CN203685207U - Dual-lining trolley structure - Google Patents

Dual-lining trolley structure Download PDF

Info

Publication number
CN203685207U
CN203685207U CN201320886364.5U CN201320886364U CN203685207U CN 203685207 U CN203685207 U CN 203685207U CN 201320886364 U CN201320886364 U CN 201320886364U CN 203685207 U CN203685207 U CN 203685207U
Authority
CN
China
Prior art keywords
lining
lining trolley
trolley
section
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320886364.5U
Other languages
Chinese (zh)
Inventor
范廉明
杨秀文
姜朋军
李�杰
张克宏
谷孝军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority to CN201320886364.5U priority Critical patent/CN203685207U/en
Application granted granted Critical
Publication of CN203685207U publication Critical patent/CN203685207U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model belongs to the technical field of tunnel construction equipment, specifically a dual-lining trolley structure. The structure solves problems that the normal construction of a tunnel is affected by that a new lining trolley is assembled through anchoring section lining construction, and the investment is high. The structure comprises a lining trolley disposed on a guide rail. The lower side of the lining trolley is provided with a travel system which comprises a travel beam and a travel wheel support. The outer side of the lining trolley is provided with a reversed U-shaped bent wall template. A high block is disposed between the travel beam and the travel wheel support. Two reversed U-shaped pin parts of the lower end of the reversed U-shaped bent wall template are respectively provided with a template. Through the reconstruction of the lining trolley, the structure can completely meet the requirement that the safe construction pace and lining clearance section can be met at lower cost on construction site.

Description

Two lining trolley structures
Technical field
The utility model belongs to constructing tunnel equipment technical field, specifically a kind of two lining trolley structures.
Background technology
Constructing tunnel management now, lining cutting is extremely strict with the safe step pitch requirement of excavation face, and the distance of lining cutting hysteresis excavation face can not exceed safe distance requirement.In constructing tunnel, be divided into tunnel and be divided into normal reach and anchor section, in the time of anchor section lining construction, if assemble new lining trolley, because chassis built-up time is relatively long, easily cause lining cutting to the distance of excavation face be greater than safe distance result, affect front, tunnel normal construction, moreover anchor section work operations amount is less, drop into independent chassis, cost is larger.
Summary of the invention
The utility model is assembled new lining trolley and is affected tunnel normal construction in order to solve anchor section lining construction, and the problem that cost has high input provides a kind of two lining trolley structures especially.
The utility model is taked following technical scheme: a kind of two lining trolley structures, comprise the lining trolley being arranged on rail, lining trolley downside is provided with running gear, running gear comprises walking beam and road wheel support, lining trolley outside is provided with the bent wall form of inverted U, between walking beam and road wheel support, be provided with and increase piece, inverted U pin place, two of bent wall form lower ends is respectively equipped with template.
The described height of increasing piece is that anchor section lining section vault arrives difference between the distance of interior tread upper thread to distance and the normal reach lining section vault of interior tread upper thread; Described template height is the corresponding arc length of anchor section lining cutting radius and the difference of the corresponding camber line of normal reach lining cutting radius.
Compared with prior art, the utility model, by the transformation to lining trolley, can meet job site completely and reach the requirement that meets construction safety step pitch and lining cutting cross-section with less cost.
Brief description of the drawings
Fig. 1 is the utility model structure front view;
Fig. 2 is the utility model texture edge figure;
1-lining trolley in figure, 2-walking beam, 3-increases piece, 4-rail, the bent wall form of 5-, 6-template, 7-road wheel support.
Detailed description of the invention
As shown in Figure 1, 2, a kind of two lining trolley structures, comprise the lining trolley 1 being arranged on rail 4, lining trolley 1 downside is provided with running gear, running gear comprises walking beam 2 and road wheel support 7, lining trolley 1 outside is provided with the bent wall form 5 of inverted U, between walking beam 2 and road wheel support 7, is provided with and increases piece 3, and inverted U pin place, two of 5 lower ends of bent wall form is respectively equipped with template 6.
The described height of increasing piece 3 is that anchor section lining section vault arrives difference between the distance of interior tread upper thread to distance and the normal reach lining section vault of interior tread upper thread; Described template 6 height are the corresponding arc length of anchor section lining cutting radius and the difference of the corresponding camber line of normal reach lining cutting radius.
Taking No. two tunnels of new peach blossom paving as example, 7531 meters of No. two tunnel total lengths of new peach blossom paving, are single-track railway tunnel.Full tunnel is R=1600 rice except 247.14 meters of inducers are positioned at radius, and it is that the curve of R=1400 rice is upper outside that 763.51 meters of outlet sections are positioned at radius, and all the other are all positioned on straight line.On circuit straightway, except anchor section lining section, all the other paragraph lining sections do not change, and are unified standard section.Current constructing tunnel management, lining cutting is extremely strict with the safe step pitch requirement of excavation face, and the distance of lining cutting hysteresis excavation face can not exceed safe distance requirement.Full tunnel has six place's anchor sections, and every director's degree is 120 meters, and the intersegmental distance of anchor is 1280 meters.
By the comparative analysis of cross dimensions, can draw two lining sections do not exist together for:
1. the corresponding camber line of anchor section lining cutting R3 radius is long is 518cm, the corresponding camber line of normal reach lining cutting R3 radius is long is 469cm, the corresponding camber line of anchor section lining cutting R3 radius is than the long 49cm of the corresponding camber line of normal reach lining cutting R3 radius, the radian of the corresponding camber line of anchor section lining cutting R3 radius is 0.487rad, the radian of the corresponding camber line of normal reach lining cutting R3 radius is 0.499rad, although the radian of two camber lines is different, but error is in allowed band, can consider to utilize this template of normal reach lining trolley as a joint of the bent wall form of anchor section lining cutting.
2. anchor section lining section vault is 724cm to the height of interior tread upper thread, normal reach lining section vault is 674cm to the height of interior tread upper thread, and anchor section lining section vault arrives the high 50cm of height of interior tread upper thread to the aspect ratio normal reach lining section vault of interior tread upper thread.

Claims (2)

1. a lining trolley structure, comprise the lining trolley (1) being arranged on rail (4), lining trolley (1) downside is provided with running gear, running gear comprises walking beam (2) and road wheel support (7), lining trolley (1) outside is provided with the bent wall form (5) of inverted U, it is characterized in that: between walking beam (2) and road wheel support (7), be provided with and increase piece (3), inverted U pin place, two of bent wall form (5) lower ends is respectively equipped with template (6).
2. two lining trolley structures according to claim 1, is characterized in that: the described height of increasing piece (3) is that anchor section lining section vault arrives difference between the distance of interior tread upper thread to distance and the normal reach lining section vault of interior tread upper thread; Described template (6) height is the corresponding arc length of anchor section lining cutting radius and the difference of the corresponding camber line of normal reach lining cutting radius.
CN201320886364.5U 2013-12-31 2013-12-31 Dual-lining trolley structure Expired - Fee Related CN203685207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320886364.5U CN203685207U (en) 2013-12-31 2013-12-31 Dual-lining trolley structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320886364.5U CN203685207U (en) 2013-12-31 2013-12-31 Dual-lining trolley structure

Publications (1)

Publication Number Publication Date
CN203685207U true CN203685207U (en) 2014-07-02

Family

ID=51007125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320886364.5U Expired - Fee Related CN203685207U (en) 2013-12-31 2013-12-31 Dual-lining trolley structure

Country Status (1)

Country Link
CN (1) CN203685207U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929660A (en) * 2015-05-29 2015-09-23 北京铁五院工程机械有限公司 Formation and construction set for continuous open-cut tunnel
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN107060823B (en) * 2017-04-11 2024-05-14 中铁二十一局集团第三工程有限公司 Non-dismantling trolley for tunnel anchor section secondary lining concrete construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929660A (en) * 2015-05-29 2015-09-23 北京铁五院工程机械有限公司 Formation and construction set for continuous open-cut tunnel
CN107060823A (en) * 2017-04-11 2017-08-18 中铁二十局集团第三工程有限公司 Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN107060823B (en) * 2017-04-11 2024-05-14 中铁二十一局集团第三工程有限公司 Non-dismantling trolley for tunnel anchor section secondary lining concrete construction

Similar Documents

Publication Publication Date Title
CN203639824U (en) Walking mechanism of bridge upper chord inspection vehicle
CN104816728B (en) Underground station structure of the city track traffic engineering with stop line
CN203685207U (en) Dual-lining trolley structure
CN201756967U (en) Single track railway shield tunnel longitudinal rigidity reinforcing structure
CN201305797Y (en) Narrow gauge symmetrical turnout device
CN203050731U (en) Grouting trolley for secondary grouting operation
CN103850184B (en) Main rope of suspension bridge stringer
CN102094654A (en) Three-track tunnel structure for high speed railway
CN206015442U (en) A kind of removable compound shield-tunneling construction sleeper
CN203602971U (en) Semi-linear type split switch
CN204607431U (en) A kind of trackless transfer crane
CN202208869U (en) Symmetrical three-throw turnout for line rails of urban rail transit engineering
CN203716976U (en) Track panel frame for backup of tunnel boring machine and transportation in tunnel
CN105484118A (en) Linear design method of tunnel passageway transition sections based on traffic capacity stability
CN202707076U (en) Double-line railway tunnel trolley
CN206722840U (en) A kind of belt frame and chassis for rock tunnel(ling) machine
CN209483370U (en) It is a kind of for installing the sideslip tower wagon of subway circular tunnel upper arcuate bracket
CN203393520U (en) Special sleeper for train washing tank of passenger motor train unit
CN206887633U (en) A kind of grooved track trouble frog structure
CN209635762U (en) Lamp box installs vehicle
CN103821524B (en) The section of track frame of transport in supporting and hole after tunneler
CN205737577U (en) Friction obstruction formula sky rail train stopper
CN203359441U (en) Direction-changing rail for steel structure roof transport cart
CN205638489U (en) A construction trolley car that is used for shield to construct intermediate layer soil slip casting of superimposing thread tunnel
CN205474623U (en) Sloping between tracks connection device goes up and down

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20211231

CF01 Termination of patent right due to non-payment of annual fee