EP0005117A1 - Method of constructing playgrounds and products issuing from it - Google Patents

Method of constructing playgrounds and products issuing from it Download PDF

Info

Publication number
EP0005117A1
EP0005117A1 EP79400252A EP79400252A EP0005117A1 EP 0005117 A1 EP0005117 A1 EP 0005117A1 EP 79400252 A EP79400252 A EP 79400252A EP 79400252 A EP79400252 A EP 79400252A EP 0005117 A1 EP0005117 A1 EP 0005117A1
Authority
EP
European Patent Office
Prior art keywords
slab
formwork
thickness
plates
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP79400252A
Other languages
German (de)
French (fr)
Inventor
Armand Moreau
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0005117A1 publication Critical patent/EP0005117A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Definitions

  • the present invention relates to a method of building a hard tennis court.
  • the construction method according to the invention makes it possible to avoid these drawbacks. In it, it is indeed possible to pour on site a thin concrete slab a few centimeters from the ground, while allowing to recover part of the support means of said slab after drying.
  • object of the invention is to sink a number of reinforced concrete sills or not arranged at regular intervals along the greatest width of the ground, the upper face of said sills being perfectly leveled. Transversely to these sills, are stretched at determined intervals steel ropes clamping the upper faces thereof. These ropes are housed, at the passage of each sill, in a portion of tube, which will then be embedded in the thickness of the slab allowing to recover the said ropes after drying of the slab. On this rope frame are placed wooden or agglomerated sheets of sufficient thickness to avoid any deformation of flatness during the pouring and drying of the slab.
  • the process for constructing thin concrete slabs for the production of platforms located a few centimeters above the ground, and more particularly of platforms used for the practice of sports, such as tennis, is characterized in what it consists of maintaining a non-deformable formwork plane at the desired distance from the ground by means of recoverable supports after the casting and drying of the platform and simultaneously making the expansion joints necessary for the good performance of said platform -form using removable means, which means make it possible to draw the vibrating ruler of the whole of the platform,
  • the means of supporting the the formwork plane at a certain distance from the ground is a frame of parallel steel ropes stretched transversely to reinforced or unreinforced concrete beams, arranged parallel on the ground in the direction of the width of the structure, which ropes / moored at each end to piles driven into the ground outside the structure, clamping their tension on the upper face of the stringers.
  • the cables pass directly above each sill portion a portion of tube, which is embedded in the concrete slab during the casting of the slab, leaving the possibility of sliding of the rope for its removal after casting.
  • the non-deformable formwork plan is made up of wooden or agglomerated sheets of sufficient thickness to avoid any deformation of flatness during the casting and drying of the platform, which wooden plates are placed on the weft of the ropes of steel.
  • Each plate constituting the formwork plane rests by its longitudinal edges on wooden battens placed on beams and in the direction thereof between the tube elements, the thickness of said battens corresponding to the diameter of the rope plus the tube thickness.
  • Each plate constituting the formwork plane is made up in the width direction, of two lateral bands and of a central band, which bands rest on the frame of the steel ropes, which lateral bands are fixed integrally with the wooden battens placed on the sills and in the direction thereof between the tube elements, which central strip / width less than the spacing of the lonqrines, has its contiguous edges with the side bands in clearance so as to facilitate its fall into the void area located under the slab after the removal of the ropes for recovery.
  • the plates constituting the formwork plane have, uniformly distributed, frustoconical hollow dowels - with cylindrical base provided with a collar implanted in the thickness of the plates, large base down, the height of the conical part corresponding to l he thickness of the slab, which pegs, embedded in the concrete, allow the evacuation of rainwater towards the vacuum zone existing under the slab.
  • the recoverable plates constituting the formwork plan comprise, uniformly distributed, solid frustoconical dowels, being implanted in the thickness of the plate and held by nut, in order to produce as many molds as possible for the evacuation of rainwater. towards the existing vacuum zone under the slab,
  • Rainwater is evacuated by hollow frustoconical dowels glued at regular intervals on a sheet of waterproof felt placed on the formwork plates before pouring the slab.
  • the slab is squared by lines of orthogonal expansion joints, the spacing of which corresponds to the length and to a multiple of the width of the formwork plates, the width of which expansion joints are determined by the thickness of flat bars arranged on the field. and held at their intersection by cruciform supports allowing their removal after use, the edge of which flat irons corresponding to the planned upper level of the pouring slab thus constituting m reference plane for the drawing with the vibrating rule of the whole of the slab after its casting.
  • Notches are provided, arranged at regular intervals along the length of the reinforced or unreinforced concrete sills, in which are received steel ropes constituting a frame and serving to support the formwork plane at a distance from the ground, said notches being made of so as to be punched in coincidence with each other, and to allow both easy passage and removal of the ropes.
  • the notches on the sills have a V shape with a rounded base
  • the sheet is a light sheet of the strip type, said sheet being embedded in the assembly during the demolding of the concrete slab.
  • the sheet retains the formwork panels, and provision is made for the installation of nails for fixing said sheet to the beams.
  • the straps are stapled to the panels.
  • the straps when the panels are brought together, have a recess
  • sills 1 of length corresponding to the width of the court, spaced about seventy five centimeters, these sills being made of reinforced concrete or not, depending the nature of the land; their upper face must be perfectly level, so as to constitute a reference plane.
  • steel cables 2 are placed at fixed intervals, each end of the cable being moored to a pile 3 driven into the ground outside the structure; directly above each sill, the rope 2 passes through a portion of tube 4 whose length is less than the width of the sill.
  • the width of the expansion joints is obtained by placing, before casting, flat bars 7 placed on the field, the upper edge of these lying at the level provided for the upper face of the slab, These flat irons are held in place by means of sup - Phillips ports 8 arranged at each intersection of expansion joints.
  • the upper edge of the flat irons 7 makes it possible to pull the casting platform with the vibrating rule, these flat irons then being removed after drying of the platform.
  • a certain quantity of hollow frustoconical dowels 9 with cylindrical base provided with a collar implanted in holes provided for this purpose in the panels 5.
  • These dowels made of plastic for example, are arranged large base downward, to allow the evacuation of water to the existing vacuum zone under the platform, without risk of obstruction which could be caused by sand or gravel.
  • the contiguous edges of the pan nea flow with the bands 5a and 5b are inclined so as to form an undercut avoiding blocking therewith; during the implementation of the formwork before pouring concrete, the joints are lined with a strip 10, of triangular section, in foam or in any other similar material, the lateral strips 5a and 5b and the battens 6 are fixed on the side rails using steel spikes.
  • a mechanical connection can be provided between the panels, in order to facilitate their extraction after their fall between the stringers after removal of the ropes.
  • This connection can be, for example, hooks hitching onto legs provided with holes, each panel then being equipped with hooks at one end, and legs at the other end.
  • FIG. 11 a section of sill 1 has been illustrated, in reinforced or unreinforced concrete, provided with notches 14 formed at regular intervals. These intervals may represent for example, by way of nonlimiting indication, approximately 50 cm.
  • the notches 14 are made when the concrete sill 1 is poured; various known means can be used for this purpose. A simple way is to use a chamfered ruler positioned in the theoretical axis of the notch; it suffices to proceed with the fitting and removal of the rule. During such an operation, it is absolutely essential to avoid tearing off the edges of the notch.
  • the notches 14 are intended to allow the passage of steel cables which constitute a frame.
  • FIG. 12 illustrates in detail, a notch 14, in particular its V-shape with rounded base.
  • a notch 14 in particular its V-shape with rounded base.
  • a prismatic shape for the notch 14; by way of example, a prismatic shape, however, in the implementation of the invention, it has been found that such a V shape with rounded base gives very good results.
  • the dimensions of such a notch 14 are substantially, both in width and in depth, of the order of 1.5 cm.
  • FIG. 13 illustrates the assembly of the various elements during the implementation of the method of the invention.
  • This sheet 16 remains in the mold; it also has an effect of strengthening the whole
  • the sheet 16 is nailed to the sill 1 using any suitable means, using nails 17, only one of which has been illustrated in the figure.
  • the sheet 16 has the effect of preventing the passage of concrete, since it covers both a sill 1 and a panel 5, and prevents the pouring of lost concrete.
  • the sheet 16 is a light sheet whose dimension can be of the order of 0.33 m x 2.55 m. It is, for example, a strip 0.4 mm thick.
  • FIG 14 there is shown an overview of several beams 1, formwork panels 5 whose width is less than the spacing of the beams 1, the ropes 2 and the sheets 16; the installation sequence is always the same: the cables 2 are inserted, the panels 5 are then placed, the sheets 16 are then passed, _ finally the concrete slab 15 is poured.
  • FIG. 15 there is illustrated in perspective a detail concerning the establishment and removal of the formwork panels; thus, more precisely in this FIG. 15, the two arrows 17 designate the direction of the sills 1, the ropes are designated by 2 and the formwork panels by 5, 18 represent straps which leave a gap between the panels 5.
  • the straps 18 are stapled to the panels 5, they will enable the said panels 5 to be removed.
  • Figures 16 and 17 illustrate schematically ment the relationship between the panels 5 and the straps 18.
  • the process which is the subject of the invention can be used in the production of all horizontal concrete slabs separated from the ground by a crawl space, and more particularly sports fields and tennis courts.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A method of constructing a hard tennis court, in which it is possible to cast in situ a thin concrete slab while permitting recovery of part of the formwork supporting means. It consists in placing formwork panels 5 on a screen of cables 2 arranged transversely to reinforced-concrete longitudinal members 1 and secured at the ends to posts 3. Plumb with each longitudinal member, each cable passes through a tube portion 4; between the tube elements and in the direction of the longitudinal members, the plates 5 rest on wooden strips 6, of thickness corresponding to the diameter of the cables plus a tube thickness; after drying of the slab, the cables and formwork elements can be removed, as well as elements for framing the expansion joints and perforations permitting drainage of rainwater. The invention is applied to the production of any horizontal slabs separated from the ground by a ventilation space, such as tennis courts. <IMAGE>

