form 14, make panel body 10 and steel form not with subway tunnel top surface Contact.
Walking mechanism include universal wheel 15, the double flute steel underframe 16 for installing universal wheel 15 and for contacting with ground and Telescopically adjustable support base 17, top and the bottom of standard steel pipe frame 1 of double flute steel underframe 16 are fixedly connected, universal Wheel 15 is arranged on the bottom of double flute steel underframe 16, and the top of support base 17 upwardly extends and penetrates double flute steel underframe 16 and be fixed on The bottom of standard steel pipe frame 1, during normal forward state, the bottom of support base 17 is not contacted with ground, is propped up during normal operating conditions The bottom of support base 17 is contacted with ground, for supporting whole formwork jumbo.
Overall structure is simple, stable firm, easy for installation, is provided with lowering or hoisting gear, and during working condition, scalable rises to Suitable height and position, makes subway tunnel roof is adjacent at the top of facing, and during normal forward state, scalable is reduced to adaptation Highly, formwork jumbo is made just can usually to walk along railway, compared with traditional structure, same set of formwork jumbo is suitable for different height The subway tunnel of degree, thus produce when only need to manufacture a set of formwork jumbo standard component it is i.e. generally applicable, production cost can be saved, The waste of material caused by the formwork jumbo because of the various different sizes of manufacture can be avoided simultaneously.
Above content is with reference to specific preferred embodiment further description made for the present invention, it is impossible to assert this Invention be embodied as be confined to these explanations.For general technical staff of the technical field of the invention, not On the premise of departing from present inventive concept, some simple deduction or replace can also be made, protection scope of the present invention is regarded as.

Claims (9)

1. subway station formwork jumbo, it includes supporting mechanism, facing and walking mechanism, and facing is installed on supporting mechanism Top, it is characterised in that:
Supporting mechanism includes the steel frame component being arranged side by side more than two, and walking mechanism is installed on the bottom of each group steel frame component, The steel frame component is made up of least one set standard steel pipe frame, oil gear and lowering or hoisting gear, and lowering or hoisting gear is fixedly mounted on standard The top of steel pipe frame, lowering or hoisting gear are made up of the horizontal even channel-section steel in expansion bracket, the expansion link of more than two and top, are pushed up horizontal even channel-section steel and are fixed It is fixedly connected at the top of expansion link and with facing, being provided between adjacent two expansion links can be carried out along expansion link The shrinking connecting-rod of oscilaltion, is fixedly connected at the top of the bottom of expansion bracket and standard steel pipe frame, and the top of expansion bracket is For penetrating and fixing the location division of expansion link, several location holes being mutually paired are provided with location division and expansion link, and It is provided with for matching the alignment pin in insertion location hole, so as to lock connection expansion link and expansion bracket, oil gear includes fixing Oil pressure fixed seat and vertically-mounted oil hydraulic cylinder at the top of standard steel pipe frame, the expansion link of oil hydraulic cylinder upwardly extend and with The horizontal even channel-section steel in top is fixedly connected;
Facing includes panel body, steel form and can carry out the regulation strut of telescopic length, and panel body tiling is fixed on The top of the horizontal even channel-section steel in top, adjusting strut includes the left regulation strut of structure identical and right regulation strut, and steel form includes structure Steel form and right side steel form on the left of identical, the right-hand member of left side steel form is by active connection and the left-end point of panel body It is attached, the right end of the left end of right side steel form also by active connection with panel body is attached, left side punching block The left end of plate is attached with the left top for adjusting strut, and the left bottom for adjusting strut is attached with the left end of shrinking connecting-rod, By controlling the left angle of inclination for adjusting steel form on the left of strut scalable, the right-hand member of right side steel form and the right top for adjusting strut End is attached, and the right bottom for adjusting strut is attached with the right-hand member of shrinking connecting-rod, by controlling right regulation strut scalable The angle of inclination of right side steel form.
2. subway station formwork jumbo according to claim 1, it is characterised in that:The two ends of the shrinking connecting-rod are provided with for matching somebody with somebody To penetrating and being fixed on the locating sleeve on expansion link, it is additionally provided with locating sleeve corresponding with the position of positioning hole of expansion link Locking hole, and be provided with for matching the alignment pin inserted in the locking hole, so as to lock connection expansion link and shrinking connecting-rod.
3. the subway station formwork jumbo according to claims 1 or 2, it is characterised in that:The two ends for adjusting strut are all provided with Have a threaded rod, the middle-end for adjusting strut is provided with and carries out matching the threaded sleeve being spirally connected with threaded rod, threaded rod and threaded sleeve it Between telescopic adjustment is carried out by screw thread.
4. subway station formwork jumbo according to claim 3, it is characterised in that:The active connection is hinge arrangement.
5. the subway station formwork jumbo according to claim 1,2 or 4, it is characterised in that:The walking mechanism includes universal Wheel, the double flute steel underframe for installing universal wheel and for contacting with ground and telescopically adjustable support base, double flute steel bottom The top of frame is fixedly connected with the bottom of standard steel pipe frame, and universal wheel is arranged on the bottom of double flute steel underframe, support base Top upwardly extend the bottom for penetrating double flute steel underframe and being fixed on standard steel pipe frame.
6. subway station formwork jumbo according to claim 5, it is characterised in that:By at least between two adjacent groups steel frame component Two horizontal steel pipes are attached fixation, and horizontal steel pipe is each passed through and is fixed on every group of steel frame component.
7. the subway station formwork jumbo according to claim 1,2 or 4 or 6, it is characterised in that:The oil pressure fixed seat Lower section is additionally provided with supports for the lower scissors for increasing support force, and lower scissors support is fixedly mounted on standard steel pipe frame.
8. subway station formwork jumbo according to claim 7, it is characterised in that:Two or more is additionally provided with the lowering or hoisting gear For increasing the upper bridging of support force, the upper end of upper bridging is fixed on the upper end of expansion link, and the lower end of upper bridging is fixed In the upper end of expansion bracket.
9. subway station formwork jumbo according to claim 8, it is characterised in that:The standard steel pipe frame is by horizontal rectangle steel Pipe, longitudinal rectangular steel pipe and the combination of oblique rectangular steel pipe are constituted.
CN201510554404.XA 2015-09-01 2015-09-01 Subway station formwork jumbo Active CN105114102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510554404.XA CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510554404.XA CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Publications (2)

Publication Number Publication Date
CN105114102A CN105114102A (en) 2015-12-02
CN105114102B true CN105114102B (en) 2017-03-29

Family

ID=54662188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510554404.XA Active CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Country Status (1)

Country Link
CN (1) CN105114102B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313446A (en) * 2016-04-26 2017-11-03 尤兆云 A kind of city integrated piping lane construction vehicles combination formula internal model
CN108979664A (en) * 2018-06-20 2018-12-11 中铁六局集团有限公司 Existing subway tunnel based on mobile casting platform protects steel structure pouring construction method
CN110792100B (en) * 2019-11-01 2021-05-07 海门市帕源路桥建设有限公司 Installation and correction female die for box-type telescopic inner die telescopic frame
CN113533048B (en) * 2021-07-16 2022-10-14 华东交通大学 Tunnel model test device and method capable of changing tunnel burial depth

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2351097A (en) * 1999-05-26 2000-12-20 Mabey Hire Ltd Telescopic support having inner and outer members with apertures of different spacing
JP2011058314A (en) * 2009-09-11 2011-03-24 Daiei Koki Kk Portal frame and center truck
CN203097904U (en) * 2013-01-25 2013-07-31 中铁十四局集团有限公司 Separating type trolley system used for underground excavation of long-span cross section
CN103806926B (en) * 2014-03-07 2016-05-18 陕西理工学院 The change of concrete lining steel formwork jumbo is across uprising device
CN204532376U (en) * 2015-04-21 2015-08-05 中国葛洲坝集团股份有限公司 Split type lifting construction trolley
CN204899947U (en) * 2015-09-01 2015-12-23 东莞市万桥钢模有限公司 Subway station formworking jumbo

Also Published As

Publication number Publication date
CN105114102A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN204899947U (en) Subway station formworking jumbo
CN105114102B (en) Subway station formwork jumbo
CN105887696A (en) Variable-cross-section adjustable integral form board of mobile formwork
CN204282219U (en) Large-scale bridge beam supports grouting die carrier
CN204662274U (en) Leaning tower template system
CN102825410A (en) Horizontal-type fast assembling platform for H profile steel
CN201810021U (en) Liftable and mining deformation prevention device of high-tension cable tower with expandable foundation
CN104372744B (en) Large-scale bridge beam supports grouting die carrier
CN206408969U (en) A kind of support meanss for being used to adjust bent cap vertical and horizontal gradient
CN205804189U (en) A kind of High-speed Railway Bridges beam support installs equipment
CN207245243U (en) Prefabricated superimposed sheet vertical supporting device
CN103708389A (en) Lifting device and paver with same
CN203818013U (en) Vehicle-mounted drilling and servicing rig derrick assembling tooling
CN205476584U (en) Detachable supporting structure
CN205907588U (en) Multi -functional braced system of bridge limit web
CN107795148A (en) The support mechanism that construction site uses
CN204019070U (en) Derrick assembling combination steelframe
CN100387797C (en) Building template
CN204492192U (en) A kind of building form tension and compression rod member
CN202544394U (en) Early-dismounting template system
CN203113314U (en) Underground continuous wall and guide wall mobile framework
CN205840388U (en) Novel building steel structure bracing frame
CN206971267U (en) The mobile device of underground pipe gallery formwork
CN110374611A (en) A kind of adjustable reaction frame for launching shaft
CN103334708A (en) Injection head support frame for continuous tubing operation machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240905

Address after: No. 2, Zhaqian Section of G355 National Highway, Maxing Village, Yonghan Town, Longmen County, Huizhou City, Guangdong Province, 516000

Patentee after: Huizhou Wanqiao Heavy Industry Technology Co.,Ltd.

Country or region after: China

Address before: No. B-13, Lane 6, Gukeng Village, Jinhe Community, Zhangmutou Town, Dongguan City, Guangdong Province 523000

Patentee before: DONGGUAN WANQIAO STEEL MOULD Co.,Ltd.

Country or region before: China