CN109145380A - A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM - Google Patents

A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM Download PDF

Info

Publication number
CN109145380A
CN109145380A CN201810807642.0A CN201810807642A CN109145380A CN 109145380 A CN109145380 A CN 109145380A CN 201810807642 A CN201810807642 A CN 201810807642A CN 109145380 A CN109145380 A CN 109145380A
Authority
CN
China
Prior art keywords
tunnel
bim
construction
information
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810807642.0A
Other languages
Chinese (zh)
Inventor
黄欣
张京京
袁帅
刘松涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201810807642.0A priority Critical patent/CN109145380A/en
Publication of CN109145380A publication Critical patent/CN109145380A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The New Austrian Tunneling Method constructing tunnel management system based on BIM that the invention discloses a kind of, including BIM tunnel management system, central database and positioning operation terminal.BIM tunnel management system carries out the interaction of New Austrian Tunneling Method constructing tunnel data by central database and positioning operation terminal.Simultaneously storage tunneling model and tunnel geology data are established in computer BIM model system, include BIM model system and BIM tunnel management system in BIM.Central database is used to store the tunnel model of BIM model system and the input of BIM tunnel management system, tunnel geology parameter, construction information management information and the site operation record material of positioning operation terminal input, and receive BIM model system and fixed outer operating terminal progress information calling.Typing Profiling module selects current working procedure, is recorded according to condition of construction according to live position location.Scene is inquired at any time according to information such as live positioning, tunnel mileages has formed construction information.

