CN104988817A - 高速铁路轨道分段测量数据的平顺连接法 - Google Patents
高速铁路轨道分段测量数据的平顺连接法 Download PDFInfo
- Publication number
- CN104988817A CN104988817A CN201510247500.XA CN201510247500A CN104988817A CN 104988817 A CN104988817 A CN 104988817A CN 201510247500 A CN201510247500 A CN 201510247500A CN 104988817 A CN104988817 A CN 104988817A
- Authority
- CN
- China
- Prior art keywords
- centerdot
- track
- survey
- track point
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
- E01B35/02—Applications of measuring apparatus or devices for track-building purposes for spacing, for cross levelling; for laying-out curves
Abstract
本发明公开了一种高速铁路轨道分段测量数据的平顺连接法,在高铁轨道测量中,轨道几何状态测量仪根据CPⅢ网进行全站仪定位和定向,然后测量小车棱镜,并集成轨距和水平传感器数据获取轨道测点的坐标高程。CPⅢ网间隔50~70m成对布设,轨道测量时全站仪需每隔50~70m分段设站。为保证轨道测量点的连续性,相邻测站的全站仪需重叠测量6~10根轨枕的轨道点,2次测量的轨道点结果会不相符。为消除不符值,本发明提出的轨道测量数据平顺连接法,可调整每个测站包括重叠区内外所测轨道点的测量结果,以解决在高铁轨道铺装、维护和检测中分段测量的轨道测点坐标高程数据的平顺连接问题,提高其测量结果的精度。
Description
技术领域
本发明涉及(高速)铁路轨道精密测量技术领域,特别是高速铁路轨道铺装、维护和检测以及轨道几何状态测量仪和标准轨道检验场中分段测量的轨道测点坐标高程数据的平顺连接方法。
背景技术
轨道静态检测所使用的轨道三维精测系统是以轨道控制网(CPⅢ)为基准,采用具有自动跟踪、自动照准和自动测量的全站仪,配合集成轨距和倾斜传感器的轨检小车组合成的“轨道几何状态测量仪”,或利用全站仪配合附有陀螺定向的“轨道检查仪”,采集轨道点坐标高程数据,以获取轨道内部和外部几何参数,评价轨道短波(10m弦)、中波(30m弦)和长波(300m弦)的不平顺性,用以指导轨道精调、轨道检测及其维护修缮。
根据高速铁路CPⅢ控制网间隔50~70m成对布设的特点,为保证轨道三维精测系统的测量精度,轨道几何状态测量仪或轨道检查仪需每隔一段距离进行全站仪设站,根据《高速铁路工程测量规范》(TB10601-2009)要求,相邻测站检测的轨道要求有6~10根轨枕的重叠区。由于测量误差的影响,重叠区轨道点的2套坐标和高程会存在差异。为了消除轨道重叠区测点的不符值,轨道几何状态测量仪常采用的方法有:扩展法、平均值法、跳过重叠点法、不补偿法和线性函数平滑法。其中,平均值法、跳过重叠点法、不补偿法和线性函数平滑法四种方法均只调整重叠区轨道点,对于非重叠区轨道点未作任何调整;扩展法则将重叠区测点数据取平均,根据线性函数对重叠区前后实测数据做一定程度的补偿。补偿区长度通常由重叠段偏差值的一半与常规补偿区域设置值的乘积决定,在重叠段较多的情况下,扩展法会导致补偿区长度减小或重复补偿。因此,顾及重叠区和非重叠区轨道点测量误差特性的高速铁路轨道分段测量数据的平顺连接方法,对于提高高速铁路轨道静态检测及其平顺性,建立高标准轨道检验场,编制高速铁路测量技术标准等均有重要的应用价值。
发明内容
本发明的目的是提供一种轨道几何状态测量仪、轨道检查仪和标准轨道检验场中轨道分段测量数据的平顺连接方法,以克服现有铁路轨道测量数据处理算法的缺陷,提供精度更高、轨道平顺性更好的数据处理算法。
本发明的目的是通过以下手段实现的。
高速铁路轨道分段测量数据的平顺连接法,在高铁轨道测量中用于消除二次测量的轨道点结果不符值,其特征在于,全站仪的每个测站所测轨道点的横向和垂向偏差(或坐标高程)不仅在相邻测站重叠区需要调整,在非重叠区也需要调整,且考虑了重叠区与非重叠区点的平顺性处理。
设测站Ai所测轨道点Q的横向和垂向偏差(或坐标高程)修正模型:
式中,和LQ,i分别为轨道点Q(包含重叠区轨道点q与非重叠区轨道点q′)调整前后的横向或垂向偏差(或坐标高程)向量;κi为待定参数;SQ,i为轨道点Q到测站Ai的距离向量;ΔQ,i为测量随机误差向量。
测站Ai-1和测站Ai所测轨道点在重叠区的横向偏差或垂向偏差(或坐标高程)应该相等,由此列出误差方程:
式中,为重叠区轨道点q横向偏差或垂向偏差(或坐标高程)不符值的改正数向量;为重叠区轨道点q的横向或垂向偏差(或坐标高程)向量的代数和,即其中,和分别为测站Ai-1和Ai所测轨道点q的横向或垂向偏差(或坐标高程)初始值向量。
根据重叠区轨道点横向和垂向偏差(或坐标高程)的不符值列出的误差方程(2),所有相邻测站重叠区组成的误差方程矩阵表达式:
V=Sκ-l
式中,测站数n>1,即多测站时,轨道点r为测站A1、A2的重叠点,p为测站A2、A3的重叠点,q为测站Ai-1、Ai的重叠点,t为测站An-1、An的重叠点。测站数n=1,即单测站时,测站Ai需要与已调整的轨道点进行搭接,故公式(2)中κi-1=0,为已经调整的轨道重叠区点q的横向或垂向偏差值(或坐标或高程)向量,此时,单测站Ai与已调整的轨道点仅存在一个重叠区,纯量形式为:
采用最小二乘平差(或整体最小二乘平差),求得测站所测轨道点横向或垂向偏差(或坐标高程)修正模型的待定参数κi。将参数κi代入式(1),获得测站所测轨道点调整后的横向或垂向偏差(或坐标高程)。
本发明所述的方法中,针对平面测量数据的调整,需要依据轨道点X和Y坐标求得其横向偏差和纵向偏差,然后按照平顺连接法得到调整后的横向偏差。根据轨道点线路切线方位角将调整后的横向偏差投影到铁路测量坐标系的X和Y轴方向,得到调整后的轨道点平面坐标。
本发明所述的方法中,采用轨道点的坐标表达修正模型时,使用整体最小二乘平差代替最小二乘平差。
本发明所述的方法中,当测站数为多测站(n>1)或单测站(n=1)时,采用最小二乘或整体最小二乘平差,需要根据测量精度考虑测站重叠区轨道测点的权重。
附图说明
图1为本发明中多测站数据处理的示意图。
图2为本发明中单测站数据处理的示意图。
在图1中,1、2、3均为测站;4、测站1观测的轨道点;5、测站2观测的轨道点;6、测站3观测的轨道点;7、相邻测站观测的轨道点重叠区;8、测站1观测的轨道点调整后的位置;9、测站2观测的轨道点调整后的位置;10、测站3观测的轨道点调整后的位置;11、轨道点的调整方向。
在图2中,12、已调整轨道点(包括黑色实心点);13、单测站;14、黑色实心点,已调整的轨道点,且为测站13观测的重叠区轨道点调整的基准点;15、测站13观测的轨道点;16、测站13观测的轨道点调整后的位置;17、轨道点的调整方向;18、相邻测站观测的轨道点重叠区。
具体实施方式
高速铁路轨道测量时,根据高速铁路CPⅢ控制网间隔50~70m成对布设的特点,为保证轨道三维精测系统的测量精度,轨道几何状态测量仪或轨道检查仪需每隔一段距离进行全站仪设站,且相邻测站检测的轨道要求有6~10根轨枕或一段线路的重叠区。当获得测站的测量数据时,可采用平顺连接法处理。现结合附图对本发明作进一步的说明。但是应该强调的是,下面的实施方式只是示例性的,而不是为了限制本发明的范围及应用。
当测站数n>1,即多测站时,平顺连接法处理步骤如下:
①计算相邻测站重叠区轨道点的横向偏差或垂向偏差(或坐标和高程)向量的代数和:
式中,式(4)中和分别为测站1和2所测重叠区4个轨道点(图1中7所示)的横向或垂向偏差(或坐标和高程)向量初始值;式(5)中和分别为测站2和3所测重叠区4个轨道点(图1中7所示)的横向或垂向偏差(或坐标和高程)向量初始值,故式(4)与(5)中含义不同。
②列出相邻测站重叠区的误差方程组。测站1所测14个轨道点(包括与测站2重叠的4个轨道点以及非重叠的10个轨道点)横向和垂向偏差(或坐标和高程)修正模型:
式中,和L14,1分别为轨道点调整前后的横向或垂向偏差(或坐标和高程)向量;κ1为待定参数;S14,1为轨道点到测站1的距离向量;Δ14,1为测量随机误差向量。
同理,可列出测站2与3的轨道点横向和垂向偏差(或坐标和高程)修正模型:
式中,测站2所测14个轨道点,其中与测站1重叠4个轨道点,与测站3重叠4个轨道点,非重叠轨道点6个;测站3所测14个轨道点,其中与测站2重叠4个轨道点,非重叠轨道点10个。
相邻测站所测轨道点在重叠区的横向偏差或垂向偏差(或坐标高程)应该相等,由此,得到各相邻测站重叠区的误差方程:
式中,分别为重叠区轨道点横向或垂向偏差(或坐标和高程)不符值的改正数向量;式(9)中S4,2为测站2所测与测站1重叠的轨道点到测站2的距离向量,式(10)中S4,2为测站2所测与测站3重叠的轨道点到测站2的距离向量,其含义不同。
所有相邻测站重叠区组成的误差方程矩阵表达式:
V=Sκ-l
式中,测站1与2的重叠区轨道点有4个(图1中7所示),测站2与3的重叠区轨道点有4个(图1中7所示)。
③最小二乘平差计算。求得每个测站所测轨道点横向和垂向偏差(或坐标和高程)修正模型的待定参数κ。将参数κ代入相应公式(6)~(8)中,求得各测站重叠区和非重叠区轨道点调整后的横向和垂向偏差(或坐标和高程)。
若平面调整中轨道点采用坐标结果,需先把轨道点X和Y坐标转换成横向和纵向偏差,然后按照平顺连接法获得调整后的横向偏差,再根据轨道点线路切线方位角将调整后的横向偏差投影到X、Y坐标方向进行偏差改正,得到调整后的轨道点平面坐标。当用轨道点的坐标表达修正模型时,可采用整体最小二乘平差法代替最小二乘平差法。
当测站数n=1,即单测站时,平顺连接法处理步骤:
图2中已调整的轨道点12与单测站13的轨道点存在重叠区(图2中18所示),以已调整的重叠区轨道点(图2中14所示)作为测站13检测点(图2中15所示)调整的基准点,列出重叠区误差方程:
式中,重叠区轨道点个数为5;为重叠区轨道点横向或垂向偏差(或坐标高程)向量的代数和;S5,13为测站13重叠区待调整点到测站13的距离。
由于单测站13与已调整的轨道点12仅存在一个重叠区,故误差方程式组展开为:
采用最小二乘平差(或整体最小二乘平差),求得单测站13所测轨道点横向或垂向偏差(或坐标高程)修正模型的待定参数κ13。将参数κ13代入式可获得单测站13所测非重叠区9个轨道点调整后的横向或垂向偏差(或坐标高程)。
Claims (4)
1.高速铁路轨道分段测量数据的平顺连接法,在高铁轨道测量中用于消除二次测量的轨道点结果不符值,其特征在于,全站仪的每个测站所测轨道点的横向和垂向偏差(或坐标高程)不仅在相邻测站重叠区需要调整,在非重叠区也需要调整,且考虑了重叠区与非重叠区点的平顺性处理;
设测站Ai所测轨道点Q的横向偏差或垂向偏差修正模型:
式中,和LQ,i分别为轨道点Q(包含重叠区轨道点q与非重叠区轨道点q′)调整前后的横向或垂向偏差向量;κi为待定参数;SQ,i为轨道点Q到测站Ai的距离向量;ΔQ,i为测量随机误差向量;
测站Ai-1和测站Ai所测轨道点在重叠区的横向或垂向偏差应该相等,由此列出误差方程:
式中,为重叠区轨道点q横向或垂向偏差不符值的改正数向量;为重叠区轨道点q的横向或垂向偏差向量的代数和,即其中,和分别为测站Ai-1和Ai所测轨道点q的横向或垂向偏差初始值向量;
根据重叠区轨道点横向或垂向偏差的不符值列出的误差方程(2),所有相邻测站重叠区组成的误差方程矩阵表达式:
V=Sκ-l
式中,测站数n>1,即多测站时,轨道点r为测站A1、A2的重叠点,p为测站A2、A3的重叠点,q为测站Ai-1、Ai的重叠点,t为测站An-1、An的重叠点;测站数n=1,即单测站时,测站Ai需要与已调整的轨道点进行搭接,故式(2)中κi-1=0,为已经调整的轨道重叠区点q的横向或垂向偏差值向量,此时,单测站Ai与已调整的轨道点仅存在一个重叠区,纯量形式为:
采用最小二乘平差,求得每个测站所测轨道点横向或垂向偏差修正模型的待定参数κ,将参数κ代入式(1),获得重叠区和非重叠区轨道点调整后的横向或垂向偏差。
2.根据权利要求1所述的高速铁路轨道分段测量数据的平顺连接法,其特征是平面调整中,需要依据轨道点X和Y坐标求得其横向和纵向偏差,然后按照平顺连接法获得调整后的横向偏差;根据轨道点线路切线方位角将调整后的横向偏差投影到铁路测量坐标系的X和Y轴方向,得到调整的轨道点平面坐标。
3.根据权利要求1所述的高速铁路轨道分段测量数据的平顺连接法,其特征在于,当用轨道点的坐标表达修正模型时,采用整体最小二乘平差代替最小二乘平差。
