CN104989122B - 建筑物顶升方法 - Google Patents

建筑物顶升方法 Download PDF

Info

Publication number
CN104989122B
CN104989122B CN201510397229.8A CN201510397229A CN104989122B CN 104989122 B CN104989122 B CN 104989122B CN 201510397229 A CN201510397229 A CN 201510397229A CN 104989122 B CN104989122 B CN 104989122B
Authority
CN
China
Prior art keywords
building
jack
jacking
plate
distribution beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510397229.8A
Other languages
English (en)
Other versions
CN104989122A (zh
Inventor
束学智
殷小军
王建永
彭勇平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION SHIFT BUILDING ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION SHIFT BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION SHIFT BUILDING ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION SHIFT BUILDING ENGINEERING Co Ltd
Priority to CN201510397229.8A priority Critical patent/CN104989122B/zh
Publication of CN104989122A publication Critical patent/CN104989122A/zh
Application granted granted Critical
Publication of CN104989122B publication Critical patent/CN104989122B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种建筑物顶升方法,通过在分配梁与千斤顶之间设置水平方向位移纠偏装置,当建筑物在顶升过程中,产生水平方向的偏移,则通过纠偏装置进行加塞楔形纠偏板,用以改变千斤顶的垂直度,从而形成水平方向上可控的水平力,对建筑物造成偏移的水平力施加反向水平力,使得建筑物由于水平力的改变而改变其水平位移,最终达到纠偏效果,保证顶升过程的安全可靠。

Description

建筑物顶升方法
技术领域
本发明涉及建筑物顶升技术,更具体地说,涉及一种建筑物顶升方法。
背景技术
在一般的建筑物顶升过程中,建筑物由于水平方向上水平力的不平衡,或者其他外力影响下打破了建筑物的水平力的平衡,从而产生水平方向上的偏移,如果水平偏移量太大,可能导致支撑体系间的连系变得不稳定,从而对整个支撑体系产生破坏并失稳,因此存在巨大的安全隐患。
由此可见,如何有效消除建筑物顶升过程中产生的水平方向位移,是本领域亟需要解决的问题。
发明内容
针对现有技术中存在的上述缺点,本发明的目的是提供一种建筑物顶升方法,能够有效纠正建筑物在顶升过程中产生的水平方向偏移量,消除偏移量所产生的影响,保证顶升过程的安全可靠。
为实现上述目的,本发明采用如下技术方案:
一方面,建筑物顶升系统,包括布置于建筑物底部的分配梁、布置于分配梁下方的千斤顶、垫设于千斤顶下部的支撑体系,还包括:设于分配梁与千斤顶之间的水平方向位移纠偏装置,该纠偏装置包括上连接板、纠偏板和下连接板,上连接板与分配梁相连接紧固,下连接板与千斤顶相连接紧固,纠偏板为楔形板,其楔形面朝下并加塞于上、下连接板之间,并通过上、下连接板的栓接而紧固。
所述的上连接板与下连接板的水平面尺寸相同,并与纠偏板的水平面尺寸相适配,且大于千斤顶底部尺寸。
所述的上连接板、下连接板、纠偏板均采用钢板制作。
所述的上连接板、下连接板的厚度均大于20mm。
所述的支撑体系包括多组支撑机构,每组支撑机构包括若干个层叠垫设的钢支撑,上下相邻的钢支撑之间采用栓接,水平相邻的钢支撑之间通过连接杆件加固成钢桁架结构。
另一方面,一种建筑物顶升方法,包括步骤:
A.在建筑物底部布置分配梁;
B.在分配梁下方布置千斤顶,并由千斤顶进行反向顶升;
C.在每顶升一个行程后,在千斤顶下端加垫钢支撑,将上下钢支撑进行栓接,并将水平相邻的钢支撑之间通过连接杆件加固成钢桁架结构;其特征在于,还包括步骤:
D.当建筑物在顶升过程中产生水平方向上的偏移时,通过在分配梁与千斤顶之间设置水平方向位移纠偏装置,用以改变千斤顶的垂直度,从而对建筑物的水平偏移进行纠偏。
所述的步骤D具体包括步骤:
D1.在分配梁底部连接固定一上连接板;
D2.在千斤顶上端连接固定一下连接板;
D3.在上、下连接板之间加塞一楔形的纠偏板,纠偏板的楔形面朝下,并通过上、下连接板之间的栓接而紧固。
在上述技术方案中,本发明的建筑物顶升方法,通过在分配梁与千斤顶之间设置水平方向位移纠偏装置,当建筑物在顶升过程中,产生水平方向的偏移,则通过纠偏装置进行加塞楔形纠偏板,用以改变千斤顶的垂直度,从而形成水平方向上可控的水平力,对建筑物造成偏移的水平力施加反向水平力,使得建筑物由于水平力的改变而改变其水平位移,最终达到纠偏效果,保证顶升过程的安全可靠。
附图说明
图1是本发明的建筑物顶升系统的结构示意图。
具体实施方式
下面结合附图和实施例进一步说明本发明的技术方案。
请结合图1所示,本发明的建筑物顶升系统与现有技术相同的是,同样也包括布置于建筑物底部的分配梁1、布置于分配梁1下方的千斤顶2、垫设于千斤顶2下部的支撑体系,千斤顶2活塞向下设置。不同的是,该顶升系统还包括:设于分配梁1与千斤顶2之间的水平方向位移纠偏装置,该纠偏装置具体包括上连接板3、纠偏板4和下连接板5,上连接板3与分配梁1相连接紧固,下连接板5与千斤顶2相连接紧固,纠偏板4为楔形板,其楔形面朝下并加塞于上、下连接板3、5之间,并通过上、下连接板3、5的栓接而紧固。
作为一个实施例,所述的上连接板3与下连接板5的水平面尺寸相同,并与纠偏板4的水平面尺寸相适配,且大于千斤顶2底部尺寸,从而确保顶升力通过纠偏装置传递给分配梁1,所述的上连接板3、下连接板5、纠偏板4均可采用钢板制作,并且而上连接板3、下连接板5的厚度可根据上部荷载进行确定,一般大于20mm。
作为另一个实施例,所述的支撑体系包括多组支撑机构,每组支撑机构包括若干个层叠垫设的钢支撑6及设于钢支撑6最上端的与千斤顶2活塞相连接的钢顶帽7,上下相邻的钢支撑6之间采用栓接,水平相邻的钢支撑6之间通过连接杆件加固成钢桁架结构。
该建筑物顶升装置的顶升方法,具体包括步骤:
A.在建筑物底部布置数个分配梁1;
B.在每个分配梁1下方均布置千斤顶2,并由千斤顶2进行反向顶升;
C.在每顶升一个行程后,在千斤顶2下端加垫一钢支撑6,将上下钢支撑6进行栓接,并将水平相邻的钢支撑6之间通过连接杆件加固成钢桁架结构,从而保证整个支撑体系的稳固性;另外,在加垫过程中,必须保证钢支撑6与千斤顶2的中心对齐,从而防止受力时产生偏心受压。其中,千斤顶2、钢支撑6、钢顶帽7可根据建筑物荷载、体系受力大小进行尺寸、型号的调整及优化;
D.当建筑物在顶升过程中产生水平方向上的偏移时,通过在分配梁1与千斤顶2之间设置水平方向位移纠偏装置,用以改变千斤顶2的垂直度,从而对建筑物的水平偏移进行纠偏,具体纠偏步骤如下:
D1.在分配梁1底部连接固定一上连接板3;
D2.在千斤顶2上端连接固定一下连接板5;
D3.在上、下连接板3、5之间加塞一楔形的纠偏板4,纠偏板4的楔形面朝下,并通过上、下连接板3、5之间的栓接而紧固。
采用本发明的建筑物顶升方法,在正常顶升状态下,建筑物没有产生水平方向上的偏移时,不用加塞纠偏板4;当顶升过程中个,建筑物产生水平方向的偏移时,则通过纠偏装置进行加塞楔形的纠偏板4,用以改变千斤顶2的垂直度,从而形成水平方向上可控的水平力,对建筑物造成偏移的水平力施加反向水平力,使得建筑物由于水平力的改变而改变其水平位移,最终达到纠偏效果。当纠偏完成后,由于建筑物恢复原位,即可拆除纠偏板4。
综上所述,本发明提供的方案简单易行,在不改变原有顶升系统主体结构的基础上,能够对建筑物的水平方向位移进行有效纠偏,从而实时调整建筑物的偏移量,消除偏移量所产生的影响,有效保证顶升过程的安全可靠。
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,而并非用作为对本发明的限定,只要在本发明的实质精神范围内,对以上所述实施例的变化、变型都将落在本发明的权利要求书范围内。

Claims (2)

1.一种建筑物顶升方法,包括步骤:
A.在建筑物底部布置分配梁;
B.在分配梁下方布置千斤顶,并由千斤顶进行反向顶升;
C.在每顶升一个行程后,在千斤顶下端加垫钢支撑,将上下钢支撑进行栓接,并将水平相邻的钢支撑之间通过连接杆件加固成钢桁架结构;其特征在于,还包括步骤:
D.当建筑物在顶升过程中产生水平方向上的偏移时,通过在分配梁与千斤顶之间设置水平方向位移纠偏装置,用以改变千斤顶的垂直度,从而对建筑物的水平偏移进行纠偏。
2.如权利要求1所述的建筑物顶升方法,其特征在于:
所述的步骤D具体包括步骤:
D1.在分配梁底部连接固定一上连接板;
D2.在千斤顶上端连接固定一下连接板;
D3.在上、下连接板之间加塞一楔形的纠偏板,纠偏板的楔形面朝下,并通过上、下连接板之间的栓接而紧固。
CN201510397229.8A 2015-07-08 2015-07-08 建筑物顶升方法 Active CN104989122B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510397229.8A CN104989122B (zh) 2015-07-08 2015-07-08 建筑物顶升方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510397229.8A CN104989122B (zh) 2015-07-08 2015-07-08 建筑物顶升方法

Publications (2)

Publication Number Publication Date
CN104989122A CN104989122A (zh) 2015-10-21
CN104989122B true CN104989122B (zh) 2017-04-26

Family

ID=54301003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510397229.8A Active CN104989122B (zh) 2015-07-08 2015-07-08 建筑物顶升方法

Country Status (1)

Country Link
CN (1) CN104989122B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507168A (zh) * 2015-12-30 2016-04-20 中交第三航务工程局有限公司 多跨箱梁整体超高交替顶升施工系统及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1177048A (zh) * 1997-07-23 1998-03-25 夏强 倾斜建筑物可控纠偏施工方法及装置
JP2006257741A (ja) * 2005-03-17 2006-09-28 Kawaguchi Metal Industries Co Ltd ゴム支承載荷用治具
JP2011179252A (ja) * 2010-03-02 2011-09-15 Yokogawa Koji Kk 免震装置の荷重受け替え方法及び装置
CN102493674A (zh) * 2011-12-12 2012-06-13 广州市鲁班建筑集团有限公司 建筑物顶升系统
CN204876627U (zh) * 2015-07-08 2015-12-16 上海天演建筑物移位工程股份有限公司 建筑物顶升系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1177048A (zh) * 1997-07-23 1998-03-25 夏强 倾斜建筑物可控纠偏施工方法及装置
JP2006257741A (ja) * 2005-03-17 2006-09-28 Kawaguchi Metal Industries Co Ltd ゴム支承載荷用治具
JP2011179252A (ja) * 2010-03-02 2011-09-15 Yokogawa Koji Kk 免震装置の荷重受け替え方法及び装置
CN102493674A (zh) * 2011-12-12 2012-06-13 广州市鲁班建筑集团有限公司 建筑物顶升系统
CN204876627U (zh) * 2015-07-08 2015-12-16 上海天演建筑物移位工程股份有限公司 建筑物顶升系统

Also Published As

Publication number Publication date
CN104989122A (zh) 2015-10-21

Similar Documents

Publication Publication Date Title
CN102864795B (zh) 一种适应填土地基沉降的轻钢厂房柱基础及施工方法
CN105863362B (zh) 一种用于倾斜输电铁塔的纠偏装置
CN202509404U (zh) 一种高墩单柱盖梁模板施工支撑系统
CN103938749B (zh) 一种具有双屈服点的十字型耗能内芯防屈曲支撑构件
RU150462U1 (ru) Металлический свайный фундамент для станка-качалки скважинной насосной установки
CN103088756A (zh) 钢棒承重搭建盖梁施工平台的方法
CN103437300A (zh) 墩顶钢梁无墩旁托架架设双悬臂的施工方法
CN103233588B (zh) 带筏板基础建筑物的平移方法
CN104533105A (zh) 一种外包钢加固柱预加力装置
CN203256626U (zh) 桥梁顶升系统
CN105369745A (zh) 一种桥梁支座更换顶升反力架
CN104989122B (zh) 建筑物顶升方法
CN201942994U (zh) 一种桥梁支座垫块
CN206971084U (zh) 桥梁盖梁模板的支撑结构
CN103981807B (zh) 一种无牛腿钢锚梁
CN204876627U (zh) 建筑物顶升系统
CN204663099U (zh) 新型直升机停机坪甲板
CN201614746U (zh) 建筑物顶升用限位传力装置
CN208329695U (zh) 一种用于加固无梁楼盖框架柱的装置
CN103790258B (zh) 一种震后自复位混凝土框架-偏心支撑结构体系
CN102116094A (zh) 建筑物顶升用限位传力装置
CN216999749U (zh) 一种便于基坑后续施工的基坑支撑装置
CN202809636U (zh) 一种适应填土地基沉降的轻钢厂房柱基础
CN211037088U (zh) 一种高层剪力墙结构顶升纠偏装置
CN208055884U (zh) 一种设置在牛腿上的灌砂筒防倾覆结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Building jacking method

Effective date of registration: 20221123

Granted publication date: 20170426

Pledgee: Industrial Bank Co.,Ltd. Shanghai Shizhong sub branch

Pledgor: SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING CO.,LTD.

Registration number: Y2022310000335

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231130

Granted publication date: 20170426

Pledgee: Industrial Bank Co.,Ltd. Shanghai Shizhong sub branch

Pledgor: SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING CO.,LTD.

Registration number: Y2022310000335

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Building Jacking Method

Effective date of registration: 20231213

Granted publication date: 20170426

Pledgee: Industrial Bank Co.,Ltd. Shanghai Branch

Pledgor: SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING CO.,LTD.

Registration number: Y2023310000849

PE01 Entry into force of the registration of the contract for pledge of patent right