CN102418417B CN201010297704.1A CN201010297704A CN102418417B CN 102418417 B CN102418417 B CN 102418417B CN 201010297704 A CN201010297704 A CN 201010297704A CN 102418417 B CN102418417 B CN 102418417B
Authority
CN
China
Prior art keywords
formwork
densely
ribbed
profiled steel
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010297704.1A
Other languages
Chinese (zh)
Other versions
CN102418417A (en
Inventor
杨峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yang Feng
Original Assignee
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAHUI ENGINEERING DESIGN GROUP Co Ltd filed Critical HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority to CN201010297704.1A priority Critical patent/CN102418417B/en
Publication of CN102418417A publication Critical patent/CN102418417A/en
Application granted granted Critical
Publication of CN102418417B publication Critical patent/CN102418417B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

大板跨现浇梁密肋楼板早拆模板支模体系,包括梁模板、密肋楼板模板、桁架和支架,还包括有梁下可调支柱,梁下可调支柱晚于支架、桁架、梁模板和密肋楼板模板拆除,支架包括梁下模板支架、搁置杆和杆支柱,密肋楼板模板包括压型钢模板和格栅,密肋楼板模板铺设在桁架上,压型钢模板的端部位于梁模板的顶部,压型钢模板的端部与梁模板顶部之间设置有堵头。本发明的楼板模板采用压型钢模板,该压型钢模板铺设在格栅上,而格栅铺设在桁架上,桁架横跨在梁模板上,楼板底部无需设置支撑脚手架,上层楼板的自重不会传递到下层楼板上,因此,该楼板模板施工简单,可以容易实现早拆,而压型钢模板周转次数多,成本低。

Large-span cast-in-place beam densely ribbed slab early demolition formwork support system, including beam formwork, densely ribbed slab formwork, trusses and brackets, and also includes adjustable pillars under the beams, which are later than brackets, trusses, and beams The formwork and ribbed slab formwork are removed, the support includes formwork brackets under the beam, shelving rods and pole pillars, the densely ribbed slab formwork includes profiled steel formwork and grids, the densely ribbed slab formwork is laid on the truss, and the end of the profiled steel formwork is located on the beam On the top of the formwork, a plug is arranged between the end of the profiled steel formwork and the top of the beam formwork. The floor formwork of the present invention adopts profiled steel formwork, the profiled steel formwork is laid on the grid, and the grid is laid on the truss, the truss spans on the beam formwork, no supporting scaffolding is required at the bottom of the floor, and the self-weight of the upper floor will not be transmitted Therefore, the construction of the floor formwork is simple, and early demolition can be easily realized, while the profiled steel formwork has many turnover times and low cost.

Description

大板跨现浇梁密肋楼板早拆模板支模体系Formwork support system for early demolition formwork of large-span cast-in-place beams and dense ribbed slabs

技术领域technical field

本发明涉及一种建造房屋结构体系的支模结构,尤其涉及大板跨现浇梁密肋楼板早拆模板支模体系。The invention relates to a formwork support structure for building a building structure system, in particular to a formwork support system for early demolition formwork for large-span cast-in-place beams and densely ribbed floor slabs.

背景技术Background technique

提高模板的使用效率一直是业主和施工单位努力追求的目标,目前,建筑施工所采用的模板早拆体系主要由碗扣式脚手架、早拆柱头、调节底座、主、次梁和模板搭设而成。碗扣式脚手架包括立杆、横杆、斜杆等多种构件,立杆顶端需安装早拆柱头,底端需安装调节底座,支撑高度的调节需通过调节底座和早拆柱头来进行,这种支撑体系所需材料多,搭设工作量大,支撑高度调节量小,且支撑搭设后,人员不能通过,不能进行其他施工操作。早拆体系常采用木方作为主次梁,木材具有强度低且波动性大,耐用性差等缺点,实际使用过程中材料损耗大,模板较厚重,施工操作不方便,且不经济。为了解决早拆的问题,现有技术中出现了一些解决方案,例如中国专利申请号为CN200910104171.8,公开日为2009年6月26日,公开了一种用于楼板含梁、板和柱结构建筑的早拆模板体系,主要包括模板,早拆支撑柱,早拆支撑柱的顶端固定连接有矩形顶板,所述早拆支撑柱上套有至少一个早拆机构;早拆支撑柱上设有至少一个通孔,早拆支撑柱的下端通过通孔与卸载机构中外管的上端连接;所述模板的四个角上均连接有L型转角。还设有辅助梁,次辅助梁和次辅助模板。上述技术方案通过结构上的特别设计和综合调整,解决了房屋楼板含梁、板和柱复杂结构的水平模板难于使用早拆体系,或即便使用传统的早拆并无明显优势的难题,采用积木式的系统使得整个体系操作使用简便,安全可靠,高效省时省力,易学易用,便于推广。但这种体系还是基于常规的整体现浇结构体系提出的,采用模块化的结构,将楼板模板分割成多个单元,每个单元采用独立的支撑结构。这种模板的成本更高,大规模使用时,为了提高施工速度,大大的增加了成本。Improving the use efficiency of formwork has always been the goal pursued by owners and construction units. At present, the early demolition system of formwork used in building construction is mainly composed of bowl-buckle scaffolding, early demolition column heads, adjusting bases, main and secondary beams and formwork. . Bowl buckle scaffolding includes various components such as vertical poles, horizontal poles, and oblique poles. The top of the vertical poles needs to be installed with early dismantling columns, and the bottom end needs to be equipped with adjustment bases. This kind of support system requires a lot of materials, the erection workload is large, and the support height adjustment is small, and after the support is erected, personnel cannot pass through it, and other construction operations cannot be performed. The early demolition system often uses wooden beams as the primary and secondary beams. The wood has the disadvantages of low strength, large volatility, and poor durability. In actual use, the material loss is large, the formwork is thick, and the construction operation is inconvenient and uneconomical. In order to solve the problem of early demolition, some solutions have appeared in the prior art. For example, the Chinese patent application number is CN200910104171.8, and the publication date is June 26, 2009. The early demolition formwork system of a structural building mainly includes a formwork, an early demolition support column, and a rectangular top plate is fixedly connected to the top of the early demolition support column, and at least one early demolition mechanism is set on the early demolition support column; There is at least one through hole through which the lower end of the early demolition support column is connected with the upper end of the outer tube in the unloading mechanism; the four corners of the template are connected with L-shaped corners. There are also auxiliary beams, secondary auxiliary beams and secondary auxiliary templates. Through the special design and comprehensive adjustment of the structure, the above-mentioned technical scheme solves the problem that the horizontal formwork of the complex structure of the house floor including beams, slabs and columns is difficult to use the early demolition system, or there is no obvious advantage even if the traditional early demolition system is used. Building blocks are used. The integrated system makes the whole system easy to operate, safe and reliable, efficient, time-saving and labor-saving, easy to learn and use, and easy to promote. However, this system is proposed based on the conventional overall cast-in-place structure system, which adopts a modular structure, divides the floor formwork into multiple units, and each unit adopts an independent support structure. The cost of this formwork is higher, and when it is used on a large scale, in order to increase the construction speed, the cost is greatly increased.

发明内容Contents of the invention

本发明所要解决的技术问题在于克服上述现有技术之不足,提供一种结构简单、能够早拆的大板跨现浇梁密肋楼板早拆模板支模体系。The technical problem to be solved by the present invention is to overcome the deficiencies of the above-mentioned prior art, and provide a formwork support system with a simple structure and early demolition of large-span cast-in-place beams with densely ribbed slabs.

按照本发明提供的大板跨现浇梁密肋楼板早拆模板支模体系,包括梁模板、密肋楼板模板、支撑所述密肋楼板模板的桁架和支撑所述梁模板与桁架的支架,还包括有梁下可调支柱,所述梁下可调支柱晚于所述支架、桁架、梁模板和密肋楼板模板拆除,所述支架包括支撑在所述梁模板底部的梁下模板支架、支撑所述桁架的搁置杆和支撑所述搁置杆的杆支柱,所述密肋楼板模板包括压型钢模板和支撑所述压型钢模板的格栅,所述密肋楼板模板铺设在所述桁架上,所述密肋楼板模板的端部位于所述梁模板的顶部,所述压型钢模板的端部与所述梁模板顶部之间设置有堵头。According to the present invention, the large-span cast-in-place beam densely-ribbed floor formwork support system includes beam formwork, densely-ribbed floor formwork, trusses supporting the densely-ribbed floor formwork, and brackets supporting the beam formwork and trusses, It also includes adjustable pillars under the beam, and the adjustable pillars under the beam are removed later than the support, truss, beam formwork and ribbed floor formwork, and the support includes the formwork support under the beam supported at the bottom of the beam formwork, The rest rods supporting the truss and the rod pillars supporting the rest rods, the densely ribbed floor formwork includes a profiled steel formwork and a grid supporting the profiled steel formwork, and the densely ribbed floor formwork is laid on the truss , the end of the ribbed floor formwork is located at the top of the beam formwork, and a plug is provided between the end of the profiled steel formwork and the top of the beam formwork.

