CN104850945B - Geological record acquisition system and management-control method based on network and Android system - Google Patents

Geological record acquisition system and management-control method based on network and Android system Download PDF

Info

Publication number
CN104850945B
CN104850945B CN201510224786.XA CN201510224786A CN104850945B CN 104850945 B CN104850945 B CN 104850945B CN 201510224786 A CN201510224786 A CN 201510224786A CN 104850945 B CN104850945 B CN 104850945B
Authority
CN
China
Prior art keywords
record
acquisition
data
module
prospecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510224786.XA
Other languages
Chinese (zh)
Other versions
CN104850945A (en
Inventor
任治军
蔡升华
任亚群
葛海明
马骁
严忠文
刘益平
许崧
王小龙
葛阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Jiangsu Power Design Institute Co Ltd filed Critical China Energy Engineering Group Jiangsu Power Design Institute Co Ltd
Priority to CN201510224786.XA priority Critical patent/CN104850945B/en
Publication of CN104850945A publication Critical patent/CN104850945A/en
Application granted granted Critical
Publication of CN104850945B publication Critical patent/CN104850945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of geological record acquisition system and management-control method based on network and Android system, including module:Engineering management module, project planning module, data acquisition module, data analysis module and background maintenance module.Practical application shows, the present invention disclosure satisfy that actual demands of engineering, the not only specification content of geotechnical engineering inspection of the scene of a crime geological record, efficiently solve the situation that field note varies with each individual, and the information such as GPS coordinate and time are edited and recorded by automatic collection during editing and recording, survey that quality in site management and control provides the time, two, space dimension traces channel for ground, taking pictures then to examine for school with video capture module provides the fresh and alive firsthand information;The acquisition and transmission of electronic data drastically increase work efficiency, effectively reduce the human error in data transfer, it is ensured that survey the accurate transmission of the firsthand data, have huge application potential in geotechnical engineering investigation quality management and control field.

Description

Geological record acquisition system and management-control method based on network and Android system
Technical field
The present invention relates to a kind of geological record acquisition system and management-control method based on network and Android system, fieldss For geotechnical engineering investigation and computer software fields.
Background technology
The work on the spot of geotechnical engineering investigation is the basis of entire prospecting process, all kinds of record files formed be into Row materials compilation, the basic material of analysis, authenticity, the integrality of data play conclusive work to the quality for surveying work With.Investigation and prospecting at present still generally forms record file, this recording mode by the way of the Hand writing on paper carrier On the one hand it is less efficient, while it is likely to occur incorrect posting, the situation of error of omission, on the other hand when carrying out finishing analysis to data, palpus Paper record is converted into electronic data, this conversion process for being recognized to paper record, being refined and being formed data file Efficiency is not only reduced, also increases the possibility of error.
Since geotechnical engineering investigation field operation is based on packet mode outside labor service, prospecting labor service threshold is low, market competition swashs Strong, labor service enterprises are reconnoitred to make a desperate move the purpose of obtaining Winning-Bid Opportunities or acquisition improper profit, mostly by making up in part The examination of consigner is dealt in field engineering geologic record.Due to traditional engineering geology edit and record be record exploration process in mirror Determine as a result, the record file only write from word can not become the thin of engineering investigation industry quality management and control to reducing field condition Weak link.
The content of the invention
The present invention provides a kind of based on network and Android to solve drawbacks described above and deficiency in the prior art The geological record acquisition system and management-control method of system, Development by Depending on Network, Android mobile terminal and information management service platform are realized Engineering geology edits and records overall process informationization in geotechnical engineering investigation, solves asking for Traditional project prospecting industry on-site editing, recording fraud Topic.
In order to solve the above technical problems, the present invention provides a kind of geological record acquisition system based on network and Android system System, including:
Engineering management module, for the tissue construction for the project of reconnoitring, engineering information management, engineering duty requirement, engineering thing Part is recorded;
Project strategic plan module for the design of exploration program, and forms prospecting job task according to exploration program, then, Generation prospecting outline and field operation control system file storage on the server, finally, will reconnoitre job task and knowledge base Data dictionary is issued to Android system client;According to areal geology data, project strategic plan module is directed to geological conditions and structure Load distribution characteristics, to in-situ test in the hole of prospecting Site Design single hole and sampling task;
Data acquisition module using Android system client to rely on, bores for including acquisition round trip to prospecting field data In-situ test data, round trip photo and the real-time of voice data are edited and recorded in spy element, the description of round trip content, sampling and hole, and Information back will be edited and recorded to server;Android system client is equipped with:
GPS navigation module for the auxiliary positioning to the drilling of prospecting scene, and is edited and recorded editing and recording information process automatic collection Space coordinates and temporal information, for ground survey quality in site management and control provide the time, two, space dimension retrospect channel;
It takes pictures and video capture module, for recording prospecting field condition in real time, visualization is provided for data analysis module Data;
Data analysis module, the information of editing and recording for data acquisition module to be returned carry out quality evaluation, and the quality is commented Estimate including geological model compliance evaluation, edit and record the assessment of content compliance, electronical record space-time reasonable evaluation, and according to assessment As a result handle it scheme;
Background maintenance module, information management, personnel's qualification for on-site personnel confirm, collect operating personnel's evaluation Information and the live ground attribute record of prospecting.
Preferably, after operating personnel logs in Android system client, data acquisition module includes compiling to operating personnel's information Record personnel, probing captain and signature are confirmed.
