CN103806926B - The change of concrete lining steel formwork jumbo is across uprising device - Google Patents

The change of concrete lining steel formwork jumbo is across uprising device Download PDF

Info

Publication number
CN103806926B
CN103806926B CN201410083806.1A CN201410083806A CN103806926B CN 103806926 B CN103806926 B CN 103806926B CN 201410083806 A CN201410083806 A CN 201410083806A CN 103806926 B CN103806926 B CN 103806926B
Authority
CN
China
Prior art keywords
span
height
variable
column
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410083806.1A
Other languages
Chinese (zh)
Other versions
CN103806926A (en
Inventor
张国海
张政武
何勇
王保民
张金誉
蔡舒庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi University of Technology
Original Assignee
Shaanxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi University of Technology filed Critical Shaanxi University of Technology
Priority to CN201410083806.1A priority Critical patent/CN103806926B/en
Publication of CN103806926A publication Critical patent/CN103806926A/en
Application granted granted Critical
Publication of CN103806926B publication Critical patent/CN103806926B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种砼衬砌钢模台车的变跨变高装置,由变跨装置和变高装置组成。变跨和变高功能通过框架结构实现,框架结构包括行走轮、下纵梁、立柱、门架横梁、上纵梁、拱部横梁、伸缩支撑杆。本发明有益效果在于:设置了变跨和变高装置,可在一定范围根据洞库断面的跨度和高度,横向外伸或内收框架及侧墙模板,升高或降低框架、拱架及拱顶模板,满足多断面洞库施工要求;为单截结构,可多截同步使用,适应性强;克服了多断面洞库砼衬砌施工中,更换不同钢模台车带来的诸多不便,有效节约施工成本提高施工效率;由电气控制的液压系统实现,操作方便,功能可靠;节省了材料,降低了成本,使整体结构更加简洁。

The invention discloses a span-changing and height-changing device for a concrete-lined steel mold trolley, which is composed of a span-changing device and a height-changing device. The functions of span and height change are realized through the frame structure, which includes traveling wheels, lower longitudinal beams, columns, mast beams, upper longitudinal beams, arch beams, and telescopic support rods. The beneficial effect of the present invention is that: the span and height variable devices are provided, and the frames, arches and arches can be raised or lowered in a certain range according to the span and height of the cavern section, extending or retracting the frame and side wall formwork horizontally. The top formwork meets the construction requirements of multi-section caverns; it is a single-section structure, which can be used synchronously with multiple sections, and has strong adaptability; it overcomes the inconvenience caused by replacing different steel formwork trolleys in the construction of multi-section caverns. Save construction costs and improve construction efficiency; realized by the hydraulic system controlled by electricity, it is easy to operate and reliable in function; it saves materials, reduces costs, and makes the overall structure more concise.

Description

The change of concrete lining steel formwork jumbo is across uprising device
Technical field
The invention belongs to underground cavern engineering construction equipment technical field, be specifically related to a kind of concrete lining steel formwork jumboFrame structure.
Background technology
Concrete lining steel formwork jumbo is the indispensable nonstandard product of secondary lining in underground cavern work progress. Due toThe diversity of actual requirement of engineering, makes the size of cave depot section there will be variation, as occur span, height andThe variation that the two has concurrently. Be used at present the telescoping steel form in underground cavern construction, can not adapt to cave depot section and go outSituation about now changing, can only take the method for changing different size telescoping steel form to meet requirement of engineering, like this,In the cave depot construction of many cross dimensions, just need to be equipped with the telescoping steel form of plurality of specifications, not only increased constructionEquipment investment, and installation, assembling, transport, storage and the increase of management chassis cost, reduced engineering constructionBenefit.
Summary of the invention
The shortcoming that the object of the invention is to overcome telescoping steel form bad adaptability in existing cave depot construction, provides a kind ofApplicable to the change of the concrete lining steel formwork jumbo of different cave depot section spans and the high size of wall across uprising device.
For achieving the above object, the technical solution used in the present invention is:
Installation composition is put and uprised to the change of described concrete lining steel formwork jumbo across uprising device by becoming straddle mounting. Become across withUprise function and realize by frame structure, frame structure comprise road wheel, lower longeron, column, door frame crossbeam,Upper longeron, arch crossbeam, telescopic supporting rod.
Become straddle mounting put comprise door frame crossbeam, door frame crossbeam become across oil cylinder, arch crossbeam, arch crossbeam become across oil cylinder,Become across flexible road wheel assembly, become across cross slide way. Door frame crossbeam and arch crossbeam are three joint telescopic structures,Both ends are that box-shaped overcoat, pars intermedia are box inner sleeve, are provided with moving sets between inner-outer sleeve, box overcoat with inOverlap corresponding connecting portion and be uniformly distributed multiple equally spaced connection pin-and-holes. By being arranged on door frame crossbeam and arch horizontal strokeThe push-and-pull of beam intracavity liquid compressing cylinder, make door frame crossbeam and arch crossbeam flexible drive framework to realize to become across.
Uprising device comprises column, uprises oil cylinder. Column is the overlapping telescopic structure of three joints, by inner sleeve, middle coverBe formed by connecting by moving sets with overcoat, relevant position arranges alignment pin and is connected with holding screw. By being arranged onThe two-way function of column intracavity liquid compressing cylinder, makes column up-down drive framework upper motion to realize and uprises.
Further, described hydraulic system is by electrical control.
Further, door frame crossbeam, the change of arch crossbeam are single-piston rod formula double acting push action cylinder across oil cylinder.
Further, to uprise oil cylinder be the telescopic double acting push action cylinder of two-stage stretching to column.
Further, door frame crossbeam, arch crossbeam and pillar construction junction are provided with strength-enhanced structure, described inStrength-enhanced structure be the rectangle frame that an outer use steel plate bar that is enclosed within the inside and outside socket place of body structure is welded.
Further, lower longeron inner chamber doubles as fuel tank.
Further, the change of described concrete lining steel formwork jumbo is across uprising device into singly cutting off structure, according to real workNeed, select two-section and above change across uprising device synchronous working.
The change of concrete lining steel formwork jumbo of the present invention is across the using method that uprises device: a side become across time opposite side motionless;By being fixed on change on the lower longeron hydraulic jack across flexible road wheel assembly, top is lower to be become across flexible road wheel,It is contacted with longitudinal rail, take off the each pin that connects door frame crossbeam and arch crossbeam, becoming across flexible road wheelBelow lay cross slide way, oil cylinder continue action road wheel and longitudinal rail are disengaged, by being arranged onThe door frame crossbeam of door frame crossbeam and arch crossbeam inner chamber becomes across oil cylinder and arch crossbeam and becomes pushing away or drawing and make across oil cylinderDoor frame crossbeam and arch crossbeam drive framework to laterally move to need position, by longitudinal rail by former span positionMove to new span position, by oil cylinder this skidding travelling wheel that lands, it is contacted again with rail, this side becomes and is cross overPosition;
