CN104929660A CN201510290314.4A CN201510290314A CN104929660A CN 104929660 A CN104929660 A CN 104929660A CN 201510290314 A CN201510290314 A CN 201510290314A CN 104929660 A CN104929660 A CN 104929660A
Authority
CN
China
Prior art keywords
tunnel
template
continuous open
open cut
construction equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510290314.4A
Other languages
Chinese (zh)
Other versions
CN104929660B (en
Inventor
万鹏
章远方
王浩
孙世豪
纪博林
耿冬梅
周衍领
姚坤锋
李刚
王玲
张传程
王德乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
Beijing Railway No5 Institute Engineering Machinery Co Ltd
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Railway No5 Institute Engineering Machinery Co Ltd, China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical Beijing Railway No5 Institute Engineering Machinery Co Ltd
Priority to CN201510290314.4A priority Critical patent/CN104929660B/en
Publication of CN104929660A publication Critical patent/CN104929660A/en
Application granted granted Critical
Publication of CN104929660B publication Critical patent/CN104929660B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a formation and construction set for a continuous open-cut tunnel. The formation and construction set comprises a frame; the frame comprises two gantries; the gantries are connected together through a vertical beam; the vertical beam is connected with a formwork through a mechanical support; telescopic posts and travelling mechanisms are provided below the gantries. The formwork comprises a plurality of groups of tunnel arc forms vertically spliced; the tunnel arc forms in each group are in integrated large form structures, the tops of which fit the sectional shape of the tunnel; an arc slurry-lifting and leveling unit is arranged at the top of the tunnel arc forms. The formation and construction set is suitable for lining construction by a wall-first and arch-second method; the designed lining is suitable for use in highways, diversion tunnels, railway tunnels and the like, with less than 600mm of thickness. The formation and construction set is simple in structure and attractive in style, allows convenience for construction, and is of good integrity, high automation level, high form removal speed and high in-position speed.