按照本发明提供的大板跨现浇梁密肋楼板早拆模板支模体系还具有如下附属技术特征:According to the present invention, the large-span cast-in-place beam and ribbed floor slab early demolition formwork support system also has the following subsidiary technical features:

所述格栅铺设在所述桁架上,所述密肋楼板模板由多块压型钢模板拼接而成,多块所述压型钢模板重叠拼接后铺设在所述格栅上。The grid is laid on the truss, the densely ribbed floor formwork is spliced by multiple pieces of profiled steel formwork, and multiple pieces of the profiled steel formwork are overlapped and spliced and laid on the grid.

所述格栅为木档或矩形钢管铺设而成。The grid is made of wooden shelves or rectangular steel pipes.

所述梁下可调支柱包括支撑杆、位于所述支撑杆顶部调节结构和与所述调节结构连接的托板。The adjustable pillar under the beam includes a support rod, an adjustment structure located on the top of the support rod and a supporting plate connected with the adjustment structure.

所述梁下模板支架包括有支撑所述梁模板的横杆,所述横杆固定在所述杆支柱上,所述杆支柱间设置有斜撑杆。The formwork support under the beam includes a cross bar supporting the beam formwork, the cross bar is fixed on the pole pillars, and diagonal braces are arranged between the pole pillars.

所述堵头为橡胶堵头,包括基础部、形成在所述基础部上并与所述压型钢模板配合的封堵部,所述封堵部为形成在所述基础部上的多个凸起部,所述基础部内沿橡胶堵头的径向方向设置有加强筋。The plug is a rubber plug, including a base part, a plugging part formed on the base part and matched with the profiled steel template, and the plugging part is a plurality of convex parts formed on the base part The base part is provided with reinforcing ribs along the radial direction of the rubber plug.

所述堵头与所述梁模板固定在一起,所述压型钢模板的端部搁置在所述堵头的封堵部上。The plug is fixed together with the beam template, and the end of the profiled steel template rests on the plugging portion of the plug.

所述杆支柱上设置有高度调节机构,所述高度调节机构包括调节螺母、由所述调节螺母驱动的可调螺杆和设置所述可调螺杆顶部的支撑板,所述支撑板具有凹槽结构,所述搁置杆卡入所述凹槽中。A height adjustment mechanism is provided on the rod pillar, the height adjustment mechanism includes an adjustment nut, an adjustable screw driven by the adjustment nut, and a support plate on the top of the adjustable screw, and the support plate has a groove structure , the resting rod snaps into the groove.

所述桁架为可伸缩式组合桁架,其端部具有挑头,所述挑头卡在所述搁置杆上。The truss is a telescopic composite truss, and its end has a pick, and the pick is clamped on the shelving rod.

按照本发明提供的一种大板跨现浇梁密肋楼板早拆模板支模体系与现有技术相比具有如下优点:Compared with the prior art, a large-span cast-in-place beam densely ribbed slab formwork supporting system provided by the present invention has the following advantages:

1、本发明的楼板模板采用压型钢模板,该压型钢模板铺设在格栅上,而格栅铺设在桁架上,桁架横跨在梁模板上,楼板底部无需设置支撑脚手架,上层楼板的自重不会传递到下层楼板上,因此,该楼板模板施工简单,可以容易实现早拆,而压型钢模板周转次数多,成本低。节约了木材,从而有效保护了森林资源。1. The floor formwork of the present invention adopts profiled steel formwork. The profiled steel formwork is laid on the grid, and the grid is laid on the truss. Therefore, the construction of the floor formwork is simple, and early demolition can be easily realized, while the profiled steel formwork has many turnover times and low cost. Wood is saved, thereby effectively protecting forest resources.

2、本发明设置有梁下可调支柱,在梁模板及支柱拆除后能够减小梁的受力跨度,在砼梁强度没有完全达到设计强度时,也能承受上部荷载,可使梁模板和支架先于梁下可调支柱拆除,使得梁模板和支架提早用于下一个施工工序中。2. The present invention is provided with adjustable pillars under the beam, which can reduce the stress span of the beam after the beam formwork and pillars are removed, and can also bear the upper load when the strength of the concrete beam does not fully reach the design strength, so that the beam formwork and The support is removed before the adjustable pillar under the beam, so that the beam formwork and support can be used in the next construction process earlier.

3、由于设置的堵头能够将压型钢模板与梁模板之间的缝隙封堵,防止漏浆,使得压型钢模板与梁模板搭接紧密拆除方便。3. Since the set plug can seal the gap between the profiled steel formwork and the beam formwork to prevent slurry leakage, it is easy to remove the overlapping joint between the profiled steel formwork and the beam formwork.

4、杆支柱上设置有高度调节机构,使板标高准确,立柱中心受压承载力大,立柱数量可减少。4. There is a height adjustment mechanism on the pole pillar, so that the elevation of the plate is accurate, the pressure bearing capacity of the center of the pillar is large, and the number of pillars can be reduced.

5、本发明压型钢模板采用多块重叠拼接,可以缩短压型钢模板长度,重量轻,运输拆除方便。5. The profiled steel formwork of the present invention adopts multiple overlapping splicing, which can shorten the length of the profiled steel formwork, is light in weight, and is convenient for transportation and disassembly.

附图说明Description of drawings

图1是本发明的主视示意图。Fig. 1 is a schematic front view of the present invention.

图2是本发明的局部结构立体图。Fig. 2 is a perspective view of a partial structure of the present invention.

图3是图1中A处放大图。Fig. 3 is an enlarged view of A in Fig. 1 .

图4是图1中B处放大图。Fig. 4 is an enlarged view of B in Fig. 1 .

图5是本发明中堵头的立体图。Fig. 5 is a perspective view of the plug in the present invention.

图6是本发明中密肋楼板模板的立体图。Fig. 6 is a perspective view of the ribbed floor formwork in the present invention.

具体实施方式Detailed ways

参见图1和图2,在本发明提供的大板跨现浇梁密肋楼板早拆模板支模体系的实施例,包括梁模板1、密肋楼板模板2、支撑所述密肋楼板模板2的桁架7和支撑所述梁模板1与桁架7的支架3,还包括有梁下可调支柱4,所述梁下可调支柱4晚于所述支架3、桁架7、梁模板1和密肋楼板模板2拆除,所述支架3包括支撑在所述梁模板1底部的梁下模板支架31、支撑所述桁架7的搁置杆32和支撑所述搁置杆32的杆支柱33,所述密肋楼板模板2包括波形压型钢模板21和支撑所述压型钢模板21的格栅22,所述密肋楼板模板2铺设在所述桁架7上,所述密肋楼板模板2的端部位于所述梁模板1的顶部,所述压型钢模板2的端部与所述梁模板1顶部之间设置有堵头5。本发明采用桁架7和压型钢模板2结合的结构,可以省掉传统的木模板的支模方法,节省了木材的使用量。并且压型钢模板具有较高的强度,能够满足楼板施工的要求,且成本低。在大跨板中间无需设落地支撑架,提高模板体系的搭建速度,另外也可以减小对于其他工序施工的影响。由于采用的是压型钢模板,压型钢模板2与梁模板1之间存在缝隙,容易造成砼从缝隙中流出,影响楼板的成形。本发明在压型钢模板2与梁模板1之间设置有堵头4,从而将该缝隙封堵,防止砼流出。本实施例中的格栅22为木格栅,由木档铺设而成。所述木格栅铺设在桁架7上。Referring to Fig. 1 and Fig. 2, the embodiment of the early demolition formwork support system of the large-span cast-in-place beam densely ribbed floor slab provided by the present invention includes a beam formwork 1, a densely ribbed floor formwork 2, and supports the densely ribbed floor formwork 2 The truss 7 and the bracket 3 supporting the beam template 1 and the truss 7 also include an adjustable pillar 4 under the beam, and the adjustable pillar 4 under the beam is later than the bracket 3, the truss 7, the beam template 1 and the dense The ribbed slab formwork 2 is removed, and the support 3 includes a beam formwork support 31 supported at the bottom of the beam formwork 1, a resting rod 32 supporting the truss 7 and a rod pillar 33 supporting the resting rod 32. The ribbed slab formwork 2 includes a corrugated profiled steel formwork 21 and a grid 22 supporting the profiled steel formwork 21, the densely ribbed slab formwork 2 is laid on the truss 7, and the end of the densely ribbed slab formwork 2 is located at the The top of the beam formwork 1, a plug 5 is arranged between the end of the profiled steel formwork 2 and the top of the beam formwork 1. The present invention adopts the combined structure of the truss 7 and the profiled steel formwork 2, which can save the traditional formwork support method of the wood formwork and save the amount of wood used. Moreover, the profiled steel formwork has high strength, can meet the requirements of floor slab construction, and has low cost. There is no need to set a ground support frame in the middle of the large-span slab, which improves the construction speed of the formwork system, and can also reduce the impact on the construction of other processes. Since the profiled steel formwork is used, there is a gap between the profiled steel formwork 2 and the beam formwork 1, which may easily cause concrete to flow out from the gap and affect the formation of the floor slab. In the present invention, a plug 4 is arranged between the profiled steel formwork 2 and the beam formwork 1, so as to seal the gap and prevent concrete from flowing out. The grid 22 in this embodiment is a wooden grid, which is formed by laying wooden shelves. The wooden grid is laid on the truss 7 .

