CN206971268U - The working top plate mobile formwork body of underground pipe gallery - Google Patents
The working top plate mobile formwork body of underground pipe gallery Download PDFInfo
- Publication number
- CN206971268U CN206971268U CN201720734669.2U CN201720734669U CN206971268U CN 206971268 U CN206971268 U CN 206971268U CN 201720734669 U CN201720734669 U CN 201720734669U CN 206971268 U CN206971268 U CN 206971268U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- underground pipe
- top plate
- bearing
- mobile formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
A kind of working top plate mobile formwork body of underground pipe gallery is the utility model is related to, including:Supporting frame of the branch on underground pipe gallery bottom plate, the bottom of support frame as described above body is provided with shifting roller;Support frame as described above body bottom and the adjustable bearing of bearing height set close to the shifting roller are installed in, it is hanging with the shifting roller by adjusting the bearing height of the bearing;It is installed in support frame as described above body top and the adjustable branch membrane module of bearing height;And the top template on the branch membrane module is installed on, adjust bearing height by the branch membrane module is installed in place with the top template.Top template is arranged on moveable supporting frame so that during top plate pouring construction, without repeating formwork supporting plate and setting up scaffold, can be moved integrally by supporting frame to next construction section, save material and have bad luck expense.And material is once put into, repeatedly it is used in turn, spillage of material can be greatly reduced.
Description
Technical field
The construction field of underground pipe gallery is the utility model is related to, refers in particular to a kind of working top plate of underground pipe gallery
Mobile formwork body.
Background technology
Underground pipe gallery, it is the facility for implementing unified planning, design, construction and maintenance, is built in Urban Underground and is used to apply
If the public utility of municipal public use pipeline.General pipe gallery is located at along the supporting setting of basic road, i.e. pipe gallery
The lower section of basic road is simultaneously parallel with basic road, and the pipe gallery is used to house underground utilities, solves the laying of underground utilities
Problem.
Pipe gallery typically uses rectangular configuration, and its work progress is first excavates piping lane tunnel, then in piping lane tunnel
Inside construct out Pipe rack, Pipe rack is concrete structure, existing Normal practice to be spliced using prefabricated components, or
Person is that cast-in-place concrete forms, and operation, the construction such as splices again, it is necessary to lift and be transported to construction location when being constructed using prefabricated components
It is cumbersome, using cast-in-place concrete construction, it is necessary to which formwork pours form removal again is transported to next construction area and carries out formwork again and pour
Operation, the workload of construction is big, low construction efficiency.
Utility model content
A kind of the defects of the purpose of this utility model is to overcome prior art, there is provided working top of underground pipe gallery
Plate mobile formwork body, solve existing cast-in-place piping lane and apply man-hour requirement formwork and pour form removal again to be transported to existing for next construction area
Construction operation amount is big and the problem of low construction efficiency.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of working top plate mobile formwork body of underground pipe gallery, including:
Supporting frame of the branch on underground pipe gallery bottom plate, the bottom of support frame as described above body is provided with shifting roller;
Support frame as described above body bottom and the adjustable bearing of bearing height set close to the shifting roller are installed in, is passed through
The bearing height of the bearing is adjusted to cause the shifting roller hanging;
It is installed in support frame as described above body top and the adjustable branch membrane module of bearing height;And
The top template being installed on the branch membrane module, bearing height is adjusted with described by the branch membrane module
Top template installs in place.
By top template be arranged on moveable supporting frame on so that during top plate pouring construction, without repeat formwork supporting plate and
Scaffold is set up, can be moved integrally by supporting frame to next construction section, material is saved and has bad luck expense.And material is once thrown
Enter, be repeatedly used in turn, spillage of material can be greatly reduced.It is whole to save piping lane without assembly every time for top template and supporting frame
The construction period of body, top plate mobile formwork body of the present utility model have the advantages of easy to operate, support system is safe and reliable.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the backform
The bottom surface of plate is installed with main joist;
The branch membrane module includes support screw, the cradle being fixedly arranged on the support screw and located at the support
The top bracing member of seat both sides;
The support screw is screwed together in the top of support frame as described above body, and the branch is screwed together in by adjusting the support screw
Realize the bearing height regulation of the branch membrane module in position at the top of support body;
On the cradle corresponding tank is partially disposed in formed with the tank for housing the main joist, the main joist
It is interior, and the part on the main joist in the tank is stayed on by the top bracing member, so as to which the main joist be consolidated
Due in the cradle.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the support
Seat includes bottom plate, the block that is erected on the side plate of the bottom plate both sides and is fixedly arranged in the middle part of the bottom plate, the block with it is right
The tank is formed between the side plate answered, for the top bracing member to press closer bolt, the bolt that presses closer is screwed together in the side plate.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the support
Support body includes adjustable for height vertical rod, supports the cross bar being connected between two adjacent vertical rods and skewed horizontal load to be connected to phase
Brace between two adjacent vertical rods, the adjustable length of the brace.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the brace
Including the sleeve pipe positioned at middle part, the right-hand thread screw mandrel and left-hand thread screw mandrel at described sleeve pipe both ends are screwed together in, is made by rotating described sleeve pipe
The right-hand thread screw mandrel and left-hand thread screw mandrel for obtaining both ends are stretched into described sleeve pipe or overhang to described sleeve pipe simultaneously, it is achieved thereby that
Adjust the length of the brace.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the vertical rod
Including the first pole and the second pole being socketed up and down, fixing hole, second pole are offered at the top of first pole
Upper be spaced apart is provided with connecting hole, adjusts the depth that second pole is inserted in first pole, and wear by connecting bolt
If the fixing hole is fixedly connected with first pole and second pole with corresponding connecting hole, it is achieved thereby that described vertical
The height regulation of bar.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the vertical rod
Periphery be installed with connection otic placode.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the bearing
Including base, it is erected on screw rod and the stiffener being fixedly arranged between the screw rod and the base on base, the screw rod spiral shell
Together in the bottom of support frame as described above body, the branch is realized in the position that support frame as described above body bottom is screwed together in by adjusting the screw rod
The regulation of the bearing height of seat.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, it is in addition to vertical
Supported rod erecting on the underground pipe gallery bottom plate and the morning at the top of the supported rod erecting tear structure, the support open
Vertical rod is between two supporting frames, and the morning tears structure open and connect relatively with adjacent top template.
The working top plate mobile formwork body of the utility model underground pipe gallery further improvement is that, the backform
Plate is connected with bracket close to the end of side wall, and the bottom of the bracket is connected with a side template, and the outside of the side wall corresponds to institute
State to be sticked at side template and have Side Template, the either flush of the top of the Side Template and top plate to be poured, the Side Template and
The side template is fastenedly connected on corresponding side wall by split bolt.
Brief description of the drawings
Fig. 1 is the structural representation of the first side of the working top plate mobile formwork body of the utility model underground pipe gallery
Figure.
Fig. 2 is the structural representation of the second side of the working top plate mobile formwork body of the utility model underground pipe gallery
Figure.
Fig. 3 is the brace in the supporting frame of the working top plate mobile formwork body of the utility model underground pipe gallery
Structural representation.
Fig. 4 is the structural representation of branch membrane module in the working top plate mobile formwork body of the utility model underground pipe gallery
Figure.
Fig. 5 is the structural representation of bearing in the working top plate mobile formwork body of the utility model underground pipe gallery.
Fig. 6 is the top view of bearing in the working top plate mobile formwork body of the utility model underground pipe gallery.
Fig. 7 is the working top plate mobile formwork body branch of the utility model underground pipe gallery in underground pipe gallery
Structural representation.
Fig. 8 is that the working top plate mobile formwork body of the utility model underground pipe gallery moves along underground pipe gallery bottom plate
Dynamic structural representation.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1 and Fig. 2, the utility model provides the working top plate mobile formwork body of underground pipe gallery, is used for
The construction of casting top slab in basement pipe gallery, the top plate mobile formwork body have assembling flexibly, tear down and reconstruct conveniently, process it is simple
Advantage, and with may move, exempt to take the characteristics of exempting to tear open to tear open early.Top plate mobile formwork body provided by the utility model is applicable
In various template, such as aluminum alloy mould plate, aluminium frame wooden model and steel framework wooden model etc..And top plate mobile formwork body of the present utility model can
Coordinate and early tear structure and supported rod erecting open, realize and early tears function open, reach the 50% of design strength grade in the concrete roof poured
When can be stripped and be moved to next section and constructed, and leave it is early tear structure open and continue to shore with supported rod erecting reached the last 50%
The concrete roof of degree, the dismountable morning tears structure open when the concrete roof reaches the 75% of design strength grade and support is vertical
Bar.The structure of the working top plate mobile formwork body of the utility model underground pipe gallery is illustrated below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, the working top plate mobile formwork body 20 of underground pipe gallery provided by the utility model wraps
Supporting frame 21, bearing 22, branch membrane module 23 and top template 24 are included, with reference to shown in Fig. 7, supporting frame 21 is comprehensive located at underground
On the bottom plate 11 for closing piping lane 10, the bottom of the supporting frame 21 is provided with shifting roller 211, is made by the shifting roller 211 of setting
Obtaining the supporting frame 21 has locomotive function.Bearing 22 is installed in the bottom of supporting frame 21 and set close to shifting roller 211,
The bearing height of the bearing 22 is adjustable, and its bearing height refers to distance of the bottom of supporting frame 21 away from the upper surface of bottom plate 11, leads to
The bearing height for overregulating bearing 22 make it that shifting roller 211 is hanging, so as to which supporting frame 21 is supported on into bottom by bearing 22
On plate 11, shifting roller 211 it is hanging, it can be ensured that the stability of strutting system of supporting frame 21.Branch membrane module 23 is installed in support
The top of support body 21, and the bearing height of branch membrane module 23 is adjustable, the bearing height of branch membrane module 23 protrudes out branch for its own
The length at the top of support body 21.Top template 24 is installed on branch membrane module 23, by branch membrane module 23 adjust bearing height so that
Top template 24 installs in place, be used to pour the top plate 13 to form underground pipe gallery 10 on top template 24, by support frame
After body 21 installs stabilization, pass through branch membrane module 23 and adjust installing highly for top template 24 so that the upper surface of the top template 24 is
The bottom surface of the top plate 13 of design.
As a better embodiment of the present utility model, as shown in Figure 1, Figure 2 and Figure 4, consolidate in the bottom surface of top template 24
Provided with main joist 241, branch membrane module 23 includes support screw 231, cradle 232 and top bracing member 233, the spiral shell of support screw 231
Together in the top of supporting frame 21, formwork is realized in the position that the top of supporting frame 21 is screwed together in by adjusting the support screw 231
The bearing height regulation of component 23, when by inside precession of the support screw 231 to supporting frame 21 so that support screw 231
Partial Height more than the top of supporting frame 21 diminishes, and diminishes so as to adjust bearing height, now available for top template 24
The demoulding construction;When support screw 231 is screwed out to the outside of supporting frame 21 so that support screw 231 is located at support frame
The Partial Height more than top of body 21 becomes big, becomes big so as to adjust bearing height, now the formwork construction available for top template 24.
Cradle 232 is installed on support screw 231, and the cradle 232 is installed in the top of support screw 231, and top bracing member 233 is located at
The both sides of cradle 232.Tank 2321 formed with accommodating main joist 241 on the cradle 232, main joist 241 are partially disposed in
In corresponding tank 2321, and the part on main joist 241 in tank 2321 is stayed on by top bracing member 233, so that will
Main joist 241 is fixed in cradle 232.Further, cradle 232 includes bottom plate 2322, is erected on the both sides of bottom plate 2322
Side plate 2323 and be fixedly arranged on the block 2324 at the middle part of bottom plate 2322, formed and held between block 2324 and corresponding side plate 2323
Groove 2321, top bracing member 233 press closer bolt and are screwed together in side plate 2323 to press closer bolt.Through hole is offered on side plate 2323 simultaneously
In the fixed nut in outer surface of corresponding through hole, press closer that bolt is screwed together in the nut and tank 2321 is stretched into end from through hole
It is interior.Bottom plate 2322 and side plate 2323 therein are stripe board, and block 2324 is square piece.