Preferably, geological model compliance evaluation after system obtains engineering geology division, is quoted when being designed with exploration program Virtual borehole or quote drilling layering carry out attribute comparison, when be layered error be less than 1.0m when think that former designing scheme is reasonable, Without adjustment;Otherwise data analysis module is to the live alert of prospecting, and reminds designer to subsequently reconnoitring task Detail is finely adjusted, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system client.
Preferably, the assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, works as word When section content is that the record strip number of " sky " is less than 5, is sent to prospecting on-site personnel and " edit and record and missing prompting is had in acquisition The warning message of live accurate acquisition ";When record strip number 5-9 of the field contents for " sky ", to reconnoitring on-site personnel Send " edit and record acquisition content it is unqualified require redrilling and accurately acquisition " warning message;When the note that field contents are " sky " It is sent when record item number is more than 10 to designer and " edits and records acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or outer committee is single The warning message of position ".
Preferably, electronical record space-time reasonable evaluation is closed including trace playback, position geofence, probing and time The science and engineering phase is assessed, and trace playback checks the spatial relationship of record position and bore position by googlearth, to being more than with brill The record of 20m centered on hole, the red mark, and send alarm log in playback.
The management-control method of geological record acquisition based on network and Android system, comprises the following steps:
Step 1, front-end task design design exploration program by project strategic plan module, and are surveyed according to exploration program formation Job task is examined, then, generation prospecting outline and field operation control system file storage on the server, finally, will be reconnoitred Job task and knowledge base data dictionary are issued to Android system client;According to areal geology data, project strategic plan module pin To geology condition and structure load distribution characteristics, in-situ test and sampling task in the hole to reconnoitring Site Design single hole;
Step 2, on-site data gathering, by data acquisition module to prospecting field data include acquisition round trip drill element, The progress of in-situ test data, round trip photo and voice data is edited and recorded in real time in the description of round trip content, sampling and hole, and will be compiled Information back is recorded to server;
Step 3, Back end data processing, the information of editing and recording for being returned data acquisition module by data analysis module carry out Quality evaluation, the quality evaluation include geological model compliance evaluation, edit and record the assessment of content compliance, the conjunction of electronical record space-time Rational calculation, and handled it scheme according to assessment result.
The geological mapping for being preferably based on network and Android system edits and records the management-control method of acquisition and further includes operating personnel's letter Confirmation process is ceased, after operating personnel logs in Android system client, data acquisition module includes operating personnel's information to edit and record people Member, probing captain and signature are confirmed.
Preferably, geological model compliance evaluation after system obtains engineering geology division, is quoted when being designed with exploration program Virtual borehole or quote drilling layering carry out attribute comparison, when be layered error be less than 1.0m when think that former designing scheme is reasonable, Without adjustment;Otherwise data analysis module is to the live alert of prospecting, and reminds designer to subsequently reconnoitring task Detail is finely adjusted, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system client.
Preferably, the assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, works as word When section content is that the record strip number of " sky " is less than 5, is sent to prospecting on-site personnel and " edit and record and missing prompting is had in acquisition The warning message of live accurate acquisition ";When record strip number 5-9 of the field contents for " sky ", to reconnoitring on-site personnel Send " edit and record acquisition content it is unqualified require redrilling and accurately acquisition " warning message;When the note that field contents are " sky " It is sent when record item number is more than 10 to designer and " edits and records acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or outer committee is single The warning message of position ".
Preferably, electronical record space-time reasonable evaluation is closed including trace playback, position geofence, probing and time The science and engineering phase is assessed, and trace playback checks the spatial relationship of record position and bore position by googlearth, to being more than with brill The record of 20m centered on hole, the red mark, and send alarm log in playback.
The advantageous effects that the present invention is reached:
1. the present invention solves data synchronization, basic data issues the problems such as being returned with gathered data
2. Android system Client Design is succinct, multiple functional, each module logic control is reasonable, is carried for on-site data gathering Powerful support is supplied.
3. project strategic plan module is combined with data acquisition module, that improves ground exploration planning performs normalization, passes through Task navigation realizes the on-the-spot guidance and control of ground exploration, forms effective prospecting planning and instructs field operation pattern, adopts The real-time, interactive of collection data solves the problems, such as prospecting planning optimization and gathered data authenticity verification.
4. the introducing based on network and internet on-line/off-line map, using Android system during reconnoitring at the scene The GPS module of client realizes the quick auxiliary positioning that drills, and provides convenience for the comprehensive utilization of ground field operation time, and The information such as GPS coordinate and time are edited and recorded by automatic collection during editing and recording, when being provided for ground exploration quality in site management and control Between, two, space dimension trace channel, efficiently solve the situation that field note varies with each individual.
5. live core takes pictures and record etc., modules are then that school is examined and provides the fresh and alive firsthand information, electronic data Acquisition and transmission, drastically increase work efficiency, effectively reduce the human error in data transfer, it is ensured that exploration The accurate transmission of the firsthand data.
Description of the drawings
Fig. 1 is the system architecture schematic diagram of the present invention;
Fig. 2 is the acquisition system design topology relational graph of the present invention;
Fig. 3 is the acquisition system flow chart of data processing figure of the present invention;
Fig. 4 is the real-time management and control flow chart of the present invention.
Specific embodiment
It is existing in order to which auditor can be better understood by technical characteristic, technology contents and its technique effect reached of the present invention The attached drawing of the present invention is described in detail in conjunction with the embodiments.However, shown attached drawing, is intended merely to better illustrate this hair Bright technical solution, be not the present invention actual proportions and best configuration, so, ask auditor should not with regard to attached drawing ratio and Configuration limits the claims of the present invention.
Patent of the present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figs. 1-2, the present invention provides a kind of geological record acquisition system based on network and Android system, including:
Engineering management module, for the tissue construction for the project of reconnoitring, engineering information management, engineering duty requirement, engineering thing Part is recorded;
Project strategic plan module for the design of exploration program, and forms prospecting job task according to exploration program, then, Generation prospecting outline and field operation control system file storage on the server, finally, will reconnoitre job task and knowledge base Data dictionary is issued to Android system client;According to areal geology data, project strategic plan module is directed to geological conditions and structure Load distribution characteristics, to in-situ test in the hole of prospecting Site Design single hole and sampling task;
Data acquisition module using Android system client to rely on, bores for including acquisition round trip to prospecting field data In-situ test data, round trip photo and the real-time of voice data are edited and recorded in spy element, the description of round trip content, sampling and hole, and Information back will be edited and recorded to server;Android system client is equipped with:
GPS navigation module for the auxiliary positioning to the drilling of prospecting scene, and is edited and recorded editing and recording information process automatic collection Space coordinates and temporal information, for ground survey quality in site management and control provide the time, two, space dimension retrospect channel;
It takes pictures and video capture module, for recording prospecting field condition in real time, visualization is provided for data analysis module Data;
Data analysis module, the information of editing and recording for data acquisition module to be returned carry out quality evaluation, and the quality is commented Estimate including geological model compliance evaluation, edit and record the assessment of content compliance, electronical record space-time reasonable evaluation, and according to assessment As a result handle it scheme;
Background maintenance module, information management, personnel's qualification for on-site personnel confirm, collect operating personnel's evaluation Information and the live ground attribute record of prospecting.
Preferably, after operating personnel logs in Android system client, data acquisition module includes compiling to operating personnel's information Record personnel, probing captain and signature are confirmed.
Preferably, geological model compliance evaluation after system obtains engineering geology division, is quoted when being designed with exploration program Virtual borehole or quote drilling layering carry out attribute comparison, when be layered error be less than 1.0m when think that former designing scheme is reasonable, Without adjustment;Otherwise data analysis module is to the live alert of prospecting, and reminds designer to subsequently reconnoitring task Detail is finely adjusted, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system client.