参见图1和图2,在本发明给出的上述实施例中,所述格栅22铺设在所述桁架7上,所述密肋楼板模板2由多块压型钢模板重叠拼接而成,多块所述压型钢模板拼接后铺设在所述格栅22上。本发明采用多块压型钢模板拼接的结构,压型钢模板的运输和搭拆更加方便。Referring to Fig. 1 and Fig. 2, in the above-mentioned embodiment given by the present invention, the grid 22 is laid on the truss 7, and the ribbed floor formwork 2 is formed by overlapping and splicing a plurality of profiled steel formworks, many The profiled steel templates of the blocks are spliced and laid on the grid 22 . The present invention adopts the splicing structure of a plurality of profiled steel formworks, and the transportation, assembly and disassembly of the profiled steel formworks are more convenient.

参见图1、图2和图3,在本发明给出的上述实施例中,所述梁下可调支柱4包括支撑杆41、位于所述支撑杆41顶部调节结构42和与所述调节结构42连接的托板43。所述托板43用于支撑所述梁体的底部,对梁体进行支撑,从而可以在梁体达到一定强度后,拆除其他支架和模板,仅保留梁下可调支柱4。所述调节结构42用于调节高度,方便安装和拆卸。Referring to Fig. 1, Fig. 2 and Fig. 3, in the above-mentioned embodiment given by the present invention, the adjustable pillar 4 under the beam includes a support rod 41, an adjustment structure 42 located at the top of the support rod 41 and an adjustment structure connected with the adjustment structure. 42 connected pallet 43. The supporting plate 43 is used to support the bottom of the beam body, and supports the beam body, so that after the beam body reaches a certain strength, other brackets and templates can be removed, and only the adjustable pillar 4 under the beam remains. The adjustment structure 42 is used for height adjustment, which is convenient for installation and disassembly.

参见图1和图2,在本发明给出的上述实施例中,所述梁下模板支架31包括有支撑所述梁模板1的横杆311,所述横杆311固定在所述杆支柱33上,所述杆支柱33间设置有斜撑杆331。该支架结构能够稳定的支持梁模板1,保证梁模板稳定。Referring to Fig. 1 and Fig. 2, in the above-mentioned embodiment given by the present invention, the beam lower formwork support 31 includes a cross bar 311 supporting the beam formwork 1, and the cross bar 311 is fixed on the bar support 33 Above, diagonal struts 331 are arranged between the rod struts 33 . The support structure can stably support the beam formwork 1 and ensure the stability of the beam formwork.

参见图5,在本发明给出的上述实施例中,所述堵头5为橡胶堵头,包括基础部51、形成在所述基础部51上并与所述压型钢模板配合的封堵部52,所述封堵部52为形成在所述基础部上的多个凸起部,所述基础部51内沿橡胶堵头的径向方向设置有加强筋54。橡胶堵头具有一定的弹性,当密肋楼板模板2压在上面时,能够使两者贴合的更加紧密,所述加强筋54能够提高堵头5的整体性,即使断裂也能使用。Referring to Fig. 5, in the above-mentioned embodiment of the present invention, the plug 5 is a rubber plug, including a base part 51, a plugging part formed on the base part 51 and matched with the profiled steel template 52, the blocking portion 52 is a plurality of raised portions formed on the base portion, and the base portion 51 is provided with reinforcing ribs 54 along the radial direction of the rubber plug. The rubber plug has a certain degree of elasticity. When the ribbed floor formwork 2 is pressed on it, the two can be bonded more closely. The reinforcing rib 54 can improve the integrity of the plug 5 and can be used even if it breaks.

参见图1和图4,在本发明给出的上述实施例中,所述堵头5与所述梁模板1固定在一起,所述压型钢模板2的端部搁置在所述堵头5的封堵部52上。本发明将堵头5首先固定在梁模板1上,再将压型钢模板2铺设在其上,所述堵头5采用橡胶材料制成,压型钢模板2压在上面后,其能够轻微变形,更好的起到封堵的作用。Referring to Fig. 1 and Fig. 4, in the above-mentioned embodiment given by the present invention, the plug 5 is fixed together with the beam formwork 1, and the end of the profiled steel formwork 2 rests on the end of the plug 5. On the blocking part 52 . In the present invention, the plug 5 is first fixed on the beam formwork 1, and then the profiled steel formwork 2 is laid on it. The plug 5 is made of rubber material. After the profiled steel formwork 2 is pressed on it, it can be slightly deformed. Better play a blocking role.

参见图2和图4,在本发明给出的上述实施例中,所述杆支柱33上设置有高度调节机构6。所述高度调节机构6包括调节螺母61、由所述调节螺母61驱动的可调螺杆62和设置在所述可调螺杆顶部的支撑板,所述支撑板具有凹槽结构,所述搁置杆卡入所述凹槽中。Referring to FIG. 2 and FIG. 4 , in the above-mentioned embodiments of the present invention, a height adjustment mechanism 6 is provided on the rod support 33 . The height adjustment mechanism 6 includes an adjustment nut 61, an adjustable screw rod 62 driven by the adjustment nut 61, and a support plate arranged on the top of the adjustable screw rod, the support plate has a groove structure, and the rest bar is clamped into the groove.

参见图1和图2,在本发明给出的上述实施例中,所述支架3还包括有支撑所述梁模板1的横杆36和连接各个支柱36的斜拉杆37。Referring to FIG. 1 and FIG. 2 , in the above-mentioned embodiment of the present invention, the bracket 3 also includes a cross bar 36 supporting the beam formwork 1 and a diagonal stay bar 37 connecting each pillar 36 .

参见图1和图6,在本发明给出的上述实施例中,所述桁架7为可伸缩式组合桁架,其端部具有挑头71,所述挑头71卡在所述搁置杆32上。本发明采用可伸缩式组合桁架,能够方便的调节桁架的跨度,桁架的通用性强。Referring to FIG. 1 and FIG. 6 , in the above-mentioned embodiment of the present invention, the truss 7 is a telescopic composite truss with a pick 71 at its end, and the pick 71 is clamped on the resting rod 32 . The invention adopts a telescopic combined truss, which can conveniently adjust the span of the truss, and the truss has strong versatility.

Claims (9)

1.大板跨现浇梁密肋楼板早拆模板支模体系,包括梁模板、密肋楼板模板、支撑所述密肋楼板模板的桁架和支撑所述梁模板与桁架的支架,其特征在于:还包括有梁下可调支柱,所述梁下可调支柱晚于所述支架、桁架、梁模板和密肋楼板模板拆除,所述支架包括支撑在所述梁模板底部的梁下模板支架、支撑所述桁架的搁置杆和支撑所述搁置杆的杆支柱,所述密肋楼板模板包括压型钢模板和支撑所述压型钢模板的格栅,所述密肋楼板模板铺设在所述桁架上,所述压型钢模板的端部位于所述梁模板的顶部,所述压型钢模板的端部与所述梁模板顶部之间设置有堵头。1. The early demolition formwork support system for large-span cast-in-place beam densely ribbed slabs, including beam formwork, densely ribbed slab formwork, trusses supporting the densely ribbed slab formwork and supports for supporting the beam formwork and trusses, characterized in that : It also includes adjustable pillars under the beam, and the adjustable pillars under the beam are removed later than the support, truss, beam formwork and ribbed floor formwork, and the support includes the formwork support under the beam supported at the bottom of the beam formwork , the resting rod supporting the truss and the rod pillar supporting the resting rod, the densely ribbed floor formwork includes a profiled steel formwork and a grid supporting the profiled steel formwork, and the densely ribbed floor formwork is laid on the truss Above, the end of the profiled steel formwork is located at the top of the beam formwork, and a plug is provided between the end of the profiled steel formwork and the top of the beam formwork. 2.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述格栅铺设在所述桁架上,所述密肋楼板模板由多块压型钢模板拼接而成,多块所述压型钢模板重叠拼接后铺设在所述格栅上。2. The formwork support system for large-span cast-in-place beams with densely ribbed slabs as claimed in claim 1, characterized in that: the grid is laid on the truss, and the densely ribbed slab formwork is composed of a plurality of pressed The profiled steel formwork is spliced, and multiple pieces of the pressed profiled steel formwork are overlapped and spliced and laid on the grid. 3.如权利要求2所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述格栅为木档或矩形钢管铺设而成。3. The formwork support system for large-span cast-in-place beams with densely ribbed slabs as claimed in claim 2, characterized in that: the grid is made of wooden stalls or rectangular steel pipes. 4.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述梁下可调支柱包括支撑杆、位于所述支撑杆顶部的调节结构和与所述调节结构连接的托板。4. The large-span cast-in-place beam densely ribbed early demolition formwork support system of claim 1 is characterized in that: the adjustable pillar under the beam includes a support rod, an adjustment structure positioned at the top of the support rod and A supporting plate connected with the adjustment structure. 5.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述梁下模板支架包括有支撑所述梁模板的横杆,所述横杆固定在所述杆支柱上,所述杆支柱间设置有斜撑杆。5. The large-span cast-in-place beam densely ribbed slab formwork supporting system for early demolition as claimed in claim 1, characterized in that: the formwork support under the beam includes a cross bar supporting the beam formwork, and the cross bar It is fixed on the rod pillars, and diagonal bracing rods are arranged between the rod pillars. 6.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述堵头为橡胶堵头,包括基础部、形成在所述基础部上并与所述压型钢模板配合的封堵部,所述封堵部为形成在所述基础部上的多个凸起部,所述基础部内沿橡胶堵头的径向方向设置有加强筋。6. The large-span cast-in-place beam densely ribbed slab early demolition formwork support system as claimed in claim 1, characterized in that: the plug is a rubber plug, including a base, formed on the base and The plugging portion matched with the profiled steel formwork, the blocking portion is a plurality of raised portions formed on the base portion, and reinforcing ribs are arranged in the base portion along the radial direction of the rubber plug. 7.如权利要求6所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述堵头与所述梁模板固定在一起,所述压型钢模板的端部搁置在所述堵头的封堵部上。7. The formwork support system for large-span cast-in-place beams with densely ribbed floors as claimed in claim 6, characterized in that: the plug is fixed with the beam formwork, and the end of the profiled steel formwork Rest on the plugging portion of the plug. 8.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述杆支柱上设置有高度调节机构,所述高度调节机构包括调节螺母、由所述调节螺母驱动的可调螺杆和设置在所述可调螺杆顶部的支撑板,所述支撑板具有凹槽结构,所述搁置杆卡入所述凹槽中。8. The formwork support system for large-span cast-in-place beams with densely ribbed slabs as claimed in claim 1, characterized in that: a height adjustment mechanism is arranged on the rod pillar, and the height adjustment mechanism includes an adjustment nut, a The adjustable screw rod driven by the adjusting nut and the support plate arranged on the top of the adjustable screw rod, the support plate has a groove structure, and the rest rod is snapped into the groove. 9.如权利要求1所述的大板跨现浇梁密肋楼板早拆模板支模体系,其特征在于:所述桁架为可伸缩式组合桁架,其端部具有挑头,所述挑头卡在所述搁置杆上。9. The large-span cast-in-place beam and densely ribbed slab formwork support system for early demolition as claimed in claim 1, characterized in that: the truss is a telescopic composite truss, and its end has a pick, and the pick is stuck in the The rest on the rod.
CN201010297704.1A 2010-09-28 2010-09-28 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system Expired - Fee Related CN102418417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010297704.1A CN102418417B (en) 2010-09-28 2010-09-28 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010297704.1A CN102418417B (en) 2010-09-28 2010-09-28 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system

Publications (2)

Publication Number Publication Date
CN102418417A CN102418417A (en) 2012-04-18
CN102418417B true CN102418417B (en) 2014-08-20

Family

ID=45943042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010297704.1A Expired - Fee Related CN102418417B (en) 2010-09-28 2010-09-28 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system

Country Status (1)