Description

A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM
Technical field
The present invention relates to BIM field of engineering technology, it is related to a kind of New Austrian Tunneling Method constructing tunnel management system, more particularly to a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM.
Background technique
In constructing tunnel field, in order to ensure construction speed and quality, the formation and management of construction information are extremely important:
BIM is built based on every relevant information data of construction-engineering project by digital information analogue simulation Real information possessed by object is the important tool for realizing information system management;In tunnel actual management, usually technical staff It is supplemented interior industry data after completing Contraction in Site, error probability is high, risk is big, and BIM information management is further according to interior industry data Carry out typing.New Austrian Tunneling Method tunnel process is more, and each process is field operation, existing construction information recording method, low efficiency, Quality assurance difficulty is big.
Patent CN103530826B discloses the shield method tunnel construction management method based on BIM, and this method is in tunnel RFID tag is set on section of jurisdiction, stores corresponding section of jurisdiction encoded information, section of jurisdiction encoded information is read by RFIDA reader It writes, record, by obtaining RFID tag in BIM model, call section of jurisdiction information, the various data sources that will be recorded in work progress It is associated with BIM model, by data simultaneously operating, realize the analogue simulation of shield method tunnel construction process;Shield construction It is segment prefabricated, using RFID tag convenient for management when management, but for other structures form poor universality, such as New Austrian Tunneling Method tunnel Road construction, complex procedures concealed work is more, and there are inconveniences for tag control;
Summary of the invention
The purpose of the present invention is being directed to New Austrian Tunneling Method constructing tunnel complex procedures, interior industry data is more, is not easy to record and manage Technical problem, system of the present invention mainly solves New Austrian Tunneling Method constructing tunnel management problems;Positioning operation terminal first, Tunnel construction site positions construction location, and the on-the-spot record construction information in positioning operation terminal;In BIM model system, Establish New Austrian Tunneling Method tunnel process library;BIM model system splits construction note according to tunnel model, geologic information, related specifications automatically Record data inspection batch;Realize New Austrian Tunneling Method constructing tunnel quality, progress msg management and maintenance.
To achieve the above object, the technical solution adopted by the present invention is a kind of New Austrian Tunneling Method constructing tunnel management based on BIM System, including BIM tunnel management system, central database and positioning operation terminal.
BIM tunnel management system carries out the friendship of New Austrian Tunneling Method constructing tunnel data by central database and positioning operation terminal Mutually.
Simultaneously storage tunneling model and tunnel geology data are established in computer BIM model system, include BIM mould in BIM Type system and BIM tunnel management system, develop the BIM construction management system in New Austrian Tunneling Method tunnel in BIM, which combines In the tunnel model of storage, tunnel geology data and typing construction quality accident code requirement, construction method, working procedure etc. Hold, thus creates excavation method module, process library module and process and split module, for splitting determining construction information management and note Record template.
Central database is used to store tunnel model, the tunnel geology of BIM model system and the input of BIM tunnel management system The site operation record material of parameter, construction information management information and the input of positioning operation terminal, and receive BIM model system Surely outer operating terminal carries out information calling.
Positioning operation terminal is used by the mobile operating terminal realization in New Austrian Tunneling Method tunnel construction site, positioning operation terminal In New Austrian Tunneling Method tunnel construction site be accurately positioned, positioning operation terminal call central database in New Austrian Tunneling Method tunnel model information, The contents such as construction information, on-the-spot record New Austrian Tunneling Method tunnel construction site situation, and the data of New Austrian Tunneling Method tunnel construction site are deposited It is stored in central database.BIM model system, positioning operation terminal can store at any time, call information in central database, To realize New Austrian Tunneling Method tunnel site operation data, quality, the record of progress and management.
BIM tunnel management system:
BIM tunnel management system is created in BIM model system, exploitation excavation method module, process library module, process are torn open Sub-module;
Excavation method module is created in BIM model system, excavation method module includes full section method, positive benching tunnelling method, annular Excavation stays core local method, interval wall approach, intersection interval wall approach, two side-wall pilot tunnel etc., is determined according to excavation construction method each Secondary circulation construction information division numbers.
New Austrian Tunneling Method tunnel process library module is created in BIM model system, process library module includes partitioned project, subitem work The information such as journey, inspection lot scale recycle the data of construction, creation inspection lot construction according to inspection lot scale creation record each time Data form;Process library module is only used for process information storage, and process library module is only capable of carrying out by BIM tunnel management system Modification, mobile operating terminal have no right to access;
BIM model system creates process and splits module, and process library is called in integrating tunnel structure, geologic parameter, excavation method Module information, the automatic working procedure that splits generate construction information logging template, in conjunction with actual demand to unreasonable fractionation process into Row adjustment, optimization record process.
BIM model system creates construction information management module, which splits mould for storing process The construction information logging template that block generates checks construction information record case, carries out construction quality, progress control, construction money The information of material management module is stored in the central database in BIM model system, and construction information management module can be set with movement It is standby to be docked, and mobile device operation terminal is allowed to carry out data inputting.
Central database:
Centre data has storage BIM model system, the function of positioning operation terminal typing information, including New Austrian Tunneling Method tunnel Model, geologic information, process library data, construction note data etc..Positioning operation terminal:
Positioning operation terminal includes three live positioning, typing data, scene inquiry modules, passes through wireless network and center Database connection, is called, logging data.
Live locating module uses IL1000 type indoor positioning management system, dynamic realtime 5~10cm of positioning accuracy, precision Circulation is recorded less than each construction information of tunnel to require, and can precisely realize that site operation position positions.
Typing Profiling module selects current working procedure, is recorded according to condition of construction according to live position location.
Live enquiry module inquires scene according to information such as live positioning, tunnel mileages at any time and has formed construction information.
Detailed description of the invention
Fig. 1 New Austrian Tunneling Method constructing tunnel management system.
Fig. 2 New Austrian Tunneling Method constructing tunnel management process.
Specific embodiment
As shown in Figs. 1-2, a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM, including BIM tunnel management system, Central database and positioning operation terminal.
BIM tunnel management system carries out the friendship of New Austrian Tunneling Method constructing tunnel data by central database and positioning operation terminal Mutually.
Simultaneously storage tunneling model and tunnel geology data are established in computer BIM model system, include BIM mould in BIM Type system and BIM tunnel management system, develop the BIM construction management system in New Austrian Tunneling Method tunnel in BIM, which combines In the tunnel model of storage, tunnel geology data and typing construction quality accident code requirement, construction method, working procedure etc. Hold, thus creates excavation method module, process library module and process and split module, for splitting determining construction information management and note Record template.
Central database is used to store tunnel model, the tunnel geology of BIM model system and the input of BIM tunnel management system The site operation record material of parameter, construction information management information and the input of positioning operation terminal, and receive BIM model system Surely outer operating terminal carries out information calling.
Positioning operation terminal is used by the mobile operating terminal realization in New Austrian Tunneling Method tunnel construction site, positioning operation terminal In New Austrian Tunneling Method tunnel construction site be accurately positioned, positioning operation terminal call central database in New Austrian Tunneling Method tunnel model information, The contents such as construction information, on-the-spot record New Austrian Tunneling Method tunnel construction site situation, and the data of New Austrian Tunneling Method tunnel construction site are deposited It is stored in central database.BIM model system, positioning operation terminal can store at any time, call information in central database, To realize New Austrian Tunneling Method tunnel site operation data, quality, the record of progress and management.
New Austrian Tunneling Method constructing tunnel management method, including the BIM constructing tunnel management system developed in BIM, according to tunnel The archiving needs of construction information establish excavation method module, process library module, process in construction management system and split module, In conjunction with the New Austrian Tunneling Method tunnel model in BIM, New Austrian Tunneling Method tunnel geology data, is split in module in process and New Austrian Tunneling Method tunnel is carried out Process is split, and is generated construction information management and logging template, construction information adjustment is carried out if not being inconsistent with actual demand, according to reality Border technique splits module in process and is deleted or added;
Positioning operation terminal built-in high-accuracy position system realizes information mutual communication by wireless network and data center, Tunnel construction site positions construction location, New Austrian Tunneling Method tunnel information, construction information template in central database is called, in conjunction with scene Condition of construction is recorded, central database is stored data in;Central database is for storing New Austrian Tunneling Method tunnel model, geology ginseng The module library created in number, BIM constructing tunnel management system and the scene of construction information information, the input of positioning operation terminal are applied Wage material, and receive BIM constructing tunnel management system and positioning operation terminal progress information calling, the information of central database can It is stored or is called at any time, to realize New Austrian Tunneling Method tunnel site operation quality, the record of progress and management.
New Austrian Tunneling Method constructing tunnel management method based on BIM:
New Austrian Tunneling Method tunnel model is established in S1.BIM, surveys data and Analysis of Field Geotechnical Parameters to input;
S2. the excavation method module in BIM constructing tunnel management system is opened, excavation method is selected;
S3. it opens process in BIM constructing tunnel management system and splits module, according to New Austrian Tunneling Method tunnel model, geologic parameter, And excavation method, and process library module in BIM constructing tunnel management system is called, and working procedure is split, it is automatic raw At construction information template;
S4. the generation of construction information template is checked as a result, being adjusted in conjunction with actual situations of construction to construction information information, It is added or deletes according to job specfication or technical data demand;
S5. positioning operation terminal is opened, local coordinate is established by indoor locating system, positioning is checked;
S6. enter New Austrian Tunneling Method tunnel construction site, open positioning operation terminal filed locating module, determine current construction position It sets;
S7. it opens typing Profiling module and current working procedure is selected according to New Austrian Tunneling Method tunnel construction site position location, It is recorded according to practice of construction situation, is passed the information on by wireless network to central database and stored;
S8. it is checked by the live enquiry module of the construction management module of BIM tunnel management system or positioning operation terminal Construction information realizes inquiring about climatic information inspection lot using modes such as mileage number, dragging, positioning, and management method is convenient, is not easy out It is wrong;
Compared with prior art, the present invention can position construction location in tunnel construction site by positioning operation terminal, And record construction information, high efficiency in real time in positioning operation terminal;In addition it is high to also achieve New Austrian Tunneling Method constructing tunnel data Effect record and management.

