CN104947719A - 地下室顶板后浇带吊支模结构及其后浇带施工方法 - Google Patents

地下室顶板后浇带吊支模结构及其后浇带施工方法 Download PDF

Info

Publication number
CN104947719A
CN104947719A CN201510260102.1A CN201510260102A CN104947719A CN 104947719 A CN104947719 A CN 104947719A CN 201510260102 A CN201510260102 A CN 201510260102A CN 104947719 A CN104947719 A CN 104947719A
Authority
CN
China
Prior art keywords
steel pipe
ater
casting
screw rod
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510260102.1A
Other languages
English (en)
Other versions
CN104947719B (zh
Inventor
徐建军
张国光
卢润安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO JIANGONG ENGINEERING GROUP CO., LTD.
Original Assignee
NINGBO CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO CONSTRUCTION CO Ltd filed Critical NINGBO CONSTRUCTION CO Ltd
Priority to CN201510260102.1A priority Critical patent/CN104947719B/zh
Publication of CN104947719A publication Critical patent/CN104947719A/zh
Application granted granted Critical
Publication of CN104947719B publication Critical patent/CN104947719B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及地下室顶板后浇带吊支模结构及其后浇带施工方法,该吊支模结构包括受力钢管、底模板。受力钢管分为上受力钢管、下受力钢管,上受力钢管通过垫木支撑于后浇带两侧顶板混凝土的上部,且垫木连接铁钉定位上受力钢管,后浇带两侧顶板混凝土的下部依次设置底模板、木楞、下受力钢管,底模板固定连接木楞;进行螺杆连接之前,通过钢丝将底模板与上受力钢管之间预固定。螺杆一端通过山型卡、螺母固定限位于上受力钢管,螺杆另一端依次穿过底模板、下受力钢管后连接山型卡、螺母固定限位下受力钢管;螺杆中部设有止水环。拆除钢丝,向后浇带支模结构内浇筑混凝土,割除后浇带外露螺杆,即完成后浇带施工,施工较为方便,后浇带无渗漏水隐患。

Description

地下室顶板后浇带吊支模结构及其后浇带施工方法
技术领域
本发明涉及建筑施工技术领域,是一种地下室顶板后浇带吊支模结构及其后浇带施工方法。
背景技术
在建筑工程结构的设计中,由于要考虑建筑物的不均匀沉降和浇筑收缩,往往需要设置后浇带。而地下室起减少沉降影响作用的后浇带,其封闭的时间需要在结构封顶之后才能进行,故周期较长。通常的后浇带支模与周边地下室顶板结构的支模是连体设计,在地下室顶板拆模时一并拆除。后浇带的两边梁板作临时支撑处理,后浇带浇筑前再进行两次支模搭设,而常规地下室后浇带的两次支模结构大多采用落地式支撑架,故费材又费工,成本较高。而有些后浇带虽与地下室支模架脱开独立支设,但支设的时间较长,成本较高。另外,因底模的阻挡会导致后浇带两侧混凝土浆体清理较困难,影响后浇带与已浇结构的结合力及防水性能。而采用吊支模结构及施工方法,即可有效解决上述问题。
目前地下室顶板后浇带吊支模已有一些改进技术,但都存在一些问题,尤其是渗漏问题。如中国专利文献刊载的授权公告号为CN204098486U,授权公告日为2015.01.14,实用新型名称为“浇筑地下室顶板后浇带的混凝土吊模”,该项专利技术中采用吊绳的方法进行吊模,因吊绳的延伸性较大,刚性差且较难紧固,容易造成底模板受混凝土及施工荷载的受力而产生下坠,与周边结构产生高低差。其由于吊绳无止水结构,如顶板防水层失效,会造成雨水会顺着吊绳渗入至室内。又如中国专利文献刊载的授权公告号为CN202017346U,授权公告日为2011.10.26,实用新型名称为“后浇带悬吊支模结构”,该悬吊支模结构的上拉杆件为钢管排架,故不经济,另外其采用套管来穿悬吊螺杆,套管内外壁与混凝土的接触面会有渗水隐患,不适合作为有防水要求的地下室顶板后浇带吊支模使用。还有如中国专利文献刊载的授权公告号为CN204163115U,授权公告日为2015.2.18,实用新型名称为“一种后浇带吊模板施工装置”,该专利技术采用在后浇带两侧预埋套管来穿受力螺杆的方法,同样不适合作为有防水要求的地下室顶板后浇带吊支模使用,且该专利吊模框架采用钢制材料及镀锌钢板,不如木、竹底模经济。还有,以上专利的吊支模结构施工较为困难,特别是上下穿孔对位固定较为费力,底模板需要多人操作支撑才能进行。
综上所述,现有的地下室顶板后浇带吊支模结构及其施工方法有待进一步改进。
发明内容
为克服上述不足,本发明的目的是向本领域提供一种地下室顶板后浇带吊支模结构及其后浇带施工方法,使其解决现有后浇带吊支模结构在地下室顶板应用中存在渗漏水隐患,以及刚性欠佳、成本高、施工困难的技术问题。其目的是通过如下技术方案实现的。
该地下室顶板后浇带吊支模结构包括受力钢管、垫木、底模板、木楞、螺杆、山型卡、螺母,后浇带两侧为顶板混凝土。其结构要点在于所述受力钢管分为上受力钢管、下受力钢管,上受力钢管通过垫木支撑于所述后浇带两侧顶板混凝土的上部,且垫木连接铁钉定位所述上受力钢管,后浇带两侧顶板混凝土的下部依次设置底模板、木楞、下受力钢管,底模板通过铁钉固定木楞;所述螺杆两端设有螺纹,螺杆一端通过山型卡、螺母固定限位于所述上受力钢管,螺杆另一端依次穿过底模板、下受力钢管,并通过连接山型卡、螺母固定限位所述下受力钢管;所述螺杆中部设有止水环。通过在螺杆中部设置止水环,当混凝土浇筑完成后,有效防止后浇带渗漏水。且采用螺杆、上受力钢管、垫木、下受力钢管、木楞固定底模板,成本控制较为合理,结构强度高,后浇带成型效果好。
该后浇带吊支模结构设有至少一对上受力钢管及与其对应的下受力钢管,且每对上受力钢管之间及下受力钢管之间形成适合所述螺杆穿过的间隙。该种结构较为紧凑,方便实施操作,对底模板承载受力较为可靠。
所述底模板孔与所述螺杆螺纹配合。通过该结构,使得底模板与螺杆之间形成预固定,方便实施操作。除此以外,亦可所述螺杆穿过所述底模板后螺纹连接一用于底模板底部限位的限位块。或所述螺杆穿过所述底模板后连接一用于底模板底部限位的插销。
该地下室顶板后浇带吊支模结构的后浇带施工方法为:首先,在所述后浇带两侧的顶板混凝土上方放置垫木,在两侧垫木上方放置至少一组由一对且并排设置的上受力钢管,每对上受力钢管之间设有适合所述螺杆穿过的间隙,上受力钢管两侧通过铁钉连接垫木,依靠铁钉对上受力钢管两侧进行限位;底模板底部通过铁钉固定连接至少两根等距排列的木楞,且底模板设有适合所述螺杆端部穿过的穿孔;通过钢丝将所述底模板悬吊固定于上受力钢管,底模板上端面与所述后浇带两侧顶板混凝土的下部相抵齐平;每对上受力钢管之间对应穿接一根螺杆,螺杆一端通过连接山型卡、螺母限位于上受力钢管;所述木楞下方设置与所述上受力钢管对齐的下受力钢管,所述螺杆另一端穿过后浇带、底模板穿孔及对应下受力钢管之间的间隙后,连接山型卡、螺母固定限位下受力钢管,依靠螺杆两端的山型卡、螺母,将所述上受力钢管、垫木、底模板、木楞、下受力钢管相互夹紧固定;此时,拆除上受力钢管与底模板之间的钢丝,即完成该地下室顶板后浇带吊支模结构;然后向该后浇带吊支模结构内浇筑混凝土,即可形成后浇带混凝土;待后浇带混凝土强度达到拆模要求后,将螺杆两端山型卡、螺母卸下,即可拆卸上受力钢管、垫木、底模板、木楞、下受力钢管,最后对露出于后浇带混凝土的螺杆部分进行割除,实现螺杆与后浇带混凝土成一体,完成地下室顶板后浇带浇筑。
本发明结构较为简单,成本低,强度可靠,无渗漏水隐患,且施工较为方便,省时省力,适合于地下室顶板或有防水要求的后浇带施工使用。
附图说明
图1是本发明预固定底模板的结构示意图。
图2是图1连接螺杆的结构示意图。
图3是本发明完成后浇带吊支模结构的示意图。
图4是本发明后浇带施工完成后拆除吊支模结构的示意图。
图5是图3的顶面结构示意图。
图6是图3的底面结构示意图。
图7是本发明螺杆穿过底模板螺纹连接限位块的结构示意图。
图8是本发明螺杆穿过底模板连接插销的结构示意图。
图中序号的名称为:1、顶板混凝土,101、止水铁板,2、垫木,201、铁钉,3、后浇带内钢筋,301、后浇带,4、上受力钢管,5、钢丝,6、底模板,7、木楞,8、螺杆,801、止水环,9、山型卡,10、螺母,11、下受力钢管,12、后浇带混凝土,13、限位块,14、插销。
具体实施方式
现结合附图,以地下室顶板后浇带具体施工为例,对本发明作如下描述。
在进行后浇带301施工之前,首先对原地下室顶板混凝土1的侧面、止水铁板101表面及后浇带内钢筋3进行清理和修整,然后开始安装该后浇带吊支模结构。如图1~6所示,该后浇带吊支模结构包括上受力钢管4、垫木2、底模板6、木楞7、下受力钢管11、螺杆8、山型卡9、螺母10,具体实施过程为:在后浇带两侧的顶板混凝土上方分别放置垫木,垫木上方放置至少一组由一对且并排间隔设置的上受力钢管,垫木连接铁钉201定位上受力钢管两侧。底模板下部通过铁钉连接并排等距分布的木楞,位于中部的两根木楞各自两侧对应的底模板上设有钢丝孔,底模板的中部开设有适合螺杆穿过的穿孔。通过将木楞的两侧钢丝孔对穿同一根钢丝5,使钢丝对底模板、木楞起悬吊支撑,再通过吊绳预连接钢丝,将底模板、木楞吊起至与后浇带两侧顶板混凝土的下部齐平相抵,最后将钢丝与上受力钢管绑接,即完成底模板与上受力钢管的预固定。预固定底模板后,各组上受力钢管之间的间隙对应穿接一根螺杆,螺杆中部带有止水环801,螺杆一端固定连接山型卡、螺母限位于上受力钢管。后浇带下部设置与上受力钢管对齐的下受力钢管,螺杆另一端依次穿过后浇带、底模板的穿孔及对应下受力钢管之间的间隙连接山型卡、螺母,由该端山型卡、螺母固定限位下受力钢管。在螺杆两端山型卡、螺母的紧固作用下,底模板与后浇带两侧顶板混凝土实现可靠固定,以承受后浇带混凝土及施工载荷。底模板固定后,拆除上述底模板预固定的钢丝,即完成该地下室顶板后浇带吊支模结构的施工。
除上述采用钢丝5对底模板6进行预固定以外,如图7、图8所示,亦可将底模板的穿孔设计为与螺杆螺纹配合,或螺杆穿过底模板的穿孔后螺纹连接限位块13或插接插销14实现底模板预固定。
当后浇带吊支模结构施工完成后,即可进行后浇带混凝土12浇筑。待后浇带混凝土强度达到拆模要求后,将螺杆8两端山型卡9、螺母10卸下,即可拆除上受力钢管4、垫木2、底模板6、木楞7、下受力钢管11。最后对露出于后浇带混凝土的螺杆部分进行割除,实现螺杆与后浇带混凝土成一体,完成地下室顶板后浇带施工。
以上内容旨在说明本发明的技术手段,并非限制本发明的技术范围。本领域技术人员结合现有公知常识对本发明做显而易见的改进,例如:根据施工面积大小,选择合适数量的垫木、木楞、螺杆,根据结构强度需要选择不同材质的底模板等,均落入本发明权利要求的保护范围之内。

Claims (6)

1. 一种地下室顶板后浇带吊支模结构,该后浇带吊支模结构包括受力钢管、垫木(2)、底模板(6)、木楞(7)、螺杆(8)、山型卡(9)、螺母(10),后浇带(301)两侧为顶板混凝土(1);其特征在于所述受力钢管分为上受力钢管(4)、下受力钢管(11),上受力钢管通过垫木(2)支撑于所述后浇带(301)两侧顶板混凝土(1)的上部,且垫木连接铁钉(201)定位所述上受力钢管,后浇带两侧顶板混凝土的下部依次设置底模板(6)、木楞(7)、下受力钢管(11),底模板通过铁钉固定木楞;所述螺杆(8)两端设有螺纹,螺杆一端通过山型卡(9)、螺母(10)固定限位于所述上受力钢管,螺杆另一端依次穿过底模板、下受力钢管,并通过连接山型卡、螺母固定限位所述下受力钢管;所述螺杆中部设有止水环(801)。
2. 根据权利要求1所述的地下室顶板后浇带吊支模结构,其特征在于该后浇带吊支模结构设有至少一对上受力钢管(4)及与其对应的下受力钢管(11),且每对上受力钢管之间及下受力钢管之间形成适合所述螺杆(8)穿过的间隙。
3. 根据权利要求1所述的地下室顶板后浇带吊支模结构,其特征在于所述底模板(6)与所述螺杆(8)螺纹配合。
4.根据权利要求1所述的地下室顶板后浇带吊支模结构,其特征在于所述螺杆(8)穿过所述底模板(6)后螺纹连接一用于底模板底部限位的限位块(13)。
5. 根据权利要求1所述的地下室顶板后浇带吊支模结构,其特征在于所述螺杆(8)穿过所述底模板(6)后连接一用于底模板底部限位的插销(14)。
6. 一种如权利要求1所述的地下室顶板后浇带吊支模结构的后浇带施工方法,其特征在于:首先,在所述后浇带(301)两侧的顶板混凝土(1)上方放置垫木(2),在两侧垫木上方放置至少一组由一对且并排设置的上受力钢管(4),每对上受力钢管之间设有适合所述螺杆(8)穿过的间隙,上受力钢管两侧通过铁钉(201)连接垫木,依靠铁钉对上受力钢管两侧进行限位;底模板(6)底部通过铁钉固定连接至少两根等距排列的木楞(7),且底模板设有适合所述螺杆端部穿过的穿孔;通过钢丝(5)将所述底模板悬吊固定于上受力钢管,底模板上端面与所述后浇带两侧顶板混凝土的下部相抵齐平;每对上受力钢管之间对应穿接一根螺杆,螺杆一端通过连接山型卡(9)、螺母(10)限位于上受力钢管;所述木楞下方设置与所述上受力钢管对齐的下受力钢管(11),所述螺杆另一端穿过后浇带、底模板穿孔及对应下受力钢管之间的间隙后,连接山型卡、螺母固定限位下受力钢管,依靠螺杆两端的山型卡、螺母,将所述上受力钢管、垫木、底模板、木楞、下受力钢管相互夹紧固定;此时,拆除上受力钢管与底模板之间的钢丝,即完成该地下室顶板后浇带吊支模结构;然后向该后浇带吊支模结构内浇筑混凝土,即可形成后浇带混凝土(12);待后浇带混凝土强度达到拆模要求后,将螺杆两端山型卡、螺母卸下,即可拆卸上受力钢管、垫木、底模板、木楞、下受力钢管,最后对露出于后浇带混凝土的螺杆部分进行割除,实现螺杆与后浇带混凝土成一体,完成地下室顶板后浇带浇筑。
CN201510260102.1A 2015-05-20 2015-05-20 地下室顶板后浇带吊支模结构的后浇带施工方法 Expired - Fee Related CN104947719B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510260102.1A CN104947719B (zh) 2015-05-20 2015-05-20 地下室顶板后浇带吊支模结构的后浇带施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510260102.1A CN104947719B (zh) 2015-05-20 2015-05-20 地下室顶板后浇带吊支模结构的后浇带施工方法

Publications (2)

Publication Number Publication Date
CN104947719A true CN104947719A (zh) 2015-09-30
CN104947719B CN104947719B (zh) 2016-10-05

Family

ID=54162737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510260102.1A Expired - Fee Related CN104947719B (zh) 2015-05-20 2015-05-20 地下室顶板后浇带吊支模结构的后浇带施工方法

Country Status (1)

Country Link
CN (1) CN104947719B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401718A (zh) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 楼层洞孔封堵吊模结构
CN106996190A (zh) * 2017-05-23 2017-08-01 中国建筑局(集团)有限公司 后浇带模板及后浇带浇筑方法
CN107859066A (zh) * 2017-11-06 2018-03-30 中国建筑第八工程局有限公司 综合管廊快拆支模结构及其施工方法
CN108457478A (zh) * 2018-05-08 2018-08-28 宁波建工工程集团有限公司 砌体灰缝厚度控制装置及其施工方法
CN109518950A (zh) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 一种应用于装配式现浇段无支撑工具化模板体系及其使用方法
CN109680931A (zh) * 2018-12-29 2019-04-26 中建四局第六建筑工程有限公司 一种后浇带无顶撑支模加固装置及其施工方法
CN109944278A (zh) * 2019-03-11 2019-06-28 国骅建设有限公司 一种后浇带免支撑结构及后浇带施工方法
CN111075036A (zh) * 2020-01-08 2020-04-28 五冶集团上海有限公司 一种楼板预留洞口的混凝土填充辅助工具及使用方法
CN113047460A (zh) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 一种后浇带结构及施工方法
CN113585728A (zh) * 2021-08-01 2021-11-02 宫成军 一种装配式叠合楼板后浇带支模系统
CN114753637A (zh) * 2022-04-21 2022-07-15 中建八局第一建设有限公司 一种可周转的后浇带成型防护装置及其安装方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2248196A1 (de) * 1972-10-02 1974-04-11 Heilmann & Littmann Bau Ag Bauteile und verfahren zur herstellung von fugen mit reparierbarem oder austauschbarem fugenverschluss
JPS61102929A (ja) * 1984-10-26 1986-05-21 ヤマウコンクリ−ト工業株式会社 土木、建築等に用いる各種製品の接合目地工法
CN201865127U (zh) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 地下室底板加强防水型后浇带
CN202482891U (zh) * 2012-03-20 2012-10-10 叶长青 一种地下室模板构造
CN103321257A (zh) * 2013-06-18 2013-09-25 浙江海天建设集团有限公司 超长大体积混凝土结构地下室抗裂防渗施工方法
CN204690801U (zh) * 2015-05-20 2015-10-07 宁波建工股份有限公司 地下室顶板后浇带吊支模结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2248196A1 (de) * 1972-10-02 1974-04-11 Heilmann & Littmann Bau Ag Bauteile und verfahren zur herstellung von fugen mit reparierbarem oder austauschbarem fugenverschluss
JPS61102929A (ja) * 1984-10-26 1986-05-21 ヤマウコンクリ−ト工業株式会社 土木、建築等に用いる各種製品の接合目地工法
CN201865127U (zh) * 2010-10-18 2011-06-15 中冶成工上海五冶建设有限公司 地下室底板加强防水型后浇带
CN202482891U (zh) * 2012-03-20 2012-10-10 叶长青 一种地下室模板构造
CN103321257A (zh) * 2013-06-18 2013-09-25 浙江海天建设集团有限公司 超长大体积混凝土结构地下室抗裂防渗施工方法
CN204690801U (zh) * 2015-05-20 2015-10-07 宁波建工股份有限公司 地下室顶板后浇带吊支模结构

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
肖锡鸿: "超大面积多层地下室建筑后浇带设置和施工技术", 《广东土木与建筑》 *
赵超等: "建筑中后浇带的设计和施工方法", 《黑龙江水利科技》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401718A (zh) * 2015-12-09 2016-03-16 苏州金螳螂建筑装饰股份有限公司 楼层洞孔封堵吊模结构
CN106996190A (zh) * 2017-05-23 2017-08-01 中国建筑局(集团)有限公司 后浇带模板及后浇带浇筑方法
CN107859066A (zh) * 2017-11-06 2018-03-30 中国建筑第八工程局有限公司 综合管廊快拆支模结构及其施工方法
CN108457478B (zh) * 2018-05-08 2023-11-28 宁波建工工程集团有限公司 砌体灰缝厚度控制装置及其施工方法
CN108457478A (zh) * 2018-05-08 2018-08-28 宁波建工工程集团有限公司 砌体灰缝厚度控制装置及其施工方法
CN109518950A (zh) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 一种应用于装配式现浇段无支撑工具化模板体系及其使用方法
CN109680931A (zh) * 2018-12-29 2019-04-26 中建四局第六建筑工程有限公司 一种后浇带无顶撑支模加固装置及其施工方法
CN109944278A (zh) * 2019-03-11 2019-06-28 国骅建设有限公司 一种后浇带免支撑结构及后浇带施工方法
CN111075036A (zh) * 2020-01-08 2020-04-28 五冶集团上海有限公司 一种楼板预留洞口的混凝土填充辅助工具及使用方法
CN113047460A (zh) * 2021-03-29 2021-06-29 中信国安建工集团有限公司 一种后浇带结构及施工方法
CN113047460B (zh) * 2021-03-29 2023-02-03 中信国安建工集团有限公司 一种后浇带结构及施工方法
CN113585728A (zh) * 2021-08-01 2021-11-02 宫成军 一种装配式叠合楼板后浇带支模系统
CN114753637A (zh) * 2022-04-21 2022-07-15 中建八局第一建设有限公司 一种可周转的后浇带成型防护装置及其安装方法
CN114753637B (zh) * 2022-04-21 2023-06-16 中建八局第一建设有限公司 一种可周转的后浇带成型防护装置及其安装方法

Also Published As

Publication number Publication date
CN104947719B (zh) 2016-10-05

Similar Documents

Publication Publication Date Title
CN104947719A (zh) 地下室顶板后浇带吊支模结构及其后浇带施工方法
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN101818527B (zh) 装配整体式剪力墙结构体系及其施工方法
CN201687102U (zh) 装配整体式剪力墙结构体系
CN105133755B (zh) 一种钢筋焊接网架复合剪力墙的施工方法及剪力墙结构
CN104712086B (zh) 一种装配式混凝土空心叠合楼板及其制作方法
CN204690801U (zh) 地下室顶板后浇带吊支模结构
CN204098486U (zh) 浇筑地下室顶板后浇带的混凝土吊模
CN203961238U (zh) 螺栓锚板可调工具式悬挑脚手架
CN205976167U (zh) 基于可拆卸式定位控制件现浇楼板结构
CN103510466B (zh) T形梁桥面系湿接缝施工方法
CN206233560U (zh) 墙体支模结构
CN108086674A (zh) 一种屋面板吊模及屋面板的施工方法
CN213173317U (zh) 一种用于t梁悬挑湿接缝施工装置
CN206706844U (zh) 一种后浇带模板支设构造
CN203334661U (zh) 一种砖混结构构造柱无架眼支模施工装置
CN101624841B (zh) 一次性浇注钢筋混凝土房屋的建造方法
CN209443765U (zh) 一种用于提前填土的沉降后浇带剪力墙的钢模板
CN202787242U (zh) 预应力混凝土管桩截桩后桩头灌芯吊模装置
CN203668894U (zh) 可快速安装的混凝土预制模板结构
CN204299162U (zh) 悬挑工字钢梁锚固结构
CN203891470U (zh) 一种剪力墙模板用紧固螺栓
CN205024733U (zh) 超前止水带的固定装置
CN108385981A (zh) 一种室外地下室顶板后浇带防渗漏施工方法
CN105019656B (zh) 楼盖混凝土后浇带悬挂模板施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170306

Address after: Jiangdong District 315040 Zhejiang city of Ningbo Province Ning Chuan Road No. 538

Patentee after: NINGBO JIANGONG ENGINEERING GROUP CO., LTD.

Address before: Jiangdong District 315040 Zhejiang city of Ningbo Province Ning Chuan Road No. 538

Patentee before: Ningbo Construction Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20200520

CF01 Termination of patent right due to non-payment of annual fee