One side become be cross over behind position, opposite side with same method realize become across;
Both sides become across after all putting in place, the more piece box-structure of door frame crossbeam and arch crossbeam are connected to multiple pinsOne, becomes across completing.
Further, the change of described concrete lining steel formwork jumbo, across the using method that uprises device, is removed each column (4)All circular cone alignment pins and the holding screw of upper installation;
By being arranged on the two-way function that uprises oil cylinder of each column inner chamber, make column realize lifting, drive frameThe lifting of frame top realizes and uprising; After needs height and position, each column circular cone alignment pin is installed and is realized altitude location,The all holding screws of each column are installed and are realized fixing between column body structure, uprised.
Adopt the change of the concrete lining steel formwork jumbo that as above technical scheme provides across uprising device compared with prior art,Beneficial effect is:
(1) be provided with become across with uprise device, can certain limit according to the span of cave depot section and height,Laterally overhanging or interior receipts framework and side wall template, raises or reduces framework, bow member and vault template, meets multibreakFace cave depot construction requirement.
(2) change of described concrete lining steel formwork jumbo is across uprising device into singly cutting off structure, can many sections of synchronous uses,Strong adaptability.
(3) overcome in multibreak cave depot concrete lining construction, changed the inconvenience that different telescoping steel forms bring,Effectively save construction cost and improved efficiency of construction.
(4) change of described concrete lining steel formwork jumbo can be realized by the hydraulic system of electrical control across uprising device,Easy to operate, reliable in function.
(5) because following longeron inner chamber doubles as fuel tank, saved material, reduced cost, made overall structureMore succinct.
Brief description of the drawings
Fig. 1 is the structural representation of telescoping steel form framework of the present invention;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural representation that the present invention becomes straddle mounting and put middle arch crossbeam;
Fig. 4 is the structural representation that the present invention uprises device central post.
In figure: 1. longitudinal rail, 2. road wheel, 3. descends longeron, 4. column, 4-1. column inner sleeve, 4-2.In column, overlap, 4-3. column overcoat, 4-4. circular cone alignment pin, 4-5. holding screw, 5. uprises oil cylinder, 6.Door frame crossbeam becomes across oil cylinder, 7. door frame crossbeam, the left outside cover of 7-1. door frame crossbeam, 7-2. door frame crossbeam inner sleeve, 7-3.The right outside cover of door frame crossbeam, 8. goes up longeron, and 9. arch crossbeam becomes across oil cylinder, 10. arch crossbeam, and 11. become across flexibleRoad wheel assembly, 12. telescopic supporting rods, 13. cross slide waies.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the change of a kind of concrete lining steel formwork jumbo of the present invention is across uprising dressPut, become and put and uprise installation composition across uprising device by becoming straddle mounting, become across with to uprise function real by frame structureExisting, frame structure comprises longitudinal rail 1, lower longeron 3, lower longeron 3 bottom surfaces, two ends row of each installation respectivelyTravelling wheel 2, lower longeron 3 two ends end faces are fixedly connected with column 4 bottom surfaces respectively, two front column 4 or rear columns4 middle parts are fixedly connected with door frame crossbeam 7 two ends respectively; Before and after the left and right sides column 4 end faces respectively with left and right twoIn side, longeron 8 bottom surfaces are fixedly connected with; Each upper longeron 8 front end end faces or rear end end face respectively with an arch crossbeam10 bottom surface, two ends are fixedly connected with; Between lower longeron 3 front end inner sides, left and right, between rear inside, vertical before left and rightBetween post 4 inner sides, the each hinged telescopic supporting rod 12 of difference between left and right rear column 4 inner sides;
Change is walked wheel assembly 11 across lateral rows and is installed on respectively each lower longeron 3 bottoms, bottom surface, becomes across cross slide way 13Be layed in and become across under lateral rows travelling wheel 11; It is hinged in door frame horizontal stroke respectively across oil cylinder 6 two ends that door frame crossbeam becomesBeam 7 both ends of the surface inner sides, it is hinged in crossbeam 10 both ends of the surface of each arch respectively across oil cylinder 9 two ends that arch crossbeam becomesSide; Uprise oil cylinder 5 two ends hinged in each column 4 both ends of the surface inner sides respectively;
Door frame crossbeam 7, arch crossbeam 10 and column 4 are Multi-section retractable box-structure, each box knotInside and outside mutual between structure, be socketed and be provided with moving sets, the corresponding connecting portion of box overcoat and inner sleeve distributes many verticallyIndividual pin-and-hole;
Each box-structure of door frame crossbeam 7 is connected to a door frame crossbeam 7 with multiple pin 7-4; With multiple pin 7-4Each box-structure of arch crossbeam 10 is connected to an arch crossbeam 10; With circular cone alignment pin 4-4 and column 4On pin-and-hole coordinate the position of determining between the each casing of column 4, with multiple holding screw 4-5 by column 4 respectivelyBox structure is connected to column 4.
Door frame crossbeam 7 is the telescopic retangular section structure of three joints, and one end is the left outside cover of box-shaped door frame crossbeam 7-1,The other end is the right outside cover of box-shaped door frame crossbeam 7-3, and middle part is box door frame crossbeam inner sleeve 7-2, between inner-outer sleeveBe provided with moving sets, the corresponding connecting portion of moving sets is uniformly distributed multiple equally spaced pin-and-holes along its length.
Arch crossbeam 10 is the telescopic retangular section structure of three joints, and one end is the left outside cover of box-shaped beam 7-1, anotherOne end is the right outside cover of box-shaped beam 7-3, and middle part is box crossbeam inner sleeve 7-2, is provided with moving sets between inner-outer sleeve,The corresponding connecting portion of moving sets is uniformly distributed multiple equally spaced dowel holes along its length.
Column 4 is the telescopic rectangle end face structure of three joints, is passed through by inner sleeve 4-1, middle cover 4-2 and overcoat 4-3Moving sets is formed by connecting.
The inner chamber of lower longeron 3 doubles as the fuel tank of hydraulic system.
Become across uprising device into singly cutting off structure, can select one section of independent use, also can select many sections of synchronous worksDo.
Hydraulic system is by electrical control.
Door frame crossbeam becomes across oil cylinder 6, arch crossbeam and becomes and be respectively single-piston rod formula double acting thrust oil across oil cylinder 9Cylinder.
Uprise oil cylinder 5 for the telescopic double acting push action cylinder of two-stage stretching.
The inside and outside socket place of body structure is provided with strength-enhanced structure, and strength-enhanced structure is for being enclosed within body structure outwardThe rectangle frame that one use steel plate bar of inside and outside socket place is welded.
Concrete lining steel formwork jumbo becomes straddle mounting and puts using method:
One side become across time opposite side motionless; By being fixed on change on lower longeron 3 across flexible road wheel assembly 11Hydraulic jack, top is lower to be become across flexible road wheel, and it is contacted with longitudinal rail 1, takes off connection door frame crossbeam7 and each pin 7-4 of arch crossbeam 10, below becoming across flexible road wheel, lay cross slide way 13, oil cylinderContinue action road wheel 2 and longitudinal rail 1 are disengaged, by being arranged on door frame crossbeam 7 and arch crossbeamThe door frame crossbeam of 10 inner chambers becomes across oil cylinder 6 and arch crossbeam and becomes pushing away or drawing and make door frame crossbeam 7 across oil cylinder 9Driving framework to laterally move to arch crossbeam 10 needs position, longitudinal rail 1 is moved to by former span positionNew span position, by oil cylinder this skidding travelling wheel 2 that lands, makes it again contact with rail 1, and this side change is cross overPosition;
One side become be cross over behind position, opposite side with same method realize become across;
Both sides become across after all putting in place, the more piece box-structure of door frame crossbeam and arch crossbeam are connected with multiple pin 7-4Connect and be integrated, become across completing.
Concrete lining steel formwork jumbo uprises device using method:
Remove all circular cone alignment pin 4-4 and the holding screw 4-5 that on each column 4, install;
By being arranged on the two-way function that uprises oil cylinder 5 of each column 4 inner chambers, make column 4 realize lifting,Driving framework upper lifting to realize uprises; After needs height and position, each column circular cone alignment pin 4-4 is installedRealize altitude location, all holding screw 4-5 of each column are installed and realize fixing between column body structure, becomeHeight completes.
Above content is in conjunction with concrete preferred embodiment further description made for the present invention, can notAssert that the specific embodiment of the present invention only limits to this, for general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all answerDetermine scope of patent protection when being considered as belonging to the present invention by submitted to claims.

Claims (10)

1.一种砼衬砌钢模台车的变跨变高装置,其特征在于:变跨变高装置由变跨装置和变高装置组成,变跨和变高功能通过框架结构实现,框架结构包括纵向导轨(1),下纵梁(3),下纵梁(3)两端底面分别各安装一个行走轮(2),下纵梁(3)两端顶面分别与一立柱(4)底面固定连接,两前立柱(4)或后立柱(4)中部分别与门架横梁(7)两端固定连接;左右两侧前后立柱(4)顶面分别与左右两侧上纵梁(8)底面固定连接;各上纵梁(8)前端顶面或后端顶面分别与一拱部横梁(10)两端底面固定连接;左右下纵梁(3)前端内侧之间、后端内侧之间,左右前立柱(4)内侧之间,左右后立柱(4)内侧之间分别各铰支一伸缩支撑杆(12); 1. A span-changing and height-changing device for a concrete-lined steel formwork trolley, characterized in that: the span-changing and height-changing device is made up of a span-changing device and a height-changing device, and the span-changing and height-changing functions are realized by a frame structure, and the frame structure includes The longitudinal guide rail (1), the lower longitudinal beam (3), and the bottom surface of both ends of the lower longitudinal beam (3) are respectively equipped with a walking wheel (2), and the top surface of the lower longitudinal beam (3) is connected with the bottom surface of a column (4) respectively. Fixed connection, the middle parts of the two front columns (4) or the rear columns (4) are respectively fixedly connected with the two ends of the mast beam (7); The bottom surface is fixedly connected; the top surface of the front end or the top surface of the rear end of each upper longitudinal beam (8) is fixedly connected with the bottom surface of both ends of an arch beam (10) respectively; Between, between the left and right front column (4) inboards, between the left and right rear column (4) inboards respectively hinge a telescopic support rod (12); 变跨横向行走轮总成(11)分别安装于各下纵梁(3)底面下部,变跨横向导轨(13)铺设于变跨横向行走轮(11)正下方;门架横梁变跨油缸(6)两端分别铰支于门架横梁(7)两端面内侧,拱部横梁变跨油缸(9)两端分别铰支于各拱部横梁(10)两端面内侧;变高油缸(5)两端分别铰支于各立柱(4)两端面内侧; The variable-span transverse travel wheel assembly (11) is respectively installed on the lower part of the bottom surface of each lower longitudinal beam (3), and the variable-span transverse guide rail (13) is laid directly below the variable-span transverse travel wheel (11); 6) The two ends are respectively hinged on the inner side of the two ends of the mast beam (7), and the two ends of the arch beam variable-span oil cylinder (9) are respectively hinged on the inner side of each arch beam (10); the variable height oil cylinder (5) The two ends are respectively hinged and supported on the inner sides of the two ends of each upright column (4); 门架横梁(7)、拱部横梁(10)以及立柱(4)均为多节伸缩式箱型结构,各箱型结构之间互相内外套接并设有移动副,箱型外套与内套相应连接部位沿轴向分布多个销孔; The gantry beam (7), the arch beam (10) and the upright column (4) are all multi-section telescopic box-shaped structures, and each box-shaped structure is connected with each other inside and outside and is equipped with a moving pair. A plurality of pin holes are distributed along the axial direction of the corresponding connecting parts; 用多个销(7-4)将门架横梁(7)的各箱型结构连接为一门架横梁(7);用多个销(7-4)将拱部横梁(10)的各箱型结构连接为一拱部横梁(10);用圆锥定位销(4-4)与立柱(4)上的销孔配合确定立柱(4)各箱体之间的位置,用多个紧定螺钉(4-5)将立柱(4)的各箱形结构连接为立柱(4); Use multiple pins (7-4) to connect each box-shaped structure of the door frame beam (7) into a door frame beam (7); use multiple pins (7-4) to connect each box-shaped structure of the arch beam (10) The structure is connected as an arch crossbeam (10); the position between each box of the column (4) is determined with the conical positioning pin (4-4) and the pin hole on the column (4), and a plurality of set screws ( 4-5) connecting each box-shaped structure of the column (4) into a column (4); 门架横梁(7)为三节伸缩式矩形断面结构,一端为箱形门架横梁左外套(7-1),另一端为箱形门架横梁右外套(7-3),中部为箱型门架横梁内套(7-2),内外套之间设有移动副,移动副相应连接部位沿长度方向均匀分布多个等间距的定位销孔; The gantry beam (7) is a three-section telescopic rectangular section structure, one end is the left jacket (7-1) of the box-shaped gantry beam, the other end is the right jacket (7-3) of the box-shaped gantry beam, and the middle part is a box-shaped door The inner sleeve (7-2) of the frame crossbeam, a movable pair is arranged between the inner outer jacket, and the corresponding connection parts of the movable pair are evenly distributed with a plurality of positioning pin holes at equal intervals along the length direction; 拱部横梁(10)为三节伸缩式矩形断面结构,一端为箱形门架横梁左外套(7-1),另一端为箱形门架横梁右外套(7-3),中部为箱型门架横梁内套(7-2),内外套之间设有移动副,移动副相应连接部位沿长度方向均匀分布多个等间距的定位销孔; The arch beam (10) is a three-section telescopic rectangular section structure, one end is the left jacket (7-1) of the box-shaped door frame beam, the other end is the right jacket (7-3) of the box-shaped door frame beam, and the middle part is a box-shaped door The inner sleeve (7-2) of the frame crossbeam, a movable pair is arranged between the inner outer jacket, and the corresponding connection parts of the movable pair are evenly distributed with a plurality of positioning pin holes at equal intervals along the length direction; 立柱(4)为三节伸缩式矩形端面结构,由内套(4-1)、中套(4-2)和外套(4-3)通过移动副连接而成。 The column (4) is a three-section telescopic rectangular end face structure, which is formed by connecting the inner sleeve (4-1), the middle sleeve (4-2) and the outer sleeve (4-3) through moving pairs. 2.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:下纵梁(3)的内腔兼作液压系统的油箱。 2. The device for changing the span and height of the concrete-lined steel formwork trolley according to claim 1, characterized in that: the inner cavity of the lower longitudinal beam (3) doubles as the oil tank of the hydraulic system. 3.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:所述的变跨变高装置为单截结构,可以选择一截独立使用,也可以选择多截同步工作。 3. The variable-span and height-changing device of the concrete-lined steel formwork trolley according to claim 1, characterized in that: the described span-variable and height-changing device is a single-section structure, and one section can be selected for independent use, and multiple sections can also be selected. Synchronous work. 4.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:变跨变高装置的液压系统由电气控制。 4. The device for changing the span and height of the concrete-lined steel formwork trolley according to claim 1, characterized in that the hydraulic system of the device for changing the span and height is controlled by electricity. 5.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:所述的门架横梁变跨油缸(6)、拱部横梁变跨油缸(9)分别为单活塞杆式双作用推力油缸。 5. The variable-span and height-changing device for concrete-lined steel formwork trolley as claimed in claim 1, characterized in that: the cross-beam variable-span oil cylinder (6) of the gantry and the cross-beam variable-span oil cylinder (9) of the arch are respectively single Piston rod type double acting thrust cylinder. 6.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:所述的变高油缸(5)为双级伸缩套筒式双作用推力油缸。 6. The device for changing the span and height of the concrete-lined steel mold trolley according to claim 1, characterized in that: the height-variable oil cylinder (5) is a double-stage telescopic sleeve type double-acting thrust oil cylinder. 7.如权利要求1所述砼衬砌钢模台车的变跨变高装置,其特征在于:箱体结构的内外套接处设有强度增强结构。 7. The device for changing the span and height of the concrete-lined steel formwork trolley according to claim 1, characterized in that: the inner and outer joints of the box structure are provided with strength-enhancing structures. 8.如权利要求7所述砼衬砌钢模台车的变跨变高装置,其特征在于:所述的强度增强结构为外套在箱体结构内外套接处的一用钢板条焊接而成的矩形框。 