Preferably, the assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, works as word When section content is that the record strip number of " sky " is less than 5, is sent to prospecting on-site personnel and " edit and record and missing prompting is had in acquisition The warning message of live accurate acquisition ";When record strip number 5-9 of the field contents for " sky ", to reconnoitring on-site personnel Send " edit and record acquisition content it is unqualified require redrilling and accurately acquisition " warning message;When the note that field contents are " sky " It is sent when record item number is more than 10 to designer and " edits and records acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or outer committee is single The warning message of position ".
Preferably, electronical record space-time reasonable evaluation is closed including trace playback, position geofence, probing and time The science and engineering phase is assessed, and trace playback checks the spatial relationship of record position and bore position by googlearth, to being more than with brill The record of 20m centered on hole, the red mark, and send alarm log in playback.
As shown in Figure 3-4, the management-control method of the geological record acquisition based on network and Android system, comprises the following steps:
Step 1, front-end task design design exploration program by project strategic plan module, and are surveyed according to exploration program formation Job task is examined, then, generation prospecting outline and field operation control system file storage on the server, finally, will be reconnoitred Job task and knowledge base data dictionary are issued to Android system client;According to areal geology data, project strategic plan module pin To geology condition and structure load distribution characteristics, in-situ test and sampling task in the hole to reconnoitring Site Design single hole;
Step 2, on-site data gathering, by data acquisition module to prospecting field data include acquisition round trip drill element, The progress of in-situ test data, round trip photo and voice data is edited and recorded in real time in the description of round trip content, sampling and hole, and will be compiled Information back is recorded to server;
Step 3, Back end data processing, the information of editing and recording for being returned data acquisition module by data analysis module carry out Quality evaluation, the quality evaluation include geological model compliance evaluation, edit and record the assessment of content compliance, the conjunction of electronical record space-time Rational calculation, and handled it scheme according to assessment result.
The geological mapping for being preferably based on network and Android system edits and records the management-control method of acquisition and further includes operating personnel's letter Confirmation process is ceased, after operating personnel logs in Android system client, data acquisition module includes operating personnel's information to edit and record people Member, probing captain and signature are confirmed.
Preferably, geological model compliance evaluation after system obtains engineering geology division, is quoted when being designed with exploration program Virtual borehole or quote drilling layering carry out attribute comparison, when be layered error be less than 1.0m when think that former designing scheme is reasonable, Without adjustment;Otherwise data analysis module is to the live alert of prospecting, and reminds designer to subsequently reconnoitring task Detail is finely adjusted, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system client.
Preferably, the assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, works as word When section content is that the record strip number of " sky " is less than 5, is sent to prospecting on-site personnel and " edit and record and missing prompting is had in acquisition The warning message of live accurate acquisition ";When record strip number 5-9 of the field contents for " sky ", to reconnoitring on-site personnel Send " edit and record acquisition content it is unqualified require redrilling and accurately acquisition " warning message;When the note that field contents are " sky " It is sent when record item number is more than 10 to designer and " edits and records acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or outer committee is single The warning message of position ".
Preferably, electronical record space-time reasonable evaluation is closed including trace playback, position geofence, probing and time The science and engineering phase is assessed, and trace playback checks the spatial relationship of record position and bore position by googlearth, to being more than with brill The record of 20m centered on hole, the red mark, and send alarm log in playback.
The present invention is disclosed with preferably embodiment above, so it is not intended to limiting the invention, and all take equally is replaced It changes or technical solution that the scheme of equivalent transformation is obtained, all falls in protection scope of the present invention.

