CN102720127A - 箱梁高度调整结构 - Google Patents

箱梁高度调整结构 Download PDF

Info

Publication number
CN102720127A
CN102720127A CN2012102178902A CN201210217890A CN102720127A CN 102720127 A CN102720127 A CN 102720127A CN 2012102178902 A CN2012102178902 A CN 2012102178902A CN 201210217890 A CN201210217890 A CN 201210217890A CN 102720127 A CN102720127 A CN 102720127A
Authority
CN
China
Prior art keywords
pad
groups
box beam
piers
height adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102178902A
Other languages
English (en)
Inventor
佟飞
王忠良
梁彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN2012102178902A priority Critical patent/CN102720127A/zh
Publication of CN102720127A publication Critical patent/CN102720127A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开一种箱梁高度调整结构,包括箱梁(1),在箱梁(1)长度方向两端的下方设置有盖梁(2),在盖梁(2)与箱梁(1)之间设置有高度调整结构(3),其特征在于:所述的高度调整结构(3)包括四组对称设置且纵向叠摞放置的垫墩(4),在垫墩(4)的上方设置有与其横截面相配的垫板(5),内侧的两组垫板(5)上端设置有两个千斤顶(6);所述的相邻的两个垫墩(4)之间通过螺栓连接,螺栓螺纹连接在垫墩(4)上的法兰盘上。这是一种结构简单,设计巧妙,布局合理,能够平稳、快速地让箱梁落到盖梁上的箱梁高度调整结构。

Description

箱梁高度调整结构
技术领域
本发明涉及一种现浇钢筋混凝土箱梁的高度调整结构。
背景技术
在桥梁的施工过程中,桥梁的上部结构多采用预架设的方式进行制作,在其他地点预先将箱梁浇筑出来,然后利用大型起重设备将其放置在盖梁上,但是在某些环境复杂、空间狭小的地段进行施工时,大型起重设备无法进入施工,因此只能采取直接在盖梁上方搭建支架,并在支架上进行箱梁浇筑的方式,但是这种方式存在的问题是:箱梁与盖梁之间会存在一个高度差,在箱梁制作完成后需要将箱梁平稳、快速地落到盖梁上。因此现在需要一种能够解决上述问题的新型箱梁的高度调整结构。
发明内容
本发明是为了解决现有技术所存在的上述不足,提出一种结构简单,设计巧妙,布局合理,能够平稳、快速地让箱梁落到盖梁上的箱梁高度调整结构。
本发明的技术解决方案是:一种箱梁高度调整结构,包括箱梁1,在箱梁1长度方向两端的下方设置有盖梁2,在盖梁2与箱梁1之间设置有高度调整结构3,其特征在于:所述的高度调整结构3包括四组对称设置且纵向叠摞放置的多个垫墩4,在垫墩4的上方设置有与其横截面相配的垫板5,内侧的两组垫墩4的高度小于外侧的两组垫墩4,且在内侧两组垫墩4的上部还设置有两个千斤顶6。
所述的相邻的两个垫墩4之间通过螺栓连接,螺栓螺纹连接在垫墩4上的法兰盘上。
本发明同现有技术相比,具有如下优点:
本种结构形式的箱梁高度调整结构,其结构简单,设计巧妙,布局合理,它针对现有的箱梁施工工艺很难再环境复杂、空间狭小的地段或位置进行吊装的问题,设计出能够让浇筑完成后的箱梁改变高度,并落在盖梁上,让盖梁为箱梁提供支撑的高度调整结构,并且这种高度调整结构的操作简单易行,箱梁的下降过程平稳快速,因此可以说它具备了多种优点,特别适合于在本领域中推广应用,其市场前景十分广阔。
附图说明
图1是本发明实施例的主视图。
图2是本发明实施例的侧视图。
具体实施方式
下面将结合附图说明本发明的具体实施方式。如图1、图2所示:一种箱梁高度调整结构,包括箱梁1,在箱梁1长度方向上的两端、箱梁1的下方设置有盖梁2,在盖梁2和箱梁1之间设置有高度调整结构3,这个高度调整结构3包括四组对称设置且纵向叠摞放置的多个垫墩4,在垫墩4的上方设置有横截面与其相配的垫板5,并且位于内侧的两组垫墩4的高度要小于外侧的两组垫墩4,在内侧两组垫墩4的上部分别设置有两个千斤顶6,在垫墩4纵向的上下两端分别设置有法兰盘,为了让垫墩4与垫墩4之间的结合力更强,相邻的两个垫墩4之间通过螺栓连接为一体。
本发明实施例的箱梁高度调整结构的工作过程如下:首先在盖梁2上方搭设支架,并在支架上进行箱梁1的浇筑,当箱梁1加工完成后,将本实施例所述的高度调整结构3放置在箱梁1与盖梁2之间,根据二者之间的高度差来决定放置多少个垫墩4,当剩余的高度差不足一个垫墩4时,在空隙内插入多个垫板5进行调整,直至垫板5与箱梁1的底面相接触。而位于内侧的两组垫墩4上方的千斤顶6顶出,其端头也同样与箱梁1的底面接触。准备工作完成。
撤去支架,箱梁1的重量完全落在高度调整结构3上(以下动作箱梁1两端的高度调整结构3同时进行),抬升千斤顶6,让内侧的两组垫墩4承承载箱梁1的重量,撤去外侧两组垫墩4中的一对垫墩4,然后让千斤顶6的端部回收,直至箱梁1的底面重新与外侧的两组垫墩4的上端面接触,让外侧的两组垫墩4承载箱梁1的重量,撤去内侧两组垫墩4中的一对垫墩4,然后让千斤顶6的端部顶出,直至千斤顶6的工作端重新与箱梁1的底面接触,让千斤顶6承载箱梁1的重量,反复进行上述动作,让箱梁1平稳地降低高度,当箱梁1的降低至与设置在盖梁2上端支座接触后,箱梁1由支座支撑,撤去千斤顶6和余下的垫墩4即可。

Claims (2)

1. 一种箱梁高度调整结构,包括箱梁(1),在箱梁(1)长度方向两端的下方设置有盖梁(2),在盖梁(2)与箱梁(1)之间设置有高度调整结构(3),其特征在于:所述的高度调整结构(3)包括四组对称设置且纵向叠摞放置的多个垫墩(4),在垫墩(4)的上方设置有与其横截面相配的垫板(5),内侧的两组垫墩(4)的高度小于外侧的两组垫墩(4),且在内侧两组垫墩(4)的上部还设置有两个千斤顶(6)。
2.根据权利要求1所述的箱梁高度调整结构,其特征在于:所述的相邻的两个垫墩(4)之间通过螺栓连接,螺栓螺纹连接在垫墩(4)上的法兰盘上。
CN2012102178902A 2012-06-28 2012-06-28 箱梁高度调整结构 Pending CN102720127A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102178902A CN102720127A (zh) 2012-06-28 2012-06-28 箱梁高度调整结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102178902A CN102720127A (zh) 2012-06-28 2012-06-28 箱梁高度调整结构

Publications (1)

Publication Number Publication Date
CN102720127A true CN102720127A (zh) 2012-10-10

Family

ID=46945982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102178902A Pending CN102720127A (zh) 2012-06-28 2012-06-28 箱梁高度调整结构

Country Status (1)