Description

La présente invention concerne un procédé de construction d'un court de tennis en dur.The present invention relates to a method of building a hard tennis court.

Il est de plus en plus connu de substituer aux courts traditionnels en terre battue des courts en dur, permettant entre autres avantages de pouvoir pratiquer ce sport durant toute l'année sans obligation que ces courts soient couverts, pour combattre les risques de gel. De plus, il s'est confirmé que ces réalisations donnaient une qualité de rebond de la balle satisfaisante. La mise en oeuvre des procédés de construction doit permettre d'obtenir une plate-forme parfaitement plane qui, bien que relativement souple, doit résister aux risques de soulèvement ou d'affaissement. C'est ainsi que certains procédés de construction consistent à réaliser un quadrillage de blocs de béton parallélépipédiques préfabriqués posés sur des dés en béton coulés dans le sol et émergeant de celui-ci, sur lesquels sont posées des poutrelles de béton armé dans le sens longitudinal du court, destinées à supporter des lambourdes en béton armé disposées dans le sens transversal. L'ensemble de cette structure reçoit des plaques de béton disposées de façon jointive, réalisant l'aire de jeu proprement dite, laquelle se trouve suspendue à quelques centimètres au-dessus du sol. Cette disposition lui assure l'élasticité et la souplesse dé-. siréeset évite toute influence de l'humidité du sol ou l'accumulation d'eau de pluie. Cependant, ce mode de construction présente l'inconvénient de nécessiter des moyens de transport importants ainsi que des moyens de levage indispensables sur le chantier, ce qui rend cette solution onéreuse, Pour y remédier, d'autres techniques consistant à couler l'ensemble de la structure sur place ont été envisagés : compte tenu de la faible hauteur de l'ouvrage par rapport au sol, on ne peut envisager de récupérer les moyens de coffrage.It is increasingly known to replace traditional clay courts with hard courts, allowing among other advantages to be able to practice this sport all year round without the obligation that these courts be covered, to combat the risks of frost. In addition, it was confirmed that these achievements gave a satisfactory rebound quality of the ball. The implementation of the construction methods must make it possible to obtain a perfectly flat platform which, although relatively flexible, must resist the risks of lifting or subsidence. Thus, certain construction methods consist in making a grid of prefabricated parallelepipedal concrete blocks placed on concrete dice poured into the ground and emerging from it, on which are laid reinforced concrete beams in the longitudinal direction. of the court, intended to support reinforced concrete joists arranged in the transverse direction. The whole of this structure receives concrete plates arranged in a contiguous manner, providing the actual playing area, which is suspended a few centimeters above the ground. This arrangement gives it elasticity and flexibility. siréeset avoids any influence of the humidity of the ground or the accumulation of rainwater. However, this construction method has the drawback of requiring significant means of transport as well as essential lifting means on the site, which makes this solution expensive. To remedy this, other techniques consisting in pouring the whole of the on-site structure has been envisaged: given the low height of the structure relative to the ground, we cannot envisage recovering the formwork means.

Le procédé de construction selon l'invention permet d'éviter ces inconvénients. Dans celui-ci, il est en effet possible de couler sur place une dalle de béton de faible épaisseur à quelques centimètres du sol, tout en permettant de récupérer une partie des moyens de support de la dite dalle après son séchage.The construction method according to the invention makes it possible to avoid these drawbacks. In it, it is indeed possible to pour on site a thin concrete slab a few centimeters from the ground, while allowing to recover part of the support means of said slab after drying.

Le procédé de construction. objet de l'invention consiste à couler un certain nombre de longrines en béton armé ou non disposéesà intervalles réguliers selon la plus grande largeur du terrain, la face supérieure des dites longrines étant parfaitement nivelée.. Transversalement à ces longrines,sont tendus à intervalles déterminés des filins d'acier bridant les faces supérieures de celles-ci. Ces filins se logent,au passage de chaque longrine, dans une portion de tube, laquelle sera ensuite noyée dans l'épaisseur de la dalle permettant de récupérer les dits filins après séchage de la dalle. Sur cette trame de filin sont posées des plaques de bois ou d'aggloméré d'épaisseur suffisante pour éviter toute déformation de planéité au moment de la coulée et du séchage de la dalle. Les bords longitudinaux de ces plaques reposent entre les filins, sur des tasseaux de bois disposés sur les longrines et dans le même sens que celles-ci : leur longueur correspond à l'écartement des joints de dilatation de la dalle; dans l'autre dimension l'écartement de ces joints équivaut à un certain nombre de plaques. La valeur du joint de dilatation est obtenue au moyen de fers plats posés sur champ, l'arête supérieure de ces fers permettant de tirer la plate-forme coulée à la règle vibrante. Des supports cruciformes placés aux intersections des joints de dilatation maintiennent des fers plats dans leur position pendant la coulée de la plate-forme, lesquels fers plats sont ensuite retirés.The construction process. object of the invention is to sink a number of reinforced concrete sills or not arranged at regular intervals along the greatest width of the ground, the upper face of said sills being perfectly leveled. Transversely to these sills, are stretched at determined intervals steel ropes clamping the upper faces thereof. These ropes are housed, at the passage of each sill, in a portion of tube, which will then be embedded in the thickness of the slab allowing to recover the said ropes after drying of the slab. On this rope frame are placed wooden or agglomerated sheets of sufficient thickness to avoid any deformation of flatness during the pouring and drying of the slab. The longitudinal edges of these plates rest between the ropes, on wooden battens arranged on the sills and in the same direction as these: their length corresponds to the spacing of the expansion joints of the slab; in the other dimension the spacing of these joints is equivalent to a certain number of plates. The value of the expansion joint is obtained by means of flat bars placed on the field, the upper edge of these bars making it possible to pull the casting platform with the vibrating rule. Cross supports placed at the intersections of the expansion joints keep the flat irons in their position during the casting of the platform, which flat irons are then removed.

Le procédé de construction de dalles de béton de faible épaisseur pour la réalisation de plates-formes situées à quelques centimètres au-dessus du sol, et plus particulièrement de plates-formes utilisées pour la pratique de sports, tels que le tennis, est caractérisé en ce qu'il consiste à maintenir un plan de coffrage indéformable à la distance désirée du sol au moyen de supports récupérables après la coulée et le séchage de la plate-forme et à réaliser simultanément les joints de dilatation nécessaires à la bonne tenue de ladite plate-forme à l'aide de moyens démontables, lesquels moyens permettent de réaliser le tirage à la règle vibrante de l'ensemble de la plate-forme,The process for constructing thin concrete slabs for the production of platforms located a few centimeters above the ground, and more particularly of platforms used for the practice of sports, such as tennis, is characterized in what it consists of maintaining a non-deformable formwork plane at the desired distance from the ground by means of recoverable supports after the casting and drying of the platform and simultaneously making the expansion joints necessary for the good performance of said platform -form using removable means, which means make it possible to draw the vibrating ruler of the whole of the platform,

Selon l'invention, le moyen de sustenter le le plan de coffrage à une certaine distance du sol est une trame de filins d'acier parallèles tendus transversalement à des longrines en béton armé ou non, disposées parallèlement sur le sol dans le sens de la largeur de l'ouvrage, lesquels filins/amarrés à chaque extrémité à des pieux enfoncés au sol en dehors de l'ouvrage, brident par leur mise en tension la face supérieure des longrines.According to the invention, the means of supporting the the formwork plane at a certain distance from the ground is a frame of parallel steel ropes stretched transversely to reinforced or unreinforced concrete beams, arranged parallel on the ground in the direction of the width of the structure, which ropes / moored at each end to piles driven into the ground outside the structure, clamping their tension on the upper face of the stringers.

Les câbles traversent à l'aplomb de chaque une portion longrine une portion de tube, laquelle est noyée dans la dalle de béton au cours de la coulée de la dalle, laissant la possibilité de coulissement du filin pour son retrait après la coulée.The cables pass directly above each sill portion a portion of tube, which is embedded in the concrete slab during the casting of the slab, leaving the possibility of sliding of the rope for its removal after casting.

Le plan de coffrage indéformable est constitué de plaques de bois ou d'aggloméré d'épaisseur suffisante pour éviter toute déformation de planéité au moment de la coulée et du séchage de la plate-forme, lesquelles plaques de bois sont posées sur la trame des filins d'acier.The non-deformable formwork plan is made up of wooden or agglomerated sheets of sufficient thickness to avoid any deformation of flatness during the casting and drying of the platform, which wooden plates are placed on the weft of the ropes of steel.

Chaque plaque constituant.le plan de coffrage repose par ses bords longitudinaux sur des tasseaux de bois placés sur des longrines et dans le sens de celles-ci intercalairement entre les éléments de tubes, l'épaisseur desdits tasseaux correspondant au diamètre du filin plus l'épaisseur du tube.Each plate constituting the formwork plane rests by its longitudinal edges on wooden battens placed on beams and in the direction thereof between the tube elements, the thickness of said battens corresponding to the diameter of the rope plus the tube thickness.

Chaque plaque constituant le plan de coffrage est constituée dans le sens de la largeur, de deux bandes latérales et d'une bande centrale, lesquelles bandes reposent sur la trame des filins d'acier, lesquelles bandes latérales sont fixées solidairement avec les tasseaux de bois placés sur les longrines et dans le sens de celles-ci intercalairement entre les éléments de tube, laquelle bande centrale/de largeur inférieure à l'écartement des lonqrines,a ses bords jointifs avec les bandes latérales en dépouille de façon à faciliter sa chute dans la zone de vide située sous la dalle après le retrait des filins en vue de leur récupération.Each plate constituting the formwork plane is made up in the width direction, of two lateral bands and of a central band, which bands rest on the frame of the steel ropes, which lateral bands are fixed integrally with the wooden battens placed on the sills and in the direction thereof between the tube elements, which central strip / width less than the spacing of the lonqrines, has its contiguous edges with the side bands in clearance so as to facilitate its fall into the void area located under the slab after the removal of the ropes for recovery.

Les plaques constituant le plan de coffrage comportent,uniformément réparties, des chevilles creuses tronconique - à embase cylindrique munies d'une collerette s'implantant dans l'épaisseur des plaques, grande base vers le bas, la hauteur de la partie conique correspondant à l'épaisseur de la dalle, lesquelles chevilles,noyées dans le béton, permettent l'évacuation des eaux de pluie vers la zone de vide existant sous la dalle.The plates constituting the formwork plane have, uniformly distributed, frustoconical hollow dowels - with cylindrical base provided with a collar implanted in the thickness of the plates, large base down, the height of the conical part corresponding to l he thickness of the slab, which pegs, embedded in the concrete, allow the evacuation of rainwater towards the vacuum zone existing under the slab.

Les plaques récupérables constituant le plan de coffrage comportent,uniformément réparties,des chevilles pleines tronconiques, s'implantant dans l'épaisseur de la plaque et maintenues par écrou, afin de réaliser au démoulage autant d'orifices permettant l'évacuation des eaux de pluie vers la zone de vide existant sous la dalle,The recoverable plates constituting the formwork plan comprise, uniformly distributed, solid frustoconical dowels, being implanted in the thickness of the plate and held by nut, in order to produce as many molds as possible for the evacuation of rainwater. towards the existing vacuum zone under the slab,

L'évacuation des eaux de pluie est assurée par des chevilles creuses tronconiques collées à espaces réguliers sur une feuille de feutre imperméable placée sur les plaques de coffrage avant coulage de la dalle.Rainwater is evacuated by hollow frustoconical dowels glued at regular intervals on a sheet of waterproof felt placed on the formwork plates before pouring the slab.

La dalle est quadrillée par des lignes de joints de dilatation orthogonaux dont l'écartement correspond à la longueur et à un multiple de la largeur des plaques de coffrage, la largeur desquels joints de dilatation étant déterminée par l'épaisseur de fers plats disposés sur champ et maintenus à leur intersection par des supports cruciformes permettant leur retrait après usage, l'arête desquels fers plats correspondant au niveau supérieur prévu de la dalle à couler constituant ainsi m plan de référence pour le tirage à la règle vibrante de l'ensemble de la dalle après sa coulée.The slab is squared by lines of orthogonal expansion joints, the spacing of which corresponds to the length and to a multiple of the width of the formwork plates, the width of which expansion joints are determined by the thickness of flat bars arranged on the field. and held at their intersection by cruciform supports allowing their removal after use, the edge of which flat irons corresponding to the planned upper level of the pouring slab thus constituting m reference plane for the drawing with the vibrating rule of the whole of the slab after its casting.

On prévoit des encoches, disposées à inter- vallesrégulierssur la longueur des longrines en béton armé ou non, dans lesquelles sont reçus des filins d'acier constituant une trame et servant à soutenir le plan de coffrage à distance du sol, lesdites encoches étant réalisées de façon à se trouer en coïncidence les unes par rapport aux autres, et à permettre à la fois un passage et un retrait aisés des filins.Notches are provided, arranged at regular intervals along the length of the reinforced or unreinforced concrete sills, in which are received steel ropes constituting a frame and serving to support the formwork plane at a distance from the ground, said notches being made of so as to be punched in coincidence with each other, and to allow both easy passage and removal of the ropes.

On réalise la mise en oeuvre des encoches au moment du coulage des longrines en béton,We carry out the implementation of the notches at the time of the pouring of the concrete stringers,

Les encoches sur les longrines présentent une forme en V à base arrondie,The notches on the sills have a V shape with a rounded base,

Après la mise en oeuvre des longrines pourvues d'encoches recevant la trame de filins, on interpose,avant l'opération de mise en place du plan de coffrage constitué de panneaux, une tôle prenant appui sur les longrines dont le rôle est de permettre le retrait des filins après le séchage de la dalle de béton.After the implementation of the beams provided with notches receiving the frame of ropes, there is interposed, before the operation of setting up the formwork plane consisting of panels, a sheet metal bearing on the beams whose role is to allow the removal of the ropes after the concrete slab has dried.

La tôle est une tôle légère du type feuillard, ladite tôle étant noyée dans l'ensemble lors du démoulage de la dalle de béton.The sheet is a light sheet of the strip type, said sheet being embedded in the assembly during the demolding of the concrete slab.

La tôle retient les panneaux de coffrage,et on prévoit la mise en place de clous pour fixer ladite tôle aux longrines.The sheet retains the formwork panels, and provision is made for the installation of nails for fixing said sheet to the beams.

Pour la mise en place des plaques ou panneaux, on dispose des sangles parallèles laissant un intervalle entre les panneaux,For the positioning of the plates or panels, there are parallel straps leaving a gap between the panels,

Après le séchage de la dalle de béton, pour décoffrer, on retire les filins, ce qui provoque la chute d'une ligne de panneaux,lesquels sont récupérés par traction sur les sangles qui les relient,After the concrete slab has dried, to remove formwork, the ropes are removed, which causes fall of a line of panels, which are recovered by traction on the straps which connect them,

Les sangles sont agrafées sur les panneaux.The straps are stapled to the panels.

Les sangles, au moment du rapprochement des panneaux, présentent une creusure,The straps, when the panels are brought together, have a recess,

Selon une variante de réalisation de la présente invention, on a trouvé que l'on pouvait pratiquer,à intervalles réguliers sur les longrines, des encoches destinées à recevoir les filins, évitant ainsi la prévision de tubes noyés ensuite dans l'épaisseur de la dalle.According to an alternative embodiment of the present invention, it has been found that it was possible to practice, at regular intervals on the sleepers, notches intended to receive the ropes, thus avoiding the provision of tubes then embedded in the thickness of the slab .

De même, on a trouvé que l'insertion d'une tôle légère retenant les panneaux, et qui est clouée sur les longrines, constituait un moyen avantageux de substitution des tasseaux,Likewise, it has been found that the insertion of a light plate retaining the panels, and which is nailed to the sills, constituted an advantageous means of replacing the cleats,

Enfin, comme autre caractéristique, il convient d'indiquer la mise en place de sangles agrafées aux plaques ou panneaux et permettant leur retrait.Finally, as another characteristic, it is advisable to indicate the installation of straps stapled to the plates or panels and allowing their removal.

Les dessins annexés illustrent, à titre d'exemple, un mode de mise en oeuvre du procédé conforme à la présente invention, Ceux-ci représentent :

  • - en figure 1, une vue en perspective cavalière partielle de la mise en place des panneaux supports sur les câbles tendus transversalement aux longrines,
  • - en figure 2, une coupe transversale correspondant à la figure 1,
  • - en figure 3, une vue de dessus correspondant à la figure 2,
  • - en figure 4, une vue de dessus montrant le détail des fers plats dont l'enlèvement après coulée réalise les joints de dilatation des dalles,
  • - en figure 5, une vue en perspective cavalière d'un support cruciforme servant au positionnement des fers plats représentés en figure 4,
  • - en figures 6 et 7, le détail en élévation coupe et en vue de dessus du positionnement d'un support cruciforme,
  • - en figures 8, 9 et 10, différents types de moyens incorporés au coffrage pour obtenir la perforation de la dalle en vue de l'évacuation des eaux de pluie,
  • - en figure 11, une vue de côté,prise dans le sens longitudinal,d'une longrine en béton armé ou non, pourvue d'encoches pour la mise en place de filins d'acier,
  • - en figure 12, une vue de détail de la figure 11 montrant mieux la forme de l'encoche,
  • - en figure 13, une coupe transversale illustrait la disposition de divers éléments pour la mise en oeuvre du procédé de l'invention,
  • - en figure 14, selon une coupe transversale, l'emplacement respectif des éléments constitutifs, notamment des panneaux de coffrage de largeur inférieure à l'écartement des longrines,
  • - en figure 15, en perspective, l'association entre les panneaux de coffrage et les sangles destinées à leur retrait après la coulée d'une dalle,
  • - en figure 16, la façon selon laquelle les sangles recouvrent les panneaux en vue d'une opération de pliage desdits panneaux,
  • - en figure 17, une vue de côté de plusieurs panneaux et des sangles agrafées sur ces panneaux, montrant la creusure des sangles au moment du rapprochement des panneaux
The accompanying drawings illustrate, by way of example, an embodiment of the method according to the present invention. These represent:
  • in FIG. 1, a partial perspective view of the positioning of the support panels on the cables stretched transversely to the stringers,
  • in FIG. 2, a cross section corresponding to FIG. 1,
  • in FIG. 3, a top view corresponding to FIG. 2,
  • - in FIG. 4, a top view showing the detail of the flat irons, the removal of which after casting produces the expansion joints of the slabs,
  • in FIG. 5, a perspective view of a cruciform support used for positioning the flat bars shown in FIG. 4,
  • - in Figures 6 and 7, the detail in sectional elevation and in top view of the positioning of a cruciform support,
  • - in FIGS. 8, 9 and 10, different types of means incorporated into the formwork to obtain the perforation of the slab for the evacuation of rainwater,
  • - in FIG. 11, a side view, taken in the longitudinal direction, of a reinforced concrete sill or not, provided with notches for the installation of steel cables,
  • in FIG. 12, a detailed view of FIG. 11 better showing the shape of the notch,
  • in FIG. 13, a cross section illustrates the arrangement of various elements for implementing the method of the invention,
  • in FIG. 14, in a cross section, the respective location of the constituent elements, in particular shuttering panels of width less than the spacing of the stringers,
  • in FIG. 15, in perspective, the association between the formwork panels and the straps intended for their removal after the casting of a slab,
  • - in FIG. 16, the way in which the straps cover the panels for a folding operation of said panels,
  • - In Figure 17, a side view of several panels and straps stapled on these panels, showing the recess of the straps when the panels are brought together

La mise en oeuvre du procédé selon l'invention consiste à couler,sur un terrain parfaitement nivelé, des longrines 1 de longueur correspondant à la largeur du court, espacées d'environ soixante quinze centimètres, ces longrines étant en béton armé ou non, selon la nature du terrain; leur face supérieure doit être parfaitement nivelée, de façon à constituer un plan de référence. Transversalement à ces longrines, il est procédé à la mise en place de filins d'acier 2, à intervalles déterminés, chaque extrémité de filin étant amarrée à un pieu 3 enfoncé dans le sol à l'extérieur de l'ouvrage; à l'aplomb de chaque longrine, le filin 2 traverse une portion de tube 4 dont la longueur est inférieure à la largeur de la longrine. La mise en tension du filin bride celui-ci sur les longrines, et provoque l'immobilisation des tubes 4, lesquels resteront noyés par la suite dans l'épaisseur de la dalle de béton, permettant ainsi la récupération des filins après l'achèvement de l'ouvrage. Sur la trame de filins ainsi constituée, sont placées des plaques de bois ou d'aggloméré 5, d'épaisseur suffisante pour réaliser un plan de coffrage indéformable, assurant une parfaite planéité de la dalle au moment de la coulée et du séchage de celle-ci. Entre les éléments de tube 4, et dans le sens des longrines, les plaques 5 reposent sur des tasseaux de bois 6, d'épaisseur correspondant au diamètre des filins plus une épaisseur de tube. Sur les plaques 5, est disposée une armature en treillis soudé. La largeur des joints de dilatation est obtenue par mise en place,avant la coulée, de fers plats 7 posés sur champ, l'arête supérieure de ceux-ci se situant au niveau prévu de la face supérieure de la dalle, Ces fers plats sont maintenus en place au moyen de sup- ports cruciformes 8, disposés à chaque intersection des joints de dilatation. L'arête supérieure des fers plats 7 permet de tirer la plate-forme coulée à la règle vibrante, ces fers plats étant ensuite enlevés après séchage de la plate-forme.The implementation of the method according to the invention consists in pouring, on perfectly leveled ground, sills 1 of length corresponding to the width of the court, spaced about seventy five centimeters, these sills being made of reinforced concrete or not, depending the nature of the land; their upper face must be perfectly level, so as to constitute a reference plane. Crosswise to these sills, steel cables 2 are placed at fixed intervals, each end of the cable being moored to a pile 3 driven into the ground outside the structure; directly above each sill, the rope 2 passes through a portion of tube 4 whose length is less than the width of the sill. The tensioning of the rope bridles it on the sills, and causes the immobilization of the tubes 4, which will remain embedded thereafter in the thickness of the concrete slab, thus allowing the recovery of the ropes after the completion of the book. On the frame of ropes thus formed, are placed wooden or chipboard 5, of sufficient thickness to produce a non-deformable formwork plane, ensuring perfect flatness of the slab at the time of pouring and drying thereof. this. Between the tube elements 4, and in the direction of the beams, the plates 5 rest on wooden battens 6, of thickness corresponding to the diameter of the cables plus a thickness of tube. On the plates 5, a welded mesh frame is arranged. The width of the expansion joints is obtained by placing, before casting, flat bars 7 placed on the field, the upper edge of these lying at the level provided for the upper face of the slab, These flat irons are held in place by means of sup - Phillips ports 8 arranged at each intersection of expansion joints. The upper edge of the flat irons 7 makes it possible to pull the casting platform with the vibrating rule, these flat irons then being removed after drying of the platform.

Pour éviter toute stagnation des eaux de pluie sur le court, et permettre son séchage rapide, il peut être incorporé,au moment de la coulée de la dalle de béton, une certaine quantité de chevilles creuses tronconiques 9, à embase cylindrique munie d'une collerette s'implantant dans des orifices prévus à cet effet dans les panneaux 5. Ces chevilles, réalisées en matière plastique par exemple, sont disposées grande base vers le bas, afin de permettre l'évacuation de l'eau vers la zone de vide existant sous la plate-forme, sans risque d'obstruction qui pourrait être provoquée par le sable ou le gravier.To avoid any stagnation of rainwater on the court, and allow its rapid drying, it can be incorporated, at the time of the pouring of the concrete slab, a certain quantity of hollow frustoconical dowels 9, with cylindrical base provided with a collar implanted in holes provided for this purpose in the panels 5. These dowels, made of plastic for example, are arranged large base downward, to allow the evacuation of water to the existing vacuum zone under the platform, without risk of obstruction which could be caused by sand or gravel.

L'invention ne se limite pas au mode de réalisation de ses différentes parties spécialement indiquées, mais elle admet toutes les variantes possibles, à condition que celles-ci ne soient pas en contradiction avec l'objet de chacune des revendications annexées à la présente description.The invention is not limited to the embodiment of its various specially indicated parts, but it admits all possible variants, provided that these are not in contradiction with the subject of each of the claims appended to this description .

C'est ainsi qu'il peut être envisagé, sans sortir du cadre de l'invention, de permettre la récupération des panneaux de coffrage 5; dans ce cas, ceux-ci sont limités en largeur à deux bandes laté- rales 5a et 5b, entre lesquelles le panneau repose, toujours soutenu par les filins 2, Cette largeur est inférieure à l'écartement des longrines, de façon à pouvoir extraire les panneaux ùne fois que ceux-ci seront tombés après le retrait des filins. Pour faciliter leur chute, les bords jointifs des pan- neaux avec les bandes 5a et 5b sont inclinés de façon à constituer une dépouille évitant tout blocage avec celles-ci; à la mise en oeuvre du coffrage avant coulée de béton, les joints sont garnis d'une bande 10, de section triangulaire, en mousse ou en tout autre matériau similaire, Les bandes latérales 5a et 5b et les tasseaux 6 sont fixés sur les longrines au moyen de pointes d'acier. Une liaison mécanique peut être prévue entre les panneaux,de fapn à en faciliter l'extraction après leur chute entre les longrines après enlèvement des filins. Cette liaison peut être, par exemple, des crochets s'attelant sur des pattes munies de trous, chaque panneau étant alors équipé de crochets à une extrémité, et de pattes à l'autre extrémité. L'évacuation des eaux de pluie est alors assurée dans ce cas au moyen de chevilles creuses tronconiques 11, dont la base est munie d'une collerette permettant leur fixation par collage sur une feuille 12 de feutre imperméable,ou de bidine, déposée sur les panneaux d'aggloméré avant coulage de la dalle, Il peut être également envisagé d'implanter dans les panneaux 5 des chevilles métalliques pleines, coniques 13, fixées par écrou sur lesdits panneaux et récupérables avec ceux-ci au moment du décoffrage,Thus it can be envisaged, without departing from the scope of the invention, to allow the recovery of formwork panels 5; in this case, these are limited in width to two lateral strips 5a and 5b, between which the panel rests, still supported by the ropes 2, this width is less than the spacing of the struts, so as to be able to extract the panels once they have fallen after the ropes have been removed. For facilitate their fall, the contiguous edges of the pan nea flow with the bands 5a and 5b are inclined so as to form an undercut avoiding blocking therewith; during the implementation of the formwork before pouring concrete, the joints are lined with a strip 10, of triangular section, in foam or in any other similar material, the lateral strips 5a and 5b and the battens 6 are fixed on the side rails using steel spikes. A mechanical connection can be provided between the panels, in order to facilitate their extraction after their fall between the stringers after removal of the ropes. This connection can be, for example, hooks hitching onto legs provided with holes, each panel then being equipped with hooks at one end, and legs at the other end. The evacuation of rainwater is then ensured in this case by means of frustoconical hollow pegs 11, the base of which is provided with a collar allowing their fixing by gluing on a sheet 12 of waterproof felt, or of bidine, deposited on the chipboard before pouring the slab, It can also be envisaged to install in the panels 5 solid, conical metal dowels 13, fixed by nut on said panels and recoverable with them at the time of formwork,

Sur la figure 11, on a illustré un tronçon de longrine 1, en béton armé ou non, pourvu d'encoches 14 ménagées à des intervalles réguliers. Ces intervalles peuvent représenter par exemple, à titre indicatif et non limitatif, 50 cm environ, Les encoches 14 sont réalisées au moment du coulage de la longrine 1 en béton; à cet effet,on peut utiliser divers moyens connus. Un moyen simple consiste à utiliser une règle chanfreinée positionnée dans l'axe théorique de l'encoche; il suffit ainsi de procéder à la mise en place et à l'enlèvement convenable de la règle. Lors d'une telle opération, il faut absolument éviter d'arracher les bords de l'encoche.In FIG. 11, a section of sill 1 has been illustrated, in reinforced or unreinforced concrete, provided with notches 14 formed at regular intervals. These intervals may represent for example, by way of nonlimiting indication, approximately 50 cm. The notches 14 are made when the concrete sill 1 is poured; various known means can be used for this purpose. A simple way is to use a chamfered ruler positioned in the theoretical axis of the notch; it suffices to proceed with the fitting and removal of the rule. During such an operation, it is absolutely essential to avoid tearing off the edges of the notch.

Les encoches 14 ont pour-objet de permettre le passage des filins d'acier qui constituent une trame.The notches 14 are intended to allow the passage of steel cables which constitute a frame.

La figure 12 illustre en détail, une encoche 14, notamment sa forme en V à base arrondie, Selon l'invention, on peut envisager d'autres formes géométriques pour l'encoche 14; à titre d'exemple, une forme prismatique, toutefois,dans la mise en oeuvre de l'invention, on a trouvé qu'une telle forme en V à base arrondie donne de très bons résultats. Les dimensions d'une telle encoche 14 sont sensiblement, tant en largeur qu'en profondeur, de l'ordre de 1, 5 cm.FIG. 12 illustrates in detail, a notch 14, in particular its V-shape with rounded base. According to the invention, it is possible to envisage other geometric shapes for the notch 14; by way of example, a prismatic shape, however, in the implementation of the invention, it has been found that such a V shape with rounded base gives very good results. The dimensions of such a notch 14 are substantially, both in width and in depth, of the order of 1.5 cm.

La figure 13 illustre l'assemblage des divers éléments lors de la mise en oeuvre du procédé de l'invention.FIG. 13 illustrates the assembly of the various elements during the implementation of the method of the invention.

Sur cette figure, on voit une longine 1 sur laquelle est posée un filin 2. Sur chaque filin 2, dont l'ensemble constitue une trame, on place des plaques (bois ou aggloméré) ou panneaux de coffrage 5, dont l'épaisseur est suffisante pour réaliser un plan de coffrage indéformable assurant une parfaite planéité de la dalle en béton 15, au moment de la coulée,et du séchage de celle-ci.In this figure, we see a longine 1 on which a rope 2 is placed. On each rope 2, the whole of which constitutes a frame, we place plates (wood or chipboard) or formwork panels 5, the thickness of which is sufficient to produce a non-deformable formwork plane ensuring perfect flatness of the concrete slab 15, at the time of casting, and of drying thereof.

Dans cette forme de réalisation, on prévoit l'incorporation d'une tôle légère 16, qui déborde sur les panneaux de coffrage 5 permettant de retirer les filins 2 après séchage de la dalle de béton.In this embodiment, provision is made for the incorporation of a light sheet 16, which overflows on the formwork panels 5 making it possible to remove the ropes 2 after drying of the concrete slab.

Cette tôle 16 reste au démoulage; elle a également un effet de renforcement de l'ensemble,This sheet 16 remains in the mold; it also has an effect of strengthening the whole,

Pour assurer une mise en place parfaite de la tôle 16, cette dernière est clouée sur la longrine 1 à l'aide de tout moyen convenable, en utilisant des clous 17, dont un seul a été illustré sur la figure.To ensure perfect positioning of the sheet 16, the latter is nailed to the sill 1 using any suitable means, using nails 17, only one of which has been illustrated in the figure.

La tôle 16 a pour effet d'empêcher le passage du béton, car elle recouvre à la fois une longrine 1 et un panneau 5, et empêche la coulée de béton perdu.The sheet 16 has the effect of preventing the passage of concrete, since it covers both a sill 1 and a panel 5, and prevents the pouring of lost concrete.

La tôle 16 est une tôle légère dont la dimension peut être de l'ordre de 0,33 m x 2,55 m, Il s'agit, par exemple, d'un feuillard de 0,4 mm d'épaisseur.The sheet 16 is a light sheet whose dimension can be of the order of 0.33 m x 2.55 m. It is, for example, a strip 0.4 mm thick.

Sur la figure 14, on a montré une vue d'ensemble de plusieurs longrines 1, des panneaux de coffrage 5 dont la largeur est inférieure à l'écartement des longrines 1, des filins 2 et des tôles 16; la séquence de mise en place est toujours la même : on insère les filins 2, on pose ensuite les panneaux 5, on passe alors les tôles 16,_on effectue enfin la coulée de la dalle de béton 15.In Figure 14, there is shown an overview of several beams 1, formwork panels 5 whose width is less than the spacing of the beams 1, the ropes 2 and the sheets 16; the installation sequence is always the same: the cables 2 are inserted, the panels 5 are then placed, the sheets 16 are then passed, _ finally the concrete slab 15 is poured.

Selon la figure 15, on a illustré en perspective un détail concernant la mise en place et le retrait des panneaux de coffrage; ainsi, plus précisément sur cette figure 15, les deux flèches 17 désignent le sens des longrines 1, les filins sont désignés par 2 et les panneaux de coffrage par 5, 18 représente des sangles qui laissent un intervalle entre les panneaux 5. Les sangles 18 sont agrafées sur les panneaux 5, elles permettront de retirer ai­ sément lesdits panneaux 5.According to Figure 15, there is illustrated in perspective a detail concerning the establishment and removal of the formwork panels; thus, more precisely in this FIG. 15, the two arrows 17 designate the direction of the sills 1, the ropes are designated by 2 and the formwork panels by 5, 18 represent straps which leave a gap between the panels 5. The straps 18 are stapled to the panels 5, they will enable the said panels 5 to be removed.

Les figures 16 et 17 illustrent schématiquement la relation entre les panneaux 5 et les sangles 18.Figures 16 and 17 illustrate schematically ment the relationship between the panels 5 and the straps 18.

En position de coffrage, les panneaux sont bien évidemment rapprochés; il en résulte la formation de boucles ou creusures des sangles, dont une, 19,a été illustrée sur la figure 17.In the formwork position, the panels are obviously close together; this results in the formation of loops or recesses in the straps, one of which, 19, has been illustrated in FIG. 17.

Après le séchage de la dalle de béton, pour décoffrer, on retire les filins 2, ce qui a pour effet de provoquer la chute d'une ligne de panneaux 5, lesquels sont récupérés par traction sur les sangles 18 qui les relient.After the concrete slab has dried, to remove formwork, the ropes 2 are removed, which has the effect of causing the fall of a line of panels 5, which are recovered by traction on the straps 18 which connect them.

Le pliage obtenu est indiqué sur la figure 16; il s'agit là d'un mode préféré selon l'invention.The folding obtained is shown in Figure 16; this is a preferred mode according to the invention.

Le procédé objet de l'invention peut être utilisé dans la réalisation de toutes dalles horizontales en béton séparées du sol par un vide sanitaire, et plus particulièrement des terrains de sport et courts de tennis.The process which is the subject of the invention can be used in the production of all horizontal concrete slabs separated from the ground by a crawl space, and more particularly sports fields and tennis courts.

Claims (11)

1/ Procédé de construction de dalles de béton de faible épaisseur, pour la réalisation de plates-formes situées à quelques centimètres au-dessus du sol, et plus particulièrement de plates-formes utilisées pour la pratique de sports, tels que le tennis, caractérisé en ce qu'il consiste à maintenir un plan de coffrage indéformable à la distance désirée du sol, au moyen de supports récupérables après la coulée et le séchage de la plate-forme, et à réaliser simultanément les joints de dilatation nécessaires à la bonne tenue de ladite plate-forme à l'aide de moyens démontables, lesquels moyens permettent de réaliser le tirage à la règle vibrante de l'ensemble de la plate-forme.1 / Method for constructing thin concrete slabs, for the production of platforms located a few centimeters above the ground, and more particularly of platforms used for the practice of sports, such as tennis, characterized in that it consists in maintaining a non-deformable formwork plane at the desired distance from the ground, by means of supports recoverable after the casting and the drying of the platform, and in simultaneously producing the expansion joints necessary for the good performance of said platform by means of removable means, which means make it possible to carry out the drawing with the vibrating rule of the whole of the platform. 2/ Procédé selon la revendication 1, caractérisé en ce que le moyen de sustenter le plan de coffrage à une certaine distance du sol est une trame de filins d'acier parallèles tendus transversalement à des longrines en béton armé ou non, disposées parallèlement sur le sol dans le sens de la largeur de l'ouvrage, lesquels filins;amarrés à chaque extrémité à des pieux enfoncés au sol en dehors de l'ouvrage, brident par leur mise en tension la face supérieure des longrines.2 / A method according to claim 1, characterized in that the means of supporting the formwork plane at a certain distance from the ground is a frame of parallel steel ropes stretched transversely to beams of reinforced concrete or not, arranged parallel on the ground across the width of the structure, which ropes; moored at each end to stakes driven into the ground outside the structure, constrain by their tensioning the upper face of the stringers. 3/ Procédé selon les revendications 1 et 2, caractérisé en ce que les câbles traversent à l'aplomb de chaque longrine une encoche et/ou une portion de tube, laquelle est noyée dans la dalle de béton au cours de la coulée de la dalle, laissant la possibilité de coulissement du filin pour son retrait après la coulée.3 / A method according to claims 1 and 2, characterized in that the cables pass directly over each sill a notch and / or a portion of tube, which is embedded in the concrete slab during the casting of the slab , leaving the possibility of sliding the rope for its removal after casting. 4/ Procédé selon les revendications 1, 2 et 3, prises ensemble, caractérisé en ce que le plan de coffrage indéformable est constitué de plaques de bois ou d'aggloméré d'épaisseur suffisante pour éviter toute déformation de planéité au moment de la coulée et du séchage de la plate-forme, lesquelles plaques de bois sont posées sur la trame des filins d'acier.4 / A method according to claims 1, 2 and 3, taken together, characterized in that the plane of non-deformable formwork consists of wooden or agglomerated sheets of sufficient thickness to avoid any deformation of flatness during the casting and drying of the platform, which wooden plates are placed on the frame of steel ropes . 5/ Procédé selon la revendication 4, caractérisé en ce que chaque plaque constituant le plan de coffrage repose,par ses bords longitudinaux, sur des tasseaux de bois et/ou sur une tôle placés sur les longrines et dans le sens de celles-ci intercalairement entre les éléments de tubes, l'épaisseur desdits tasseaux correspondant au diamètre du filin plus l'épaisseur du tube.5 / A method according to claim 4, characterized in that each plate constituting the formwork plane rests, by its longitudinal edges, on wooden battens and / or on a sheet placed on the sills and in the direction thereof between the elements of tubes, the thickness of said battens corresponding to the diameter of the rope plus the thickness of the tube. 6/ Procédé selon la revendication 4, caractérisé en ce que chaque plaque constituant le plan de coffrage est constituée dans le sens de la largeur, de deux bandes latérales et d'une bande centrale, lesquelles bandes reposent sur la trame des filins d'acier, lesquelles bandes latérales sont fixées solidairement avec les tasseaux de bois placés sur les longrines et dans le sens de celles-ci intercalairement entre les éléments de tube, laquelle bande centrale, de largeur inférieure à l'écartement des longrines, a ses bords jointifs avec les bandes latérales en dépouille, de façon à faciliter sa chute dans la zone de vide située sous la dalle après le retrait des filins en vue de leur récupération, et en ce que des sangles agrafées aux plaques sont prévues pour leur retrait.6 / A method according to claim 4, characterized in that each plate constituting the formwork plane is formed in the direction of the width, two lateral strips and a central strip, which strips rest on the frame of steel ropes , which lateral bands are fixed integrally with the wooden battens placed on the sills and in the direction of these interposed between the tube elements, which central strip, of width less than the spacing of the sills, has its edges joined with the lateral strips in clearance, so as to facilitate its fall into the vacuum zone located under the slab after the removal of the ropes for recovery, and in that straps stapled to the plates are provided for their removal. 7/ Procédé selon les revendications 4 et 5, caractérisé en ce que les plaques constituant le plan de coffrage comportent,uniformément réparties, des chevilles creuses tronconiques à embase cylindrique munie d'une collerette s'implantant dans l'épaisseur des plaques, grande base vers le bas, la hauteur de la partie conique correspondant à l'épaisseur de la dalle, lesquelles chevilles,noyées dans le béton,permettent l'évacuation des eaux de pluie vers la zone de vide existant sous la dalle.7 / A method according to claims 4 and 5, characterized in that the plates constituting the formwork plane comprise, uniformly distributed, frustoconical hollow dowels with cylindrical base drique provided with a collar implanted in the thickness of the plates, large base downwards, the height of the conical part corresponding to the thickness of the slab, which pegs, embedded in the concrete, allow the evacuation of rainwater to the existing vacuum zone under the slab. 8/ Procédé selon les revendications 4 et 6, caractérisé en ce que les plaques récupérables constituant le plan de coffrage comportent,uniformément réparties, des chevilles pleines tronconiques, s'implantant dans l'épaisseur de la plaque et maintenues par écrou, afin de réaliser au démoulage autant d'orifices permettant l'évacuation des eaux de pluie vers la zone de vide existant sous la dalle.8 / A method according to claims 4 and 6, characterized in that the recoverable plates constituting the formwork plane have, uniformly distributed, solid frustoconical dowels, implanting in the thickness of the plate and held by nut, in order to achieve during demoulding as many orifices allowing the evacuation of rainwater towards the vacuum zone existing under the slab. 9/ Procédé selon les revendications 4 et 6, caractérisé en ce que l'évacuation des eaux de pluie est assurée par des chevilles creuses tronconiques, collées à espaces réguliers sur une feuille de feutre imperméable placée sur les plaques de coffrage avant coulage de la dalle,9 / A method according to claims 4 and 6, characterized in that the evacuation of rainwater is provided by frustoconical hollow pegs, glued at regular intervals on a sheet of waterproof felt placed on the formwork plates before pouring the slab , 10/ Procédé selon les revendications 1 et 4, caractérisé en ce que la dalle est quadrillée par des lignes de joints de dilatation orthogonaux, dont l'écartement correspond à la longueur et à un multiple de la largeur des plaques de coffrage, la largeur desquels joints de dilatation est déterminée par l'épaisseur de fers plats disposés sur champ et maintenus à leur intersection par des supports cruciformes permettant leur retrait après usage, l'arête desquels fers plats correspondant au niveau supérieur prévu de la dalle à couler constituant ainsi un plan de référence pour le tirage à la règle vibrante de l'ensemble de la dalle après sa coulée.10 / A method according to claims 1 and 4, characterized in that the slab is squared by lines of orthogonal expansion joints, the spacing of which corresponds to the length and to a multiple of the width of the formwork plates, the width of which expansion joints is determined by the thickness of flat bars arranged on the field and held at their intersection by cruciform supports allowing their removal after use, the edge of which flat bars corresponding to the planned upper level of the slab to be cast thus constituting a plane of reference for the drawing with the vibrating rule of the whole of the slab after its casting. 11/ Aire de jeu obtenue, notamment court de tennis, par la mise en oeuvre du procédé selon l'une quelconque des revendications 1 à 10.11 / Playground obtained, in particular tennis court, by the implementation of the method according to any one of claims 1 to 10.
EP79400252A 1978-04-21 1979-04-19 Method of constructing playgrounds and products issuing from it Withdrawn EP0005117A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR7813452A FR2423603A1 (en) 1978-04-21 1978-04-21 PROCESS FOR CONSTRUCTION OF TENNIS COURTS AND PRODUCTS THEREOF
FR7813452 1978-04-21

Publications (1)

Publication Number Publication Date
EP0005117A1 true EP0005117A1 (en) 1979-10-31

Family

ID=9207963

Family Applications (1)

Application Number Title Priority Date Filing Date
EP79400252A Withdrawn EP0005117A1 (en) 1978-04-21 1979-04-19 Method of constructing playgrounds and products issuing from it

Country Status (3)

Country Link
EP (1) EP0005117A1 (en)
ES (1) ES479717A1 (en)
FR (1) FR2423603A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418415A (en) * 2010-09-28 2012-04-18 杨峰 Short-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102418417A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2454494A2 (en) * 1979-04-19 1980-11-14 Moreau Armand Construction procedure for thin concrete slabs for play areas - has slabs cast slightly above ground
FR2807078B1 (en) 2000-03-29 2002-10-18 Envirosport SPORTS FLOORING, ESPECIALLY FOR TENNIS COURTS AND OTHER BALL GAMES

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR555042A (en) * 1922-08-11 1923-06-21 Suspension device for supporting formwork for beams, ceilings and similar constructions in reinforced concrete
FR965694A (en) * 1950-09-19
FR1109366A (en) * 1954-09-15 1956-01-25 Improvements to the construction processes of waterproof coatings in poured concrete, in particular for terraces and exterior pavements, as well as to coatings of this kind

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR965694A (en) * 1950-09-19
FR555042A (en) * 1922-08-11 1923-06-21 Suspension device for supporting formwork for beams, ceilings and similar constructions in reinforced concrete
FR1109366A (en) * 1954-09-15 1956-01-25 Improvements to the construction processes of waterproof coatings in poured concrete, in particular for terraces and exterior pavements, as well as to coatings of this kind

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102418415A (en) * 2010-09-28 2012-04-18 杨峰 Short-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102418417A (en) * 2010-09-28 2012-04-18 杨峰 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102418415B (en) * 2010-09-28 2014-08-13 杨峰 Short-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102418417B (en) * 2010-09-28 2014-08-20 杨峰 Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system

Also Published As

Publication number Publication date
ES479717A1 (en) 1980-01-01
FR2423603B1 (en) 1981-04-10
FR2423603A1 (en) 1979-11-16

Similar Documents

Publication Publication Date Title
FR2610661A1 (en) ARCHED STRUCTURE FOR PROTECTION AGAINST SNOW
FR2609295A1 (en) METHOD FOR CONSTRUCTING DRAINAGE PLANTS OR THE LIKE, AND SUPPORT DEVICE AND BUFFER BLOCK FOR ITS IMPLEMENTATION
FR2564873A1 (en) WATERPROOFING METHOD AND DEVICE FOR THE PROTECTION AGAINST WATER OF INFILTRATION OF DISCHARGES
CH626131A5 (en)
FR2566031A1 (en) METHOD AND APPARATUS FOR PRODUCING A RIGID SLAB FOR CARRYING A CONSTRUCTION
FR2897378A1 (en) Casting concrete swimming pool walls uses formwork made up of rigid panels held together by rods which fit into anchoring heads and assembly heads
EP0142448B1 (en) Sports ground, particularly a tennis court or minitennis court constructed by means of movable panels
EP0005117A1 (en) Method of constructing playgrounds and products issuing from it
FR3006700A1 (en) METHOD AND DEVICE FOR MANUFACTURING BANCH WALLS USING REUSABLE FORMWORK AND REINFORCING REINFORCEMENT
FR2613394A1 (en) SEALING WALLS FOR COMPACT CONCRETE HYDRAULIC WORKS AND METHOD OF CONSTRUCTION THEREOF
FR2818998A1 (en) PROCESS FOR THE PRODUCTION OF CIVIL ENGINEERING WORKS, AND PARTICULARLY POOLS OR WATER-RETAINING PONDS, AND MEANS FOR IMPLEMENTING SAME
FR3006701A1 (en) METHOD AND DEVICE FOR MANUFACTURING BANCH WALLS USING A REUSABLE FORMWORK AND COMPRISING AT LEAST ONE ADJUSTED FRAME
FR2618345A1 (en) Method for making lines on open-air playing surfaces and material for implementing the method
EP0360682B1 (en) Expansion joint for a concrete pavement
CH434335A (en) Method of construction of a passage under track and installation for the implementation of this method
WO2009087321A1 (en) Prefabricated element for creating a reinforced concrete slab and slab thus created
FR2479298A1 (en) Playing surface for sports - is constructed by placing prefabricated tiles onto array of supports cast in situ
FR2600359A1 (en) Device for facilitating the masoning of construction elements
WO2012019959A1 (en) Formwork system for reinforced-concrete swimming pool and method for mounting same
US745585A (en) Concrete-mold.
EP1832696A1 (en) Formwork element for concrete and use for a pool formwork
CA1189295A (en) Precast concrete slab with steel beam
FR2530705A1 (en) Structural elements especially for the prefabrication of floors.
FR2656885A1 (en) Improved coating for protecting soil subject to erosion, and implementation method
JP3054101U (en) Paving wood block

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE CH DE GB IT NL

ITCL It: translation for ep claims filed

Representative=s name: STUDIO TORTA SOCIETA' SEMPLICE

17P Request for examination filed
DET De: translation of patent claims
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 19810317