CN105442838A - Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof - Google Patents

Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof Download PDF

Info

Publication number
CN105442838A
CN105442838A CN201510989386.8A CN201510989386A CN105442838A CN 105442838 A CN105442838 A CN 105442838A CN 201510989386 A CN201510989386 A CN 201510989386A CN 105442838 A CN105442838 A CN 105442838A
Authority
CN
China
Prior art keywords
template
bed die
formwork
prefabricated
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510989386.8A
Other languages
Chinese (zh)
Inventor
王祥军
谢亮
杨波
李辉
蒋平文
李纲平
杨建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Wuxin Steel Formwork Co Ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN201510989386.8A priority Critical patent/CN105442838A/en
Publication of CN105442838A publication Critical patent/CN105442838A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a stub matching prefabricated U-shaped segmental beam formwork and a formwork retracting method thereof. An end formwork (1) is composed of an end formwork board (11) and a fixing frame (12) connected with the end formwork board (11). A bottom formwork (2) comprises a bottom formwork board (21), bottom formwork supports (22), a bottom formwork trolley (23) and tracks (24), wherein the bottom formwork trolley (23) is arranged below the bottom formwork supports (22). An outer side formwork (3) comprises an outer side formwork board (31), a plurality of first adjusting screws (32), first supporting rods (33), second supporting rods (34) and a bottom frame (35), wherein the outer side formwork board (31) is connected with the bottom frame (35) through the first supporting rods (33) and the second supporting rods (34), and telescopic oil cylinders (53) are arranged between the first supporting rods (33) and the bottom frame (35). An inner side formwork (4) comprises a plurality of inner side formwork boards (41), a support (42) and a plurality of second adjusting screws (43), wherein every two corresponding inner side formwork boards (41) are oppositely arranged into a U shape, and telescopic oil cylinders (54) are connected between the support (42) and the inner side formwork boards (41). The stub matching prefabricated U-shaped segmental beam formwork is safe to use, easy and convenient to remove and erect, good in overall stability, low in labor intensity, high in production efficiency and low in construction cost.

Description

A kind of short-term mates prefabricated U-shaped beam sections template and receives modeling method
Technical field
The present invention relates to a kind of template, particularly relate to a kind of short-term and mate prefabricated U-shaped beam sections template.The invention still further relates to the receipts modeling method that this short-term mates prefabricated U-shaped beam sections template.
Background technology
Along with developing rapidly of urban construction, traffic problems become increasingly conspicuous, and in order to relax this contradiction, Development of Urban elevated road and urban track traffic are important measures.And build urban elevated road and urban track traffic in down town and planning and development district, require beautiful design, presentation quality is high, constructs and affects little on periphery bad border and traffic above-ground.For reducing bridge construction, urban traffic is impacted; shorten the bridge site operation cycle; strengthen environmental protection, adopts precast segment free cantilever erection construction method and the whole beam that collapses to be divided into different sections to adopt slug matching to produce prefabricated, scene in factory and carries out assembled mode to carry out bridge superstructure construction method be the good approach overcome the above problems.
Summary of the invention
First technical problem to be solved by this invention is to provide a kind of use safety, takes off, formwork erection is simple and convenient, resistance to overturning good, effectively can reduce labor strength, enhance productivity, and the short-term saving construction cost mates prefabricated U-shaped beam sections template.
Second technical problem to be solved by this invention is to provide the receipts modeling method that this short-term a kind of mates prefabricated U-shaped beam sections template.
In order to solve above-mentioned first technical problem, short-term provided by the invention mates prefabricated U-shaped beam sections template, comprise end mould, bed die, outer side mold, interior side form and hydraulic system, described end mould is made up of the fixed mount holding mould template and be connected with described end mould template, and described end mould template is fixed on the measuring basis as whole beam sections on beam platform position processed by described fixed mount; Described bed die includes bed die template, bed die support, bed die dolly and track, described bed die template is by described bed die stent support on beam platform position processed, and described bed die dolly is placed in below described bed die support and also can slides on described track; Described outer side mold includes outboard template, many first adjusting screw(rod)s, the first supporting rod, the second supporting rod and underframe, described outboard template is connected with described underframe with the second described supporting rod by the first described supporting rod, telescopic oil cylinder is provided with, for receipts, the formwork erection of outer side mold between the first described supporting rod and described underframe; Described interior side form includes multiple inner side template, support and Duo Gen second adjusting screw(rod), one end of described inner side template is hinged on described support by hinged screw rod, the second described adjusting screw(rod) is connected with between described inner side template and described support, inner side template described in two is oppositely arranged formation U-shaped, be connected with telescopic oil cylinder between described support and described inner side template, described telescopic oil cylinder is used for receipts, the formwork erection of described inner side template.
Adopt the first pull bar to be connected between described bed die and described outer side mold, and be provided with rubber strip mortar leakage prevention.
Adopt the second pull bar to be connected between described interior side form and described outer side mold, for prevent described in side form float.
Described bed die dolly is provided with the jacking cylinder acting on described bed die template, described bed die dolly is superposed by multi-layer planar and forms and be connected with translation oil cylinder between flat board described in multilayer, makes that described bed die template is elevated, translation and rotation.
Flexibly connect between the upper and lower each several part of described outboard template, finely tuned by described adjusting screw(rod) to shape of template, the first described supporting rod and the second supporting rod can regulate length, make described outboard template vertically can carry out suitable adjustment.
Be connected with Level tune screw rod between described underframe and the second described supporting rod, described outboard template can be carried out laterally and longitudinally suitable translation on described underframe.Described inner side template suitably carries out horizontal fine setting by hinged screw rod on described support.
Described interior side form overlaps internal mold sharing between multiple beam making bench by lifting appliance integral hoisting to realize list.
Described bed die, outer side mold and interior side form all can realize that hydraulic pressure is received automatically, formwork erection.
In order to solve above-mentioned second technical problem, short-term provided by the invention mates the receipts modeling method of prefabricated U-shaped beam sections template, comprises the following steps:
One, remove first connecting rod and the second pull bar, remove the connecting bolt of end mould and other templates;
Two, remove the second adjusting screw(rod) of interior side form, primer fluid pressing system, the telescopic oil cylinder of collapsed inner side mould, makes inner side template turn to precalculated position, hangs away to other beam making bench by hanging device by interior side form entirety;
Three, shrink the telescopic oil cylinder of outer side mold, make outboard template turn to precalculated position along the connection bearing pin of the second supporting rod;
Four, the jacking cylinder operated on bed die dolly extends, and makes bed die template and support drive the beam section of building to leave ground, and recycling is outside draws bed die and the beam section of having poured into a mould to move to and mate platform position.
The short-term of technique scheme is adopted to mate prefabricated U-shaped beam sections template and receive modeling method, end mould forms by holding mould template and fixed mount, adopt bolt to be flexibly connected between the two, be fixed on beam platform position processed, as the measuring basis of whole beam sections by described fixed mount.Described bed die includes bed die template, bed die support, bed die dolly and track, described bed die template by described bed die stent support on beam platform position processed, described bed die dolly is placed in below bed die support, and can slide in orbit, bed die dolly is provided with jacking cylinder and translation oil cylinder, the lifting of bed die template in beam platform position processed, translation and rotation can be made.Described outer side mold includes outboard template, adjusting screw(rod), the first supporting rod, the second supporting rod and underframe, described outboard template is connected with described underframe with described second supporting rod by described first supporting rod, described first supporting rod is provided with telescopic oil cylinder, for receipts, the formwork erection of outer side mold.Described interior side form includes inner side template, support, adjusting screw(rod), and described inner side template is articulated with on described support, and fixes its position by adjusting screw(rod), described support is provided with receipts, the formwork erection of telescopic oil cylinder for inner side template.Adopt pull bar to be connected between bed die with described outer side mold, and be provided with rubber strip mortar leakage prevention.Also adopt pull bar to be connected between interior side form with described outer side mold, prevent interior side form from floating.Flexibly connect between the upper and lower each several part of outboard template, by described adjusting screw(rod), shape of template is finely tuned, described first supporting rod and the second supporting rod adjustable length, make outboard template vertically can carry out suitable adjustment, described underframe is also provided with the adjusting screw(rod) of level, makes outboard template laterally with longitudinally can carry out suitable translation.Inner side template suitably can carry out horizontal fine setting on the bracket.Interior side form overlaps internal mold sharing between multiple beam making bench by lifting appliance integral hoisting to realize list.Bed die, outer side mold and interior side form all can realize that hydraulic pressure is received automatically, formwork erection.The present invention has easy and simple to handle, and receipts, formwork erection are easy, the features such as production efficiency is high, and labour intensity is low.
In sum, the present invention is a kind of use safety, takes off, formwork erection is simple and convenient, resistance to overturning good, effectively can reduce labor strength, enhance productivity, and the short-term saving construction cost mates prefabricated U-shaped beam sections template and receives modeling method.
Accompanying drawing explanation
Fig. 1 is structure elevation of the present invention.
Fig. 2 is structure side view of the present invention.
Fig. 3 is the structural representation of bed die of the present invention.
Fig. 4 is the texture edge schematic diagram of bed die of the present invention.
Schematic diagram when Fig. 5 is the demoulding of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As depicted in figs. 1 and 2, short-term mates prefabricated U-shaped beam sections template, comprises end mould 1, bed die 2, outer side mold 3, interior side form 4 and hydraulic system, end mould 1 and bed die 2, outer side mold 3, is all overlapped with certain length between interior side form 4, adopts bolt to be interconnected.Adopt the first pull bar 6 to be connected between bed die 2 with outer side mold 3, and be provided with rubber strip mortar leakage prevention.Interior side form 4 is connected with adopting the second pull bar 61 between outer side mold 3, prevents interior side form 4 from floating.
As shown in Figure 2, end mould 1 is made up of end mould template 11 and fixed mount 12, adopts bolt to be flexibly connected between the two, is fixed on beam platform position processed, as the measuring basis of whole beam sections, need ensures enough strength and stiffness by fixed mount 12.
As shown in Figure 3 and Figure 4, bed die 2 includes bed die template 21, bed die support 22, bed die dolly 23 and track 24, bed die template 21 is supported on beam platform position processed by bed die support 22, bed die dolly 23 is placed in below bed die support 22, and can slide on the tracks 24, bed die dolly 23 is provided with the jacking cylinder 51 acting on bed die template 21, bed die dolly 23 is superposed by multi-layer planar 25 and forms and be connected with translation oil cylinder 52 between multi-layer planar 25, makes that bed die template 21 can be elevated, translation and rotation.
As shown in Figure 1 and Figure 5, outer side mold 3 includes outboard template 31, many first adjusting screw(rod) 32, first supporting rod 33, second supporting rods 34 and underframe 35, flexibly connect between outboard template about 31 each several part, finely tune by many first adjusting screw(rod)s 32 pairs of shape of template, outboard template 31 is connected with underframe 35 with the second supporting rod 34 by the first supporting rod 33, telescopic oil cylinder 53 is provided with, for receipts, the formwork erection of outer side mold 3 between first supporting rod 33 and underframe 35.First supporting rod 33 and the second supporting rod 34 adjustable length, makes outboard template 31 vertically can carry out suitable adjustment.Be connected with Level tune screw rod 36 between underframe 35 and the second supporting rod 34, outboard template 31 can be carried out laterally and longitudinally suitable translation on underframe 35.
As shown in Figure 1 and Figure 5, interior side form 4 includes inner side template 41, support 42 and Duo Gen second adjusting screw(rod) 43, one end of inner side template 41 is hinged on support 42 by hinged screw rod 44, be connected with the second adjusting screw(rod) 43 between inner side template 41 and support 42, inner side template 41 is fixed its position by hinged screw rod 44 and is laterally finely tuned by hinged screw rod 44 opposite brackets 42.Two inner side template 41 are oppositely arranged formation U-shaped.Be connected with telescopic oil cylinder 54 between support 42 and inner side template 41, telescopic oil cylinder 54 is for receipts, the formwork erection of inner side template 41.
Receipts mould step of the present invention is as follows:
One, remove the first pull bar 6 and the second pull bar 61, remove end mould 1 and other templates
Connecting bolt;
Two, remove many second adjusting screw(rod)s 43 of interior side form 4, primer fluid pressing system, the telescopic oil cylinder 54 of collapsed inner side mould 4, makes inner side template 41 turn to precalculated position, hangs away to other beam making bench by hanging device by interior side form 4 entirety;
Three, shrink the telescopic oil cylinder 53 of outer side mold 3, make outboard template 31 turn to precalculated position along the connection bearing pin of the second supporting rod 34;
Four, the jacking cylinder 51 operated on bed die dolly 23 extends, and makes bed die template 21 and support 22 drive the beam section of building to leave ground, and bed die 2 and the beam section of having poured into a mould move to by the outside traction of recycling mates platform position, as shown in Figure 5.

Claims (10)

1. a short-term mates prefabricated U-shaped beam sections template, comprise end mould (1), bed die (2), outer side mold (3), interior side form (4) and hydraulic system, it is characterized in that: described end mould (1) is made up of end mould template (11) and the fixed mount (12) that is connected with described end mould template (11), and described end mould template (11) is fixed on the measuring basis as whole beam sections on beam platform position processed by described fixed mount (12), described bed die (2) includes bed die template (21), bed die support (22), bed die dolly (23) and track (24), described bed die template (21) is supported on beam platform position processed by described bed die support (22), and described bed die dolly (23) is placed in described bed die support (22) below and can in the upper slip of described track (24), described outer side mold (3) includes outboard template (31), many first adjusting screw(rod)s (32), the first supporting rod (33), the second supporting rod (34) and underframe (35), described outboard template (31) is connected with described underframe (35) with described the second supporting rod (34) by described the first supporting rod (33), telescopic oil cylinder (53) is provided with, for receipts, the formwork erection of outer side mold (3) between described the first supporting rod (33) and described underframe (35), described interior side form (4) includes multiple inner side template (41), support (42) and many second adjusting screw(rod)s (43), one end of described inner side template (41) is hinged on described support (42) by hinged screw rod (44), described the second adjusting screw(rod) (43) is connected with between described inner side template (41) and described support (42), inner side template (41) described in two is oppositely arranged formation U-shaped, telescopic oil cylinder (54) is connected with between described support (42) and described inner side template (41), described telescopic oil cylinder (54) is for the receipts of described inner side template (41), formwork erection.
2. short-term according to claim 1 mates prefabricated U-shaped beam sections template, it is characterized in that: described bed die (2) is connected with adopting the first pull bar (6) between described outer side mold (3), and is provided with rubber strip mortar leakage prevention.
3. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described interior side form (4) is connected with adopting the second pull bar (61) between described outer side mold (3), for prevent described in side form (4) float.
4. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described bed die dolly (23) is provided with the jacking cylinder (51) acting on described bed die template (21), described bed die dolly (23) is superposed by multi-layer planar (25) and form and be connected with translation oil cylinder (52) between flat board (25) described in multilayer, makes the lifting of described bed die template (21), translation and rotation.
5. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described outboard template (31) flexibly connects between each several part up and down, by described the first adjusting screw(rod) (32), shape of template is finely tuned, described the first supporting rod (33) and the second supporting rod (34) can regulate length, make described outboard template (31) vertically can carry out suitable adjustment.
6. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: be connected with Level tune screw rod (36) between described underframe (35) and described the second supporting rod (34).
7. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described inner side template (41) suitably carries out horizontal fine setting by hinged screw rod (44) on described support (42).
8. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described interior side form (4) overlaps internal mold sharing between multiple beam making bench by lifting appliance integral hoisting to realize list.
9. short-term according to claim 1 and 2 mates prefabricated U-shaped beam sections template, it is characterized in that: described bed die (2), outer side mold (3) and interior side form (4) all can realize that hydraulic pressure is received automatically, formwork erection.
10. use the short-term described in claim 1 to mate the receipts modeling method of prefabricated U-shaped beam sections template, it is characterized in that: comprise the following steps:
One, remove the first pull bar and the second pull bar, remove the connecting bolt of end mould and other templates;
Two, remove the second adjusting screw(rod) of interior side form, primer fluid pressing system, the telescopic oil cylinder of collapsed inner side mould, makes inner side template turn to precalculated position, hangs away to other beam making bench by hanging device by interior side form entirety;
Three, shrink the telescopic oil cylinder of outer side mold, make outboard template turn to precalculated position along the connection bearing pin of the second supporting rod;
Four, the jacking cylinder operated on bed die dolly extends, and makes bed die template and support drive the beam section of building to leave ground, and recycling is outside draws bed die and the beam section of having poured into a mould to move to and mate platform position.
CN201510989386.8A 2015-12-24 2015-12-24 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof Pending CN105442838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510989386.8A CN105442838A (en) 2015-12-24 2015-12-24 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510989386.8A CN105442838A (en) 2015-12-24 2015-12-24 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof

Publications (1)

Publication Number Publication Date
CN105442838A true CN105442838A (en) 2016-03-30

Family

ID=55553428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510989386.8A Pending CN105442838A (en) 2015-12-24 2015-12-24 Stub matching prefabricated U-shaped segmental beam formwork and formwork retracting method thereof

Country Status (1)

Country Link
CN (1) CN105442838A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592433A (en) * 2016-12-08 2017-04-26 浙江省三门县远峰水电建设有限公司 Moving die carrier used for construction of U-shaped water conservancy aqueduct
CN106639307A (en) * 2017-03-03 2017-05-10 湖南中铁五新钢模有限责任公司 Formwork system for rectangular stand column pouring
CN108162144A (en) * 2017-12-26 2018-06-15 湖南五新模板有限公司 A kind of segment beam bottom board system
CN108252225A (en) * 2018-04-04 2018-07-06 湖南中铁五新钢模有限责任公司 A kind of distortion beam outer side mold
CN108412196A (en) * 2018-05-16 2018-08-17 中铁十局集团第五工程有限公司 The construction method of the general roof plate template component of continuous beam and continuous beam top plate
CN110184924A (en) * 2019-05-08 2019-08-30 中铁十八局集团第四工程有限公司 A kind of U case combination continuous beam subsection cast-in-situ activity adjustment gang form
CN111231071A (en) * 2020-03-16 2020-06-05 湖南中铁五新钢模有限责任公司 A prefabricated formwork system for prefabricated cable troughs
CN111531687A (en) * 2020-05-12 2020-08-14 宁波交通工程建设集团有限公司 Quick template mounting and dismounting device for large prefabricated T beam produced by industrial production line
CN111535575A (en) * 2020-05-26 2020-08-14 正如(广东)机器人科技有限公司 Integrated building beam intelligent mold
CN112177323A (en) * 2020-09-09 2021-01-05 中国一冶集团有限公司 Cell body structure assembled support system
CN112305989A (en) * 2020-11-04 2021-02-02 山东淄博环宇桥梁模板有限公司 Automatic adjusting control system and control method for segment prefabricated assembly beam template
CN112476728A (en) * 2020-10-27 2021-03-12 中建三局基础设施建设投资有限公司 Improved generation festival section case roof beam prefabricated formwork system
CN112523106A (en) * 2020-12-29 2021-03-19 山东博远大数据集团有限公司 Novel side form bearing structure
CN112936519A (en) * 2021-01-27 2021-06-11 中铁十六局集团有限公司 Short line matching prefabricated U-shaped section beam template
CN113322815A (en) * 2021-05-11 2021-08-31 湖北三峡职业技术学院 Special-shaped box girder template supporting structure and forming method
CN113585736A (en) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 Cast-in-place case roof beam integral sliding type side form with adjustable it is multidirectional
CN114633364A (en) * 2021-12-09 2022-06-17 中铁十九局集团有限公司 Prefabricated segment box girder concrete pouring device
CN115741970A (en) * 2022-11-24 2023-03-07 湖南五新智能科技股份有限公司 Prefabricated pipe gallery formwork system and construction method thereof
CN116572389A (en) * 2023-04-11 2023-08-11 杭州市交通工程集团有限公司 Precast system and construction method of prestressed concrete box girder short-line matching segment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302739A (en) * 2008-07-10 2008-11-12 中铁大桥局股份有限公司 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system
CN201669775U (en) * 2010-06-01 2010-12-15 湖南中铁五新钢模有限责任公司 Internal mold adjusting mechanism of prefabricated U-shaped concrete beam
CN202090289U (en) * 2011-05-20 2011-12-28 湖南中铁五新钢模有限责任公司 Shared type outer lateral template for straight web box girders with different heights
KR101103001B1 (en) * 2010-05-18 2012-01-05 동도산업 주식회사 Internal formwork for the manufacture of PS C box girder
CN202185966U (en) * 2011-07-08 2012-04-11 四川五新智能设备有限公司 Novel U-shaped beam hydraulic internal mold
CN204309101U (en) * 2014-12-17 2015-05-06 湖南中铁五新钢模有限责任公司 A kind of case beam external mold for the rotation mode demoulding
CN205243003U (en) * 2015-12-24 2016-05-18 湖南中铁五新钢模有限责任公司 Prefabricated U -shaped segment girder template of stub matching

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101302739A (en) * 2008-07-10 2008-11-12 中铁大桥局股份有限公司 A prestressed concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system
KR101103001B1 (en) * 2010-05-18 2012-01-05 동도산업 주식회사 Internal formwork for the manufacture of PS C box girder
CN201669775U (en) * 2010-06-01 2010-12-15 湖南中铁五新钢模有限责任公司 Internal mold adjusting mechanism of prefabricated U-shaped concrete beam
CN202090289U (en) * 2011-05-20 2011-12-28 湖南中铁五新钢模有限责任公司 Shared type outer lateral template for straight web box girders with different heights
CN202185966U (en) * 2011-07-08 2012-04-11 四川五新智能设备有限公司 Novel U-shaped beam hydraulic internal mold
CN204309101U (en) * 2014-12-17 2015-05-06 湖南中铁五新钢模有限责任公司 A kind of case beam external mold for the rotation mode demoulding
CN205243003U (en) * 2015-12-24 2016-05-18 湖南中铁五新钢模有限责任公司 Prefabricated U -shaped segment girder template of stub matching

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592433A (en) * 2016-12-08 2017-04-26 浙江省三门县远峰水电建设有限公司 Moving die carrier used for construction of U-shaped water conservancy aqueduct
CN106639307A (en) * 2017-03-03 2017-05-10 湖南中铁五新钢模有限责任公司 Formwork system for rectangular stand column pouring
CN106639307B (en) * 2017-03-03 2022-08-12 湖南中铁五新钢模有限责任公司 A formwork system for pouring rectangular columns
CN108162144A (en) * 2017-12-26 2018-06-15 湖南五新模板有限公司 A kind of segment beam bottom board system
CN108252225A (en) * 2018-04-04 2018-07-06 湖南中铁五新钢模有限责任公司 A kind of distortion beam outer side mold
CN108412196A (en) * 2018-05-16 2018-08-17 中铁十局集团第五工程有限公司 The construction method of the general roof plate template component of continuous beam and continuous beam top plate
CN108412196B (en) * 2018-05-16 2023-05-23 中铁十一局集团第五工程有限公司 Roof template assembly universal for continuous beam and construction method of continuous beam roof
CN110184924A (en) * 2019-05-08 2019-08-30 中铁十八局集团第四工程有限公司 A kind of U case combination continuous beam subsection cast-in-situ activity adjustment gang form
CN111231071A (en) * 2020-03-16 2020-06-05 湖南中铁五新钢模有限责任公司 A prefabricated formwork system for prefabricated cable troughs
CN111531687A (en) * 2020-05-12 2020-08-14 宁波交通工程建设集团有限公司 Quick template mounting and dismounting device for large prefabricated T beam produced by industrial production line
CN111535575A (en) * 2020-05-26 2020-08-14 正如(广东)机器人科技有限公司 Integrated building beam intelligent mold
CN112177323A (en) * 2020-09-09 2021-01-05 中国一冶集团有限公司 Cell body structure assembled support system
CN112476728A (en) * 2020-10-27 2021-03-12 中建三局基础设施建设投资有限公司 Improved generation festival section case roof beam prefabricated formwork system
CN112305989A (en) * 2020-11-04 2021-02-02 山东淄博环宇桥梁模板有限公司 Automatic adjusting control system and control method for segment prefabricated assembly beam template
CN112305989B (en) * 2020-11-04 2023-09-29 山东淄博环宇桥梁模板有限公司 Automatic adjustment control system and control method for segmental prefabrication assembly beam templates
CN112523106A (en) * 2020-12-29 2021-03-19 山东博远大数据集团有限公司 Novel side form bearing structure
CN112936519A (en) * 2021-01-27 2021-06-11 中铁十六局集团有限公司 Short line matching prefabricated U-shaped section beam template
CN113322815A (en) * 2021-05-11 2021-08-31 湖北三峡职业技术学院 Special-shaped box girder template supporting structure and forming method
CN113585736A (en) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 Cast-in-place case roof beam integral sliding type side form with adjustable it is multidirectional
CN114633364A (en) * 2021-12-09 2022-06-17 中铁十九局集团有限公司 Prefabricated segment box girder concrete pouring device
CN115741970A (en) * 2022-11-24 2023-03-07 湖南五新智能科技股份有限公司 Prefabricated pipe gallery formwork system and construction method thereof
CN116572389A (en) * 2023-04-11 2023-08-11 杭州市交通工程集团有限公司 Precast system and construction method of prestressed concrete box girder short-line matching segment

Similar Documents

Publication Publication Date Title
CN206538790U (en) Interior mould trolley is used in a kind of cast-in-place pipe gallery construction
CN104908149B (en) A kind of magnetic suspension linear track beam form system and application method
CN101408019B (en) A construction method of low-height prefabricated box girder internal formwork
CN111594228B (en) Lining of round water delivery tunnel steel mould trolley and construction method
CN107387122A (en) A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN104234723B (en) A kind of open trench tunnel square-section self-propelled mobile falsework chassis
CN203768814U (en) High-pier minor-radius curve cast-in-situ box girder novel moving die carrier
CN205243003U (en) Prefabricated U -shaped segment girder template of stub matching
CN102198691B (en) Hydraulic inner die for segmented box girder
CN204899948U (en) Cable groove formworking jumbo
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN112681162A (en) Construction method for movable split mounting type light formwork cast-in-situ box culvert
CN108098979A (en) A kind of PK sections concrete box girder precast segment template
CN104533460A (en) Construction method for concrete pouring of support-changing type formwork trolley and underground channel
CN111749270B (en) Concrete pipe gallery internal mold positioning and demolding method
CN205112085U (en) Hydraulic pressure centre form construction system
CN115110765B (en) Construction method and device for shear wall at deformation joint
CN102001127B (en) Combined box girder hydraulic internal mould
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN115821981A (en) Concrete pouring formwork device for tunnel open hole
CN107489101A (en) A kind of concrete small box girder hydraulic control auto-folder internal model
CN100542762C (en) Full-automatic hydraulic prefabricated box girder inner formwork system
CN204712262U (en) A kind of self-propelled integrated hydraulic prefabricated case beam plate device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Xie Liang

Inventor after: Yang Bo

Inventor after: Li Hui

Inventor after: Jiang Pingwen

Inventor after: Li Gangping

Inventor after: Yang Jianguo

Inventor before: Wang Xiangjun

Inventor before: Xie Liang

Inventor before: Yang Bo

Inventor before: Li Hui

Inventor before: Jiang Pingwen

Inventor before: Li Gangping

Inventor before: Yang Jianguo

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330

RJ01 Rejection of invention patent application after publication