4.根据权利要求1所述的高速铁路轨道分段测量数据的平顺连接法,其特征在于,测站数为多测站(n>1)或单测站(n=1)时,采用最小二乘或整体最小二乘平差,需要根据测量精度考虑重叠区轨道测点的权重。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510247500.XA CN104988817B (zh) | 2015-05-15 | 2015-05-15 | 高速铁路轨道分段测量数据的平顺连接法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510247500.XA CN104988817B (zh) | 2015-05-15 | 2015-05-15 | 高速铁路轨道分段测量数据的平顺连接法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104988817A true CN104988817A (zh) | 2015-10-21 |
CN104988817B CN104988817B (zh) | 2017-01-04 |
Family
ID=54300700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510247500.XA Expired - Fee Related CN104988817B (zh) | 2015-05-15 | 2015-05-15 | 高速铁路轨道分段测量数据的平顺连接法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104988817B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105611568A (zh) * | 2015-11-11 | 2016-05-25 | 北京电旗通讯技术股份有限公司 | 一种基于mro测量报告对lte终端位置进行准确定位的方法 |
CN107024196A (zh) * | 2017-05-11 | 2017-08-08 | 中南大学 | 一种高速铁路缓和曲线轨道横向偏差检测方法 |
CN108457143A (zh) * | 2018-03-27 | 2018-08-28 | 株洲时代电子技术有限公司 | 一种轨道线路坐标测量系统 |
CN108534765A (zh) * | 2018-03-27 | 2018-09-14 | 株洲时代电子技术有限公司 | 一种轨道线路坐标测量方法 |
CN110735369A (zh) * | 2019-10-17 | 2020-01-31 | 中铁第五勘察设计院集团有限公司 | 一种动态轨道几何状态测量方法 |
CN112097586A (zh) * | 2020-08-18 | 2020-12-18 | 中铁物总运维科技有限公司 | 一种钢轨不平顺数据处理方法 |
CN113189564A (zh) * | 2021-07-01 | 2021-07-30 | 西南交通大学 | 一种列车轨道点云提取方法 |
CN115307599A (zh) * | 2022-08-11 | 2022-11-08 | 济南致通华铁测量技术有限公司 | 一种铁路轨道平顺性调整方法 |
CN117630998A (zh) * | 2024-01-25 | 2024-03-01 | 西南交通大学 | 基于时距转换的高频振动标靶坐标动态测量装置及方法 |
CN117630998B (zh) * | 2024-01-25 | 2024-04-26 | 西南交通大学 | 基于时距转换的高频振动标靶坐标动态测量装置及方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4173073A (en) * | 1977-05-25 | 1979-11-06 | Hitachi, Ltd. | Track displacement detecting and measuring system |
EP0643786B1 (en) * | 1992-06-05 | 1996-02-21 | British Railways Board | Methods of railway track maintenance |
CN101876157A (zh) * | 2010-08-02 | 2010-11-03 | 成都普罗米新科技有限责任公司 | 轨道板钢模测量系统及其测量方法 |
CN202522213U (zh) * | 2012-01-11 | 2012-11-07 | 西南交通大学 | 高铁轨道测量控制点cpⅲ标志杆件检测仪 |
CN102251451B (zh) * | 2011-05-27 | 2013-04-10 | 长沙高新开发区瑞智机电科技有限公司 | 基于多源信息融合的轨道几何状态测量方法 |
CN104358194A (zh) * | 2014-10-27 | 2015-02-18 | 同济大学 | 基于激光跟踪仪的轨道静态平顺性测量与分析方法 |
-
2015
- 2015-05-15 CN CN201510247500.XA patent/CN104988817B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4173073A (en) * | 1977-05-25 | 1979-11-06 | Hitachi, Ltd. | Track displacement detecting and measuring system |
EP0643786B1 (en) * | 1992-06-05 | 1996-02-21 | British Railways Board | Methods of railway track maintenance |
US5598782A (en) * | 1992-06-05 | 1997-02-04 | British Railways Board | Methods of railway track maintenance |
CN101876157A (zh) * | 2010-08-02 | 2010-11-03 | 成都普罗米新科技有限责任公司 | 轨道板钢模测量系统及其测量方法 |
CN102251451B (zh) * | 2011-05-27 | 2013-04-10 | 长沙高新开发区瑞智机电科技有限公司 | 基于多源信息融合的轨道几何状态测量方法 |
CN202522213U (zh) * | 2012-01-11 | 2012-11-07 | 西南交通大学 | 高铁轨道测量控制点cpⅲ标志杆件检测仪 |
CN104358194A (zh) * | 2014-10-27 | 2015-02-18 | 同济大学 | 基于激光跟踪仪的轨道静态平顺性测量与分析方法 |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105611568A (zh) * | 2015-11-11 | 2016-05-25 | 北京电旗通讯技术股份有限公司 | 一种基于mro测量报告对lte终端位置进行准确定位的方法 |
CN105611568B (zh) * | 2015-11-11 | 2019-01-01 | 北京电旗通讯技术股份有限公司 | 一种基于mro测量报告对lte终端位置进行准确定位的方法 |
CN107024196A (zh) * | 2017-05-11 | 2017-08-08 | 中南大学 | 一种高速铁路缓和曲线轨道横向偏差检测方法 |
CN107024196B (zh) * | 2017-05-11 | 2019-03-22 | 中南大学 | 一种高速铁路缓和曲线轨道横向偏差检测方法 |
CN108457143A (zh) * | 2018-03-27 | 2018-08-28 | 株洲时代电子技术有限公司 | 一种轨道线路坐标测量系统 |
CN108534765A (zh) * | 2018-03-27 | 2018-09-14 | 株洲时代电子技术有限公司 | 一种轨道线路坐标测量方法 |
CN110735369A (zh) * | 2019-10-17 | 2020-01-31 | 中铁第五勘察设计院集团有限公司 | 一种动态轨道几何状态测量方法 |
CN112097586A (zh) * | 2020-08-18 | 2020-12-18 | 中铁物总运维科技有限公司 | 一种钢轨不平顺数据处理方法 |
CN112097586B (zh) * | 2020-08-18 | 2022-07-29 | 中铁物总运维科技有限公司 | 一种钢轨不平顺数据处理方法 |
CN113189564A (zh) * | 2021-07-01 | 2021-07-30 | 西南交通大学 | 一种列车轨道点云提取方法 |
CN115307599A (zh) * | 2022-08-11 | 2022-11-08 | 济南致通华铁测量技术有限公司 | 一种铁路轨道平顺性调整方法 |
CN115307599B (zh) * | 2022-08-11 | 2023-09-22 | 济南致通华铁测量技术有限公司 | 一种铁路轨道平顺性调整方法 |
CN117630998A (zh) * | 2024-01-25 | 2024-03-01 | 西南交通大学 | 基于时距转换的高频振动标靶坐标动态测量装置及方法 |
CN117630998B (zh) * | 2024-01-25 | 2024-04-26 | 西南交通大学 | 基于时距转换的高频振动标靶坐标动态测量装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104988817B (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104988817A (zh) | 高速铁路轨道分段测量数据的平顺连接法 | |
CN105667542B (zh) | 轨道交通列车轮径校准方法 | |
US9205850B2 (en) | Displacement detecting apparatus for railroad rails | |
CN105651221A (zh) | 起重机轨道在线检测方法 | |
CN101314932B (zh) | 一种轨道几何参数的摄像测量方法 | |
CN108917638A (zh) | 基于基准传递的地铁隧道三维变形监测的车载测量装置 | |
CN104807440B (zh) | 一种用于机场的全自动高频率地表沉降监测方法 | |
AU663392B2 (en) | Methods of railway track maintenance | |
CN108444432B (zh) | 一种铁路既有线控制网及轨道线形同步测量方法 | |
CN103132411A (zh) | 一种高速铁路轨道静态平顺性分析调整方法 | |
CN102230311B (zh) | 一种适用于无砟轨道板的精度检测方法 | |
RU2167970C2 (ru) | Способ для корректировки положения рельсового пути | |
CN116234739A (zh) | 为了位置修正而确定额定几何形状的方法和系统 | |
CN104179102A (zh) | 双块式无砟轨道精调定位测量系统 | |
CN103253286B (zh) | 一种轨道参数测量方法 | |
CN108413946A (zh) | 一种车载全站仪位置参数的测量方法 | |
CN107805984A (zh) | 单边测量轨道控制网桩点的方法和系统 | |
JP2017223007A (ja) | 軌道整正装置、軌道整正方法 | |
CN103276644A (zh) | 基于轨道基桩控制网进行轨道交通接触网、轨测量方法 | |
US20230406377A1 (en) | Method and system for determining correction values for correcting the position of a track | |
CN104930991B (zh) | 基于载波相位的位移监测方法和位移监测系统 | |
CN109693686A (zh) | 一种基于双天线gnss/ins的轨向不平顺测量方法 | |
CN106140831B (zh) | 轧机倾斜和扭斜的校正定位测量方法 | |
CN107916938B (zh) | 一种用于曲线管幕机导向装置的搭载装置 | |
CN107246850B (zh) | 基于既有轮廓线的轮对踏面轮廓曲线补合方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20190515 |