Country Link
CN (1) CN102720127A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360841A (zh) * 2018-02-06 2018-08-03 南京工程学院 一种用于调节结构高程的复合装置
CN108981590A (zh) * 2018-06-13 2018-12-11 中铁隧道集团二处有限公司 一种高铁预制梁定位系统
CN110900281A (zh) * 2019-10-30 2020-03-24 沪东中华造船(集团)有限公司 一种模块化靠山工具
CN111501535A (zh) * 2020-05-21 2020-08-07 汪友仙 一种装配式道路桥梁墩柱结构
CN111702034A (zh) * 2020-05-29 2020-09-25 杭州永恒钢结构有限公司 一种钢翼缘矫正机
CN112921816A (zh) * 2021-02-04 2021-06-08 中铁五局集团有限公司 一种多层低空抗侧滑支撑垫箱及其使用方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201385995Y (zh) * 2009-04-21 2010-01-20 重庆交通建设(集团)有限责任公司 一种用于空心板梁落梁的电动液压装置
CN101736705A (zh) * 2008-11-24 2010-06-16 中铁十六局集团有限公司 军用墩双控支顶技术
JP2010144454A (ja) * 2008-12-19 2010-07-01 Ihi Infrastructure Systems Co Ltd 支承装置の取替工法及び該工法に用いる取替用支承装置
CN201627145U (zh) * 2010-03-29 2010-11-10 杭州市市政工程集团有限公司 一种对单跨预制梁板整体顶升的装置
JP2011241582A (ja) * 2010-05-18 2011-12-01 Kajima Corp 仮支承コンクリートの撤去方法
CN102383379A (zh) * 2011-09-14 2012-03-21 广东省公路勘察规划设计院股份有限公司 一种可调可控的桥墩盖梁加固的工艺方法
CN202744958U (zh) * 2012-06-28 2013-02-20 中铁十三局集团第一工程有限公司 箱梁高度调整结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736705A (zh) * 2008-11-24 2010-06-16 中铁十六局集团有限公司 军用墩双控支顶技术
JP2010144454A (ja) * 2008-12-19 2010-07-01 Ihi Infrastructure Systems Co Ltd 支承装置の取替工法及び該工法に用いる取替用支承装置
CN201385995Y (zh) * 2009-04-21 2010-01-20 重庆交通建设(集团)有限责任公司 一种用于空心板梁落梁的电动液压装置
CN201627145U (zh) * 2010-03-29 2010-11-10 杭州市市政工程集团有限公司 一种对单跨预制梁板整体顶升的装置
JP2011241582A (ja) * 2010-05-18 2011-12-01 Kajima Corp 仮支承コンクリートの撤去方法
CN102383379A (zh) * 2011-09-14 2012-03-21 广东省公路勘察规划设计院股份有限公司 一种可调可控的桥墩盖梁加固的工艺方法
CN202744958U (zh) * 2012-06-28 2013-02-20 中铁十三局集团第一工程有限公司 箱梁高度调整结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴毅彬等: ""云南安宁白塔桥整体同步降落施工工艺"", 《公路》, no. 02, 25 February 2011 (2011-02-25) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360841A (zh) * 2018-02-06 2018-08-03 南京工程学院 一种用于调节结构高程的复合装置
CN108981590A (zh) * 2018-06-13 2018-12-11 中铁隧道集团二处有限公司 一种高铁预制梁定位系统
CN110900281A (zh) * 2019-10-30 2020-03-24 沪东中华造船(集团)有限公司 一种模块化靠山工具
CN111501535A (zh) * 2020-05-21 2020-08-07 汪友仙 一种装配式道路桥梁墩柱结构
CN111702034A (zh) * 2020-05-29 2020-09-25 杭州永恒钢结构有限公司 一种钢翼缘矫正机
CN112921816A (zh) * 2021-02-04 2021-06-08 中铁五局集团有限公司 一种多层低空抗侧滑支撑垫箱及其使用方法

Similar Documents

Publication Publication Date Title
CN102720127A (zh) 箱梁高度调整结构
CN204510005U (zh) 一种盖梁施工操作平台
CN204772924U (zh) 一种防辐射砖模具
CN111254840A (zh) 一种钢箱梁桥整体落梁结构及落梁方法
CN202527535U (zh) 铝板压力精整装置和检测系统
CN202577150U (zh) 墩顶提升吊架
CN203612366U (zh) 一种具有挡板的多功能料架
CN202744958U (zh) 箱梁高度调整结构
CN102493353A (zh) 桥梁施工中大型设备的起吊方法及墩顶提升吊架
CN211541756U (zh) 一种t梁梁底预埋液压升降旋转钢板纵坡调节装置
CN203356280U (zh) 一种便携式钢板折弯机
CN104842095A (zh) 框架防止变形工装
CN204365715U (zh) 轧机整体液压提升系统
CN202580521U (zh) 一种支撑架
CN203903093U (zh) 存放冲压圆盘料的料架
CN201862956U (zh) 一种适用于桁架梁组装的装配胎模架
CN210597037U (zh) 一种超高横梁支架的预压结构
CN210164261U (zh) 钢结构用的柱顶工装
CN203904840U (zh) 新型框架桥顶进小滑车
CN206318315U (zh) 剪板机送料架
CN201738596U (zh) 核电施工专用独立支撑
CN211388689U (zh) 一种轴承活动支撑装置
CN201030613Y (zh) 砌块成型设备升板机
CN205290906U (zh) 一种机车顶盖存放架
CN110273551B (zh) 上下叠梁连接时挠度校正装置及校正方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121010