8. The variable-span variable-height device of the concrete-lined steel formwork trolley as claimed in claim 7, characterized in that: the described strength-enhancing structure is welded by a steel strip that is wrapped around the inner and outer joints of the box structure Rectangle. 9.如权利要求1所述砼衬砌钢模台车的变跨变高装置的使用方法,其特征在于:一侧变跨时另一侧不动;通过固定在下纵梁(3)上的变跨伸缩行走轮总成(11)的液压油缸,顶下变跨伸缩行走轮,使其与纵向导轨(1)接触,取下连接门架横梁(7)和拱部横梁(10)的各销(7-4),在变跨伸缩行走轮的下方铺设横向导轨(13),油缸继续动作使行走轮(2)与纵向导轨(1)脱离接触,通过安装在门架横梁(7)和拱部横梁(10)内腔的门架横梁变跨油缸(6)和拱部横梁变跨油缸(9)的推或拉使得门架横梁(7)和拱部横梁(10)带动框架横向移动至需要位置,将纵向导轨(1)由原跨度位置移至新跨度位置,通过油缸降落该侧行走轮(2),使其与纵向导轨(1)重新接触,该侧变跨到位; 9. The method for using the span-changing height-changing device of the concrete-lined steel formwork trolley as claimed in claim 1, characterized in that: the other side does not move when one side changes span; The hydraulic cylinder of the straddle-telescopic traveling wheel assembly (11), the top-bottom variable-span telescopic traveling wheel, makes it contact with the longitudinal guide rail (1), and removes the pins connecting the mast beam (7) and the arch beam (10) (7-4), the horizontal guide rail (13) is laid under the variable-span telescopic traveling wheel, and the oil cylinder continues to move to disengage the traveling wheel (2) from the longitudinal guide rail (1). The push or pull of the gantry beam variable-span oil cylinder (6) and the arch beam variable-span oil cylinder (9) in the inner cavity of the upper beam (10) makes the portal frame beam (7) and the arch beam (10) drive the frame to move laterally to If the position is required, move the longitudinal guide rail (1) from the original span position to the new span position, and lower the side traveling wheel (2) through the oil cylinder to make it contact with the longitudinal guide rail (1) again, and the side becomes span in place; 一侧变跨到位后,另一侧用同样方法实现变跨; After one side is in place, use the same method on the other side to achieve spanning; 两侧变跨都到位后,用多个销(7-4)将门架横梁和拱部横梁的多节箱型结构连接为一体,变跨完成。 After both sides variable spans are all put in place, with a plurality of pins (7-4) the multi-section box structure of gantry crossbeam and arch crossbeam is connected as a whole, variable span is completed. 10.如权利要求1所述砼衬砌钢模台车的变跨变高装置的使用方法,其特征在于: 10. The method for using the span-variable height-variable device of the concrete-lined steel formwork trolley according to claim 1, characterized in that: 拆除各立柱(4)上安装的所有圆锥定位销(4-4)和紧定螺钉(4-5); Remove all conical positioning pins (4-4) and set screws (4-5) installed on each column (4); 通过安装在各立柱(4)内腔的变高油缸(5)的双向作用,使得立柱(4)实现升降,带动框架上部升降实现变高;到需要高度位置后,安装各立柱圆锥定位销(4-4)实现高度定位,安装各立柱所有紧定螺钉(4-5)实现立柱箱体结构之间的固定,变高完成。 Through the two-way action of the variable-height oil cylinder (5) installed in the inner cavity of each column (4), the column (4) is lifted and lowered, and the upper part of the frame is driven to rise and fall to achieve heightening; after reaching the required height position, install the conical positioning pins of each column ( 4-4) To achieve height positioning, install all the set screws (4-5) of each column to realize the fixing between the column box structures, and the height change is completed.
CN201410083806.1A 2014-03-07 2014-03-07 The change of concrete lining steel formwork jumbo is across uprising device Expired - Fee Related CN103806926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410083806.1A CN103806926B (en) 2014-03-07 2014-03-07 The change of concrete lining steel formwork jumbo is across uprising device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410083806.1A CN103806926B (en) 2014-03-07 2014-03-07 The change of concrete lining steel formwork jumbo is across uprising device

Publications (2)

Publication Number Publication Date
CN103806926A CN103806926A (en) 2014-05-21
CN103806926B true CN103806926B (en) 2016-05-18

Family

ID=50704255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410083806.1A Expired - Fee Related CN103806926B (en) 2014-03-07 2014-03-07 The change of concrete lining steel formwork jumbo is across uprising device

Country Status (1)

Country Link
CN (1) CN103806926B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594918B (en) * 2014-12-31 2017-01-18 上海市机械施工集团有限公司 Split integrated underground passage steel mold plate trolley and construction method thereof
CN104695981A (en) * 2015-03-16 2015-06-10 湖南五新重型装备有限公司 Jacking heightening system and lining trolley including system
CN105114102B (en) * 2015-09-01 2017-03-29 东莞市万桥钢模有限公司 Subway station formwork jumbo
CN106837379B (en) * 2016-12-23 2019-10-01 湖南五新隧道智能装备股份有限公司 A kind of construction method in tunnel and its tunnel lining trolley of use
CN106593472B (en) * 2016-12-23 2020-01-31 湖南五新隧道智能装备股份有限公司 lining trolley suitable for construction of main tunnel and branch tunnel in parallel tunnel
CN106640140A (en) * 2017-01-05 2017-05-10 陕西理工学院 Variable-span concrete lining steel form trolley
CN106894828A (en) * 2017-04-28 2017-06-27 武汉科技大学 A kind of adjustable piping lane mould bases chassis wide
CN108756934B (en) * 2018-06-01 2023-10-20 招商局重庆交通科研设计院有限公司 Operation disease tunnel assembly type treatment structure construction operation trolley
CN109083659B (en) * 2018-07-06 2020-04-14 中国铁建重工集团股份有限公司 A portal system and lining cutting platform truck for lining cutting platform truck
CN110513126B (en) * 2019-09-27 2020-11-13 中铁四局集团有限公司 A recyclable tunnel two-liner trolley with variable cross-section
CN111636900A (en) * 2020-05-14 2020-09-08 平顶山平煤机煤矿机械装备有限公司 Tunnel lining trolley variable width gantry system
CN111852507B (en) * 2020-06-03 2023-04-11 保利长大海外工程有限公司 Assembled lining trolley capable of being used for various section sizes
CN112982308B (en) * 2021-03-01 2022-06-07 北京京水建设集团有限公司 Construction method for concrete lining of channel
CN114412515A (en) * 2022-03-03 2022-04-29 核工业井巷建设集团有限公司 Combined type straight wall lining template trolley for small-section tunnel
CN115355024B (en) * 2022-08-08 2025-08-29 中铁十一局集团有限公司 An integrated transport and safety machine for lining transportation and installation
CN118148183B (en) * 2024-05-10 2024-07-09 石家庄铁道大学 A variable movable trolley support and construction method for subway superstructure construction

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3138933A (en) * 1957-08-19 1964-06-30 Kemper Maxwell Fisher Method of and apparatus for driving a tunnel through and supporting earth structure
DE102005028767A1 (en) * 2005-06-08 2006-12-28 Domesle Schalungs- Und Metallbau Gmbh Formwork carriage for concrete formwork has two chassis formed as chassis modules whereby first chassis module has steerable, driven wheel and second chassis module has a heavy duty steering roller
CN2869322Y (en) * 2005-12-23 2007-02-14 于海滨 New-type gantry-type tunnel lining formwork trolley
CN101082280A (en) * 2007-07-18 2007-12-05 湖南中铁五新钢模有限责任公司 Single-track railway tunnel lining trolley
CN102383810A (en) * 2011-11-30 2012-03-21 中铁五局(集团)有限公司 Continuous variable cross-section tunnel lining formwork trolley
CN202731932U (en) * 2012-05-24 2013-02-13 李威德 Sectioned type stretchable steel mould trolley
CN203742618U (en) * 2014-03-07 2014-07-30 陕西理工学院 Span-changing height-changing device for concrete lining steel die trolley

Also Published As

Publication number Publication date
CN103806926A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103806926B (en) The change of concrete lining steel formwork jumbo is across uprising device
CN203742618U (en) Span-changing height-changing device for concrete lining steel die trolley
CN106593472B (en) lining trolley suitable for construction of main tunnel and branch tunnel in parallel tunnel
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN104612712B (en) A kind of tunnel double-lining construction formwork chassis based on rectangle support
CN109441497B (en) Complete equipment for advanced support and transportation without repeated support and transportation method
CN102230381B (en) Hollow needle beam lining trolley
CN205370595U (en) Automatic hydraulic pressure inverted arch landing stage platform truck
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN202768019U (en) Tunnel lining trolley used for small city gate cross section
CN105298111A (en) Open tunnel lining construction template and construction device and construction method of same
CN106640140A (en) Variable-span concrete lining steel form trolley
CN204041080U (en) General formula needle beam lining trolley in a kind of
CN110424996B (en) Self-moving type advance support device without repeated support
CN110284904B (en) Lining trolley and construction method thereof
CN106593469A (en) Trolley for construction of inverted arch
JP7306627B2 (en) Carriage with rail feeder
CN205908300U (en) Ditch cable duct movable trolley
CN206346759U (en) Span type variable concrete lining steel formwork jumbo
CN104929660A (en) Formation and construction set for continuous open-cut tunnel
CN104018869B (en) Advance timbering suspension device
CN206329348U (en) A kind of minitunnel lining trolley
CN205591951U (en) Strut leading section of actual mining roadway from moving formula hydraulic equipment
CN203796317U (en) Striding type self-moving mechanism
CN202467863U (en) Tunnel widening section lining trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20170307