CN104533105B - 一种外包钢加固柱预加力装置 - Google Patents
一种外包钢加固柱预加力装置 Download PDFInfo
- Publication number
- CN104533105B CN104533105B CN201410814097.XA CN201410814097A CN104533105B CN 104533105 B CN104533105 B CN 104533105B CN 201410814097 A CN201410814097 A CN 201410814097A CN 104533105 B CN104533105 B CN 104533105B
- Authority
- CN
- China
- Prior art keywords
- supporter
- connector
- inserted link
- steel
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410814097.XA CN104533105B (zh) | 2014-12-24 | 2014-12-24 | 一种外包钢加固柱预加力装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410814097.XA CN104533105B (zh) | 2014-12-24 | 2014-12-24 | 一种外包钢加固柱预加力装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104533105A CN104533105A (zh) | 2015-04-22 |
CN104533105B true CN104533105B (zh) | 2016-04-20 |
Family
ID=52848712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410814097.XA Expired - Fee Related CN104533105B (zh) | 2014-12-24 | 2014-12-24 | 一种外包钢加固柱预加力装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104533105B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672683A (zh) * | 2016-01-15 | 2016-06-15 | 兰州理工大学 | 一种体外预应力加固柱子的装置及加固方法 |
CN106499211B (zh) * | 2016-11-29 | 2018-09-11 | 中国电建集团成都勘测设计研究院有限公司 | 新增挑梁框架包钢锚拉法结构 |
CN107524251B (zh) * | 2017-09-22 | 2019-08-20 | 东南大学 | 预应力钢板带砌体组合墙 |
CN108756066A (zh) * | 2018-08-01 | 2018-11-06 | 上海宝冶集团有限公司 | 预埋防撞角钢施工方法及钢筋混凝土柱施工方法 |
CN109184249A (zh) * | 2018-09-29 | 2019-01-11 | 河南工业大学 | 一种平房仓墙体加固方法 |
CN110984607B (zh) * | 2019-10-25 | 2021-07-30 | 山东省建筑科学研究院有限公司 | 一种方形钢柱的加固结构 |
CN114893013B (zh) * | 2022-05-09 | 2023-08-01 | 华侨大学 | 减小钢管应力滞后的受损钢管混凝土柱修复方法及装置 |
CN114809700B (zh) * | 2022-05-11 | 2023-07-28 | 华侨大学 | 减小钢筋应力滞后的受损钢筋混凝土柱修复方法及装置 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100265697B1 (ko) * | 1998-05-07 | 2000-09-15 | 한만엽 | 외부프리스트레스 보강공법을 위한 개량된 지압지지방식의 정착방법 및 장치 |
CN1141480C (zh) * | 2002-09-05 | 2004-03-10 | 杜旌 | 预应力加固混凝土受压构件的方法 |
CN201635410U (zh) * | 2010-03-19 | 2010-11-17 | 中国江苏国际经济技术合作公司 | 承受吊装施工荷载的混凝土结构临时加固装置 |
CN201778500U (zh) * | 2010-08-16 | 2011-03-30 | 合肥工业大学 | 预张拉碳纤维板加固混凝土梁板的装置 |
RU122681U1 (ru) * | 2012-03-29 | 2012-12-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный архитектурно-строительный университет" (СГАСУ) | Устройство для усиления колонны и сочлененных элементов перекрытия здания |
CN102704698B (zh) * | 2012-05-04 | 2015-10-28 | 南京盛圆土木工程高科技有限公司 | 一种全预应力复合一体化加固钢筋混凝土结构 |
CN103321446B (zh) * | 2013-06-21 | 2015-07-29 | 叶香竹 | 预应力玻璃纤维布加固木梁的施工方法 |
CN204435927U (zh) * | 2014-12-24 | 2015-07-01 | 山东省建筑科学研究院 | 一种外包钢加固柱预加力装置 |
-
2014
- 2014-12-24 CN CN201410814097.XA patent/CN104533105B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104533105A (zh) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533105B (zh) | 一种外包钢加固柱预加力装置 | |
CN102505636B (zh) | 一种双薄壁墩连续刚构桥0号块施工方法 | |
CN204152236U (zh) | 一种体外预应力加固装置 | |
CN204435927U (zh) | 一种外包钢加固柱预加力装置 | |
CN102758494B (zh) | 一种带角钢的复合式钢板剪力墙 | |
CN105926961A (zh) | 预应力钢板箍加固矩形截面混凝土柱方法 | |
CN105369745A (zh) | 一种桥梁支座更换顶升反力架 | |
CN103046764B (zh) | 钢筋网细石混凝土加固预应力混凝土空心板的方法 | |
CN101633483B (zh) | 一种钢结构网架整体提升装置 | |
CN203961281U (zh) | 钢筋桁架梁模架及h型钢梁-现浇混凝土楼板支模体系 | |
CN103669228A (zh) | 自行式移动模架预拱度调整装置及其调整方法 | |
CN103291084B (zh) | 建筑物顶升型钢混凝土支撑体系施工方法 | |
CN215366868U (zh) | 一种用于悬浇梁挂篮的预压系统 | |
CN210597037U (zh) | 一种超高横梁支架的预压结构 | |
CN205224266U (zh) | 一种超长超大面积底板后浇带结构 | |
CN102465605A (zh) | 建筑底板钢筋支架方法 | |
CN201000413Y (zh) | 建筑工程承重梁荷载复合钢梁试验装置 | |
CN207004052U (zh) | 一种用于装配式板材的预应力张拉装置 | |
CN202787563U (zh) | 复合式钢板剪力墙 | |
CN202017278U (zh) | 半刚性连接钢框架内填延性高性能混凝土剪力墙组合结构 | |
CN205572668U (zh) | 梁结构预制模板固定夹具 | |
CN204924881U (zh) | 可同时施加拉压应力的混凝土硫酸盐腐蚀的试验装置 | |
CN209178826U (zh) | 一种构成桥梁的索塔 | |
CN209837123U (zh) | 一种桩基静载试验装置 | |
CN202299458U (zh) | 用于高空大跨度杆件的胎架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Song Shuangyang Inventor after: Sun Jiandong Inventor after: Lou Cuan Inventor after: Cui Shiqi Inventor after: Shi Lei Inventor after: Li Haiwen Inventor after: Li Long Inventor after: Li Tan Inventor after: Cheng Bo Inventor before: Song Shuangyang Inventor before: Lou Cuan Inventor before: Sun Jiandong Inventor before: Shi Lei |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160324 Address after: 250031 Shandong Province Flyover District of Ji'nan City Road 29. Applicant after: Building Science Inst., Shandong Prov. Address before: 250031 Shandong Province Flyover District of Ji'nan City No. 29 Wuyingshan road Shandong Academy of Building Research Applicant before: Song Shuangyang |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 Termination date: 20161224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |