CN105113410A - 支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法 - Google Patents
支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法 Download PDFInfo
- Publication number
- CN105113410A CN105113410A CN201510227724.4A CN201510227724A CN105113410A CN 105113410 A CN105113410 A CN 105113410A CN 201510227724 A CN201510227724 A CN 201510227724A CN 105113410 A CN105113410 A CN 105113410A
- Authority
- CN
- China
- Prior art keywords
- loose tool
- steel bridge
- line
- control panel
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及一种支撑胎架,尤其涉及一种支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法,属于钢结构领域。包括二根以上的纵向梁和二根以上的横向梁,二根横向梁间通过二根纵向梁相固定,纵向梁与横向梁拼接处的底部设有底座,所述的横向梁的上部设有均匀分布的胎模控制板。按以下步骤进行:支撑胎模的铺设→胎模检测→公路钢桥成型。支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法结构紧凑,拼装精度高,提升拼装强度,提高成桥线型。
Description
技术领域
本发明涉及一种支撑胎架,尤其涉及一种支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法,属于钢结构领域。
背景技术
现有技术中的公路钢桥单元无法成批生产,每个生产出来的公路钢桥单元存在个性的差异,无法使多个公路钢桥单元进行良好的拼接,导致使用性能和安全性能的降低。
发明内容
本发明主要是解决现有技术中存在的不足,提供一种结构紧凑,通过支撑胎模进行公路钢桥的精度成型,满足批量生产要求的支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法。
本发明的上述技术问题主要是通过下述技术方案得以解决的:
一种公路钢桥支撑胎架,包括二根以上的纵向梁和二根以上的横向梁,二根横向梁间通过二根纵向梁相固定,纵向梁与横向梁拼接处的底部设有底座,所述的横向梁的上部设有均匀分布的胎模控制板。
作为优选,二根横向梁间设有二根相互平行呈间隔状分布的中间横向梁,所述的纵向梁有4根,4根纵向梁均匀分布在二根横向梁间,所述的中间横向梁与4根纵向梁相拼接;
一端横向梁的外壁设有侧横向梁,所述的底座分别设在中间横向型和侧横向梁的底部;
所述的胎模控制板分别设在中间横向梁和侧横向梁的上部。
作为优选,一种公路钢桥支撑胎架,其特征在于:所述的横向梁、纵向梁、中间横向梁、侧横向梁的上部呈同一水平面分布。
利用支撑胎架搭设公路钢桥的线型成形方法,按以下步骤进行:
(1)、支撑胎模的铺设:
1、根据公路钢桥支撑胎模设置图,在地面上放出支撑胎模的投影线和定位线;
支撑胎模相邻横向定位中心线沿公路钢桥纵向的间距偏差应控制在±0.5mm的范围内;
2、根据支撑胎模的地样线设置胎模,先设置支撑胎模的底座,为防止支撑胎模的移动影响公路钢桥的整体线型,底座与地面采用双头螺柱连接固定;
3、支撑胎模的底座设置并检验合格后,接着将底座上的横、纵向梁的定位中心线移植至底座的上表面,然后根据定位中心线和支撑胎模的投影边界线,沿钢桥纵向依次定位横、纵向梁,并调整中心线至重合后焊接固定,固定后的相邻横向梁的中心间距偏差不得大于±1mm;
所述的横向梁包括横向梁、中间横向梁和侧横向梁;
4、支撑胎模的横向梁和纵向梁按要求铺设完成后,检查是否稳固,应确保钢桥拼装过程中不会发生移动;然后检测、调整胎膜控制板支撑面的平面度,平面度允许偏差不大于5mm;
5、支撑胎模设计图纸要求,在横向梁上放出胎膜控制板定位线,以胎膜控制板定位线为基准,依次设置胎模控制板,控制板采取数控下料,与桥底板接触面必须经精密加工;
胎膜控制板设置应满足以下要求:横向连线与桥梁横向坡度一致,为2%横坡;纵向连线为钢桥成桥线型;符合要求后固定焊在横梁上;
(2)、胎模检测:
公路钢桥的支撑胎模铺设完成后,利用全站仪进行胎模控制板上各测控点坐标的检测,并记录测量数据,然后将测量坐标值数据导入计算机,得出钢桥胎模设置线型,与设计要求的成桥线型进行比对,当存在偏差时,对局部控制板进行调整,直至完全一致满足设计成桥线型要求;
(3)、公路钢桥成型:
在搭设好的支撑胎模上进行公路钢桥的组拼,先拼底板单元,接着拼横隔板单元、纵腹板单元,最后组拼顶板单元;
上述板单元组拼时,底板单元作为公路钢桥成形的基准,与胎模控制板上接触面必须达到紧贴要求,以确保钢桥成形后的线型满足设计要求的成桥线型。
本发明提供支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法,结构紧凑,拼装精度高,提升拼装强度,提高成桥线型。
附图说明
图1是本发明的结构示意图;
图2是本发明中横向梁和纵向梁的放样结构示意图;
图3是本发明中底座的放样结构示意图;
图4是本发明中横向梁和纵向梁的设置结构示意图;
图5是本发明中胎模控制板的设置结构示意图;
图6是本发明中胎模控制板上测控点复测的结构示意图;
附图标记说明:1、纵向梁;2、横向梁;3、底座;4、胎模控制板;5、中间横向梁;6、侧横向梁;7、底座横向定位中心线;8、底座纵向定位中心线;9、胎模控制板定位线;10、胎模测控点;11、底板单元;12、横隔板单元;13、纵腹板单元;14、顶板单元。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。
实施例1:如图1、图2、图3、图4、图5和图6所示,一种公路钢桥支撑胎架,包括二根以上的纵向梁1和二根以上的横向梁2,二根横向梁2间通过二根纵向梁1相固定,纵向梁1与横向梁2拼接处的底部设有底座3,所述的横向梁2的上部设有均匀分布的胎模控制板4。
二根横向梁2间设有二根相互平行呈间隔状分布的中间横向梁5,所述的纵向梁1有4根,4根纵向梁4均匀分布在二根横向梁2间,所述的中间横向梁5与4根纵向梁1相拼接;
一端横向梁2的外壁设有侧横向梁6,所述的底座3分别设在中间横向型5和侧横向梁6的底部;
所述的胎模控制板4分别设在中间横向梁5和侧横向梁6的上部。
所述的横向梁2、纵向梁1、中间横向梁5、侧横向梁6的上部呈同一水平面分布。
利用支撑胎架搭设公路钢桥的线型成形方法,按以下步骤进行:
(1)、支撑胎模的铺设:
1、根据公路钢桥支撑胎模设置图,在地面上放出支撑胎模的投影线和定位线;
支撑胎模相邻横向定位中心线沿公路钢桥纵向的间距偏差应控制在±0.5mm的范围内;
2、根据支撑胎模的地样线设置胎模,先设置支撑胎模的底座,为防止支撑胎模的移动影响公路钢桥的整体线型,底座与地面采用双头螺柱连接固定;
3、支撑胎模的底座设置并检验合格后,接着将底座上的横、纵向梁的定位中心线移植至底座的上表面,然后根据定位中心线和支撑胎模的投影边界线,沿钢桥纵向依次定位横、纵向梁,并调整中心线至重合后焊接固定,固定后的相邻横向梁的中心间距偏差不得大于±1mm;
所述的横向梁包括横向梁、中间横向梁和侧横向梁;
4、支撑胎模的横向梁和纵向梁按要求铺设完成后,检查是否稳固,应确保钢桥拼装过程中不会发生移动;然后检测、调整胎膜控制板支撑面的平面度,平面度允许偏差不大于5mm;
5、支撑胎模设计图纸要求,在横向梁上放出胎膜控制板定位线,以胎膜控制板定位线为基准,依次设置胎模控制板,控制板采取数控下料,与桥底板接触面必须经精密加工;
胎膜控制板设置应满足以下要求:横向连线与桥梁横向坡度一致,为2%横坡;纵向连线为钢桥成桥线型;符合要求后固定焊在横梁上;
(4)、胎模检测:
公路钢桥的支撑胎模铺设完成后,利用全站仪进行胎模控制板上各测控点坐标的检测,并记录测量数据,然后将测量坐标值数据导入计算机,得出钢桥胎模设置线型,与设计要求的成桥线型进行比对,当存在偏差时,对局部控制板进行调整,直至完全一致满足设计成桥线型要求;
(5)、公路钢桥成型:
在搭设好的支撑胎模上进行公路钢桥的组拼,先拼底板单元,接着拼横隔板单元、纵腹板单元,最后组拼顶板单元;
上述板单元组拼时,底板单元作为公路钢桥成形的基准,与胎模控制板上接触面必须达到紧贴要求,以确保钢桥成形后的线型满足设计要求的成桥线型。
Claims (4)
1.一种公路钢桥支撑胎架,其特征在于:包括二根以上的纵向梁(1)和二根以上的横向梁(2),二根横向梁(2)间通过二根纵向梁(1)相固定,纵向梁(1)与横向梁(2)拼接处的底部设有底座(3),所述的横向梁(2)的上部设有均匀分布的胎模控制板(4)。
2.根据权利要求1所述的一种公路钢桥支撑胎架,其特征在于:二根横向梁(2)间设有二根相互平行呈间隔状分布的中间横向梁(5),所述的纵向梁(1)有4根,4根纵向梁(4)均匀分布在二根横向梁(2)间,所述的中间横向梁(5)与4根纵向梁(1)相拼接;
一端横向梁(2)的外壁设有侧横向梁(6),所述的底座(3)分别设在中间横向型(5)和侧横向梁(6)的底部;
所述的胎模控制板(4)分别设在中间横向梁(5)和侧横向梁(6)的上部。
3.根据权利要求1或2所述的一种公路钢桥支撑胎架,其特征在于:所述的横向梁(2)、纵向梁(1)、中间横向梁(5)、侧横向梁(6)的上部呈同一水平面分布。
4.根据权利要求1或2所述的利用支撑胎架搭设公路钢桥的线型成形方法,其特征在于按以下步骤进行:
(1)、支撑胎模的铺设:
1)、根据公路钢桥支撑胎模设置图,在地面上放出支撑胎模的投影线和定位线;
支撑胎模相邻横向定位中心线沿公路钢桥纵向的间距偏差应控制在±0.5mm的范围内;
2)、根据支撑胎模的地样线设置胎模,先设置支撑胎模的底座,为防止支撑胎模的移动影响公路钢桥的整体线型,底座与地面采用双头螺柱连接固定;
3)、支撑胎模的底座设置并检验合格后,接着将底座上的横、纵向梁的定位中心线移植至底座的上表面,然后根据定位中心线和支撑胎模的投影边界线,沿钢桥纵向依次定位横、纵向梁,并调整中心线至重合后焊接固定,固定后的相邻横向梁的中心间距偏差不得大于±1mm;
所述的横向梁包括横向梁、中间横向梁和侧横向梁;
4)、支撑胎模的横向梁和纵向梁按要求铺设完成后,检查是否稳固,应确保钢桥拼装过程中不会发生移动;然后检测、调整胎膜控制板支撑面的平面度,平面度允许偏差不大于5mm;
5)、支撑胎模设计图纸要求,在横向梁上放出胎膜控制板定位线,以胎膜控制板定位线为基准,依次设置胎模控制板,控制板采取数控下料,与桥底板接触面必须经精密加工;
胎膜控制板设置应满足以下要求:横向连线与桥梁横向坡度一致,为2%横坡;纵向连线为钢桥成桥线型;符合要求后固定焊在横梁上;
(2)、胎模检测:
公路钢桥的支撑胎模铺设完成后,利用全站仪进行胎模控制板上各测控点坐标的检测,并记录测量数据,然后将测量坐标值数据导入计算机,得出钢桥胎模设置线型,与设计要求的成桥线型进行比对,当存在偏差时,对局部控制板进行调整,直至完全一致满足设计成桥线型要求;
(3)、公路钢桥成型:
在搭设好的支撑胎模上进行公路钢桥的组拼,先拼底板单元,接着拼横隔板单元、纵腹板单元,最后组拼顶板单元;
上述板单元组拼时,底板单元作为公路钢桥成形的基准,与胎模控制板上接触面必须达到紧贴要求,以确保钢桥成形后的线型满足设计要求的成桥线型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510227724.4A CN105113410B (zh) | 2015-05-06 | 2015-05-06 | 支撑胎模及利用支撑胎模搭设公路钢桥的线型成形方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510227724.4A CN105113410B (zh) | 2015-05-06 | 2015-05-06 | 支撑胎模及利用支撑胎模搭设公路钢桥的线型成形方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105113410A true CN105113410A (zh) | 2015-12-02 |
CN105113410B CN105113410B (zh) | 2017-03-01 |
Family
ID=54661504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510227724.4A Active CN105113410B (zh) | 2015-05-06 | 2015-05-06 | 支撑胎模及利用支撑胎模搭设公路钢桥的线型成形方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113410B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841949A (zh) * | 2017-07-21 | 2018-03-27 | 南通振华重型装备制造有限公司 | 一种倒梯形大桥主梁拼装胎架的建造工艺 |
CN108755449A (zh) * | 2017-11-28 | 2018-11-06 | 江苏中铁山桥重工有限公司 | 一种用于桥面更换的新型钢桥面的制造方法 |
CN109356391A (zh) * | 2018-11-30 | 2019-02-19 | 中国冶集团有限公司 | 基于三维激光扫描技术的胎架搭设方法 |
CN109653098A (zh) * | 2018-09-28 | 2019-04-19 | 江苏中铁山桥重工有限公司 | 一种无余量钢箱梁拼装方法 |
CN110904745A (zh) * | 2018-09-17 | 2020-03-24 | 比亚迪股份有限公司 | 道岔设备支撑平台 |
CN113001176A (zh) * | 2021-03-09 | 2021-06-22 | 机械工业第九设计研究院有限公司 | 一体现岛式装配理念的工位地板装配岛 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070060583A (ko) * | 2005-12-09 | 2007-06-13 | (주) 대산개발 | 가설교량의 벤트 시공공법 |
CN201432273Y (zh) * | 2009-06-19 | 2010-03-31 | 武汉市海波钢结构安装工程有限公司 | 钢箱梁分段制造用桁架式模块胎架 |
CN202062324U (zh) * | 2011-05-20 | 2011-12-07 | 武船重型工程有限公司 | 一种可组合调节式胎架 |
CN202212724U (zh) * | 2011-08-04 | 2012-05-09 | 中建钢构江苏有限公司 | 桥面块体模拟拼装胎架 |
CN103266569A (zh) * | 2013-05-24 | 2013-08-28 | 武船重型工程股份有限公司 | 一种钢桥的预拼装方法 |
CN203304740U (zh) * | 2013-06-05 | 2013-11-27 | 天顺风能(苏州)股份有限公司 | 数控火焰切割钢板支撑胎架 |
CN203438209U (zh) * | 2013-06-05 | 2014-02-19 | 天顺风能(苏州)股份有限公司 | 钢板坡口加工用支撑用胎架 |
CN203791801U (zh) * | 2014-04-04 | 2014-08-27 | 江苏云飞机械有限公司 | 一种用于切割大型钢板的胎架 |
CN203936562U (zh) * | 2014-06-10 | 2014-11-12 | 苏州天顺新能源科技有限公司 | 适合小件切割的数控火焰切割模块化钢板支撑胎架 |
CN204644881U (zh) * | 2015-05-06 | 2015-09-16 | 浙江东南网架股份有限公司 | 一种公路钢桥支撑胎架 |
-
2015
- 2015-05-06 CN CN201510227724.4A patent/CN105113410B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070060583A (ko) * | 2005-12-09 | 2007-06-13 | (주) 대산개발 | 가설교량의 벤트 시공공법 |
CN201432273Y (zh) * | 2009-06-19 | 2010-03-31 | 武汉市海波钢结构安装工程有限公司 | 钢箱梁分段制造用桁架式模块胎架 |
CN202062324U (zh) * | 2011-05-20 | 2011-12-07 | 武船重型工程有限公司 | 一种可组合调节式胎架 |
CN202212724U (zh) * | 2011-08-04 | 2012-05-09 | 中建钢构江苏有限公司 | 桥面块体模拟拼装胎架 |
CN103266569A (zh) * | 2013-05-24 | 2013-08-28 | 武船重型工程股份有限公司 | 一种钢桥的预拼装方法 |
CN203304740U (zh) * | 2013-06-05 | 2013-11-27 | 天顺风能(苏州)股份有限公司 | 数控火焰切割钢板支撑胎架 |
CN203438209U (zh) * | 2013-06-05 | 2014-02-19 | 天顺风能(苏州)股份有限公司 | 钢板坡口加工用支撑用胎架 |
CN203791801U (zh) * | 2014-04-04 | 2014-08-27 | 江苏云飞机械有限公司 | 一种用于切割大型钢板的胎架 |
CN203936562U (zh) * | 2014-06-10 | 2014-11-12 | 苏州天顺新能源科技有限公司 | 适合小件切割的数控火焰切割模块化钢板支撑胎架 |
CN204644881U (zh) * | 2015-05-06 | 2015-09-16 | 浙江东南网架股份有限公司 | 一种公路钢桥支撑胎架 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107841949A (zh) * | 2017-07-21 | 2018-03-27 | 南通振华重型装备制造有限公司 | 一种倒梯形大桥主梁拼装胎架的建造工艺 |
CN107841949B (zh) * | 2017-07-21 | 2019-04-05 | 南通振华重型装备制造有限公司 | 一种倒梯形大桥主梁拼装胎架的建造工艺 |
CN108755449A (zh) * | 2017-11-28 | 2018-11-06 | 江苏中铁山桥重工有限公司 | 一种用于桥面更换的新型钢桥面的制造方法 |
CN110904745A (zh) * | 2018-09-17 | 2020-03-24 | 比亚迪股份有限公司 | 道岔设备支撑平台 |
CN109653098A (zh) * | 2018-09-28 | 2019-04-19 | 江苏中铁山桥重工有限公司 | 一种无余量钢箱梁拼装方法 |
CN109356391A (zh) * | 2018-11-30 | 2019-02-19 | 中国冶集团有限公司 | 基于三维激光扫描技术的胎架搭设方法 |
CN113001176A (zh) * | 2021-03-09 | 2021-06-22 | 机械工业第九设计研究院有限公司 | 一体现岛式装配理念的工位地板装配岛 |
Also Published As
Publication number | Publication date |
---|---|
CN105113410B (zh) | 2017-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113410A (zh) | 支撑胎架及利用支撑胎架搭设公路钢桥的线型成形方法 | |
CN105040567B (zh) | 一种互通立交钢桥及其制备方法 | |
CN103523169B (zh) | 一种双壳体船舶制造方法 | |
CN102767133A (zh) | 一种钢箱梁桥疲劳应力监测的传感器布置方法 | |
CN104074364A (zh) | 一种铸钢件漏斗型结构预拼装定位施工方法 | |
CN102954776A (zh) | 具有用作底座或机座的混凝土块的测量机,以及补偿由该块的变形产生的测量误差的方法 | |
CN104563525B (zh) | 一种箱式钢拱梁整体卧式组对方法 | |
CN103306204B (zh) | 一种基座钢锚箱三向式定位装置 | |
CN203371188U (zh) | 机车车体横梁组对用胎体 | |
CN103276909B (zh) | 弧形网架拼装方法及其使用的网架拼装胎架 | |
CN209195049U (zh) | 大截面扭曲钢箱梁装配推顶装置 | |
CN205313980U (zh) | 桁架式天桥钢构件便携拼装胎架 | |
CN112411387A (zh) | 一种连续钢梁桥墩支座的放样方法 | |
CN218059932U (zh) | 一种钢锚箱安装机构 | |
CN105113418A (zh) | 一种支座垫石施工放样方法 | |
CN102518045A (zh) | 拱肋预埋段安装定位支架及其调整定位方法 | |
CN205317108U (zh) | 桥墩支座预留孔轴线检查装置 | |
KR200413891Y1 (ko) | 수평게이지가 부착된 교량받침 | |
CN203109499U (zh) | 一种扶梯桁架焊接平台 | |
CN208662988U (zh) | 罐车吊托通用装配台 | |
CN108755449A (zh) | 一种用于桥面更换的新型钢桥面的制造方法 | |
CN203034378U (zh) | 横向调节限位装置 | |
CN102889995A (zh) | 一种驾驶室测试平台 | |
CN103195012A (zh) | 一种生态河道模型的地形制作台架 | |
CN114934665B (zh) | 一种华夫板平整度施工方法及机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |