CN103422667B - Double-plate prefabricated superposed wall supporting system - Google Patents

Double-plate prefabricated superposed wall supporting system Download PDF

Info

Publication number
CN103422667B
CN103422667B CN201310403195.XA CN201310403195A CN103422667B CN 103422667 B CN103422667 B CN 103422667B CN 201310403195 A CN201310403195 A CN 201310403195A CN 103422667 B CN103422667 B CN 103422667B
Authority
CN
China
Prior art keywords
support
bolts
threaded
wall
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310403195.XA
Other languages
Chinese (zh)
Other versions
CN103422667A (en
Inventor
叶燕华
薛洲海
孙锐
宋妍
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201310403195.XA priority Critical patent/CN103422667B/en
Publication of CN103422667A publication Critical patent/CN103422667A/en
Application granted granted Critical
Publication of CN103422667B publication Critical patent/CN103422667B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a double-plate prefabricated superposed wall supporting system which comprises an embedded internal thread circular tube, a steel bar truss, a support, a bolt, a nut, a water stop screw rod, an inclined strut, a vertical support and a transverse support. The invention avoids the die expansion damage of the precast slab in the pouring process, has the advantages of simplicity and convenience in construction, flexible disassembly and environmental protection.

Description

一种双板预制叠合墙体支护体系A double-slab prefabricated laminated wall support system

技术领域technical field

本发明涉及一种双板预制叠合墙体支护方式,属于施工技术领域。The invention relates to a double-slab prefabricated laminated wall support method, which belongs to the technical field of construction.

背景技术Background technique

近年来,叠合结构体系在国内得到越来越广泛的应用。叠合结构体系具有工业化程度高,现场施工速度快等优点。施工中,空腔内浇筑混凝土,由于人工振捣,以及混凝土本身侧向压力较大,往往会造成预制板胀模。一旦发生胀模,预制墙板将开裂,墙板搭接处将脱开,补救措施困难且耗时。因此防止预制板胀模破坏,建立完整的预制板支护体系具有重大的工程意义。In recent years, the superimposed structure system has been more and more widely used in China. The superimposed structure system has the advantages of high degree of industrialization and fast on-site construction. During construction, when concrete is poured in the cavity, due to manual vibration and the large lateral pressure of the concrete itself, the prefabricated slab will often expand. Once expansion occurs, the precast wall panels will crack and the panel laps will come off, making remedial measures difficult and time-consuming. Therefore, it is of great engineering significance to prevent the expansion of precast slabs and establish a complete precast slab support system.

目前,双板预制叠合墙采用的单面斜撑支护。因混凝土侧向压力大或人工操作不当引起的胀模,一般发生在墙板的中下部,斜撑支护在墙板上的支点一般离墙板顶约为2/3墙板高度,此措施仅保证了墙板在混凝土浇筑过程中的稳定性,并不能保证墙板中下部区域的刚度。因此需采取措施:既能保证稳定性又能保证墙板的刚度。At present, the double-slab prefabricated laminated walls are supported by single-sided diagonal bracing. The mold expansion caused by large concrete lateral pressure or improper manual operation generally occurs in the middle and lower part of the wall panel. The fulcrum supported by the diagonal brace on the wall panel is generally about 2/3 of the height of the wall panel from the top of the wall panel. This measure It only guarantees the stability of the wall panel during the concrete pouring process, and does not guarantee the rigidity of the middle and lower areas of the wall panel. Therefore, measures need to be taken to ensure both stability and rigidity of the wallboard.

发明内容Contents of the invention

本发明提供了一种双板预制叠合墙体支护体系,不仅解决了现场预制板的稳定性,更解决了预制板胀模的问题,并且此发明支护体系具有简单方便,拆卸灵活,绿色环保等优点。The invention provides a double-slab prefabricated superimposed wall support system, which not only solves the stability of the on-site prefabricated slab, but also solves the problem of prefabricated slab expansion, and the support system of this invention is simple and convenient, flexible to disassemble, Green environmental protection and other advantages.

本发明采用的技术方案为:一种双板预制叠合墙支护体系,包括预埋内螺纹圆管、钢筋桁架、支座、螺栓、螺母、止水螺杆、斜撑、竖向支护和横向支护,该叠合墙的两个墙板之间设有钢筋桁架和贯穿墙板的预埋内螺纹圆管,所述斜撑的两端通过螺栓与支座固定,上端的支座通过螺栓及螺母与预埋内螺纹圆管的端部连接,下端的支座通过螺栓及螺母与楼板连接,所述横向支护通过螺栓固定在竖向支护上,所述止水螺杆穿过墙板内预埋内螺纹圆管,所述竖向支护通过止水螺杆及螺母固定在叠合墙的两个墙板的外壁,并将两个墙板连接在一起。The technical scheme adopted in the present invention is: a double-slab prefabricated laminated wall support system, including a pre-embedded internal threaded circular pipe, a steel bar truss, a support, bolts, nuts, water-stop screws, diagonal braces, vertical supports and Horizontal support, a steel truss and a pre-embedded internal threaded circular tube passing through the wall panels are arranged between the two wall panels of the laminated wall. The two ends of the diagonal brace are fixed to the support by bolts, and the upper support is passed through The bolts and nuts are connected to the end of the pre-embedded internal threaded circular pipe, the support at the lower end is connected to the floor through bolts and nuts, the horizontal support is fixed on the vertical support by bolts, and the water-stop screw goes through the wall Internally threaded round pipes are pre-embedded in the panels, and the vertical support is fixed on the outer walls of the two wall panels of the laminated wall through water-stop screws and nuts, and the two wall panels are connected together.

作为优选,所述预埋内螺纹圆管长度与单片墙板厚相同。Preferably, the length of the pre-embedded internal threaded round pipe is the same as the thickness of a single wallboard.

作为优选,所述支座截面为槽钢形状,底板至少开2个螺栓孔,通过螺栓将支座固定在截面上,两翼缘开相对应螺栓孔,通过螺栓固定斜撑。Preferably, the cross section of the support is in the shape of a channel steel, and at least two bolt holes are opened on the bottom plate, and the support is fixed on the cross section by bolts, corresponding bolt holes are opened on the two flanges, and the diagonal brace is fixed by bolts.

作为优选,所述斜撑的截面为圆形。Preferably, the cross section of the brace is circular.

作为优选,所述斜撑由内螺纹管和外螺纹管组成,两螺纹管通过螺纹连接在一起形成整体,两端设螺栓孔,通过螺栓固定在支座上。两螺纹管螺纹连接部分占斜撑1/3~2/3,确保稳定性。此斜撑做法可以保证现场墙板在斜歪的情况下或支座位置偏离预设位置情况下,通过旋拧螺纹管进行精确调整,斜撑两端固定后不可旋拧,亦确保了稳定性。Preferably, the brace is composed of an internally threaded pipe and an externally threaded pipe, the two threaded pipes are screwed together to form a whole, bolt holes are provided at both ends, and are fixed on the support by bolts. The connecting part of the two threaded pipes accounts for 1/3 to 2/3 of the brace to ensure stability. This method of diagonal bracing can ensure that the wallboard on site is skewed or the position of the support deviates from the preset position, and can be adjusted accurately by screwing the threaded pipe. The two ends of the diagonal brace cannot be screwed after being fixed, which also ensures stability. .

作为优选,所述止水螺杆长度大于墙厚200~300mm。Preferably, the length of the water-stop screw is 200-300 mm longer than the wall thickness.

作为优选,所述横向支护截面宽度可取为50mm,长度取为300~500mm,横向支护截面高度大于竖向截面高度30~60mm,高出部分在横向支护两端处伸出50mm~100mm,伸出部分开螺栓孔。两端伸出部分卡在竖向支护上,并保证横竖向螺栓孔相对应。As a preference, the width of the transverse support section may be 50mm, the length is 300-500mm, the height of the transverse support section is 30-60mm greater than the height of the vertical section, and the protruding part extends 50mm-100mm at both ends of the transverse support , The extended part is divided into bolt holes. The protruding parts at both ends are stuck on the vertical support, and ensure that the horizontal and vertical bolt holes correspond to each other.

作为优选,所述竖向支护长度取为1000~3000mm,截面宽度取为100~200mm,厚度为50~100mm。竖向支护沿长度方向每隔150~200mm设置螺栓孔。止水螺杆每隔一个螺栓孔布置一个,配用螺母将横竖向支护固定在预制墙板上。其余螺栓孔用螺栓将横竖向支护固定在预制墙板上。横竖向支护形成框架增加了墙板的中下部的刚度,应当指出,当墙板长度较大,为大体积墙时,可适当增加横竖向支护框架,以确保大体积墙板的刚度。Preferably, the vertical support length is 1000-3000 mm, the section width is 100-200 mm, and the thickness is 50-100 mm. The vertical support is provided with bolt holes every 150-200mm along the length direction. Waterstop screw rods are arranged every other bolt hole, and nuts are used to fix the horizontal and vertical supports to the prefabricated wall panels. The rest of the bolt holes are used to fix the horizontal and vertical support on the prefabricated wallboard with bolts. The frame formed by the horizontal and vertical support increases the rigidity of the middle and lower part of the wall panel. It should be pointed out that when the length of the wall panel is large and the wall is a large volume, the horizontal and vertical support frame can be appropriately increased to ensure the rigidity of the large volume wall panel.

本发明具体实施步骤:The concrete implementation steps of the present invention:

一、预制墙板或浇楼板前,设置预埋内螺纹圆管;1. Before prefabricating wall panels or pouring floor slabs, set up embedded internal threaded round pipes;

二、将双墙板吊装到现场,在定位之前,安装横竖向支护;2. Hoist the double wall panels to the site, and install horizontal and vertical supports before positioning;

三、墙板定位;3. Wall panel positioning;

四、安装墙板上和底板上的支座;4. Install the support on the wall board and the bottom board;

五、先固定墙板一端的斜撑;在通过旋拧螺纹管使得墙板竖直,并确保斜撑另一段固定在底板支座上。5. First fix the diagonal brace at one end of the wallboard; then make the wallboard vertical by screwing the threaded pipe, and ensure that the other section of the diagonal brace is fixed on the base plate support.

有益效果:本发明既考虑了双板在混凝土浇筑过程中的稳定性,且增加了双板的刚度,避免了预制板在浇筑过程胀模破坏,兼顾施工的简易性,本发明具有简单方便,拆卸灵活,绿色环保。Beneficial effects: the present invention not only considers the stability of the double slab during the concrete pouring process, but also increases the rigidity of the double slab, avoids the damage of the prefabricated slab during the pouring process, and takes into account the simplicity of the construction. The present invention is simple and convenient, Flexible disassembly, green and environmental protection.

附图说明Description of drawings

图1为本发明支护体系示意图;Fig. 1 is the schematic diagram of support system of the present invention;

图2为本发明支护体系剖面示意图;Fig. 2 is a schematic sectional view of the support system of the present invention;

图3为本发明支护体系无斜撑一侧墙板示意图;Fig. 3 is a schematic diagram of a wallboard on one side of the support system without diagonal braces of the present invention;

图4为本发明支座示意图;Fig. 4 is a schematic diagram of a bearing of the present invention;

图5为本发明斜撑示意图;Fig. 5 is the schematic diagram of the brace of the present invention;

图6为本发明横向支护与竖向支护连接示意图;Fig. 6 is a schematic diagram of the connection between the lateral support and the vertical support of the present invention;

图7为本发明横向支示意护图。Fig. 7 is a schematic diagram of the lateral support of the present invention.

具体实施方式detailed description

下面结合附图和具体实施方式对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

如图1-7所示,一种双板预制叠合墙支护体系,包括预埋内螺纹圆管1、钢筋桁架10、支座2、螺栓3、螺母4、止水螺杆5、斜撑6、竖向支护7和横向支护8,该叠合墙的两个墙板9之间设有钢筋桁架10和贯穿墙板9的预埋内螺纹圆管1,所述斜撑6的两端通过螺栓3与支座2固定,上端的支座2通过螺栓3及螺母4与预埋内螺纹圆管1的端部连接,下端的支座2通过螺栓3及螺母4与楼板连接,所述横向支护8通过螺栓3固定在竖向支护7上,所述止水螺杆5穿过墙板9内预埋内螺纹圆管1,所述竖向支护7通过止水螺杆5及螺母4固定在叠合墙的两个墙板9的外壁,并将两个墙板9连接在一起。As shown in Figure 1-7, a double-slab prefabricated laminated wall support system includes a pre-embedded internal threaded circular pipe 1, a steel truss 10, a support 2, bolts 3, nuts 4, water-stop screws 5, and diagonal braces 6. Vertical support 7 and lateral support 8. A steel bar truss 10 and a pre-embedded internally threaded round pipe 1 penetrating through the wall panels 9 are arranged between the two wall panels 9 of the laminated wall. The diagonal brace 6 Both ends are fixed to the support 2 by bolts 3, the upper support 2 is connected to the end of the embedded internal threaded round pipe 1 by bolts 3 and nuts 4, and the lower support 2 is connected to the floor by bolts 3 and nuts 4, The horizontal support 8 is fixed on the vertical support 7 by bolts 3, the water stop screw 5 passes through the pre-embedded inner threaded round pipe 1 in the wallboard 9, and the vertical support 7 passes through the water stop screw 5 And nut 4 is fixed on the outer wall of two wallboards 9 of laminated wall, and two wallboards 9 are connected together.

所述预埋内螺纹圆管1长度与单片墙板厚相同,所述支座2截面为槽钢形状,底板至少开2个螺栓孔,通过螺栓将支座固定在截面上,两翼缘开相对应螺栓孔,通过螺栓固定斜撑,所述斜撑6的截面为圆形,所述斜撑6由内螺纹管和外螺纹管组成,两螺纹管通过螺纹连接在一起形成整体,两端设螺栓孔,通过螺栓固定在支座上,两螺纹管螺纹连接部分占斜撑1/3~2/3,确保稳定性,所述止水螺杆5长度大于墙厚200~300mm,所述横向支护8截面宽度可取为50mm,长度取为300~500mm,横向支护8截面高度大于竖向截面高度30~60mm,高出部分在横向支护8两端处伸出50mm~100mm,伸出部分开螺栓孔。两端伸出部分卡在竖向支护上,并保证横竖向螺栓孔相对应,所述竖向支护7长度取为1000~3000mm,截面宽度取为100~200mm,厚度为50~100mm。竖向支护7沿长度方向每隔150~200mm设置螺栓孔。The length of the pre-embedded internally threaded circular pipe 1 is the same as the thickness of a single wall plate, the section of the support 2 is in the shape of a channel steel, and at least two bolt holes are opened on the bottom plate, and the support is fixed on the section by bolts, and the two flanges are opened. Corresponding to the bolt hole, the diagonal brace is fixed by bolts. The cross section of the diagonal brace 6 is circular. The diagonal brace 6 is composed of an internally threaded pipe and an externally threaded pipe. The two threaded pipes are connected together by threads to form a whole. Bolt holes are provided, which are fixed on the support by bolts. The threaded connection part of the two threaded pipes occupies 1/3-2/3 of the diagonal brace to ensure stability. The section width of support 8 can be taken as 50mm, and the length can be taken as 300-500mm. Partially cut bolt holes. The protruding parts at both ends are stuck on the vertical support and ensure that the horizontal and vertical bolt holes correspond. The length of the vertical support 7 is 1000-3000mm, the section width is 100-200mm, and the thickness is 50-100mm. The vertical support 7 is provided with bolt holes every 150-200mm along the length direction.

图2中预埋内螺纹圆管1在墙板预制过程或楼板浇筑前预先放入;支座2通过螺栓固定在墙板2/3墙高处和楼板上;止水螺杆3沿竖向支护每隔1个螺栓孔设置一个,竖向支护上的其余螺栓孔使用螺栓固定在墙板上;斜撑6通过螺栓固定在支座上。In Fig. 2, the pre-embedded internally threaded round pipe 1 is pre-placed before the wall panel prefabrication process or the floor slab pouring; the support 2 is fixed on the wall panel 2/3 wall height and the floor panel by bolts; One bolt hole is set every other bolt hole, and the remaining bolt holes on the vertical support are fixed on the wallboard with bolts; the diagonal brace 6 is fixed on the support by bolts.

具体实施步骤:Specific implementation steps:

一、预制墙板前或浇筑楼板前,设置预埋内螺纹圆管1;1. Before the prefabricated wall panel or before pouring the floor slab, install the embedded inner threaded round pipe 1;

二、将双墙板吊装到现场,在定位之前,安装竖向支护7和横向支护8;2. Hoist the double wall panels to the site, and install the vertical support 7 and the horizontal support 8 before positioning;

三、墙板定位;3. Wall panel positioning;

四、安装墙板上和底板上的支座;4. Install the support on the wall board and the bottom board;

五、先固定墙板一端的斜撑6;在通过旋拧螺纹管使得墙板竖直,并确保斜撑另一段固定在底板支座2上。5. Fix the diagonal brace 6 at one end of the wallboard first; make the wallboard vertical by screwing the threaded pipe, and ensure that the other section of the diagonal brace is fixed on the base plate support 2.

应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。本实施例中未明确的各组成部分均可用现有技术加以实现。It should be pointed out that those skilled in the art can make some improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. All components that are not specified in this embodiment can be realized by existing technologies.

Claims (1)

1.一种双板预制叠合墙支护体系,其特征在于:包括预埋内螺纹圆管、钢筋桁架、支座、螺栓、螺母、止水螺杆、斜撑、竖向支护和横向支护,该叠合墙的两个墙板之间设有钢筋桁架和贯穿墙板的预埋内螺纹圆管,所述斜撑的两端通过螺栓与支座固定,上端的支座通过螺栓及螺母与预埋内螺纹圆管的端部连接,下端的支座通过螺栓及螺母与楼板连接,所述横向支护通过螺栓固定在竖向支护上,所述止水螺杆穿过墙板内预埋内螺纹圆管,所述竖向支护通过止水螺杆及螺母固定在叠合墙的两个墙板的外壁,并将两个墙板连接在一起;1. A double-slab prefabricated laminated wall support system, characterized in that: it includes a pre-embedded internal threaded circular pipe, a steel bar truss, a bearing, bolts, nuts, water-stop screw rods, diagonal braces, vertical supports and lateral supports A steel bar truss and a pre-embedded internally threaded round pipe passing through the wall panels are arranged between the two wall panels of the laminated wall. The nut is connected to the end of the pre-embedded internal threaded round pipe, the support at the lower end is connected to the floor through bolts and nuts, the horizontal support is fixed on the vertical support through bolts, and the water-stop screw passes through the wall panel Pre-buried internally threaded circular pipes, the vertical support is fixed on the outer walls of the two wall panels of the laminated wall through water-stop screws and nuts, and the two wall panels are connected together; 所述预埋内螺纹圆管长度与单片墙板厚相同;The length of the pre-embedded internal threaded circular pipe is the same as the thickness of a single wallboard; 所述支座截面为槽钢形状,底板至少开2个螺栓孔,通过螺栓将支座固定在截面上,两翼缘开相对应螺栓孔,通过螺栓固定斜撑;The cross-section of the support is in the shape of channel steel, and at least two bolt holes are opened on the bottom plate, and the support is fixed on the cross-section by bolts, and the corresponding bolt holes are opened on the two flanges, and the diagonal brace is fixed by bolts; 所述斜撑的截面为圆形;The cross-section of the brace is circular; 所述斜撑由内螺纹管和外螺纹管组成,两螺纹管通过螺纹连接在一起形成整体,两端设螺栓孔,通过螺栓固定在支座上,两螺纹管螺纹连接部分占斜撑1/3~2/3;The diagonal brace is composed of an internally threaded pipe and an externally threaded pipe. The two threaded pipes are threaded together to form a whole. Bolt holes are provided at both ends, and are fixed on the support by bolts. The threaded connection part of the two threaded pipes accounts for 1/ 3~2/3; 所述止水螺杆长度大于墙厚200~300mm;The length of the water-stop screw is 200-300mm longer than the wall thickness; 所述横向支护截面宽度取为50mm,长度取为300~500mm,横向支护截面高度大于竖向截面高度30~60mm,高出部分在横向支护两端处伸出50mm~100mm,伸出部分开螺栓孔;The width of the transverse support section is 50mm, the length is 300-500mm, the height of the transverse support section is 30-60mm greater than the height of the vertical section, and the protruding part is 50mm-100mm at both ends of the transverse support. Partially opened bolt holes; 所述竖向支护长度取为1000~3000mm,截面宽度取为100~200mm,厚度为50~100mm。The length of the vertical support is 1000-3000mm, the section width is 100-200mm, and the thickness is 50-100mm.
CN201310403195.XA 2013-09-06 2013-09-06 Double-plate prefabricated superposed wall supporting system Expired - Fee Related CN103422667B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310403195.XA CN103422667B (en) 2013-09-06 2013-09-06 Double-plate prefabricated superposed wall supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310403195.XA CN103422667B (en) 2013-09-06 2013-09-06 Double-plate prefabricated superposed wall supporting system

Publications (2)

Publication Number Publication Date
CN103422667A CN103422667A (en) 2013-12-04
CN103422667B true CN103422667B (en) 2016-02-03

Family

ID=49648009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310403195.XA Expired - Fee Related CN103422667B (en) 2013-09-06 2013-09-06 Double-plate prefabricated superposed wall supporting system

Country Status (1)

Country Link
CN (1) CN103422667B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086698A (en) * 2016-11-22 2018-05-29 吴方华 Levelling device and application method are fixed in a kind of prefabricated components installation
CN108316522A (en) * 2018-02-24 2018-07-24 东南大学 The prefabricated double board wall units of one kind, assembly concrete shear wall and preparation method thereof
CN108716249A (en) * 2018-09-04 2018-10-30 苏州中正建设工程有限公司 A kind of pre-buried connection component of prefabricated outer wall panel bearing diagonal
CN111075062B (en) * 2018-10-18 2022-11-18 中清大科技股份有限公司 Construction method for separating concrete shear wall structure from pipeline in wall
CN110258856B (en) * 2019-06-17 2020-06-09 山东大学 A detachable tooling system and building wall for superimposed shear wall
CN111593881A (en) * 2020-05-15 2020-08-28 中铁十四局集团建筑工程有限公司 Wall pouring formwork supporting structure
CN111764547B (en) * 2020-06-11 2021-05-11 河海大学 A kind of prefabricated shear wall structure and manufacturing method thereof
CN114108833B (en) * 2021-12-13 2023-08-22 深圳市湛艺建设集团有限公司 Assembled wallboard connecting structure and construction method thereof
CN114319859A (en) * 2022-01-11 2022-04-12 柳州市建筑设计科学研究院有限公司 Mold-dismantling-free prefabricated part and field installation method thereof
CN117552657A (en) * 2023-11-15 2024-02-13 中国建筑第二工程局有限公司 Recyclable prefabricated wallboard diagonal bracing fixing piece and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082173A (en) * 1996-09-05 1998-03-31 Kondo Kozai Kk Assembly method of fabric foundation formwork of lightweight building
CN2534289Y (en) * 2001-07-25 2003-02-05 于国杰 Combined shuttering
CN200975041Y (en) * 2006-10-20 2007-11-14 北京市丰台区榆树庄构件厂 Concrete form panel precast concrete exterior wall decoration heat preservation formwork
CN102808509A (en) * 2012-08-22 2012-12-05 中国建筑一局(集团)有限公司 Prefabricated concrete prefabricated external wall panel anchor components and pouring construction method
CN203441090U (en) * 2013-09-06 2014-02-19 南京工业大学 Double-plate prefabricated superposed wall supporting system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082173A (en) * 1996-09-05 1998-03-31 Kondo Kozai Kk Assembly method of fabric foundation formwork of lightweight building
CN2534289Y (en) * 2001-07-25 2003-02-05 于国杰 Combined shuttering
CN200975041Y (en) * 2006-10-20 2007-11-14 北京市丰台区榆树庄构件厂 Concrete form panel precast concrete exterior wall decoration heat preservation formwork
CN102808509A (en) * 2012-08-22 2012-12-05 中国建筑一局(集团)有限公司 Prefabricated concrete prefabricated external wall panel anchor components and pouring construction method
CN203441090U (en) * 2013-09-06 2014-02-19 南京工业大学 Double-plate prefabricated superposed wall supporting system

Also Published As

Publication number Publication date
CN103422667A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN103422667A (en) Double-plate prefabricated superposed wall supporting system
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN102966121B (en) Integrally movable mould frame for pipe rack cast-in-site construction
CN102808509B (en) Pouring construction method of prefabricated concrete prefabricated external wall panel anchor components
CN104912320B (en) The method for synchronously constructing of subsiding crack both sides shear wall
CN108951962A (en) A kind of autoclaved aerated concrete slab exterior wall and construction method
CN206607863U (en) A kind of post-cast strip temporary support structure
CN102518148A (en) Architecture related to triangular bracing structure of underground open cut station and construction method thereof
CN201649623U (en) Large basement shear wall truss type steel pipe single-side support formwork structure
CN202416354U (en) Building with unilateral high-supported formwork structure of subway open-cut station
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN101701494B (en) Detachable convenient support device of steel structure building template and use method thereof
CN109972730A (en) Prefabricated I-beam laminated floor installation structure
CN106522282A (en) Liftable post-cast strip template structure and system and construction method thereof
CN107237437A (en) Combined type reinforced truss floor support plate and its construction method
CN203441090U (en) Double-plate prefabricated superposed wall supporting system
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN103603494A (en) Ultra-thin steel truss inclined wall construction method and formwork structure
CN104234418A (en) Early removal formwork for fabrication of reinforced concrete beams and construction method thereof
CN203334661U (en) Scaffold-hole-free formwork construction device for brick-concrete structure construction column
CN207700680U (en) A kind of roof boarding hangs mould
CN206397136U (en) Assembled aluminum template masonry shearwalls reinforced concrete structural column
CN201539098U (en) Detachable and convenient support device for steel structure building formwork
CN103243910B (en) Hydraulic pressure controlled reinforced concrete structure bed die vertical supporting system and construction method thereof
CN206418523U (en) A kind of liftable post-cast strip template structure and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160203

Termination date: 20160906

CF01 Termination of patent right due to non-payment of annual fee