CN104895260A - 预应力拱形板高空浇筑平移工艺 - Google Patents

预应力拱形板高空浇筑平移工艺 Download PDF

Info

Publication number
CN104895260A
CN104895260A CN201510149736.XA CN201510149736A CN104895260A CN 104895260 A CN104895260 A CN 104895260A CN 201510149736 A CN201510149736 A CN 201510149736A CN 104895260 A CN104895260 A CN 104895260A
Authority
CN
China
Prior art keywords
altitude
construction
lifting
prefabrication
arched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510149736.XA
Other languages
English (en)
Inventor
陈伟冬
詹鸿坪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510149736.XA priority Critical patent/CN104895260A/zh
Publication of CN104895260A publication Critical patent/CN104895260A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明预应力拱形板高空浇筑平移工艺,克服传统施工工艺需要地面预制、产品成型后吊装的不足,全新的施工工艺不仅节约了浇筑所需的建筑材料、机具、人力、工期等各项要求。避免吊装时容易出现的质量和安全隐患。利用原有建筑物主体,采用模块化空中预制,消除了拱形板预制对场地的要求和吊装施工机具的使用,减少了预制拱形板时下部的钢管支撑搭设。空中平移利用在建工程主体作为轨道,将成型后的拱形板移动至设计位置。消除了拱形板在吊装过程中因受理不均与导致的板面开裂和空中断板的出现,减少了质量与安全事故的发生。

Description

预应力拱形板高空浇筑平移工艺
所属技术领域
本发明专利涉及一种预应力拱形板施工工艺,尤其是打破了先地面预制后吊装的传统预应力拱形板的施工模式,且不受环境等因素影响,减少了地面预制时所需的预制场地;吊装过程中风力导致的不安全因素;机械、设备、材料、人工的租赁成本和管理成本。
背景技术
目前传统预应力拱形屋面板的施工模式,需要在施工现场中搭设拱形板预制场进行现场浇筑和养护,待成品强度达到设计要求时,进行吊装。现代化粮库一般高度、跨度较大。如在吊装过程中受力点不均匀。及容易产生高空断板坠落的施工事故。采用预应力拱形板高空浇筑平移工艺将打破这一技术瓶颈。利用高空原位浇筑、空中平移的技术特性,改变传统施工模式,从而降低了建筑材料、机具、人工、和管理的直接成本。从根本上解决了预应力拱形板对施工对场地、建设周期的要求;决了地面预制后吊装的因吊装和链接不到位造成的质量问题,以及吊装过程中可能出现的质量问题及安全隐患,通过该方案的实施,以取得较好的经济效益和社会效益。减少了建设资源的浪费提高了项目的环保性。
发明内容
为了克服传统施工工艺需要地面预制、产品成型后吊装的不足,本发明提供一种全新的施工工艺,该工艺不仅节约了浇筑所需的建筑材料、机具、人力、工期要求。而且克服了传统施工工艺在吊装时容易出现的质量和安全隐患。
本发明专利解决其技术问题所采用的技术方案是:利用原有建筑物主体,采用模块化空中预制,消除了拱形板预制对场地的要求和吊装施工机具的使用,减少了预制拱形版时下部的钢管支撑搭设。空中平移利用在建工程主体作为轨道,将成型后的拱形板移动至设计位置。消除了拱形版在吊装过程中因受理不均与导致的板面开裂和空中断板的出现,减少了质量与安全事故的发生。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明专利工艺原理图。
图2是拱形版下部支撑平台的搭设。
图3是拱形板下部刚滑板位置
图中:1.电动卷扬机,2.建筑物主体圈梁,3.钢丝绳,4.预制成型后拱形板端头,5.钢丝绳链接拱形版端头锚固件,6.钢滑板,7.拱形版下部钢管支撑,8.建筑物主体,9.拱形版原设计位置,10.拱形板
具体实施方式
在2.建筑物主体圈梁下部搭设7.拱形版下部钢管支撑,在上部预制10.拱形板待板稳定成型后用在4.预制成型后拱形板端头插入6.钢滑板并且在上部固定5.钢丝绳链接拱形版端头锚固件最后用1.电动卷扬机将成品板体移动至9.拱形版原设计位置。

Claims (3)

1.一种粮仓屋面拱形板的预应力高空浇筑平移工艺,其特征是:利用原有建筑物主体,采用模块化空中预制,空中平移利用在建工程主体作为轨道,将成型后的拱形板移动至设计位置。
2.根据权利要求1所述的预应力高空浇筑平移工艺,其特征是:利用原有建筑物圈梁主体作为预制平台,采用模块化空中预制,减少预制拱形版时下部的钢管支撑搭设。
3.根据权利要求1所述的预应力高空浇筑平移工艺,其特征是:利用原有建筑物圈梁主体作作为平移轨道,将钢滑板插入成型后的拱形板并通过电动卷扬机移动至设计位置。
CN201510149736.XA 2015-04-01 2015-04-01 预应力拱形板高空浇筑平移工艺 Pending CN104895260A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510149736.XA CN104895260A (zh) 2015-04-01 2015-04-01 预应力拱形板高空浇筑平移工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510149736.XA CN104895260A (zh) 2015-04-01 2015-04-01 预应力拱形板高空浇筑平移工艺

Publications (1)

Publication Number Publication Date
CN104895260A true CN104895260A (zh) 2015-09-09

Family

ID=54028186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510149736.XA Pending CN104895260A (zh) 2015-04-01 2015-04-01 预应力拱形板高空浇筑平移工艺

Country Status (1)

Country Link
CN (1) CN104895260A (zh)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158223A (ja) * 1993-12-07 1995-06-20 Koa:Kk 薄鉄板折板材の屋根貼り工法並にその装置
CN201013057Y (zh) * 2006-12-29 2008-01-30 中国第二十冶金建设公司 轨道行走式高空压板装置
CN102251667A (zh) * 2011-05-11 2011-11-23 中冶建工集团有限公司 粮仓钢筋混凝土拱形屋盖施工方法
CN202299189U (zh) * 2011-09-26 2012-07-04 安徽鸿路钢结构(集团)股份有限公司 钢结构厂房屋顶拼装辅助设备
CN202559617U (zh) * 2012-05-16 2012-11-28 森特士兴集团股份有限公司 高空屋面生产系统
CN202577805U (zh) * 2012-03-12 2012-12-05 中冶天工上海十三冶建设有限公司 超长屋面板在屋面檩条上的运输装置
CN202731135U (zh) * 2012-08-14 2013-02-13 上海通用金属结构工程有限公司 金属屋面板安装装置
CN203755568U (zh) * 2014-03-09 2014-08-06 湖南金海钢结构股份有限公司 超长屋面板施工用组合式可调高度支架

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158223A (ja) * 1993-12-07 1995-06-20 Koa:Kk 薄鉄板折板材の屋根貼り工法並にその装置
CN201013057Y (zh) * 2006-12-29 2008-01-30 中国第二十冶金建设公司 轨道行走式高空压板装置
CN102251667A (zh) * 2011-05-11 2011-11-23 中冶建工集团有限公司 粮仓钢筋混凝土拱形屋盖施工方法
CN202299189U (zh) * 2011-09-26 2012-07-04 安徽鸿路钢结构(集团)股份有限公司 钢结构厂房屋顶拼装辅助设备
CN202577805U (zh) * 2012-03-12 2012-12-05 中冶天工上海十三冶建设有限公司 超长屋面板在屋面檩条上的运输装置
CN202559617U (zh) * 2012-05-16 2012-11-28 森特士兴集团股份有限公司 高空屋面生产系统
CN202731135U (zh) * 2012-08-14 2013-02-13 上海通用金属结构工程有限公司 金属屋面板安装装置
CN203755568U (zh) * 2014-03-09 2014-08-06 湖南金海钢结构股份有限公司 超长屋面板施工用组合式可调高度支架

Similar Documents

Publication Publication Date Title
CN210636312U (zh) 一种高速铁路装配式桥梁预制拼装结构
CN108019076B (zh) 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置
CN104695337B (zh) 自提升滑翻施工系统及施工方法
CN106087757B (zh) 箱梁架设中的高位落梁施工方法
CN108166691A (zh) 一种预制预应力混凝土梁式楼梯及制作施工方法
CN110552502A (zh) 一种c型料场中间挡墙悬挑平台的施工方法
CN206512581U (zh) 横向预应力全宽钢筋混凝土桥面板钢板组合梁
CN204662952U (zh) 一种自行式工具化单侧支模模架体系
CN110616840A (zh) 基于钢材桁架和水泥板的混凝土叠合板底板及制备方法
CN100480398C (zh) 高炉大修拆装炉自吊装施工方法及炉顶起重装置
CN104532754A (zh) 一种预应力混凝土箱梁封端模板施工方法
CN105196414A (zh) 预制t梁腹板钢筋胎架及预应力t梁施工方法
CN107217601A (zh) 一种i梁桥面板施工方法
CN201942994U (zh) 一种桥梁支座垫块
CN103321153A (zh) 一种中小跨径槽形梁桥的施工方法
CN202164030U (zh) 整体式箱梁吊架
CN210288002U (zh) 一种可重复利用临时施工道
CN103382702A (zh) 一种现浇箱梁的支架及其搭建方法
CN111441513A (zh) 组合桁架钢筋及钢板的现浇混凝土墙体及施工方法
CN104895260A (zh) 预应力拱形板高空浇筑平移工艺
CN203613464U (zh) 滑模施工物资运输装置
CN105370027A (zh) 高层悬空结构中整体提升支撑钢平台结构的施工方法
CN204955097U (zh) 预制t梁腹板钢筋胎架
CN204626965U (zh) 用于建筑楼梯间一次浇筑成形的钢楼梯模板
CN212358013U (zh) 一种索塔操作平台模板分离提升系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150909

WD01 Invention patent application deemed withdrawn after publication