Claims (4)

1. a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM, it is characterised in that: including BIM tunnel management system, center Database and positioning operation terminal;
BIM tunnel management system carries out the interaction of New Austrian Tunneling Method constructing tunnel data by central database and positioning operation terminal;
Simultaneously storage tunneling model and tunnel geology data are established in computer BIM model system, include BIM model system in BIM System and BIM tunnel management system, develop the BIM construction management system in New Austrian Tunneling Method tunnel in BIM, which combines storage Tunnel model, tunnel geology data and typing construction quality accident code requirement, construction method, working procedure content, thus It creates excavation method module, process library module and process and splits module, for splitting determining construction information management and logging template;
Central database is used to store the tunnel model of BIM model system and the input of BIM tunnel management system, tunnel geology ginseng Number, construction information management information and positioning operation terminal input site operation record materials, and receive BIM model system and Fixed outer operating terminal carries out information calling;
Positioning operation terminal is by the mobile operating terminal realization in New Austrian Tunneling Method tunnel construction site, and positioning operation terminal is for new Method tunnel construction site difficult to understand is accurately positioned, and positioning operation terminal calls New Austrian Tunneling Method tunnel model information in central database, construction Data content, on-the-spot record New Austrian Tunneling Method tunnel construction site situation, and the data of New Austrian Tunneling Method tunnel construction site are stored in In heart database;BIM model system, positioning operation terminal can store at any time, call information in central database, thus real Existing New Austrian Tunneling Method tunnel site operation data, quality, the record of progress and management.
2. a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM according to claim 1, it is characterised in that: BIM tunnel Road management system:
BIM tunnel management system is created in BIM model system, exploitation excavation method module, process library module, process split mould Block;
Excavation method module is created in BIM model system, excavation method module includes full section method, positive benching tunnelling method, Ring Cutting It stays core local method, interval wall approach, intersect interval wall approach, two side-wall pilot tunnel, recycled each time according to excavation construction method determination Construction information division numbers;
New Austrian Tunneling Method tunnel process library module is created in BIM model system, process library module includes partitioned project, subdivisional work, inspection Batch size values are tested, recycle the data of construction, creation inspection lot construction information note each time according to inspection lot scale creation record Record table;Process library module is only used for process information storage, and process library module is only capable of modifying by BIM tunnel management system, Mobile operating terminal haves no right to access;
BIM model system creates process and splits module, and process library module is called in integrating tunnel structure, geologic parameter, excavation method Information, the automatic working procedure that splits generate construction information logging template, adjust in conjunction with actual demand to unreasonable fractionation process It is whole, optimization record process;
BIM model system creates construction information management module, which splits module life for storing process At construction information logging template, check construction information record case, carry out construction quality, progress control, the construction information pipe The information of reason module is stored in the central database in BIM model system, construction information management module can with mobile device into Row docking, and mobile device operation terminal is allowed to carry out data inputting.
3. a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM according to claim 1, it is characterised in that: center Database:
Centre data has storage BIM model system, the function of positioning operation terminal typing information, including New Austrian Tunneling Method tunnel mould Type, geologic information, process library data, construction note data.
4. a kind of New Austrian Tunneling Method constructing tunnel management system based on BIM according to claim 1, it is characterised in that: positioning Operating terminal:
Positioning operation terminal includes three live positioning, typing data, scene inquiry modules, passes through wireless network and centre data Library connection, is called, logging data;
Live locating module uses IL1000 type indoor positioning management system, dynamic realtime 5~10cm of positioning accuracy, and precision is less than Each construction information of tunnel record circulation requires, and can precisely realize that site operation position positions;
Typing Profiling module selects current working procedure, is recorded according to condition of construction according to live position location;
Live enquiry module inquires scene according to scene positioning, tunnel mileage information at any time and has formed construction information.
CN201810807642.0A 2018-07-21 2018-07-21 A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM Pending CN109145380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810807642.0A CN109145380A (en) 2018-07-21 2018-07-21 A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810807642.0A CN109145380A (en) 2018-07-21 2018-07-21 A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM

Publications (1)

Publication Number Publication Date
CN109145380A true CN109145380A (en) 2019-01-04

Family

ID=64801230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810807642.0A Pending CN109145380A (en) 2018-07-21 2018-07-21 A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM

Country Status (1)

Country Link
CN (1) CN109145380A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110287566A (en) * 2019-06-18 2019-09-27 西安新视窗科技有限公司 A kind of system that tunnel piercing progress and process are controlled based on BIM
CN113051635A (en) * 2020-05-25 2021-06-29 中交隧道工程局有限公司 Railway tunnel dynamic construction management system based on BIM technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530826A (en) * 2013-09-06 2014-01-22 上海大学 BIM (Building Information Modeling)-based shield method tunnel construction management method
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN105426972A (en) * 2015-10-28 2016-03-23 上海同筑信息科技有限公司 Engineering project intelligent operation management method and system based on BIM
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103530826A (en) * 2013-09-06 2014-01-22 上海大学 BIM (Building Information Modeling)-based shield method tunnel construction management method
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN105426972A (en) * 2015-10-28 2016-03-23 上海同筑信息科技有限公司 Engineering project intelligent operation management method and system based on BIM
CN105631154A (en) * 2016-01-11 2016-06-01 中铁隧道集团有限公司 Method for viewing tunnel monitoring and measurement data on BIM (Building Information Modeling) construction management platform
CN107527143A (en) * 2017-08-10 2017-12-29 嘉兴恒创电力设计研究院有限公司 Job site data-pushing, management method and management system based on BIM models

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
毛娜: "《基于BIM和移动定位技术的建筑施工质量监管系统研究》", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
赵璐 等: "《BIM技术在铁路项目隧道施工中的应用研究》", 《施工技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110287566A (en) * 2019-06-18 2019-09-27 西安新视窗科技有限公司 A kind of system that tunnel piercing progress and process are controlled based on BIM
CN113051635A (en) * 2020-05-25 2021-06-29 中交隧道工程局有限公司 Railway tunnel dynamic construction management system based on BIM technology

Similar Documents

Publication Publication Date Title
CN110751725B (en) Disaster occurrence tracing method based on BIM + GIS fusion technology
CN110210120B (en) Automatic modeling method for railway engineering based on parameterization
CN104929687A (en) Mine digitlization production management and control system and method
CN109242724A (en) A kind of New Austrian Tunneling Method constructing tunnel management method based on BIM
Nuttens et al. Using BIM models for the design of large rail infrastructure projects: key factors for a successful implementation
CN110781257B (en) Mining earth's surface movement deformation prediction analysis system
CN109145380A (en) A kind of New Austrian Tunneling Method constructing tunnel management system based on BIM
CN113190910B (en) Slice analysis system and method based on BIM three-dimensional geological tunnel model
Mitelman et al. Implementing BIM for conventional tunnels-a proposed methodology and case study.
CN103699712A (en) Method for making mining extraction plan based on explosion unit bodies
CN105786994A (en) Oil and gas field exploration and development information integration system and method based on geographic information
CN104504756A (en) Dynamic updating method of ore deposit three dimension geology model
CN104462649B (en) A kind of automatic update method of ore body block segment model reserves
Morin Geotechnical BIM: Applying BIM principles to the subsurface
CN110287566A (en) A kind of system that tunnel piercing progress and process are controlled based on BIM
CN115982802A (en) Bentley-based railway sound barrier BIM rapid design method
CN110222457B (en) Construction method of existing structure and newly-built primary support structure with existing structure closely attached
Fajarwanto et al. Managing Mega Project with Digital Construction Technology through Project Management Information System (PMIS) Dashboard: A Case Study of Trans Sumatera Toll Road Project
CN112435334A (en) Method, system and medium for calculating thickness of any stratum covering layer
CN111667140A (en) Method for building large cutter suction dredger
Barbieri et al. The Sotra Link Project (Norway): an application of the BIM methodology in tunneling design and construction
Pirdavani et al. Application of building information modeling (BIM) for transportation infrastructure: a scoping review
CN113255019B (en) Automatic generation method based on three-dimensional visual production drawing
Zavyalov et al. Allowing for various railway project phases realization with infrastructure building information modelling of railway three-dimensional profile
CN109783668B (en) Dynamic updating method for mine information management multi-professional roadway graph

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104