As another better embodiment of the present utility model, as depicted in figs. 1 and 2, supporting frame 21 includes height can
The vertical rod 212 of tune, support are connected to cross bar 213 between two adjacent vertical rods 212 and skewed horizontal load be connected to it is adjacent
Brace 214 between two vertical rods 212, the adjustable length of brace 214.Pass through the height adjustable supporting frame of vertical rod 212
The construction of the underground pipe gallery 10 of different height can be applied to.With reference to shown in Fig. 3, brace 214 includes the set positioned at middle part
Pipe 2141, the right-hand thread screw mandrel 2142 and left-hand thread screw mandrel 2143 for being screwed together in the both ends of sleeve pipe 2141, pass through rotating casing 2,141 two
The right-hand thread screw mandrel 2142 and left-hand thread screw mandrel 2143 at end are stretched into sleeve pipe 2141 or overhang to sleeve pipe 2141 simultaneously, so as to real
The length of regulation brace 214 is showed.Gusset 2144 is connected with the outer end of right-hand thread screw mandrel 2142 and left-hand thread screw mandrel 2143, by this
Brace 214 is connected in vertical rod 212 by gusset 2144.Further, vertical rod 212 includes the first pole and second being socketed up and down
Pole, fixing hole is offered at the top of the first pole, is spaced apart on the second pole and is provided with connecting hole, the second pole of regulation inserts the
Depth in one pole, and fixing hole is worn by connecting bolt and is fixedly connected with the first pole and second with corresponding connecting hole
Bar, it is achieved thereby that the height regulation of vertical rod.Further, the periphery of vertical rod 212 is installed with connection otic placode 2121.The company of setting
Ear connecting plate 2121 is used to connect cross bar 213 and brace 214.
As another better embodiment of the present utility model, as shown in Figure 2, Figure 5 and Figure 6, bearing 22 includes base
221st, screw rod 222 on base 221 and the stiffener 223 being fixedly arranged between screw rod 222 and base 221, the spiral shell of screw rod 222 are erected on
Together in the bottom of supporting frame 21, the branch of bearing 22 is realized in the position that the bottom of supporting frame 21 is screwed together in by adjusting screw rod 222
Support the regulation of height.Base 221 is plate body structure.Inside precession of the screw rod 222 to supporting frame 21, regulation bearing height become
It is small, and then shifting roller 211 is placed on bottom plate 11, realize the locomotive function of operation support body 21;Screw rod 222 is to supporting frame
21 outside back-out, regulation bearing height become big, and then make it that shifting roller 211 is hanging, improve the stability of operation support body 21.
As another better embodiment of the present utility model, as shown in fig. 7, top plate mould bases body 20 also includes being erected on ground
Supported rod erecting 25 on the bottom plate 11 of lower pipe gallery 10 and the morning located at the top of supported rod erecting 25 tear structure 26, supported rod erecting 25 open
Between two supporting frames 21, and early structure 26 of tearing open connects relatively with adjacent top template 24.Supported rod erecting 25 tears knot open with early
The compartment of terrain of structure 26 is erected on bottom plate 11, the height adjustable of the supported rod erecting 25 so that and that early tears structure 26 open shores height adjustable,
Early tear template of the structure 26 as top plate 13 open, directly connect with the concrete poured, after the demoulding of top template 24 is removed, by staying
If supported rod erecting 25 and early tear structure 26 open and continue to shore the top plate 13 poured.Supported rod erecting 25 includes two to be mutually screwed together
Individual loop bar, fixed position is screwed togather to realize that the height of supported rod erecting 25 is adjusted by adjusting loop bar.
As better embodiment another again of the present utility model, top template 24 is connected with bracket close to the end of side wall 12
27, the bottom of bracket 27 is connected with a side template 28, and the outside of side wall 12, which corresponds to be sticked at side template 28, Side Template 29, holds mould
The either flush of the top of plate 29 and top plate 13 to be poured, Side Template 29 and side template 28 by split bolt be fastenedly connected in
On corresponding side wall 12.The bottom of Side Template 29 is provided with support bracket 291, is erected Side Template 29 in side wall by support bracket 291
12 lateral surface, support bracket 291 are tripod and are installed in the lateral surface of side wall 12.For the middle part of pipe gallery 10 located underground
Side wall 12 for, the end that top template 24 at the side wall 12 at middle part is located at this is connected with bracket 27, in the bottom of bracket 27
Fagging is installed with, the fagging of the both sides of side wall 12 is fastenedly connected by split bolt.
As shown in Figure 7 and Figure 8, the work progress of top plate mobile formwork body 20 of the present utility model is illustrated below.
The bottom plate 11 and side wall 12 of underground pipe gallery 10 have been constructed completion, cast-in-place construction need to be formed on side wall 12
Top plate 13, top plate mobile formwork body 20 of the present utility model are used for the formwork pouring construction of the top plate 13.First spelled on bottom plate 11
Assembled good supporting frame 21 is moved on bottom plate 11 by dress supporting frame 21, in the branch of formwork opening position regulation bearing 22
Height is supportted bearing 22 is supported on bottom plate 11 and makes the shifting roller 211 of the bottom of supporting frame 21 hanging, so that it is guaranteed that
The structural stability of supporting frame 21.Backform component 23 then is installed at the top of supporting frame 21, by backform component 23
Support screw 231 is screwed on supporting frame 21, main joist 241 is then placed in the cradle 232 of backform component 23, then
Assembled top template 24, top template 24 is fixed on main joist 241 on main joist 241, when splicing top template 24, is being set
Positioning, which puts to stay to set, installs the early position for tearing structure 26 open.The bearing height of regulation backform component 23 causes top template 24 to install in place,
By early tear open structure 26 by supported rod erecting 25 erect bottom plate 11 on, and adjust it is early tear structure 26 open install height, so as to early
Tear the casting space that top plate 13 is formed on structure 26 and top template 24 open.Side template 28 and Side Template are installed on side wall 12
29, so as to pour pouring for top plate 13 with formation on structure 26 is early torn open in Side Template 29 and the inner side of side template 28 and top template 24
Space, into the casting space, casting concrete is so as to foring top plate 13.Treat that top plate 13 reaches the 50% of design strength grade
When, top template 24 can be stripped, the bearing height of regulation branch membrane module 23 causes the absolute altitude of top template 24 to reduce, and adjusts bearing 22
Bearing height shifting roller 211 is placed on bottom plate 11, on bottom plate 11 set electrical hoist 31, by electrical hoist
Rope connection supporting frame 21 on 31, next construction position is moved to by the traction of electrical hoist 31 by supporting frame 21
Put, then adjust bearing 22 again and be supported in bottom plate 11 to stablize movable support body 21, then adjust branch membrane module 23 by top template 24
Position is set to, another set early tears structure 26 and top template 24 open, installs side template 28 and Side Template 29, the top plate 13 of next section of progress
Pouring construction.It is achieved thereby that mobile turnover construction.It can be incited somebody to action when the top plate 13 that the last period pours reaches the 75% of design strength
Stay that the morning set tears structure 26 open and supported rod erecting 25 is removed to be used in turn.
Top plate mould bases body of the present utility model has the beneficial effect that:
Top plate mould bases body is integrally connected by screw bolts, convenient disassembly, and turnover utilization rate is high;It is not repeated in the cabin of piping lane
Formwork supporting plate and scaffold is set up, can moved integrally to next section of construction area, saved material and have bad luck expense;Material is once put into,
Repeatedly it is used in turn, spillage of material can be greatly reduced;Top template and supporting frame only need assembly first, are all spelled without every section
Dress, saves the overall duration;Simple to operate, support safety is reliable;Top board construction is carried out according to aluminum alloy mould plate, quality is good.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (10)
- A kind of 1. working top plate mobile formwork body of underground pipe gallery, it is characterised in that including:Supporting frame of the branch on underground pipe gallery bottom plate, the bottom of support frame as described above body is provided with shifting roller;Support frame as described above body bottom and the adjustable bearing of bearing height set close to the shifting roller are installed in, passes through regulation The bearing height of the bearing is hanging to cause the shifting roller;It is installed in support frame as described above body top and the adjustable branch membrane module of bearing height;AndThe top template being installed on the branch membrane module, bearing height is adjusted with the backform by the branch membrane module Plate installs in place.
- 2. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 1, it is characterised in that the backform The bottom surface of plate is installed with main joist;The branch membrane module includes support screw, the cradle being fixedly arranged on the support screw and located at the cradle two The top bracing member of side;The support screw is screwed together in the top of support frame as described above body, and support frame as described above is screwed together in by adjusting the support screw Realize the bearing height regulation of the branch membrane module in position at the top of body;Formed with the tank for housing the main joist on the cradle, the main joist is partially disposed in corresponding tank, and Part on the main joist in the tank is stayed on by the top bracing member, so as to which the main joist is fixed on into institute State in cradle.
- 3. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 2, it is characterised in that the support Seat includes bottom plate, the block that is erected on the side plate of the bottom plate both sides and is fixedly arranged in the middle part of the bottom plate, the block with it is right The tank is formed between the side plate answered, for the top bracing member to press closer bolt, the bolt that presses closer is screwed together in the side plate.
- 4. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 1, it is characterised in that the support Support body includes adjustable for height vertical rod, supports the cross bar being connected between two adjacent vertical rods and skewed horizontal load to be connected to phase Brace between two adjacent vertical rods, the adjustable length of the brace.
- 5. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 4, it is characterised in that the brace Including the sleeve pipe positioned at middle part, the right-hand thread screw mandrel and left-hand thread screw mandrel at described sleeve pipe both ends are screwed together in, is made by rotating described sleeve pipe The right-hand thread screw mandrel and left-hand thread screw mandrel for obtaining both ends are stretched into described sleeve pipe or overhang to described sleeve pipe simultaneously, it is achieved thereby that Adjust the length of the brace.
- 6. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 4, it is characterised in that the vertical rod Including the first pole and the second pole being socketed up and down, fixing hole, second pole are offered at the top of first pole Upper be spaced apart is provided with connecting hole, adjusts the depth that second pole is inserted in first pole, and wear by connecting bolt If the fixing hole is fixedly connected with first pole and second pole with corresponding connecting hole, it is achieved thereby that described vertical The height regulation of bar.
- 7. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 4, it is characterised in that the vertical rod Periphery be installed with connection otic placode.
- 8. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 1, it is characterised in that the bearing Including base, the screw rod being erected on base and the stiffener being fixedly arranged between the screw rod and the base, the screw rod The bottom of support frame as described above body is screwed together in, is screwed together in by adjusting the screw rod described in the position realization of support frame as described above body bottom The regulation of the bearing height of bearing.
- 9. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 1, it is characterised in that also include vertical Supported rod erecting on the underground pipe gallery bottom plate and the morning at the top of the supported rod erecting tear structure, the support open Vertical rod is between two supporting frames, and the morning tears structure open and connect relatively with adjacent top template.
- 10. the working top plate mobile formwork body of underground pipe gallery as claimed in claim 1, it is characterised in that the top Template is connected with bracket close to the end of side wall, and the bottom of the bracket is connected with a side template, and the outside of the side wall is corresponding Being sticked at the side template has Side Template, the top of the Side Template and the either flush of top plate to be poured, the Side Template It is fastenedly connected with the side template by split bolt on corresponding side wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720734669.2U CN206971268U (en) | 2017-06-22 | 2017-06-22 | The working top plate mobile formwork body of underground pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720734669.2U CN206971268U (en) | 2017-06-22 | 2017-06-22 | The working top plate mobile formwork body of underground pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206971268U true CN206971268U (en) | 2018-02-06 |
Family
ID=61409696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720734669.2U Expired - Fee Related CN206971268U (en) | 2017-06-22 | 2017-06-22 | The working top plate mobile formwork body of underground pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206971268U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589772A (en) * | 2018-04-28 | 2018-09-28 | 中国建筑第八工程局有限公司 | Method is torn open for the platform modular system of piping lane top plate and the morning of early stripping formwork system |
CN109469098A (en) * | 2018-11-14 | 2019-03-15 | 上海市基础工程集团有限公司 | For concrete box cell structure inner template running gear |
CN111364516A (en) * | 2020-04-17 | 2020-07-03 | 中国建筑土木建设有限公司 | Supporting and dismantling walking system for pipeline gallery wallboard running water construction and construction method thereof |
CN111878098A (en) * | 2020-07-31 | 2020-11-03 | 中交隧道工程局有限公司 | Concrete pouring device and method for shield starting base |
CN114412511A (en) * | 2022-01-18 | 2022-04-29 | 无锡信泰模架科技有限公司 | Movable modular construction structure capable of being partitioned |
CN115075293A (en) * | 2022-07-15 | 2022-09-20 | 中铁二十五局集团有限公司 | Pipe gallery template mobile device |
-
2017
- 2017-06-22 CN CN201720734669.2U patent/CN206971268U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589772A (en) * | 2018-04-28 | 2018-09-28 | 中国建筑第八工程局有限公司 | Method is torn open for the platform modular system of piping lane top plate and the morning of early stripping formwork system |
CN108589772B (en) * | 2018-04-28 | 2024-01-23 | 中国建筑第八工程局有限公司 | Bench formwork system for pipe gallery top plate and early dismantling method of early dismantling formwork |
CN109469098A (en) * | 2018-11-14 | 2019-03-15 | 上海市基础工程集团有限公司 | For concrete box cell structure inner template running gear |
CN111364516A (en) * | 2020-04-17 | 2020-07-03 | 中国建筑土木建设有限公司 | Supporting and dismantling walking system for pipeline gallery wallboard running water construction and construction method thereof |
CN111878098A (en) * | 2020-07-31 | 2020-11-03 | 中交隧道工程局有限公司 | Concrete pouring device and method for shield starting base |
CN114412511A (en) * | 2022-01-18 | 2022-04-29 | 无锡信泰模架科技有限公司 | Movable modular construction structure capable of being partitioned |
CN115075293A (en) * | 2022-07-15 | 2022-09-20 | 中铁二十五局集团有限公司 | Pipe gallery template mobile device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206971268U (en) | The working top plate mobile formwork body of underground pipe gallery | |
CN107313589A (en) | Outer wall of basement one side steel form support system and its construction method | |
CN107700533B (en) | A kind of box quick assembly and disassembly mould piping lane construction technology | |
CN102758451B (en) | Concrete cable channel construction process | |
CN109736353A (en) | Construction method of composite single-side formwork deep foundation pit basement outer wall | |
CN206971270U (en) | Exterior wall formwork system in underground pipe gallery cast-in-place construction | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN103422667B (en) | Double-plate prefabricated superposed wall supporting system | |
CN108360814A (en) | The unilateral erecting device of adjustable steel tube and its installation method | |
CN107386327A (en) | U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made up of the template | |
CN109577166A (en) | On across active service highway door opening bracket and construction method | |
CN207314852U (en) | Outer wall of basement one side steel form support system | |
CN111622482A (en) | Simple support frame for steel structure overhanging plate edge and mounting method thereof | |
CN207944339U (en) | A kind of prefabricated superposed type anti-collision wall for urban viaduct | |
CN107988913A (en) | A kind of bridge bilayer box beam upper former method for dismounting | |
CN205558264U (en) | Space reentrant corner system of clear water inclined wall switching clear water swash plate | |
CN207143746U (en) | Support beam template system under concrete support trestle plate | |
CN207376649U (en) | U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made of the template | |
CN206539012U (en) | Large span form bracing system | |
CN212773372U (en) | Simple support frame for steel structure overhanging plate edge | |
CN102418417B (en) | Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system | |
CN111809792B (en) | Assembled precast concrete wallboard | |
CN214245823U (en) | Advance through structure of new and old structure girder on two sides of mid-partition wall | |
CN208168339U (en) | The unilateral erecting device of adjustable steel tube | |
CN208981019U (en) | Ladder type prefabricated plate with auxiliary block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 |