Description

A kind of open cut tunnel tunnel molding construction equipment continuously
Technical field
The present invention relates to a kind of tunnel construction technology, particularly relate to a kind of open cut tunnel tunnel molding construction device continuously.
Background technology
Outmoded construction equipment and means are adopted to carry out in the open cut tunnel construction that Ji Nianzhong China high ferro construction in the past runs into, by simple bar splicing and steel work assembly welding, supporting is carried out to template, and working template all adopts little template construction, the problem that this mode is brought is a lot, one be adopt fritter template construction globality poor, have crackle, water proofing property poor, two is that form removal process is numerous and diverse, and efficiency of construction is low, and cost of labor is high.
Meanwhile, in open cut tunnel construction in the past, die head all adopts manually makes firm by ramming and wipes one's face, and mechanization degree is low, and efficiency of construction is low, and cost of labor is high.Adopt long threaded rod to support and adjusting template, formwork erection form removal process is loaded down with trivial details, and efficiency is low, and cost is high, and precision is low.
Summary of the invention
The object of this invention is to provide a kind of open cut tunnel tunnel molding construction equipment continuously, be conducive to improving efficiency of construction, reducing costs, effectively ensure that the globality of open cut tunnel lining cutting, improve efficiency of construction and precision, saved cost of labor.
The present invention is achieved by the following technical solutions:
Continuous open cut tunnel tunnel of the present invention molding construction equipment, comprise vehicle frame, described vehicle frame comprises 2 door frames, 2 door frames are linked together by longeron, described longeron is connected with template system by mechanical support, and the bottom of described door frame is provided with telescopic column and walking mechanism, and described template system comprises the longitudinal spliced tunnel arcuation template together of many groups, often organize tunnel arcuation template and adopt large overall template structure respectively, its top and tunnel cross-section profile match.
As seen from the above technical solution provided by the invention, the open cut tunnel tunnel lining equipment that the embodiment of the present invention provides, owing to selecting monolithic template, lining cutting surface quality is good, with other high efficiency mix, conveying, perfusion machinery with the use of, higher lining concrete rate of flooding can be reached, improve efficiency of construction, save engineering material and labor cost.
Accompanying drawing explanation
The main TV structure schematic diagram of the continuous open cut tunnel tunnel molding construction equipment that Fig. 1 provides for the embodiment of the present invention;
The side-looking structural representation of the continuous open cut tunnel tunnel molding construction equipment that Fig. 2 provides for the embodiment of the present invention;
Fig. 3 is the main TV structure schematic diagram of steel form in the embodiment of the present invention;
Fig. 4 is the side-looking structural representation of steel form in the embodiment of the present invention;
Fig. 5 is the main TV structure schematic diagram of vehicle frame in the embodiment of the present invention;
Fig. 6 is the side-looking structural representation of vehicle frame in the embodiment of the present invention;
Fig. 7 is the main TV structure schematic diagram of walking mechanism in the embodiment of the present invention;
Fig. 8 is the main TV structure schematic diagram of ceiling in the embodiment of the present invention;
Fig. 9 is the main TV structure schematic diagram that in the embodiment of the present invention, arc carries slurry levelling means;
Figure 10 is the main TV structure schematic diagram of telescopic column in the embodiment of the present invention.
In figure:
1, ceiling, 2, vehicle frame, 3, mechanical support, 4, template system, 5, walking mechanism, 6, upper side template, 7, lower side template, 8, leading screw supports, 9, top rail, 10, arc carries slurry levelling means, and 11, shuttering supporting skeleton, 12, longeron one, 13, longeron two, 14, column, 15, connection beam, 16, telescopic column, 17, movable motor, 18, reductor, 19, sprocket wheel, 20, road wheel, 21, gear, 22, to wipe one's face device, 23, roller, 24, tamping unit, 25, bolt hole, 26, external extension column, 27, interior telescopic column.
Detailed description of the invention
To be described in further detail the embodiment of the present invention below.
Continuous open cut tunnel tunnel of the present invention molding construction equipment, its preferably detailed description of the invention be:
Comprise vehicle frame, described vehicle frame comprises 2 door frames, 2 door frames are linked together by longeron, described longeron is connected with template system by mechanical support, the bottom of described door frame is provided with telescopic column and walking mechanism, described template system comprises the longitudinal spliced tunnel arcuation template together of many groups, and often organize tunnel arcuation template and adopt large overall template structure respectively, its top and tunnel cross-section profile match.
Described vehicle frame upper cross is to being fixed with four hydraulic jacks, and one end of described hydraulic jack is connected with described door frame, and the other end is connected with described template system.
Described mechanical support comprises 7 telescopic oil cylinders, and one end of described telescopic oil cylinder is fixed on described longeron, and the other end is fixed on described template system by bearing pin.
Described template system comprises 7 groups of longitudinal spliced tunnel arcuation templates together, and the top of described tunnel arcuation template is provided with arc and carries slurry levelling means.
Described arc carries slurry levelling means for the cogged dolly of band, and the top of described tunnel arcuation template is provided with arc-shaped rack, and described gear engages with arc-shaped rack, and tamping unit, roller and device of wiping one's face are equipped with in the bottom of described dolly.
Described telescopic column comprises and is fixed on four telescopic oil cylinders bottom described door frame and chute, and described telescopic column is enclosed within described chute, is provided with lock bolt between described telescopic column and described chute.
Described walking mechanism is fixed on the bottom of described telescopic column, comprises the drive unit and road wheel that are connected by chain.
The top of described door frame is provided with ceiling, and described ceiling is equipped with opening-closing type steel plate.
Described hydraulic jack and telescopic oil cylinder are connected with hydraulic electric control system, and described hydraulic electric control system is connected with programmable logic controller and remote controller.
Specific embodiment:
As shown in Figures 1 to 10, vehicle frame, template, walking mechanism, mechanical support, ceiling and hydraulic electric control system is comprised.
Described vehicle frame is made up of 2 door frames, longeron, telescopic columns.Vehicle frame upper cross is to being fixed with four hydraulic jacks.
Described four hydraulic jack one end are connected with door frame, and one end is connected with template system, by regulating the oil cylinder of diagonal to stretch, can carry out Level tune to template.
Described 2 door frames are linked together by longeron, and described longeron is linked together by mechanical support and template.
Described mechanical support is made up of 7 telescopic oil cylinders be fixed on longeron, and the other end is fixed in template by bearing pin.
Described template forms by 7 groups of tunnel arcuation templates are longitudinal spliced, and die head is fixed arc and carried slurry levelling means, matches with tunnel cross-section profile, and adopt large form, entirety does not splice gap.
It is the cogged dolly of band that described arc carries slurry levelling means, and dolly is fixed on the die head with arc-shaped rack, can walk, tamping unit, roller are equipped with in dolly bottom, device of wiping one's face along top curve template.Making firm by ramming of top concrete can be completed strike off.
Described telescopic column is made up of four telescopic oil cylinders be fixed on bottom door frame and chute, and telescopic column is enclosed within chute, stretches after putting in place, by bolt by telescopic column fixing and locking.
Drive unit is connected together with road wheel by chain by described walking mechanism, and top is fixed on the telescopic column of door frame.
Described ceiling is fixed to door frame top, and being equipped with can folding steel plate.
The each oil cylinder of described hydraulic electric control Systematical control flexible, flexible by programmable logic controller and each oil cylinder of remote controller centralized Control.
Continuous open cut tunnel tunnel of the present invention molding construction equipment, can be applicable to adopt wall in advance of arched roof tunneling method to carry out lining construction as this serial chassis, the use such as highway, diversion, railway tunnel within 600mm of design lining thickness.Its advantage is that structure is simple, and pattern is attractive in appearance, constructability, good integrity, and automaticity is high, and form removal is rapid, pop into place.
The above; be only the present invention's preferably detailed description of the invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (9)

1. a continuous open cut tunnel tunnel molding construction equipment, it is characterized in that, comprise vehicle frame, described vehicle frame comprises 2 door frames, and 2 door frames are linked together by longeron, and described longeron is connected with template system by mechanical support, the bottom of described door frame is provided with telescopic column and walking mechanism, described template system comprises the longitudinal spliced tunnel arcuation template together of many groups, and often organize tunnel arcuation template and adopt large overall template structure respectively, its top and tunnel cross-section profile match.
2. continuous open cut tunnel tunnel according to claim 1 molding construction equipment, is characterized in that, described vehicle frame upper cross is to being fixed with four hydraulic jacks, and one end of described hydraulic jack is connected with described door frame, and the other end is connected with described template system.
3. continuous open cut tunnel tunnel according to claim 2 molding construction equipment, it is characterized in that, described mechanical support comprises 7 telescopic oil cylinders, and one end of described telescopic oil cylinder is fixed on described longeron, and the other end is fixed on described template system by bearing pin.
4. continuous open cut tunnel tunnel according to claim 3 molding construction equipment, is characterized in that, described template system comprises 7 groups of longitudinal spliced tunnel arcuation templates together, and the top of described tunnel arcuation template is provided with arc and carries slurry levelling means.
5. continuous open cut tunnel tunnel according to claim 4 molding construction equipment, it is characterized in that, described arc carries slurry levelling means for the cogged dolly of band, the top of described tunnel arcuation template is provided with arc-shaped rack, described gear engages with arc-shaped rack, and tamping unit, roller and device of wiping one's face are equipped with in the bottom of described dolly.
6. continuous open cut tunnel tunnel according to claim 5 molding construction equipment, it is characterized in that, described telescopic column comprises and is fixed on four telescopic oil cylinders bottom described door frame and chute, and described telescopic column is enclosed within described chute, is provided with lock bolt between described telescopic column and described chute.
7. continuous open cut tunnel tunnel according to claim 6 molding construction equipment, it is characterized in that, described walking mechanism is fixed on the bottom of described telescopic column, comprises the drive unit and road wheel that are connected by chain.
8. the continuous open cut tunnel tunnel molding construction equipment according to any one of claim 1 to 7, it is characterized in that, the top of described door frame is provided with ceiling, and described ceiling is equipped with opening-closing type steel plate.
9. the continuous open cut tunnel tunnel molding construction equipment according to any one of claim 3 to 7, it is characterized in that, described hydraulic jack and telescopic oil cylinder are connected with hydraulic electric control system, and described hydraulic electric control system is connected with programmable logic controller and remote controller.
CN201510290314.4A 2015-05-29 2015-05-29 Formation and construction set for continuous open-cut tunnel Active CN104929660B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510290314.4A CN104929660B (en) 2015-05-29 2015-05-29 Formation and construction set for continuous open-cut tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510290314.4A CN104929660B (en) 2015-05-29 2015-05-29 Formation and construction set for continuous open-cut tunnel

Publications (2)

Publication Number Publication Date
CN104929660A true CN104929660A (en) 2015-09-23
CN104929660B CN104929660B (en) 2017-05-03

Family

ID=54117053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510290314.4A Active CN104929660B (en) 2015-05-29 2015-05-29 Formation and construction set for continuous open-cut tunnel

Country Status (1)

Country Link
CN (1) CN104929660B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781587A (en) * 2016-04-30 2016-07-20 山西省交通科学研究院 Tunnel excavation vault emergency support equipment and method
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
CN108312325A (en) * 2018-01-22 2018-07-24 江苏银旭隧道机械有限公司 A kind of concrete pipe sheet vibration finisher
CN114592889A (en) * 2022-05-11 2022-06-07 河北东风世景轨道有限公司 Arch self-bearing type formwork for tunnel concrete construction pouring

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230785B (en) * 2008-02-22 2010-08-11 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN103615262A (en) * 2013-11-25 2014-03-05 国电大渡河沙坪水电建设有限公司 Steel form jumbo with main structure capable of passing conventional sections, and implementation method thereof
CN103742168A (en) * 2014-01-21 2014-04-23 中铁五局(集团)有限公司 Independent lining trolley for anchorage holes and opening holes of tunnels
CN203685207U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 Dual-lining trolley structure
CN203702180U (en) * 2014-03-04 2014-07-09 张进军 Single-track railway outer mold tunnel trolley
CN203756190U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Trolley device for herringbone forked tunnel
CN104033163A (en) * 2014-05-06 2014-09-10 中铁十七局集团第二工程有限公司 One-time concrete-pouring forming method of bottom plate and side walls of hydraulic tunnel
CN203948107U (en) * 2014-07-14 2014-11-19 中铁二局股份有限公司 Whole self-propelled formula hydraulic lining trolley
CN104405416A (en) * 2014-12-18 2015-03-11 北京铁五院工程机械有限公司 Whole-section, large-headroom and rapid lining trolley

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230785B (en) * 2008-02-22 2010-08-11 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
KR20130106199A (en) * 2012-03-19 2013-09-27 선산철강공업(주) Steel form for tunnel construction under linning board and tunnel construction method using it
CN103615262A (en) * 2013-11-25 2014-03-05 国电大渡河沙坪水电建设有限公司 Steel form jumbo with main structure capable of passing conventional sections, and implementation method thereof
CN203685207U (en) * 2013-12-31 2014-07-02 中铁十二局集团第二工程有限公司 Dual-lining trolley structure
CN103742168A (en) * 2014-01-21 2014-04-23 中铁五局(集团)有限公司 Independent lining trolley for anchorage holes and opening holes of tunnels
CN203702180U (en) * 2014-03-04 2014-07-09 张进军 Single-track railway outer mold tunnel trolley
CN203756190U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Trolley device for herringbone forked tunnel
CN104033163A (en) * 2014-05-06 2014-09-10 中铁十七局集团第二工程有限公司 One-time concrete-pouring forming method of bottom plate and side walls of hydraulic tunnel
CN203948107U (en) * 2014-07-14 2014-11-19 中铁二局股份有限公司 Whole self-propelled formula hydraulic lining trolley
CN104405416A (en) * 2014-12-18 2015-03-11 北京铁五院工程机械有限公司 Whole-section, large-headroom and rapid lining trolley

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781587A (en) * 2016-04-30 2016-07-20 山西省交通科学研究院 Tunnel excavation vault emergency support equipment and method
CN105781587B (en) * 2016-04-30 2017-07-21 山西省交通科学研究院 A kind of urgent support apparatus of tunnel excavation vault and method
CN106050270A (en) * 2016-08-16 2016-10-26 北京康港工程技术有限公司 Open cut tunnel forming construction device
CN108312325A (en) * 2018-01-22 2018-07-24 江苏银旭隧道机械有限公司 A kind of concrete pipe sheet vibration finisher
CN108312325B (en) * 2018-01-22 2024-04-05 江苏银旭隧道机械有限公司 Concrete segment vibration plastering machine
CN114592889A (en) * 2022-05-11 2022-06-07 河北东风世景轨道有限公司 Arch self-bearing type formwork for tunnel concrete construction pouring
CN114592889B (en) * 2022-05-11 2022-07-08 河北东风世景轨道有限公司 Arch-shaped self-bearing type formwork for tunnel concrete construction pouring

Also Published As

Publication number Publication date
CN104929660B (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN107387122A (en) A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN101408019A (en) Low altitude prefabricated case beam internal mold and construction method thereof
CN104929660A (en) Formation and construction set for continuous open-cut tunnel
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN103867215A (en) Expressway tunnel groove integral lining trolley
CN204041080U (en) General formula needle beam lining trolley in a kind of
CN210712594U (en) Culvert platform truck
CN205112063U (en) Integral hydraulic pressure exterior sheathing of precast box girder
CN214887105U (en) Tunnel widening section retractable form board platform truck
CN116971800B (en) Movable template trolley system for construction of partition wall in variable-section tunnel and conversion construction method
CN104018855B (en) General formula needle beam lining trolley in a kind of
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN111188289A (en) Culvert trolley and construction method thereof
CN201279830Y (en) Low-height prefabricated case beam internal mold
CN203702181U (en) Expressway tunnel groove integral lining trolley
CN204002842U (en) In full section, slide rail moves steel form carrier
CN203702180U (en) Single-track railway outer mold tunnel trolley
CN212671805U (en) Split type hydraulic trolley
CN212316711U (en) Culvert trolley
CN211448702U (en) Tunnel secondary lining construction trolley
CN214301676U (en) Gate chamber water delivery corridor construction device
CN203730015U (en) Groove lining forming device used for highway tunnel integral lining trolley
CN203702176U (en) Side framework support structure of tunnel lining trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant