CN104947606A - 桥梁上部结构的纠偏方法 - Google Patents

桥梁上部结构的纠偏方法 Download PDF

Info

Publication number
CN104947606A
CN104947606A CN201510272033.6A CN201510272033A CN104947606A CN 104947606 A CN104947606 A CN 104947606A CN 201510272033 A CN201510272033 A CN 201510272033A CN 104947606 A CN104947606 A CN 104947606A
Authority
CN
China
Prior art keywords
bridge
correcting error
support
superstructure
thick pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510272033.6A
Other languages
English (en)
Inventor
苟金成
王海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Original Assignee
SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD filed Critical SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Priority to CN201510272033.6A priority Critical patent/CN104947606A/zh
Publication of CN104947606A publication Critical patent/CN104947606A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了桥梁上部结构的纠偏方法,在桥墩上设置钢抱柱梁(1),钢抱柱梁(1)通过螺栓(2)和桥墩固定,在桥墩或钢抱柱梁(1)上部布置竖向千斤顶(3),在钢抱柱梁(1)上布置支架(4),在支架(4)上布置横向千斤顶(5),横向千斤顶(5)固定在支架(4)上;钢抱柱梁(1)之间用支撑(8)连为一体;启动竖向千斤顶(3),顶升桥梁到预定高度,用滑动板(7)更换桥梁支座或放在桥梁支座上,作为复位滑动平面;启动横向千斤顶(5),配合滑动板(7),横向推动桥梁,纠偏桥梁上部结构。本发明解决桥墩与桥梁空间不足对顶升作业的限制,减少桥梁上部结构纠偏时受到的阻力,增加工作效率,加强对桥梁和桥墩的保护。

Description

桥梁上部结构的纠偏方法
技术领域
本发明公开了桥梁上部结构的纠偏方法,应用于纠正桥梁上部的侧偏,属于建筑桥梁领域。
背景技术
桥梁支座是连接桥梁上部结构和下部结构的重要结构部件。它能将桥梁上部结构的反力和变形(位移和转角)可靠的传递给桥梁下部结构,从而使结构的实际受力情况与计算的理论图式相符合。架设于墩台上,顶面支承桥梁上部结构的装置。其功能为将上部结构固定于墩台,承受作用在上部结构的各种力(例如风力、机车作用力),并将它可靠地传给墩台。在载荷、温度、混凝土收缩和徐变作用下,支座能适应上部结构的转角和位移,使上部结构可自由变形而不产生额外的附加内力。
桥梁支座严重变,轻微外鼓,轻微变形,局部脱空,局部脱空,轻微变形等原因会使桥梁主梁向外侧横向位移,容易造成桥墩外侧破损严重,挡块剥离,钢筋外露,横向开裂现象。需要更换外鼓、变形支座,对脱空的支座进行加垫块处理;对桥梁进行复位;对箱梁翼板横向裂缝、底板横向裂缝进行封闭或灌浆修补处理,并加强观测。
产生原因,1)梁端固结约束、位移受限:如果梁、墩之间存在锚固螺栓,或者临时固定螺栓未解除,或者伸缩缝被块状混凝土等堵塞,本来设计为自由伸缩的梁端就会被无故固结约束、位移受限,完全不符合连续梁支承体系和梁端自由伸缩的设计的要求。2)温度影响:众所周知,在夏季升温影响下,曲线梁梁端既存在顺桥向伸长变形,又存在指向曲线外侧的横向膨胀变形(正常状态应在板式支座允许位移范围内);若梁体伸展变形在顺桥向得不到充分释放,就会随横向膨胀变形以某个相对固结约束点为转点发生指向曲线外侧的转动位移(横桥向滑移),导致梁墩相对滑移量逐渐增大,梁体侧向滑移,并挤坏混凝土挡块。
当桥墩直径过小,预留操作空间无法在桥墩上直接布设千斤顶进行顶梁、移梁、更换支座的复位工作。例如柱式桥墩,部分桥墩没有盖梁,桥墩直径为1.3m。
发明内容
    本发明公开了桥梁上部结构的纠偏方法,解决桥墩与桥梁空间不足对顶升作业的限制,减少桥梁上部结构纠偏时受到的阻力,增加工作效率,加强对桥梁和桥墩的保护。
桥梁上部结构的纠偏方法,其特征在于,所述桥梁上部结构的纠偏方法步骤如下:
1)在桥墩上设置钢抱柱梁1,所述钢抱柱梁1通过螺栓2和桥墩固定,在桥墩或钢抱柱梁1上部布置竖向千斤顶3,在钢抱柱梁1上布置支架4,在支架4上布置横向千斤顶5,所述横向千斤顶5固定在支架4上;所述钢抱柱梁1之间用支撑8连为一体;
2)启动竖向千斤顶3,顶升桥梁到预定高度,用滑动板7更换桥梁支座或放在桥梁支座上,作为复位滑动平面;
3)启动横向千斤顶5,配合滑动板7,横向推动桥梁,纠偏桥梁上部结构。
所述钢抱柱梁1和支架4之间还包括斜向的加强筋6。
所述滑动板7为聚四氟乙烯板和不锈钢板,所述聚四氟乙烯板在不锈钢板下方。
所述不锈钢板和桥梁之间还涂有硅脂油作为润滑剂。
所述用滑动板7作为复位滑动平面后,还包括回落竖向千斤顶3,使滑动板7承重。
所述桥梁纠偏完成后还包括对桥梁支座的检查,桥梁支座有问题时,再抬升桥梁对其更换或维护,桥梁支座没有问题时完成施工。
所述支撑8包括横杆和交叉杆,通过焊接固定在钢抱柱梁1。
所述竖向千斤顶3中垂线平行于桥梁的上平面。
附图说明
图1为桥梁上部结构的纠偏方法的结构示意图;
图2为桥梁支座处结构示意图;
图中:1、钢抱柱梁,2、螺栓,3、竖向千斤顶,4、支架,5、横向千斤顶,6、加强筋,7、滑动板,8、支撑。
具体实施方式
下面结合实施例具体说明:
在桥墩上设置钢抱柱梁1,钢抱柱梁1通过螺栓2和桥墩固定,在桥墩或钢抱柱梁1上部布置竖向千斤顶3,在钢抱柱梁1上布置支架4,在支架4上布置横向千斤顶5,横向千斤顶5固定在支架4上;钢抱柱梁1之间用支撑8连为一体;启动竖向千斤顶3,顶升桥梁到预定高度,用滑动板7更换桥梁支座或放在桥梁支座上,作为复位滑动平面;用滑动板7作为复位滑动平面后,回落竖向千斤顶3,使滑动板7承重,启动横向千斤顶5,配合滑动板7,横向推动桥梁,纠偏桥梁上部结构。
钢抱柱梁1和支架4之间包括斜向的加强筋6。滑动板7为聚四氟乙烯板和不锈钢板,聚四氟乙烯板在不锈钢板下方。不锈钢板和桥梁之间还涂有硅脂油作为润滑剂。支撑8包括横杆和交叉杆,通过焊接固定在钢抱柱梁1。竖向千斤顶3中垂线平行于桥梁的上平面。
桥梁纠偏完成后还包括对桥梁支座的检查,桥梁支座有问题时,再抬升桥梁对其更换或维护,桥梁支座没有问题时完成施工。

Claims (8)

1.桥梁上部结构的纠偏方法,其特征在于,所述桥梁上部结构的纠偏方法步骤如下:
1)在桥墩上设置钢抱柱梁(1),所述钢抱柱梁(1)通过螺栓(2)和桥墩固定,在桥墩或钢抱柱梁(1)上部布置竖向千斤顶(3),在钢抱柱梁(1)上布置支架(4),在支架(4)上布置横向千斤顶(5),所述横向千斤顶(5)固定在支架(4)上;所述钢抱柱梁(1)之间用支撑(8)连为一体;
2)启动竖向千斤顶(3),顶升桥梁到预定高度,用滑动板(7)更换桥梁支座或放在桥梁支座上,作为复位滑动平面;
3)启动横向千斤顶(5),配合滑动板(7),横向推动桥梁,纠偏桥梁上部结构。
2.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述钢抱柱梁(1)和支架(4)之间还包括斜向的加强筋(6)。
3.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述滑动板(7)为聚四氟乙烯板和不锈钢板,所述聚四氟乙烯板在不锈钢板下方。
4.根据权利要求1或3任一所述的桥梁上部结构的纠偏方法,其特征在于,所述不锈钢板和桥梁之间还涂有硅脂油作为润滑剂。
5.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述用滑动板(7)作为复位滑动平面后,还包括回落竖向千斤顶(3),使滑动板(7)承重。
6.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述桥梁纠偏完成后还包括对桥梁支座的检查,桥梁支座有问题时,再抬升桥梁对其更换或维护,桥梁支座没有问题时完成施工。
7.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述支撑(8)包括横杆和交叉杆,通过焊接固定在钢抱柱梁(1)。
8.根据权利要求1所述的桥梁上部结构的纠偏方法,其特征在于,所述竖向千斤顶(3)中垂线平行于桥梁的上平面。
CN201510272033.6A 2015-05-26 2015-05-26 桥梁上部结构的纠偏方法 Pending CN104947606A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510272033.6A CN104947606A (zh) 2015-05-26 2015-05-26 桥梁上部结构的纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510272033.6A CN104947606A (zh) 2015-05-26 2015-05-26 桥梁上部结构的纠偏方法

Publications (1)

Publication Number Publication Date
CN104947606A true CN104947606A (zh) 2015-09-30

Family

ID=54162631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510272033.6A Pending CN104947606A (zh) 2015-05-26 2015-05-26 桥梁上部结构的纠偏方法

Country Status (1)

Country Link
CN (1) CN104947606A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565534A (zh) * 2019-09-28 2019-12-13 中铁十八局集团第二工程有限公司 悬臂拼装连续钢箱梁的施工方法
CN110616751A (zh) * 2019-09-24 2019-12-27 华侨大学 模拟基坑开挖对邻近建筑基桩承载力影响的实验装置
CN111926685A (zh) * 2020-08-19 2020-11-13 中铁二院工程集团有限责任公司 一种高速铁路连续梁横向移梁用剪力转换构件及转换方法
CN112252173A (zh) * 2020-11-05 2021-01-22 重庆交通大学 曲线梁桥梁体横向爬移病害的自动纠偏的装置
CN112411359A (zh) * 2020-11-27 2021-02-26 中交路桥建设有限公司 基于磁悬浮的曲线梁桥横向爬移自动纠偏装置
CN112627065A (zh) * 2020-12-31 2021-04-09 陕西铁路工程职业技术学院 一种桥梁墩柱纠偏复位装置
CN113667497A (zh) * 2021-08-31 2021-11-19 中国十九冶集团有限公司 推焦设备就位纠偏方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08105240A (ja) * 1994-10-03 1996-04-23 Taisei Corp 塔状コンクリート構造物の型枠骨組及び構築工法
CN102953348A (zh) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 桥梁墩柱纠偏复位方法
CN203270467U (zh) * 2013-06-04 2013-11-06 中铁四局集团第四工程有限公司 微顶升移梁装置
CN103821091A (zh) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 梁桥梁体纵向偏位后的纠偏复位方法
CN103821090A (zh) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 桥墩倾斜后的纠偏复位方法
CN104612064A (zh) * 2015-02-09 2015-05-13 中核华泰建设有限公司 桥梁墩柱纠偏装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08105240A (ja) * 1994-10-03 1996-04-23 Taisei Corp 塔状コンクリート構造物の型枠骨組及び構築工法
CN102953348A (zh) * 2012-12-12 2013-03-06 重庆桥都桥梁技术有限公司 桥梁墩柱纠偏复位方法
CN203270467U (zh) * 2013-06-04 2013-11-06 中铁四局集团第四工程有限公司 微顶升移梁装置
CN103821091A (zh) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 梁桥梁体纵向偏位后的纠偏复位方法
CN103821090A (zh) * 2014-02-27 2014-05-28 武汉中交试验检测加固工程有限责任公司 桥墩倾斜后的纠偏复位方法
CN104612064A (zh) * 2015-02-09 2015-05-13 中核华泰建设有限公司 桥梁墩柱纠偏装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴如军: "《建筑加固改造托换工程技术实例50例》", 31 January 2014, article "桥梁顶升技术在高度公路改造中的应用", pages: 35 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616751A (zh) * 2019-09-24 2019-12-27 华侨大学 模拟基坑开挖对邻近建筑基桩承载力影响的实验装置
CN110565534A (zh) * 2019-09-28 2019-12-13 中铁十八局集团第二工程有限公司 悬臂拼装连续钢箱梁的施工方法
CN111926685A (zh) * 2020-08-19 2020-11-13 中铁二院工程集团有限责任公司 一种高速铁路连续梁横向移梁用剪力转换构件及转换方法
CN112252173A (zh) * 2020-11-05 2021-01-22 重庆交通大学 曲线梁桥梁体横向爬移病害的自动纠偏的装置
CN112411359A (zh) * 2020-11-27 2021-02-26 中交路桥建设有限公司 基于磁悬浮的曲线梁桥横向爬移自动纠偏装置
CN112627065A (zh) * 2020-12-31 2021-04-09 陕西铁路工程职业技术学院 一种桥梁墩柱纠偏复位装置
CN113667497A (zh) * 2021-08-31 2021-11-19 中国十九冶集团有限公司 推焦设备就位纠偏方法

