CN105114102A - Subway station formwork trolley - Google Patents

Subway station formwork trolley Download PDF

Info

Publication number
CN105114102A
CN105114102A CN201510554404.XA CN201510554404A CN105114102A CN 105114102 A CN105114102 A CN 105114102A CN 201510554404 A CN201510554404 A CN 201510554404A CN 105114102 A CN105114102 A CN 105114102A
Authority
CN
China
Prior art keywords
steel
steel pipe
fixed
expansion link
subway station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510554404.XA
Other languages
Chinese (zh)
Other versions
CN105114102B (en
Inventor
张阳波
张阳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Wanqiao Heavy Industry Technology Co.,Ltd.
Original Assignee
Dongguan Wanqiao Steel Mould Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Wanqiao Steel Mould Co Ltd filed Critical Dongguan Wanqiao Steel Mould Co Ltd
Priority to CN201510554404.XA priority Critical patent/CN105114102B/en
Publication of CN105114102A publication Critical patent/CN105114102A/en
Application granted granted Critical
Publication of CN105114102B publication Critical patent/CN105114102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a subway station formwork trolley and belongs to the technical field of tunnel construction devices. The subway station formwork trolley comprises a support mechanism, a panel mechanism and a walking mechanism, wherein the panel mechanism is mounted on the top of the support mechanism, the support mechanism comprises more than two sets of steel frame assemblies which are arranged side by side, the steel frame assembly comprises at least one set of standard steel pipe racks, an oil pressure device and a lifting device, the lifting device is fixedly mounted on the top of the standard steel pipe rack, the lifting device comprises a telescopic rack, more than two telescopic rods and a top horizontal continuous groove steel, the panel mechanism comprises a panel main body, a steel formwork and an adjustable support rod which is in telescopic in length. The whole structure of the formwork trolley is simple, the formwork trolley is stable and firm, and convenient to mount, the lifting device is arranged, and compared with the traditional structure, the same formwork trolley can adapt to subway tunnels of different heights, so that it is only necessary to manufacture general-purpose standard parts of one formwork trolley during the production process, the production cost can be saved, and materials for manufacturing different formwork trolleys of different specifications can be prevented from being wasted.

Description

Subway station formwork jumbo
Technical field
The present invention relates to tunnel construction apparatus field, be specifically related to subway station formwork jumbo.
Background technology
Subway station formwork jumbo is for the large-scale nonstandard machine equipments of the one of concreting in constructing metro tunnel, and its agent structure is the steel work that plate-girder combines.
Traditional subway station formwork jumbo does not possess elevating function, need to have made to order by given size according to the specification of subway tunnel, the height and the width that comprise subway station formwork jumbo all need to coordinate the size of subway tunnel to carry out Aided design, therefore, construction party needs to require that producer carries out producing new equipment according to new dimensional structure, so, not only can increase construction cost, and the subway station formwork jumbo of different size specification can not be general, will cause a large amount of waste of material.
In addition, when using subway station formwork jumbo, all need before normal forward state to dismantle a part of parts, can control to move ahead after making it be reduced to certain altitude, then need to re-assembly again, integrated operation inconvenience, and increase meeting engineering time and difficulty of construction.
Summary of the invention
The object of the invention is to solve above defect, provide subway station formwork jumbo, it can carry out lift adjustment, uses with the subway tunnel building adapting to differing heights.
The object of the invention is to realize in the following manner:
Subway station formwork jumbo, it comprises supporting mechanism, facing and walking mechanism, and facing is installed on the top of supporting mechanism.
Supporting mechanism comprises the steel frame component be arranged side by side more than two, walking mechanism is installed on the bottom of each group of steel frame component, this steel frame component is by least one group of standard steel pipe support, oil gear and lifting gear are formed, lifting gear is fixedly mounted on the top of standard steel pipe support, lifting gear is by expansion bracket, the horizontal channel-section steel that connects of the expansion link of more than two and top is formed, push up and horizontally connect the top and being fixed with facing that channel-section steel is fixed on expansion link and be connected, the shrinking connecting-rod that can carry out oscilaltion along expansion link is installed between adjacent two expansion links, the bottom of expansion bracket is fixed with the top of standard steel pipe support and is connected, the top of expansion bracket is for penetrating and the location division of fixing expansion link, location division and expansion link are provided with the locating hole that several match mutually, and be provided with for matching the alignment pin inserted in locating hole, thus locking connection expansion link and expansion bracket, oil gear comprises the oil pressure holder being fixedly mounted on standard steel pipe support top and the oil hydraulic cylinder vertically installed, the expansion link of oil hydraulic cylinder upwards extends and is fixed is connected with the horizontal channel-section steel that connects in top.
Facing comprises panel body, steel form and the adjustment strut that can carry out telescopic length, panel body tiling is fixed on the horizontal top connecting channel-section steel, top, strut is regulated to comprise the identical left adjustment strut of structure and right adjustment strut, steel form comprises the identical left side steel form of structure and right side steel form, the right-hand member of left side steel form is connected with the left-end point of panel body by active connection, the left end of right side steel form is also connected with the right end of panel body by active connection, the left end of left side steel form is connected with the top of left adjustment strut, the left bottom of adjustment strut is connected with the left end of shrinking connecting-rod, by controlling the angle of inclination of left adjustment strut adjustable left side steel form, the right-hand member of right side steel form is connected with the top of right adjustment strut, the right bottom of adjustment strut is connected with the right-hand member of shrinking connecting-rod, by controlling the angle of inclination of right adjustment strut adjustable right side steel form.
In above-mentioned explanation, as preferred scheme, the two ends of described shrinking connecting-rod are provided with and penetrate and the locating sleeve be fixed on expansion link for matching, locating sleeve is also provided with the locking hole corresponding with the position of positioning hole of expansion link, and be provided with for matching the alignment pin inserted in this locking hole, thus locking connection expansion link and shrinking connecting-rod.
In above-mentioned explanation, as preferred scheme, the two ends of described adjustment strut are equipped with threaded rod, regulate the middle-end of strut to be provided with and carry out matching with threaded rod the threaded sleeve be spirally connected, carry out telescopic adjustment between threaded rod and threaded sleeve by screw thread.
In above-mentioned explanation, as preferred scheme, described active connection is hinge arrangement.
In above-mentioned explanation, as preferred scheme, described walking mechanism comprise universal wheel, for install universal wheel double flute steel underframe and for earth surface and the base for supporting of scalable adjustment, the top of double flute steel underframe is fixed with the bottom of standard steel pipe support and is connected, universal wheel is arranged on the bottom of double flute steel underframe, and the top of base for supporting upwards extends and penetrates double flute steel underframe and the bottom being fixed on standard steel pipe support.
In above-mentioned explanation, as preferred scheme, be connected and fixed between two adjacent groups steel frame component by least two horizontal steel pipes, horizontal steel pipe is each passed through and is fixed on often to be organized on steel frame component.
In above-mentioned explanation, as preferred scheme, the lower scissors that the below of described oil pressure holder is also provided with for increasing support force supports, and lower scissors support is fixedly mounted on standard steel pipe support.
In above-mentioned explanation, as preferred scheme, described lifting gear is also provided with the upper bridging of two or more for increasing support force, the upper end of upper bridging is fixed on the upper end of expansion link, and the lower end of upper bridging is fixed on the upper end of expansion bracket.
In above-mentioned explanation, as preferred scheme, described standard steel pipe support is combined by horizontal rectangular steel pipe, rectangular steel pipe longitudinal direction and oblique rectangular steel pipe and forms.
The beneficial effect that the present invention produces is as follows:
1) overall structure is simple, firmly stable, easy for installation, be provided with lifting gear, adjustablely during duty rise to applicable height and position, the top of facing is made to be adjacent to subway tunnel roof, during normal forward state, adjustable being reduced to adapts to height, formwork jumbo just usually can be walked along railway, compared with traditional structure, same set of formwork jumbo can adapt to the subway tunnel of differing heights, only need the standard component manufacturing a set of formwork jumbo can be general when therefore producing, cost of production can be saved, the waste of material simultaneously formwork jumbo because manufacturing multiple different size can being avoided to cause,
2) formwork jumbo of the present invention also can carry out transverse combination and installs additional while can carrying out oscilaltion adjustment; the size of chassis can arbitrarily regulate; during use, multiple stage formwork jumbo is arranged side by side; and be connected and fixed by horizontal steel pipe; easy for installation; integrated connection rear stability is strong, and can install additional by the width different according to subway tunnel, mobile installation process flexibility is strong;
3) integrally-regulated lifting process is simple and convenient, have additional the adjustment strut of scalable adjustment and the steel form of movable adjustment in addition, enable the end face of facing adapt to the subway tunnel end face of differing tilt angles, free adjustment angular slope angle, makes it connect and is more close to.
4) due to subway chassis can carry out oscilaltion adjustment while also can carry out transverse combination and install additional, the subway tunnel of the applicable multiple different size of same set of subway chassis, the component of subway chassis can reuse, after entire combination, intensity is good, and convenient disassembly, it is convenient to assemble, practical.
Accompanying drawing explanation
Fig. 1 is subway station formwork jumbo normal operating conditions schematic diagram in subway tunnel in the embodiment of the present invention;
Fig. 2 is Fig. 1 and close-up schematic view;
Fig. 3 is subway station formwork jumbo normal forward view in subway tunnel in the embodiment of the present invention;
Fig. 4 is the lateral view of subway station formwork jumbo in the embodiment of the present invention;
In figure, 1 is standard steel pipe support, and 2 is expansion bracket, and 3 is expansion link, 4 is shrinking connecting-rod, and 5 is locating sleeve, and 6 is locating hole, 7 is alignment pin, and 8 is oil pressure holder, and 9 is oil hydraulic cylinder, 10 is panel body, and 11 is left adjustment strut, and 12 is right adjustment strut, 13 is left side steel form, and 14 is right side steel form, and 15 is universal wheel, 16 is double flute steel underframe, and 17 is base for supporting, and 18 is horizontal steel pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, the present invention is described in further detail.
The present embodiment, with reference to Fig. 1 ~ Fig. 4, its subway station formwork jumbo specifically implemented comprises supporting mechanism, facing and walking mechanism, and facing is installed on the top of supporting mechanism.
In figure, supporting mechanism comprises two groups of steel frame components be arranged side by side, be connected and fixed by least two horizontal steel pipes 18 between two adjacent groups steel frame component, horizontal steel pipe 18 is each passed through and is fixed on often to be organized on steel frame component, walking mechanism is installed on the bottom of each group of steel frame component, in the present embodiment, steel frame component is by one group of standard steel pipe support 1, oil gear and lifting gear are formed, standard steel pipe support 1 is by horizontal rectangular steel pipe, rectangular steel pipe longitudinal direction and the combination of oblique rectangular steel pipe are formed, the standard steel pipe support 1 of the present embodiment is provided with the frame construction of the identical transverse direction of six groups of structures altogether, two groups or standard steel pipe support 1 more than two can be set according to the height of subway tunnel, directly be fixed by superposition.
Lifting gear is fixedly mounted on the top of standard steel pipe support 1, lifting gear is by expansion bracket 2, the horizontal channel-section steel that connects of the expansion link 3 of more than two and top is formed, lifting gear is also provided with the upper bridging of two or more for increasing support force, the upper end of upper bridging is fixed on the upper end of expansion link 3, the lower end of upper bridging is fixed on the upper end of expansion bracket 2, push up and horizontally connect the top and being fixed with facing that channel-section steel is fixed on expansion link 3 and be connected, the shrinking connecting-rod 4 that can carry out oscilaltion along expansion link 3 is installed between adjacent two expansion links 3, shrinking connecting-rod 4 can carry out lift adjustment, reinforce stabilization expansion link 3 can be played simultaneously, the two ends of shrinking connecting-rod 4 are provided with and penetrate and the locating sleeve 5 be fixed on expansion link 3 for matching, locating sleeve 5 is also provided with the locking hole corresponding with locating hole 6 position of expansion link 3, and be provided with for matching the alignment pin 7 inserted in this locking hole, thus locking connection expansion link 3 and shrinking connecting-rod 4, mode when regulating shrinking connecting-rod 4 to be elevated is identical with the mode of adjustable telescopic rod 3, first alignment pin 7 is disassembled, then regulate after rising or drop to adaptation position, guarantee that the locating hole 6 of expansion link 3 reinserts alignment pin 7 after corresponding with locking hole again, it is made to carry out reconnecting fixing.
The bottom of expansion bracket 2 is fixed with the top of standard steel pipe support 1 and is connected, the top of expansion bracket 2 is for penetrating and the location division of fixing expansion link 3, location division and expansion link 3 are provided with the locating hole 6 that several match mutually, and be provided with for matching the alignment pin 7 inserted in locating hole 6, thus locking connection expansion link 3 and expansion bracket 2, when carrying out lift adjustment, first alignment pin 7 is disassembled, then regulate after rising or drop to adaptation position, again reinsert alignment pin 7 after guaranteeing locating hole 6 correspondence simultaneously, make it carry out reconnecting fixing.
Oil gear is used for providing stable support force to facing, oil gear comprises the oil pressure holder 8 being fixedly mounted on standard steel pipe support 1 top and the oil hydraulic cylinder 9 vertically installed, the expansion link 3 of oil hydraulic cylinder 9 upwards extends and is fixed is connected with the horizontal channel-section steel that connects in top, the lower scissors that the below of oil pressure holder 8 is also provided with for increasing support force supports, and lower scissors support is fixedly mounted on standard steel pipe support 1.
Facing comprises panel body 10, steel form and can carry out the adjustment strut of telescopic length, the two ends of strut are regulated to be equipped with threaded rod, regulate the middle-end of strut to be provided with and carry out matching with threaded rod the threaded sleeve be spirally connected, between threaded rod and threaded sleeve, carry out telescopic adjustment by screw thread.Panel body 10 tiling is fixed on the horizontal top connecting channel-section steel, top, be used for during duty carrying out close contact with subway tunnel top, strut is regulated to comprise the identical left adjustment strut 11 of structure and right adjustment strut 12, steel form comprises the identical left side steel form 13 of structure and right side steel form 14, the right-hand member of left side steel form 13 is connected by the left-end point of hinge with panel body 10, the left end of right side steel form 14 is also connected with the right end of panel body 10 by hinge, the left end of left side steel form 13 is connected with the top of left adjustment strut 11, the bottom of left adjustment strut 11 is connected with the left end of shrinking connecting-rod 4, by controlling the angle of inclination of left adjustment strut 11 adjustable left side steel form 13, the right-hand member of right side steel form 14 is connected with the top of right adjustment strut 12, the bottom of right adjustment strut 12 is connected with the right-hand member of shrinking connecting-rod 4, by controlling the angle of inclination of right adjustment strut 12 adjustable right side steel form 14, as shown in Figure 1, during normal operating conditions, by regulating left adjustment strut 11 and right adjustment strut 12, left side steel form 13 and right side steel form 14 is made to be adjacent to the inclined plane of subway tunnel top respectively, the inclined plane of different angles can be adapted to, shown in Fig. 3, after having built, need to proceed to subsequent processing position, during normal forward state, first by lifting gear, panel body 10 and steel form are arranged to decline, adjustment left side steel form 13 and the angle of inclination of right side steel form 14, make panel body 10 and steel form not contact with subway tunnel end face simultaneously.
Walking mechanism comprises universal wheel 15, for install universal wheel 15 double flute steel underframe 16 and for earth surface and the base for supporting 17 of scalable adjustment, the top of double flute steel underframe 16 is fixed with the bottom of standard steel pipe support 1 and is connected, universal wheel 15 is arranged on the bottom of double flute steel underframe 16, the top of base for supporting 17 upwards extends and penetrates double flute steel underframe 16 and the bottom being fixed on standard steel pipe support 1, during normal forward state the bottom of base for supporting 17 not with earth surface, the bottom of base for supporting 17 and earth surface during normal operating conditions, for supporting whole formwork jumbo.
Overall structure is simple, firmly stable, easy for installation, be provided with lifting gear, adjustablely during duty rise to applicable height and position, the top of facing is made to be adjacent to subway tunnel roof, during normal forward state, adjustable being reduced to adapts to height, formwork jumbo just usually can be walked along railway, compared with traditional structure, same set of formwork jumbo can adapt to the subway tunnel of differing heights, only need the standard component manufacturing a set of formwork jumbo can be general when therefore producing, cost of production can be saved, the waste of material simultaneously formwork jumbo because manufacturing multiple different size can being avoided to cause.
Above content is in conjunction with concrete preferred embodiment further description made for the present invention, can not assert that specific embodiment of the invention is confined to these explanations.For general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, all should be considered as protection scope of the present invention.

Claims (9)

1. subway station formwork jumbo, it comprises supporting mechanism, facing and walking mechanism, and facing is installed on the top of supporting mechanism, it is characterized in that:
Supporting mechanism comprises the steel frame component be arranged side by side more than two, walking mechanism is installed on the bottom of each group of steel frame component, this steel frame component is by least one group of standard steel pipe support, oil gear and lifting gear are formed, lifting gear is fixedly mounted on the top of standard steel pipe support, lifting gear is by expansion bracket, the horizontal channel-section steel that connects of the expansion link of more than two and top is formed, push up and horizontally connect the top and being fixed with facing that channel-section steel is fixed on expansion link and be connected, the shrinking connecting-rod that can carry out oscilaltion along expansion link is installed between adjacent two expansion links, the bottom of expansion bracket is fixed with the top of standard steel pipe support and is connected, the top of expansion bracket is for penetrating and the location division of fixing expansion link, location division and expansion link are provided with the locating hole that several match mutually, and be provided with for matching the alignment pin inserted in locating hole, thus locking connection expansion link and expansion bracket, oil gear comprises the oil pressure holder being fixedly mounted on standard steel pipe support top and the oil hydraulic cylinder vertically installed, the expansion link of oil hydraulic cylinder upwards extends and is fixed is connected with the horizontal channel-section steel that connects in top,
Facing comprises panel body, steel form and the adjustment strut that can carry out telescopic length, panel body tiling is fixed on the horizontal top connecting channel-section steel, top, strut is regulated to comprise the identical left adjustment strut of structure and right adjustment strut, steel form comprises the identical left side steel form of structure and right side steel form, the right-hand member of left side steel form is connected with the left-end point of panel body by active connection, the left end of right side steel form is also connected with the right end of panel body by active connection, the left end of left side steel form is connected with the top of left adjustment strut, the left bottom of adjustment strut is connected with the left end of shrinking connecting-rod, by controlling the angle of inclination of left adjustment strut adjustable left side steel form, the right-hand member of right side steel form is connected with the top of right adjustment strut, the right bottom of adjustment strut is connected with the right-hand member of shrinking connecting-rod, by controlling the angle of inclination of right adjustment strut adjustable right side steel form.
2. subway station formwork jumbo according to claim 1, it is characterized in that: the two ends of described shrinking connecting-rod are provided with and penetrate and the locating sleeve be fixed on expansion link for matching, locating sleeve is also provided with the locking hole corresponding with the position of positioning hole of expansion link, and be provided with for matching the alignment pin inserted in this locking hole, thus locking connection expansion link and shrinking connecting-rod.
3. subway station formwork jumbo according to claims 1 or 2, it is characterized in that: the two ends of described adjustment strut are equipped with threaded rod, regulate the middle-end of strut to be provided with and carry out matching with threaded rod the threaded sleeve be spirally connected, between threaded rod and threaded sleeve, carry out telescopic adjustment by screw thread.
4. subway station formwork jumbo according to claim 3, is characterized in that: described active connection is hinge arrangement.
5. subway station formwork jumbo according to claim 1,2 or 4, it is characterized in that: described walking mechanism comprise universal wheel, for install universal wheel double flute steel underframe and for earth surface and the base for supporting of scalable adjustment, the top of double flute steel underframe is fixed with the bottom of standard steel pipe support and is connected, universal wheel is arranged on the bottom of double flute steel underframe, and the top of base for supporting upwards extends and penetrates double flute steel underframe and the bottom being fixed on standard steel pipe support.
6. subway station formwork jumbo according to claim 5, be is characterized in that: be connected and fixed by least two horizontal steel pipes between two adjacent groups steel frame component, and horizontal steel pipe is each passed through and is fixed on often to be organized on steel frame component.
7. subway station formwork jumbo according to claim 1,2 or 4 or 6, is characterized in that: the lower scissors that the below of described oil pressure holder is also provided with for increasing support force supports, and lower scissors support is fixedly mounted on standard steel pipe support.
8. subway station formwork jumbo according to claim 7, it is characterized in that: described lifting gear is also provided with the upper bridging of two or more for increasing support force, the upper end of upper bridging is fixed on the upper end of expansion link, and the lower end of upper bridging is fixed on the upper end of expansion bracket.
9. subway station formwork jumbo according to claim 8, is characterized in that: described standard steel pipe support by horizontal rectangular steel pipe, rectangular steel pipe longitudinally and oblique rectangular steel pipe combine and form.
CN201510554404.XA 2015-09-01 2015-09-01 Subway station formwork jumbo Active CN105114102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510554404.XA CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510554404.XA CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Publications (2)

Publication Number Publication Date
CN105114102A true CN105114102A (en) 2015-12-02
CN105114102B CN105114102B (en) 2017-03-29

Family

ID=54662188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510554404.XA Active CN105114102B (en) 2015-09-01 2015-09-01 Subway station formwork jumbo

Country Status (1)

Country Link
CN (1) CN105114102B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313446A (en) * 2016-04-26 2017-11-03 尤兆云 A kind of city integrated piping lane construction vehicles combination formula internal model
CN108979664A (en) * 2018-06-20 2018-12-11 中铁六局集团有限公司 Existing subway tunnel based on mobile casting platform protects steel structure pouring construction method
CN110792100A (en) * 2019-11-01 2020-02-14 海门市帕源路桥建设有限公司 Installation and correction female die for box-type telescopic inner die telescopic frame
CN113533048A (en) * 2021-07-16 2021-10-22 华东交通大学 Tunnel model test device and method capable of changing tunnel burial depth

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2351097A (en) * 1999-05-26 2000-12-20 Mabey Hire Ltd Telescopic support having inner and outer members with apertures of different spacing
JP2011058314A (en) * 2009-09-11 2011-03-24 Daiei Koki Kk Portal frame and center truck
CN203097904U (en) * 2013-01-25 2013-07-31 中铁十四局集团有限公司 Separating type trolley system used for underground excavation of long-span cross section
CN103806926A (en) * 2014-03-07 2014-05-21 陕西理工学院 Span-changing and height-changing device of concrete lining steel bench vehicle
CN204532376U (en) * 2015-04-21 2015-08-05 中国葛洲坝集团股份有限公司 Split type lifting construction trolley
CN204899947U (en) * 2015-09-01 2015-12-23 东莞市万桥钢模有限公司 Subway station formworking jumbo

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2351097A (en) * 1999-05-26 2000-12-20 Mabey Hire Ltd Telescopic support having inner and outer members with apertures of different spacing
JP2011058314A (en) * 2009-09-11 2011-03-24 Daiei Koki Kk Portal frame and center truck
CN203097904U (en) * 2013-01-25 2013-07-31 中铁十四局集团有限公司 Separating type trolley system used for underground excavation of long-span cross section
CN103806926A (en) * 2014-03-07 2014-05-21 陕西理工学院 Span-changing and height-changing device of concrete lining steel bench vehicle
CN204532376U (en) * 2015-04-21 2015-08-05 中国葛洲坝集团股份有限公司 Split type lifting construction trolley
CN204899947U (en) * 2015-09-01 2015-12-23 东莞市万桥钢模有限公司 Subway station formworking jumbo

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313446A (en) * 2016-04-26 2017-11-03 尤兆云 A kind of city integrated piping lane construction vehicles combination formula internal model
CN108979664A (en) * 2018-06-20 2018-12-11 中铁六局集团有限公司 Existing subway tunnel based on mobile casting platform protects steel structure pouring construction method
CN110792100A (en) * 2019-11-01 2020-02-14 海门市帕源路桥建设有限公司 Installation and correction female die for box-type telescopic inner die telescopic frame
CN110792100B (en) * 2019-11-01 2021-05-07 海门市帕源路桥建设有限公司 Installation and correction female die for box-type telescopic inner die telescopic frame
CN113533048A (en) * 2021-07-16 2021-10-22 华东交通大学 Tunnel model test device and method capable of changing tunnel burial depth
CN113533048B (en) * 2021-07-16 2022-10-14 华东交通大学 Tunnel model test device and method capable of changing tunnel burial depth

Also Published As

Publication number Publication date
CN105114102B (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN204899947U (en) Subway station formworking jumbo
CN201003287Y (en) Template support frame
CN105114102A (en) Subway station formwork trolley
CN204875552U (en) Frame bridge crane vertical lift structure
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN105887696A (en) Variable-cross-section adjustable integral form board of mobile formwork
CN104033166B (en) A kind of portal frame system of tunnel lining trolley
CN105332718A (en) Trolley for construction of large-span multi-section tunnel
CN201810021U (en) Liftable and mining deformation prevention device of high-tension cable tower with expandable foundation
CN104453922A (en) Shield machine trolley
CN204511460U (en) A kind of all-hydraulic concrete lining steel formwork jumbo
CN208668988U (en) Rack jack-up construction Compact Mounts
CN105178596A (en) Cast-in-place box girder formwork diagonal bracing device
CN205369980U (en) Support frame for construction machinery
CN205476584U (en) Detachable supporting structure
CN204356659U (en) The rear auxiliary support apparatus of novel large-tonnage Bridge Erector
CN202544394U (en) Early-dismounting template system
CN103556835B (en) Floor slab trolley
CN104514200A (en) Rear auxiliary support device for novel large-tonnage bridging machine
CN211596468U (en) Culvert supporting structure
CN203531758U (en) Horizontal type adjustable machine frame used for installation of drilling machine equipment
CN110374611A (en) A kind of adjustable reaction frame for launching shaft
CN205840388U (en) Novel building steel structure bracing frame
CN104806012A (en) Large-scale high-altitude bearing cantilever beam device and construction method thereof
CN102628319A (en) Early-dismantling formwork system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240905

Address after: No. 2, Zhaqian Section of G355 National Highway, Maxing Village, Yonghan Town, Longmen County, Huizhou City, Guangdong Province, 516000

Patentee after: Huizhou Wanqiao Heavy Industry Technology Co.,Ltd.

Country or region after: China

Address before: No. B-13, Lane 6, Gukeng Village, Jinhe Community, Zhangmutou Town, Dongguan City, Guangdong Province 523000

Patentee before: DONGGUAN WANQIAO STEEL MOULD Co.,Ltd.

Country or region before: China