Claims (6)

1. the geological record acquisition system based on network and Android system, it is characterised in that:Including:
Engineering management module, for the tissue construction for the project of reconnoitring, engineering information management, engineering duty requirement, engineering practice into Row record;
Project strategic plan module for the design of exploration program, and forms prospecting job task, then, generation according to exploration program Outline and field operation control system file storage are reconnoitred on the server, finally, by prospecting job task and knowledge base data Dictionary is issued to Android system client;According to areal geology data, project strategic plan module is directed to geological conditions and structural load Feature, to in-situ test in the hole of prospecting Site Design single hole and sampling task;
Data acquisition module, will for including acquisition round trip probing to prospecting field data using Android system client to rely on In-situ test data, round trip photo and the real-time of voice data are edited and recorded in element, the description of round trip content, sampling and hole, and will be compiled Information back is recorded to server;Android system client is equipped with:
GPS navigation module, for the auxiliary positioning to the drilling of prospecting scene, and in the sky edited and recorded information process automatic collection and edited and recorded Between coordinate and temporal information, for ground survey quality in site management and control provide the time, two, space dimension retrospect channel;
It takes pictures and video capture module, for recording prospecting field condition in real time, visualization data is provided for data analysis module;
Data analysis module, the information of editing and recording for data acquisition module to be returned carry out quality evaluation, the quality evaluation bag It includes geological model compliance evaluation, edit and record the assessment of content compliance, electronical record space-time reasonable evaluation, and according to assessment result It handles it scheme;
Geological model compliance evaluation, after system obtains engineering geology division, the virtual borehole quoted when being designed with exploration program Or quote drilling layering and carry out attribute comparison, think that former designing scheme is reasonable when layering error is less than 1.0m, without adjustment;It is no Then data analysis module is to the live alert of prospecting, and reminds designer micro- to subsequently reconnoitring the detailed progress of task It adjusts, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system visitor Family end;The assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, when field contents are It when the record strip number of " sky " is less than 5, sends to prospecting on-site personnel and " edits and records and missing is had in acquisition remind scene accurate The warning message of acquisition ";When record strip number 5-9 of the field contents for " sky ", " edited and recorded to reconnoitring on-site personnel and sending Acquisition content it is unqualified requires redrilling and accurately acquisition " warning message;When field contents are big for the record strip number of " sky " The alarm of " editing and recording acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or unit of entrusting outside " is sent to designer when 10 Information;
Background maintenance module, information management, personnel's qualification for on-site personnel confirm, collect operating personnel's evaluation information With the live ground attribute record of prospecting.
2. the geological record acquisition system according to claim 1 based on network and Android system, it is characterised in that:Operation After personnel log in Android system client, data acquisition module includes operating personnel's information to edit and record personnel, probing captain and label Name is confirmed.
3. the geological record acquisition system according to claim 1 based on network and Android system, it is characterised in that:Electronics Space-time reasonable evaluation is recorded, is assessed including trace playback, position geofence, probing and time reasonable time limit for construction, trace playback The spatial relationship of record position and bore position is checked by googlearth, to being more than the record of the 20m centered on drilling, Red mark, and send alarm log in playback.
4. the management-control method of the geological record acquisition based on network and Android system, it is characterised in that:Comprise the following steps:
Step 1, front-end task design design exploration program by project strategic plan module, and form prospecting according to exploration program and make Industry task, then, generation prospecting outline and field operation control system file storage on the server, finally, will reconnoitre operation Task and knowledge base data dictionary are issued to Android system client;According to areal geology data, project strategic plan module is for ground Matter condition and structure load distribution characteristics, to in-situ test in the hole of prospecting Site Design single hole and sampling task;
Step 2, on-site data gathering include acquisition round trip to prospecting field data by data acquisition module and drill element, round trip The progress of in-situ test data, round trip photo and voice data is edited and recorded in real time in content description, sampling and hole, and will edit and record letter Breath is back to server;
Step 3, Back end data processing, the information of editing and recording for being returned data acquisition module by data analysis module carry out quality Assessment, the quality evaluation include geological model compliance evaluation, edit and record the assessment of content compliance, electronical record space-time reasonability Assessment, and handled it scheme according to assessment result;
Geological model compliance evaluation, after system obtains engineering geology division, the virtual borehole quoted when being designed with exploration program Or quote drilling layering and carry out attribute comparison, think that former designing scheme is reasonable when layering error is less than 1.0m, without adjustment;It is no Then data analysis module is to the live alert of prospecting, and reminds designer micro- to subsequently reconnoitring the detailed progress of task It adjusts, to tackle geological conditions variation;Meanwhile project strategic plan module immediately modifies to exploration program, is sent to Android system visitor Family end;The assessment of content compliance is edited and recorded, after content is edited and recorded in system acquisition, data content is judged, when field contents are It when the record strip number of " sky " is less than 5, sends to prospecting on-site personnel and " edits and records and missing is had in acquisition remind scene accurate The warning message of acquisition ";When record strip number 5-9 of the field contents for " sky ", " edited and recorded to reconnoitring on-site personnel and sending Acquisition content it is unqualified requires redrilling and accurately acquisition " warning message;When field contents are big for the record strip number of " sky " The alarm of " editing and recording acquisition content serious loss, it is proposed that personnel are edited and recorded in replacement or unit of entrusting outside " is sent to designer when 10 Information.
5. the management-control method of the geological record acquisition according to claim 4 based on network and Android system, feature exist In:Operating personnel's validation of information process is further included, after operating personnel logs in Android system client, data acquisition module is to operation Personal information includes editing and recording personnel, probing captain and signing being confirmed.
6. the management-control method of the geological record acquisition according to claim 4 based on network and Android system, feature exist In:Electronical record space-time reasonable evaluation is assessed, rail including trace playback, position geofence, probing and time reasonable time limit for construction Mark plays back the spatial relationship that record position and bore position are checked by googlearth, to being more than the 20m centered on drilling Record, the red mark, and send alarm log in playback.
CN201510224786.XA 2015-05-05 2015-05-05 Geological record acquisition system and management-control method based on network and Android system Active CN104850945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510224786.XA CN104850945B (en) 2015-05-05 2015-05-05 Geological record acquisition system and management-control method based on network and Android system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510224786.XA CN104850945B (en) 2015-05-05 2015-05-05 Geological record acquisition system and management-control method based on network and Android system

Publications (2)

Publication Number Publication Date
CN104850945A CN104850945A (en) 2015-08-19
CN104850945B true CN104850945B (en) 2018-05-22

Family

ID=53850577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510224786.XA Active CN104850945B (en) 2015-05-05 2015-05-05 Geological record acquisition system and management-control method based on network and Android system

Country Status (1)

Country Link
CN (1) CN104850945B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105069162A (en) * 2015-08-26 2015-11-18 中国电建集团北京勘测设计研究院有限公司 Informatized exploratory adit catalog data acquisition system and method
CN105160708B (en) * 2015-08-26 2018-05-18 中国电建集团北京勘测设计研究院有限公司 A kind of engineering geology inside and outside trade integration information system
CN105930972A (en) * 2016-04-22 2016-09-07 北京航天勘察设计研究院有限公司 Geotechnical engineering investigation field data acquisition system
CN106814406A (en) * 2016-12-05 2017-06-09 中山市拓维电子科技有限公司 Geological exploration control platform
CN108614819B (en) * 2016-12-09 2021-03-09 中国地质调查局发展研究中心 Geological data management system
CN107341605A (en) * 2017-07-03 2017-11-10 中冶集团武汉勘察研究院有限公司 One kind prospecting field operation informationization monitoring and managing method and system
CN109035068A (en) * 2018-07-26 2018-12-18 中佳勘察设计有限公司 A kind of comprehensive platform for project management
CN109840293B (en) * 2019-01-18 2021-01-29 河南奥菲斯电子科技有限公司 Internet-based remote sensing field investigation big data system and control method thereof
CN109947068A (en) * 2019-04-24 2019-06-28 广州市城市规划勘测设计研究院 A kind of field data acquisition system and method
CN110069552A (en) * 2019-04-28 2019-07-30 广州市城市规划勘测设计研究院 A kind of data processing system and method
CN110159252A (en) * 2019-06-04 2019-08-23 国网北京市电力公司 Data collection system and method
CN110457501B (en) * 2019-08-15 2022-11-22 广州建设工程质量安全检测中心有限公司 Rock soil core sample information editing and recording system based on image recognition
CN110968995A (en) * 2019-11-06 2020-04-07 万宝矿产有限公司 Drilling core compiling and recording method
CN111948726B (en) * 2020-07-25 2023-06-27 河南地矿集团中昊建设工程有限公司 Geotechnical engineering investigation system and geotechnical engineering investigation method
CN112360445B (en) * 2020-10-28 2022-01-11 中交第四航务工程局有限公司 Method for correcting drilling stratum conditions of karst area by using video monitoring
CN112633125A (en) * 2020-12-18 2021-04-09 东南大学 Intelligent acquisition and analysis system for quality information of engineering geological drilling site
CN112529983A (en) * 2020-12-22 2021-03-19 山东省交通规划设计院有限公司 Internet of things and cloud computing based geological exploration record smart cloud platform and method
CN112651476A (en) * 2020-12-22 2021-04-13 山东省交通规划设计院有限公司 Auxiliary device and method for logging drilling core
CN115034541A (en) * 2022-04-07 2022-09-09 国网江苏省电力有限公司建设分公司 Exploration field quality control method based on collected data space-time attribute verification
CN115827057B (en) * 2022-09-27 2024-03-01 广西发现软件技术有限公司 Investigation supervision system architecture method for reducing server storage and access pressure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104501803A (en) * 2015-01-14 2015-04-08 中国电建集团昆明勘测设计研究院有限公司 Method for geological navigation and geological mapping through portable intelligent device based on Andriod

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104501803A (en) * 2015-01-14 2015-04-08 中国电建集团昆明勘测设计研究院有限公司 Method for geological navigation and geological mapping through portable intelligent device based on Andriod

Also Published As

Publication number Publication date
CN104850945A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104850945B (en) Geological record acquisition system and management-control method based on network and Android system
CN106056268A (en) Engineering project management cloud platform system based on material tracking
CN110097335A (en) A kind of geotechnical engineering investigation informationization operating system and method
MX2008009228A (en) Method for assessment of uncertainty and risk.
CA2910883A1 (en) Method and system for performing oilfield operations based on contextual information of oilfield projects
CN103412967A (en) Geologic field information collection system, geologic field information collection method and application method of collection system
CN109471142A (en) A kind of working trajectory recognition methods based on RTK Differential positioning
CN109636312A (en) Land control engineering online monitoring and management system
CN109685896A (en) A kind of pipe engineering survey data delivery method that supporting geotechnical engineering BIM and system
CN108460834A (en) A kind of method and relevant device of the design of wind power plant digital Platform
Ding et al. BIM research vs BIM practice: a bibliometric-qualitative analysis from China
CN115617889A (en) GIS-based survey data acquisition and processing method and system
CN109695260A (en) High Side Slope of Highway inspection method based on unmanned plane
CN105117750B (en) Mark label, acquisition traceability system and its method of factor about core-drilling test concrete strength
CN214247303U (en) Geological exploration record smart cloud platform based on Internet of things and cloud computing
CN110599116A (en) Power grid decentralized collaborative design method and system based on cloud data center
Giuliani et al. A HBIM pipeline for the conservation of large-scale architectural heritage: the city Walls of Pisa
Monteiro et al. Living in a sociomaterial world
CN117056284A (en) Management system for drilling achievements of water transport engineering
CN117521231A (en) Intelligent piling monitoring management method and system based on BIM and IOT
CN116894915A (en) Artificial intelligence semi-automatic three-dimensional geological modeling data processing method
CN108182642A (en) Gas outburst parameter online management system and method
CN108806473A (en) Plot data collecting system
CN109145380A (en) A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM
CN114023134A (en) Digital information electric power simulation training system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant