CN206971267U - The mobile device of underground pipe gallery formwork - Google Patents

The mobile device of underground pipe gallery formwork Download PDF

Info

Publication number
CN206971267U
CN206971267U CN201720721132.2U CN201720721132U CN206971267U CN 206971267 U CN206971267 U CN 206971267U CN 201720721132 U CN201720721132 U CN 201720721132U CN 206971267 U CN206971267 U CN 206971267U
Authority
CN
China
Prior art keywords
connector
pipe gallery
underground pipe
formwork
mobile device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720721132.2U
Other languages
Chinese (zh)
Inventor
何晓宇
黄巍
孙振宇
赵健
孔令杰
谭元飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720721132.2U priority Critical patent/CN206971267U/en
Application granted granted Critical
Publication of CN206971267U publication Critical patent/CN206971267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of mobile device of underground pipe gallery formwork is the utility model is related to, including:Moveable supporting frame;It is installed on support frame as described above body, the side form connector of side template for supporting underground pipe gallery, the bearing length of the side form connector can adjust, and the regulation side form connector for passing through bearing length stays on the surface of the side template;And be installed on support frame as described above body, the backform connector of top template for supporting underground pipe gallery, the bearing length of the backform connector can adjust, and the regulation backform connector for passing through bearing length stays on the bottom surface of the top template.Formwork is carried out by moveable supporting frame, the supporting frame can be moved integrally after the form removal of underground pipe gallery, and the side template removed and top template can be attached on supporting frame, moved together with side template and top template using the movement of supporting frame, the operation for realizing the dismounting of template and having bad luck.

Description

The mobile device of underground pipe gallery formwork
Technical field
The field of underground pipe gallery formwork is the utility model is related to, refers in particular to a kind of movement of underground pipe gallery formwork Device.
Background technology
In recent years, Urban Underground pipe gallery is quickly grown, and Urban Underground integrated pipe is being widelyd popularize in each city in the whole nation The construction of corridor, underground pipe gallery have the characteristics of length is big, changes of section is small.Cast-in-place piping lane construction is using supporting module and pours The mode of concrete is built, conventional template and its support system need to remove template and support body is had bad luck for independent primary structural component, this The dismounting of sample and the construction procedure having bad luck are cumbersome, and efficiency is low, seriously constrain the speed of application of piping lane.
Utility model content
A kind of the defects of the purpose of this utility model is to overcome prior art, there is provided shifting of underground pipe gallery formwork Dynamic device, it is numerous need to remove and have bad luck existing construction procedure for template and support system in the existing cast-in-place piping lane construction of solution It is trivial, efficiency is low, it is serious restrict piping lane speed of application the problem of.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of mobile device of underground pipe gallery formwork, including:
Moveable supporting frame;
Be installed on support frame as described above body, for support underground pipe gallery side template side form connector, the side form The bearing length of connector be can adjust, and the side template is stayed on by the regulation side form connector of bearing length Surface;And
Be installed on support frame as described above body, for support underground pipe gallery top template backform connector, the backform The bearing length of connector be can adjust, and the top template is stayed on by the regulation backform connector of bearing length Bottom surface.
Formwork is carried out by moveable supporting frame, the supporting frame can integrally enter after the form removal of underground pipe gallery Row movement, the problem of being had bad luck for independent primary structural component need to be removed by avoiding traditional support system, and can be connected by side form Connect device and backform connector hang over the side template removed and top template on supporting frame, using supporting frame movement with Side template and top template move together, the operation for realizing the dismounting of template and having bad luck, and are needed manually after avoiding traditional form removal Carry, solve traditional dismounting and have bad luck that existing construction procedure is cumbersome, efficiency is low, the serious speed of application for restricting piping lane Problem.
The utility model underground pipe gallery formwork mobile device further improvement is that, on support frame as described above body The corresponding side form connector device is provided with the first threaded connector;
The side form connector is one first screw rod, the first end of first screw rod and the first threaded connector spiral shell Close connection, and the regulation for the bearing length for realizing side form connector by being screwed together;
The surface of the side template is installed with the first attaching nut, first attaching nut and first screw rod with The second relative end of first end is screwed together.
The utility model underground pipe gallery formwork mobile device further improvement is that, the backform connector Including the support bar being fixedly arranged on support frame as described above body and the sleeve pipe for being sheathed on the support bar, offer and pass through on the support bar Perforate, be spaced apart in described sleeve pipe and be provided with connecting hole, the bottom surface of the top template is stayed at the top of described sleeve pipe, passes through pin rod Connecting hole corresponding to wearing and the through hole connect so as to connect the support bar and described sleeve pipe and realize the backform The regulation of the bearing length of device.
The utility model underground pipe gallery formwork mobile device further improvement is that, in addition to be installed in branch The angle mould connector of Angle formwork on support body, for supporting underground pipe gallery, the bearing length of the angle mould connector is adjustable Section, the surface of the Angle formwork is stayed on by the regulation angle mould connector of bearing length.
The utility model underground pipe gallery formwork mobile device further improvement is that, on support frame as described above body The corresponding angle mould connector device is provided with the second threaded connector;
The angle mould connector is one second screw rod, the first end of second screw rod and the second threaded connector spiral shell Close connection, and the regulation for the bearing length for realizing angle mould connector by being screwed together;
The surface of the Angle formwork is installed with the second attaching nut, second attaching nut and second screw rod with The second relative end of first end is screwed together.
The utility model underground pipe gallery formwork mobile device further improvement is that, support frame as described above body bag Include the first movable support body, the second movable support body being arranged side by side with first movable support body and be detachably connected described first The regulation connecting plate of movable support body and second movable support body, first movable support body is adjusted by the regulation connecting plate Spacing between second movable support body.
The utility model underground pipe gallery formwork mobile device further improvement is that, first movable stand Spaced first mounting hole is offered on body, spaced second mounting hole is offered in second movable support body, Offer spaced pilot hole on the regulation connecting plate, the regulation connecting plate by corresponding pilot hole with it is corresponding First mounting hole and the second mounting hole align and wear bolt connection fastening, so as to realize regulation first movable support body and institute State the spacing between the second movable support body.
The utility model underground pipe gallery formwork mobile device further improvement is that, first movable stand Body and second movable support body include two vertical rods being oppositely arranged, support is connected to the drawknot bar of two vertical rods, consolidate The first cross bar located at the bottom of upright rod, the second cross bar being fixedly arranged at the top of the vertical rod and it is installed in first cross bar Bottom and main roller corresponding with the vertical rod.
The utility model underground pipe gallery formwork mobile device further improvement is that, first movable stand Body and second movable support body also include being installed in the first cross bar bottom and positioned at the secondary roller of the main roller both sides.
Brief description of the drawings
Fig. 1 is the structural representation of the mobile device use state of the utility model underground pipe gallery formwork.
Fig. 2 is the top view of the mobile device of the utility model underground pipe gallery formwork.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, the utility model provides a kind of mobile device of underground pipe gallery formwork, comprehensive suitable for underground Close the cast-in-place construction of piping lane, side template that the mobile device can be when pouring underground pipe gallery to underground pipe gallery, angle Template and top template are supported, can be by the side template, Angle formwork and top when pouring one section of underground pipe gallery of completion Template is pulled down and set up on the mobile device by template connector, and the mobile device is movable to next section of underground pipe gallery Construction location, realize moving integrally for template and support system, can significantly improve template and erection of frames and remove Efficiency, mobile device of the present utility model solve traditional template and support system and need to remove and be fallen for independent primary structural component The problem of fortune, solve traditional dismounting and have bad luck that existing construction procedure is cumbersome, efficiency is low, the serious construction speed for restricting piping lane The problem of spending.Mobile device of the present utility model have it is easy to make, be connected firmly, can repeatedly be used in turn, strong adaptability.Under Face illustrates with reference to accompanying drawing to the mobile device of the utility model underground pipe gallery formwork.
As depicted in figs. 1 and 2, the mobile device 20 of underground pipe gallery formwork of the present utility model includes moveable Supporting frame 21, be installed on supporting frame 21, for support underground pipe gallery 10 side template 14 side form connector 22, with And be installed on supporting frame 21, for support underground pipe gallery 10 top template 15 backform connector 23.Underground integrated pipe Corridor 10 includes bottom plate 11, the wall 13 and top plate 12 being erected on bottom plate 11, passes through bottom plate 11, wall 13 and top plate 12 enclose the cabin to form underground pipe gallery 10, and bottom plate 11 therein first pours completion, then by movement of the present utility model Device 20 is positioned on bottom plate 11, and the side template 14 being connected with side form connector 22 is the template for pouring wall 13, top Template 15 is the template for pouring top plate 12, and the bearing length of side form connector 22 of the present utility model can adjust, pass through The regulation of bearing length causes side form connector 22 to stay on the surface of side template 14, utilizes side form connector 22 and supporting frame 21, side template 14 is shored in the inside of underground pipe gallery 10, a phase is additionally provided with the outside of wall 13 to be formed To side template, sandwiched forms the casting space of wall 13 between the side template 14 that the side template and side form connector 22 are shored. During the bearing length of adjusting side mould connector 22, the side form connector 22 close to the direction of side template 14 to when adjusting, now side The bearing length of mould connector 22 is elongated, and side form connector 22 shores side template 14, is now formwork state, treats that wall 13 pours After the completion of, it is necessary to when dismantling and having enough to meet the need side template 14, adjusting side mould connector 22 is to the direction away from side template 14, now side form The bearing length of connector 22 is shortened, and can withdraw side template 14, and the side template 14 can also be connected by side form connector 22 It is connected on supporting frame 21, and as supporting frame 21 together movement is had enough to meet the need and had bad luck.The support length of backform connector 23 Degree is adjustable, and the bottom surface of top template 15 is stayed on by the regulation backform connector 23 of bearing length, the top template 15 it On form casting space for pouring top plate 12.When adjusting the bearing length of backform connector 23, the backform connector 23 To when being adjusted close to the direction of top template 15, the bearing length of backform connector 23 is elongated, and backform connector 23 shores top template 15, it is now formwork state, when, it is necessary to dismantle and when having enough to meet the need top template 15, adjusting backform connector after the completion of top plate 11 pours 23 shorten to the direction away from top template 15, the now bearing length of backform connector 23, can withdraw top template 15, the top Template 15 can also be connected on supporting frame 21 by backform connector for substrate 23, and is carried out as supporting frame 21 is mobile together Have enough to meet the need and have bad luck.
As a better embodiment of the present utility model, as shown in figure 1, corresponding to side form connector 22 on supporting frame 21 It is equiped with the first threaded connector 211;Side form connector 22 is the first screw rod, and first screw rod has relative first end and Two ends, the first end of the first screw rod are screwed together with the first threaded connector 211, and side form connector 22 is realized by being screwed together Bearing length regulation, rotate the first screw rod and cause the first end of the first screw rod to the inner side precession of supporting frame 21, realize The bearing length that first screw rod is located at the outside of supporting frame 21 shortens, rotate the first screw rod cause the second end of the first screw rod to The outside of supporting frame 21 screws out, and it is elongated to realize the bearing length that the first screw rod is located on the outside of supporting frame 21.Side template 14 Surface be installed with the first attaching nut, first attaching nut and the second end of the first screw rod are screwed together.
As another better embodiment of the present utility model, with reference to shown in Fig. 1, backform connector 23 includes being fixedly arranged on branch Support bar 231 on support body 21, the sleeve pipe 232 and pin rod 233 for being set in support bar 231, offer on support bar 231 Through hole, the through hole are located at the top of support bar 231, are spaced apart on sleeve pipe 232 and are provided with connecting hole, the top top of sleeve pipe 232 Support in the bottom surface of top template 15, the bearing height of adjusting sleeve pipe 232, corresponding connecting hole is alignd with through hole, by pin rod 233 The corresponding connecting hole and through hole are worn so as to connection support bar 231 and sleeve pipe 232, and also achieves backform connector 23 The regulation of bearing length.
As another better embodiment of the present utility model, mobile device 20 of the present utility model also includes being installed in branch The angle mould connector 24 of Angle formwork 16 on support body 21, for supporting underground pipe gallery 10, the support of the angle mould connector 25 Adjustable in length, the surface of Angle formwork 16 is stayed on by the regulation angle mould connector 24 of bearing length.The Angle formwork 16 Located at the corner portion of side template 14 and top template 15, for forming haunch rib structure in the junction of wall 13 and top plate 12.Adjust When saving the bearing length of angle mould connector 24, the angle mould connector 24 close to the direction of Angle formwork 16 to when adjusting, now angle mould The bearing length of connector 24 is elongated, and angle mould connector 24 shores Angle formwork 16, is now formwork state, treats wall 13 and top plate , it is necessary to dismantle and during all corner formworks 16 after the completion of 12 pour, regulation angle mould connector 24 to the direction away from Angle formwork 16, this When angle mould connector 24 bearing length shorten, Angle formwork 16 can be withdrawn, the Angle formwork 16 can also be connected by angle mould Device 24 is connected on supporting frame 21, and as supporting frame 21 together movement is had enough to meet the need and had bad luck.Further, support Angle mould connector 24 is corresponded on support body 21 and is equiped with the second threaded connector 212;The angle mould connector 24 is the second screw rod, second Screw rod has relative first end and the second end, and the first end of the second screw rod is screwed together with the second screw thread coupling 212, and leads to Cross the regulation for the bearing length for realizing angle mould connector 25 that is screwed together;Rotate the second screw rod cause the first end of the second screw rod to The inner side precession of supporting frame 21, realize the bearing length that the second screw rod is located on the outside of supporting frame 21 and shorten, rotate second Screw rod causes the second end of the second screw rod to be screwed out to the outside of supporting frame 21, realizes the second screw rod and is located at outside supporting frame 21 The bearing length of side is elongated.The surface of Angle formwork 16 is installed with the second attaching nut, and the of second connected nut and the second screw rod Two ends are screwed together.
As another better embodiment of the present utility model, supporting frame 21 includes the first movable support body 213 and first The second movable support body 214 and be detachably connected the first movable support body 213 and the second movable stand that movable support body 213 is arranged side by side The regulation connecting plate 215 of body 214, adjusted by adjusting connecting plate 215 between the first movable support body 213 and the second movable support body 214 Spacing.Realize the width adjusting of mobile device so that the mobile device 20 can adapt to the underground integrated pipe of different in width The construction of corridor 10.Specifically, spaced first mounting hole 2131, the second movable stand are offered in the first movable support body 213 Spaced second mounting hole 2141 is offered on body, adjusts and offers spaced pilot hole 2151 on connecting plate 215, The regulation connecting plate 215 is alignd by corresponding pilot hole 2151 with the corresponding mounting hole 2141 of first mounting hole 2131 and second And bolt connection fastening is worn, when selecting pilot hole to be alignd with the corresponding mounting hole 2141 of first mounting hole 2131 and second, Length of the regulation connecting plate 215 between the first movable support body 213 and the second movable support body 214 can be adjusted, it is achieved thereby that Adjust the spacing between the first movable support body 213 and the second movable support body 214.
As better embodiment another again of the present utility model, as depicted in figs. 1 and 2, the first movable support body 213 includes Two vertical rods 2132, the support being oppositely arranged are connected to the drawknot bar 2137 of two vertical rods 2132, are fixedly arranged on the bottom of vertical rod 2132 The first cross bar 2133, be fixedly arranged on second cross bar 2134 at the top of vertical rod 2132 and be installed in the bottom of the first cross bar 2133 and with Main roller 2135 corresponding to vertical rod 2132, the movement of the first movable support body 213 is realized by main roller 2135.First movable stand Body 213 also includes being installed in the bottom of the first cross bar 2133 and positioned at the secondary roller 2136 of the both sides of main roller 2135, the secondary roller 2136 serve the effect of auxiliary balance.Second movable support body 214 is connected to including two vertical rods 2142, the support being oppositely arranged The drawknot bar 2147 of two vertical rods 2142, the first cross bar 2143 for being fixedly arranged on the bottom of vertical rod 2142, it is fixedly arranged on the top of vertical rod 2142 The second cross bar 2144 and be installed in the bottom of the first cross bar 2143 and main roller 2145 corresponding with vertical rod 2142, pass through main rolling Wheel 2145 realizes the movement of the second movable support body 214.Second movable support body 214 also includes being installed in the bottom of the first cross bar 2143 And serve the effect of auxiliary balance positioned at the secondary roller 2146 of the both sides of main roller 2145, the secondary roller 2146.Adjust connecting plate 215 are removably attachable to the first cross bar 2133 of the first movable support body 213 and the second cross bar 2134 and corresponding second movable stand Between the first cross bar 2143 and the second cross bar 2144 of body 214.
In practice of construction, if underground pipe gallery 10 is constructed using early stripping formwork system engineering method, between the bottom of top template 12 Every having installed support 17, the support 17 is adjustable for height structure, is supported in by the height support 17 for adjusting support 17 The bottom of top template 12, when concrete reaches certain design strength, i.e., i.e. dismountable top template, stays and is located at branch when not solidifying Support 17 support top plates 12 and remove support 17 again after its solidification.Due to the presence of support 17, in the mobile mobile device 20, need Regulation connecting plate 215 is released and is connected with the first movable support body 213 or the second movable support body 214, reserves the first movable stand The spacing of the movable support body 214 of body 213 and second, so as to which in the mobile mobile device 20, support 17 can be avoided using spacing Stop, smoothly move the mobile device 20, realize the common movement of template and supporting frame.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.

Claims (9)

  1. A kind of 1. mobile device of underground pipe gallery formwork, it is characterised in that including:
    Moveable supporting frame;
    It is installed on support frame as described above body, the side form connector of side template for supporting underground pipe gallery, side form connection The bearing length of device be can adjust, and the table of the side template is stayed on by the regulation side form connector of bearing length Face;And
    It is installed on support frame as described above body, the backform connector of top template for supporting underground pipe gallery, backform connection The bearing length of device be can adjust, and the bottom of the top template is stayed on by the regulation backform connector of bearing length Face.
  2. 2. the mobile device of underground pipe gallery formwork as claimed in claim 1, it is characterised in that on support frame as described above body The corresponding side form connector device is provided with the first threaded connector;
    The side form connector is one first screw rod, and the first end of first screw rod screws togather company with first threaded connector Connect, and the regulation for the bearing length for realizing side form connector by being screwed together;
    The surface of the side template is installed with the first attaching nut, first attaching nut and first screw rod and first The second relative end is held to be screwed together.
  3. 3. the mobile device of underground pipe gallery formwork as claimed in claim 1, it is characterised in that the backform connector Including the support bar being fixedly arranged on support frame as described above body and the sleeve pipe for being sheathed on the support bar, offer and pass through on the support bar Perforate, be spaced apart in described sleeve pipe and be provided with connecting hole, the bottom surface of the top template is stayed at the top of described sleeve pipe, passes through pin rod Connecting hole corresponding to wearing and the through hole connect so as to connect the support bar and described sleeve pipe and realize the backform The regulation of the bearing length of device.
  4. 4. the mobile device of underground pipe gallery formwork as claimed in claim 1, it is characterised in that also include being installed in branch The angle mould connector of Angle formwork on support body, for supporting underground pipe gallery, the bearing length of the angle mould connector is adjustable Section, the surface of the Angle formwork is stayed on by the regulation angle mould connector of bearing length.
  5. 5. the mobile device of underground pipe gallery formwork as claimed in claim 4, it is characterised in that on support frame as described above body The corresponding angle mould connector device is provided with the second threaded connector;
    The angle mould connector is one second screw rod, and the first end of second screw rod screws togather company with second threaded connector Connect, and the regulation for the bearing length for realizing angle mould connector by being screwed together;
    The surface of the Angle formwork is installed with the second attaching nut, second attaching nut and second screw rod and first The second relative end is held to be screwed together.
  6. 6. the mobile device of underground pipe gallery formwork as claimed in claim 1, it is characterised in that support frame as described above body bag Include the first movable support body, the second movable support body being arranged side by side with first movable support body and be detachably connected described first The regulation connecting plate of movable support body and second movable support body, first movable support body is adjusted by the regulation connecting plate Spacing between second movable support body.
  7. 7. the mobile device of underground pipe gallery formwork as claimed in claim 6, it is characterised in that first movable stand Spaced first mounting hole is offered on body, spaced second mounting hole is offered in second movable support body, Offer spaced pilot hole on the regulation connecting plate, the regulation connecting plate by corresponding pilot hole with it is corresponding First mounting hole and the second mounting hole align and wear bolt connection fastening, so as to realize regulation first movable support body and institute State the spacing between the second movable support body.
  8. 8. the mobile device of underground pipe gallery formwork as claimed in claim 6, it is characterised in that first movable stand Body and second movable support body include two vertical rods being oppositely arranged, support is connected to the drawknot bar of two vertical rods, consolidate The first cross bar located at the bottom of upright rod, the second cross bar being fixedly arranged at the top of the vertical rod and it is installed in first cross bar Bottom and main roller corresponding with the vertical rod.
  9. 9. the mobile device of underground pipe gallery formwork as claimed in claim 8, it is characterised in that first movable stand Body and second movable support body also include being installed in the first cross bar bottom and positioned at the secondary roller of the main roller both sides.
CN201720721132.2U 2017-06-20 2017-06-20 The mobile device of underground pipe gallery formwork Expired - Fee Related CN206971267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720721132.2U CN206971267U (en) 2017-06-20 2017-06-20 The mobile device of underground pipe gallery formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720721132.2U CN206971267U (en) 2017-06-20 2017-06-20 The mobile device of underground pipe gallery formwork

Publications (1)

Publication Number Publication Date
CN206971267U true CN206971267U (en) 2018-02-06

Family

ID=61408468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720721132.2U Expired - Fee Related CN206971267U (en) 2017-06-20 2017-06-20 The mobile device of underground pipe gallery formwork

Country Status (1)

Country Link
CN (1) CN206971267U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487098A (en) * 2018-04-13 2018-09-04 中国化学工程第三建设有限公司 A kind of box culvert inner side template support system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487098A (en) * 2018-04-13 2018-09-04 中国化学工程第三建设有限公司 A kind of box culvert inner side template support system

Similar Documents

Publication Publication Date Title
WO2018171119A1 (en) Hydraulic self-lifting truss-type heavy arch dam formwork system using cantilever
CN102966121B (en) Integrally movable mould frame for pipe rack cast-in-site construction
CN105442838A (en) Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN206971268U (en) The working top plate mobile formwork body of underground pipe gallery
CN106088587A (en) A kind of Combined formwork support system
CN211421173U (en) Multi-cabin comprehensive pipe gallery pull-rod-free template supporting system
CN204825676U (en) A hang basket device that is used for widen bridge floor variable cross section case roof beam cantilever to pour
CN205243003U (en) Prefabricated U -shaped segment girder template of stub matching
CN208039827U (en) A kind of constructional form fixing apparatus
CN207794608U (en) A kind of adjustable support for shuttering of movement for groove construction column
CN107859058A (en) A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN206971267U (en) The mobile device of underground pipe gallery formwork
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN204570393U (en) A kind of double-block type bed plate limited impression builds servicing unit
CN202227365U (en) Form traveler for guide wall of underground continuous wall
CN209874484U (en) Aluminum alloy template bracing device
CN208305334U (en) A kind of box beam precast pedestal with concrete wedge block
CN108411804B (en) Bailey back-hanging combined beam device for dismantling tied arch bridge and dismantling method thereof
CN104452601B (en) Bridge floor tapping pipe bush mould and using method
CN207244455U (en) Assembled variable cross-section contracture sliding mode system
CN205875737U (en) Adopt single side wall body construction of flexible pull rod to use single -side supporting formwork system
CN213038875U (en) Reinforcing apparatus for grout formula building
CN208604922U (en) A kind of building template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206