Country Link
CN (1) CN102418417B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437112A (en) * 2016-11-28 2017-02-22 昆山征途建筑模架应用技术有限公司 Adjustable truss independent supporting system
CN108625487A (en) * 2018-06-04 2018-10-09 浙江中益建材科技有限公司 A kind of across frame structure end support node structure of steel bar girder plate
CN109138457B (en) * 2018-08-31 2020-12-11 中国建筑第八工程局有限公司 Support system for installing prefabricated building and construction method thereof
CN111155759A (en) * 2020-02-21 2020-05-15 河北建筑工程学院 A new type unit truss type concrete frame structure formwork support system and its construction method
CN112144865A (en) * 2020-09-24 2020-12-29 中冶建设高新工程技术有限责任公司 Early-dismantling formwork support system
CN117822877A (en) * 2023-11-16 2024-04-05 晟通科技集团有限公司 A truss keel template structure and installation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0005117A1 (en) * 1978-04-21 1979-10-31 Armand Moreau Method of constructing playgrounds and products issuing from it
JP2920308B2 (en) * 1990-04-04 1999-07-19 鹿島建設株式会社 Formwork method and formwork equipment
CN2539618Y (en) * 2002-05-07 2003-03-12 吴树瑜 Shuttering for working wall board
CN2556306Y (en) * 2002-07-02 2003-06-18 郭绍君 Combined bracnig frame
CN2617859Y (en) * 2003-05-14 2004-05-26 上海市第七建筑有限公司 Truss supporting template systems
CN201133076Y (en) * 2007-11-28 2008-10-15 南通华荣鹰架制造有限公司 Early dismounting formwork system
CN201428239Y (en) * 2009-04-09 2010-03-24 温州建设集团公司 Supporting system for combined channel steel cantilever bracket template
CN201794297U (en) * 2010-09-28 2011-04-13 杨峰 Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0005117A1 (en) * 1978-04-21 1979-10-31 Armand Moreau Method of constructing playgrounds and products issuing from it
JP2920308B2 (en) * 1990-04-04 1999-07-19 鹿島建設株式会社 Formwork method and formwork equipment
CN2539618Y (en) * 2002-05-07 2003-03-12 吴树瑜 Shuttering for working wall board
CN2556306Y (en) * 2002-07-02 2003-06-18 郭绍君 Combined bracnig frame
CN2617859Y (en) * 2003-05-14 2004-05-26 上海市第七建筑有限公司 Truss supporting template systems
CN201133076Y (en) * 2007-11-28 2008-10-15 南通华荣鹰架制造有限公司 Early dismounting formwork system
CN201428239Y (en) * 2009-04-09 2010-03-24 温州建设集团公司 Supporting system for combined channel steel cantilever bracket template
CN201794297U (en) * 2010-09-28 2011-04-13 杨峰 Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs

Also Published As

Publication number Publication date
CN102418417A (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102418416B (en) Long-slab-span steel beam cast-in-situ floor formwork system
CN102587661B (en) Method for constructing tall-section structural column of reinforced concrete frame
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102733606A (en) Construction method of high large cantilever structure
CN103046740B (en) Large-span moving-door type combined formwork system
CN105715043A (en) Formwork reinforcement system and construction method for high-formwork-support small-angle fair-faced slope
CN201794297U (en) Early-dismantling formwork support system for large-span cast-in-place beam ribbed floorslabs
CN116411694A (en) Adjustable modular disc buckle type supporting system and supporting method thereof
CN103031949B (en) Arc-shaped main rib template support device
CN114961257A (en) Early-dismantling construction method for disc buckle of public building basement
CN204570988U (en) Reinforced concrete frame column load conversion device
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN204825660U (en) Bent cap staple bolt device
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN202108296U (en) Assembled segmental water tank tower
CN108678424A (en) A kind of the steel latticework support device and method for supporting of super-heavy component
CN209907886U (en) An adjustable prefabricated stair construction platform
CN203403668U (en) Self-supporting plate type steel bar mesh frame combination formwork
CN110593526B (en) Conveniently-detachable slag discharging channel and mounting method
CN213268892U (en) Post-cast strip connection structure is supported to casing string
CN208267371U (en) A kind of mould plate supporting device of large size conversion beam
CN219973891U (en) A formwork structure with folded line column caps for beamless floors
CN219794647U (en) Supporting and reinforcing construction integrated platform for independent column of medical project

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170213

Address after: East Backstreet Haishu District 315000 Zhejiang province Ningbo City No. 8 Room 201

Patentee after: Yang Feng

Address before: 312000 Zhejiang Province, Shaoxing Zhongxing Road No. 339 building Huahui Changan

Patentee before: Yang Feng

Patentee before: HUAHUI ENGINEERING DESIGN GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820