Similar Documents

Publication Publication Date Title
CN104947606A (zh) 桥梁上部结构的纠偏方法
CN203947771U (zh) 一种贝雷梁悬吊模板支撑体系
CN104141383A (zh) 一种贝雷梁悬吊模板支撑体系及其施工工法
KR102368433B1 (ko) 교량받침 교체용 가설장치
CN104846750B (zh) 一种带缝预应力摩擦型抱柱梁托换方法
CN205604080U (zh) 建筑施工平台
TWI542756B (zh) Bridge jack jack support bracket
CN107419916B (zh) 以内力矩对梁结构进行加固及校正装置
CN113026792A (zh) 桥梁桩基施工钢平台局部沉降加固结构及其加固方法
CN204491429U (zh) 可调节的同步顶升组合钢支撑
RU2469948C2 (ru) Способ полной разгрузки железобетонной консоли колонны от воздействия подкрановых балок
CN206986701U (zh) 一种钢箱梁桥结构体系转换系统
CN214309937U (zh) 盖梁承载力检测结构
CN214328579U (zh) 现役超宽梁体支座更换结构
Tarasenko et al. Justification of a method for complete lifting of a tank to repair its base and foundation
CN112761081B (zh) 现役超宽梁体支座更换结构及施工方法
CN209797235U (zh) 便于桥面连续结构试验构件运输和吊装的试验装置
CN103754791A (zh) 利用预应力钢绞线提升水塔1000m3水箱的方法
CN208088151U (zh) 一种板梁桥顶升辅助钢构件
CN210002459U (zh) 修隧道穿越既有建筑主动托换的托换系统
CN112881186A (zh) 盖梁承载力检测结构及用该结构进行承载力检测的方法
CN201962962U (zh) 一种应用于建筑改造梁、柱卸载的托换工具
CN214831861U (zh) 一种地震损伤桥墩快速加固结构
CN113216288B (zh) 一种木结构房屋顶升施工方法
CN219004158U (zh) 用于中厚板钢构件变形修复的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gou Jincheng

Inventor after: Wang Haiyang

Inventor after: Yan Yangyang

Inventor after: Xing Zhenhuan

Inventor after: Wang Hai

Inventor after: Zhao Dianfeng

Inventor before: Gou Jincheng

Inventor before: Wang Haiyang

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930