CN104831846A - Hoisting method for indoor inclined curtain wall super-large glass - Google Patents

Hoisting method for indoor inclined curtain wall super-large glass Download PDF

Info

Publication number
CN104831846A
CN104831846A CN201510185374.XA CN201510185374A CN104831846A CN 104831846 A CN104831846 A CN 104831846A CN 201510185374 A CN201510185374 A CN 201510185374A CN 104831846 A CN104831846 A CN 104831846A
Authority
CN
China
Prior art keywords
curtain wall
glass
cladding glass
cladding
vehicle frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510185374.XA
Other languages
Chinese (zh)
Other versions
CN104831846B (en
Inventor
唐际宇
黄业信
王维
郭胜文
梁秋莹
张皆科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201510185374.XA priority Critical patent/CN104831846B/en
Publication of CN104831846A publication Critical patent/CN104831846A/en
Application granted granted Critical
Publication of CN104831846B publication Critical patent/CN104831846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a hoisting method for indoor inclined curtain wall super-large glass. The hoisting method comprises the steps that a girder frame perpendicular to the length direction of a curtain wall under construction is arranged on the top beam of the curtain wall under construction; an elevating mechanism capable of translating along the length direction of the girder frame is slidably arranged on the girder frame; a sucking disc is arranged on the elevating mechanism; curtain wall stay cables are arranged on the top beam and the bottom part structure of the curtain wall under construction in a stretching and drawing way; linking members used for installing curtain wall glass of the curtain wall under construction are arranged on the curtain wall stay cables, and the linking members are provided with linking grooves; curtain wall glass is installed; the girder frame is moved to the position above the installing position of curtain wall glass to be installed, curtain wall glass is adsorbed on the sucking disc, and curtain wall glass is moved to the installing position by utilizing the elevating mechanism and is installed in the linking grooves of the linking members; and the steps for installing curtain wall glass are repeated, and all curtain wall glass is installed completely according to the preset installing sequence of curtain wall glass. Curtain wall glass can bidirectionally move in horizontal and vertical directions so that construction is high-efficiency.

Description

The hanging method of indoor inclined curtain wall super large glass
Technical field
The present invention relates to technical field of building construction, refer in particular to a kind of hanging method of indoor inclined curtain wall super large glass.
Background technology
At present, newly-built large-scale public and civilian construction, the particularly building of large space, large span, increasing employing curtain wall, but the construction of this kind of large space curtain wall is a puzzlement those skilled in the art's difficult problem always, particularly for the indoor inclined curtain wall adopting oversize glass, difficulty of construction increases greatly.Therefore, the construction method finding a kind of indoor inclined curtain wall for employing oversize glass is newly necessary.
Summary of the invention
Because the problems referred to above, the invention provides a kind of hanging method of indoor inclined curtain wall super large glass, comprising:
The back timber of curtain wall to be onstructed arranges the purlin vehicle frame vertical with the length direction of curtain wall to be onstructed;
Described purlin vehicle frame slides setting can along the elevating mechanism of the length direction translation of described purlin vehicle frame;
Described elevating mechanism arranges sucker;
Stretch-draw curtain wall inhaul cable on the polycrystalline substance of described back timber and curtain wall to be onstructed;
Described curtain wall inhaul cable arranges the fastener of the cladding glass for installing curtain wall to be onstructed, and described fastener has refutes access slot;
Cladding glass is installed: the top described purlin vehicle frame being moved to the installation site of cladding glass to be installed, described cladding glass is adsorbed on described sucker, utilizes described elevating mechanism described cladding glass to be moved to described installation site and is installed on described in described fastener and refute in access slot;
Repeat the step of described installation cladding glass, according to the erection sequence that cladding glass is preset, whole cladding glasss is installed.
The hanging method of the present invention's indoor inclined curtain wall super large glass, adopt purlin vehicle frame and elevating mechanism combination, realize cladding glass and both can move in the horizontal direction, can vertically move again, exactly cladding glass can be in place, simple to operate, high construction efficiency.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, the back timber of curtain wall to be onstructed arranges the purlin vehicle frame vertical with the length direction of curtain wall to be onstructed, comprising:
Set up operating platform, described operating platform is connected with described polycrystalline substance; And
On described operating platform, described purlin vehicle frame is fixed on described back timber by connecting tooling.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, described operating platform is the full hall steel pipe scaffold of fastener type, and the full hall steel pipe scaffold of described fastener type adopts layering to set up, and comprising:
Pin is put in vertical rod, sets up bar of sweeping the floor on the ground;
Described bar of sweeping the floor sets up bridging and horizontal brace; And
Set up the scaffold of intermediate rest part and the bridging in circumferential perimeter.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, described elevating mechanism is electric block, described electric block comprises the hoist engine be arranged on the vehicle frame of described purlin that slides, is located at the assembly pulley on described hoist engine and the hook member for sucker described in hook block, and described hook member is hung at described assembly pulley by being set around the hoist cable of described assembly pulley.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, described sucker is eight pawl electric sucking discs, and described eight pawl electric sucking discs comprise chassis, are evenly laid in the multiple adsorption piece on described chassis and the connecting rod that is movably connected on described chassis.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is; before described cladding glass being adsorbed on described sucker; also comprise: tying up relative two sidepieces at described cladding glass for regulating the angle of described cladding glass with two ropes, tying up at the middle part of described cladding glass for the protection of described cladding glass with two ropes.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, utilizes described elevating mechanism to be moved into place by described cladding glass and be installed on described in described fastener and refutes in access slot, comprising:
First described cladding glass is moved in the horizontal direction by described elevating mechanism and be in same vertical plane with described installation site;
Again described cladding glass is vertically moved to described installation site by described elevating mechanism; And
Described cladding glass is installed on described in described fastener and refutes in access slot.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, after being installed on by described cladding glass in described fastener, also comprises:
The cladding glass of glue-line both sides pastes protection gummed paper; And
Carry out playing glue to described cladding glass, beat after glue completes and remove described protection gummed paper.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, according to the erection sequence that cladding glass is preset, is installed by whole cladding glasss, comprising:
Described purlin vehicle frame is moved to the top of the installation site of the first row cladding glass of curtain wall to be onstructed;
Each cladding glass in first row cladding glass is installed, the installation steps of any one cladding glass wherein in first row cladding glass comprise: be adsorbed on described sucker by described cladding glass, utilize described elevating mechanism described cladding glass to be moved to described installation site and is installed on described in described fastener and refute in access slot; And
After each cladding glass installation in described first row cladding glass, described purlin vehicle frame moved to the installation site of next column cladding glass and continue next column cladding glass to be installed, until all cladding glasss in whole curtain wall install.
The further improvement of the hanging method of the present invention's indoor inclined curtain wall super large glass is, whole cladding glasss is divided into multiple installation region, a described purlin vehicle frame is all set in installation region described in each to install described cladding glass in installation region described in each.
Accompanying drawing explanation
Fig. 1 is the flow chart of the hanging method of the present invention's indoor inclined curtain wall super large glass.
Fig. 2 is the lifting schematic diagram of the hanging method of the present invention's indoor inclined curtain wall super large glass.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Refer to Fig. 1 and Fig. 2, Fig. 1 is the flow chart of the hanging method of the present invention's indoor inclined curtain wall super large glass, and Fig. 2 is the lifting schematic diagram of the hanging method of the present invention's indoor inclined curtain wall super large glass.Coordinate referring to shown in Fig. 1 and Fig. 2, the hanging method of the present invention's indoor inclined curtain wall super large glass, comprising:
Step S101: before formal construction, first will carry out microcomputer modelling emulation lifting, comprise:
1, Holistic modeling
According to the design data that designing institute provides, the large-scale 3D design software of Rhinoceros is adopted to set up threedimensional model, simulated field actual conditions.
2, local structure modeling
According to designing requirement, and Related product, instrument relevant specification set up 3D model.
3, glass hanging simulation
1) cladding glass lifting before in place, the installation of cladding glass safeguard measure and inspection
2) cladding glass vertical direction and horizontal direction simulate.
3) adjustment of cladding glass installation direction and sizing.
Because cladding glass is in indoor lifting, the width of cladding glass is greater than the distance between two drag-lines, and cladding glass just can be put into outdoor by rotational translation, after hand fit's adjustment, and the final shaping.
Shown in composition graphs 2, after microcomputer modelling emulation lifting completes, the back timber 10 of curtain wall to be onstructed arranges the purlin vehicle frame 20 vertical with the length direction of curtain wall to be onstructed, comprising:
Set up operating platform, the polycrystalline substance of described operating platform with curtain wall to be onstructed is connected, connected mode can adopt the throwing of steel pipe support fixing, adopt shaped steel or steel pipe to fix be rigidly connected, the flexibly connecting of wire rope, drawknot structure must pass through Force Calculation, ensures the resistance to overturning of support body;
After described operating platform has been set up, on described operating platform, purlin vehicle frame 20 is fixed on the back timber 10 of curtain wall to be onstructed by connecting tooling 210.
Wherein, described operating platform is the full hall steel pipe scaffold of fastener type, and the full hall steel pipe scaffold of described fastener type adopts layering to set up, and comprising:
Pin is put in vertical rod, sets up bar of sweeping the floor on the ground;
Described bar of sweeping the floor sets up bridging and horizontal brace; And
Set up the scaffold of intermediate rest part and the bridging in circumferential perimeter.
Step S102: shown in composition graphs 2, purlin vehicle frame 20 slides setting can along the elevating mechanism 40 of the length direction translation of purlin vehicle frame 20.Preferably, elevating mechanism 40 is electric block, described electric block comprises the hoist engine be arranged on purlin vehicle frame 20 that slides, is located at the assembly pulley on described hoist engine and the hook member for sucker described in hook block, and described hook member is hung at described assembly pulley by being set around the hoist cable of described assembly pulley.Specific as follows:
(1) electric block adopts hoist engine to establish assembly pulley to lift, and notices that bundle rope must take safeguard measure in case injury device, according to the weight of equipment own, select lifting rope suspender during lifting.
(2) gap adjustment: with the gap, the track edge of a wing of purlin vehicle frame 20 inside the road wheel wheel rim of electric block, ensure between 3mm ~ 5mm, is realized by pad adjustment.
(3) detection before electric block lifting: before lifting, whether the running status of detection electric block lifting speed reducing is normal, whether wire rope is taken out tightly, whether control button wiring is correct, guarantees that device security uses.
Step S103: shown in composition graphs 2, elevating mechanism 40 arranges sucker 50.Particularly, sucker 50 is eight pawl electric sucking discs, minification is 1.2m × 0.9m, development size is 2.5m × 1.4m, suction is 800kg, described eight pawl electric sucking discs comprise chassis 510, are evenly laid in the multiple adsorption pieces 520 on chassis 510 and the connecting rod 530 that is movably connected on chassis 510, and connecting rod 530 can realize 360 ° relative to chassis 510 and rotate and 90 ° of upsets.Preferably, the connecting rod 530 of sucker 50 is arranged in the described hook member of elevating mechanism 40.
Step S104: stretch-draw curtain wall inhaul cable on the polycrystalline substance of back timber 10 and curtain wall to be onstructed.After purlin vehicle frame 20, elevating mechanism 40, sucker 50 and described curtain wall inhaul cable all installation, carry out test run and examination, specifically comprise:
1, truss truck system test run
After switching on power, first check that whether the rotation direction of each motor is consistent with the direction of control button, and then follow these steps to test run:
1) no-load (no load) test: start each mechanism and carry out positive and negative test running under zero load, check that whether control run is correct, whether the electric fixtures work such as stop are reliable.
2) static load test: in the situation that traveling mechanism is motionless, carry out examination with the rated load of 1.25 times and hang, load lifts away from ground and is about 100mm, and unsettled 10 minutes, each mechanism should be normal.
3) dynamic load test: under the condition that static load result of the test is good, carry out the unsettled test of dynamic load with the nominal load of 1.1 times, experimental period is 40s; Rise 6s, stop 14s, fall 6s, stop 14s, so carry out 15 cycles, after experiment, each position of range estimation is without exception then qualified.
2, the examination of truss car is hung, is checked and accepted
1) tissue management is carried out test run inspect for acceptance to truss car, electric block, and qualified rear use eight pawl electric sucking disc carries out examination to cladding glass and hangs.
2) lifting after cladding glass absorption, when cladding glass handling difference in height is few, shutheight is lifted by crane, and makes electric block to the translation of mounting glass face, during close to installation site, is adjusted by the installer of scaffold to cladding glass.Adjustable function in conjunction with eight pawl electric sucking discs adjusts cladding glass installation site, angle, direction, comes into operation after system cloud gray model is normal.
Step S105: after having checked and accepted, described curtain wall inhaul cable arranges the fastener of the cladding glass for installing curtain wall to be onstructed, and described fastener has refutes access slot, specifically comprises:
1, surveying setting-out
1) according to the complexity of job site and the technical difficulty of precision controlling, after determining to adopt first entirety to control, the general thought of Partial controll, relies on coordinate system to position the measurement technique of control.
2) because main stress structure is based upon on the basis of civil engineering, the foundation of the installation tracking and command network of therefore curtain wall installation is just according to the SURVEYING CONTROL NETWORK of civil engineering.
3) adopt total powerstation and level gauge to measure, accuracy of instrument is 2 ", and censorship is qualified could use.
2, reverse interface is installed
The glass determined by Deepen Design drawing is separated, and described curtain wall inhaul cable installs fastener, and ensure that installation site tolerance is in ± 1mm, under glass gravity load, splice system has displacement, now by adjustment clamping plate part system fading margin.
Step S106: install cladding glass: top purlin vehicle frame 20 being moved to the installation site of cladding glass to be installed, cladding glass 60 is adsorbed on the adsorption piece 520 of sucker 50, utilizing elevating mechanism 40 cladding glass 60 to be moved to described installation site and is installed on described in described fastener refutes in access slot, specifically comprises:
1, lifting prepares
1) before installation exercise, the personnel that reply participates in operation carry out technology and tell somebody what one's real intentions are safely, make the clear and definite content of each operating personnel, the method for employing, technical measures and the safety problem that should note.
2) pack, transport and storage: in glass processing process, must carry out label to every block glass, in-site installation is sat in the right seat.Before glass is installed, must be transported in glass storage rack that glass specifies and preserve, in transportation, glass applications rope fastens, and prevents glass to fall breakage.
3) glass is stacked by size dispersion, the various materials needed for each work plane should put in place in a pre-installation.Cladding glass should clean totally, and stacks by erection sequence.
4) should carry out checking the verticality checking glass fixture, absolute altitude before lifting, whether levelness meets designing requirement.Whether Inspection face is enough in addition, has the obstruction of without hindrance installation exercise, if any should give removing.
2, lifting sequence is determined
The order that glass hanging follows computer simulation emulation is carried out, minimum for principle with deflection value after guaranteeing glass hanging safety, structural safety, lifting.
3, assistance platform prepares
The position, operating platform people from station that glass outer side is set up completely spreads scaffold floor, and two people are ready at all times to scoop out glass, when glass near time, hand steered stabilized glass immediately.
4, glass hanging
1) colligation rope: cladding glass 60 is tied up at Liang Ge angle, glass top with two ropes before lifting by crane, for coarse adjustment glass angle, also protects cladding glass 60 to touch other objects because of mobile inertia and to be damaged simultaneously.
2) glass is adsorbed: first cladding glass 60 surface dirt, dirt are wiped examination totally, attention will correctly judge inside and outside.Sucker 50 has vacuum pump and hydraulic means, coordinates pick up cladding glass 60 with machinery, manual rotation 360 °, and before and after realizing, fine setting 100mm stretches, and the elevation angle adjusts 10 °, and centrally axle rotates ± 10 °.
3) lifting is mobile: after guaranteeing that steady cladding glass 60 inhaled by sucker 50, slowly at the uniform velocity lift by crane, first complete the movement of horizontal direction, then slowly glass is moved vertically to installation site again.In handling cladding glass 60 process, put down two ropes from scaffold and pinion cladding glass 60 both sides as lead-in wire, so that the adjustment of relevant position transported to by glass.
4) frame is entered: when cladding glass 60 puts in place, on scaffold, personnel should catch sucker 50 as early as possible, control to stablize cladding glass 60, stand in indoor location workman to be adjusted cladding glass 60 by the rope tied up on cladding glass 60 before, by the adjustable function of combined with sucking disc 50, the installation site of cladding glass 60, angle, direction are adjusted simultaneously, cladding glass 60 diagonal brace goes out outside installing frame by man-computer cooperation, align in the described fastener of rear press-in toward pushing back again, upper and lower, left and right insert depth wants consistent.When groove is arranged at top, top is allowed first to enter groove; When groove is arranged at bottom, cladding glass 60 slowly should be put into fastener notch, fix fastener with foam-filled rod immediately, prevent fastener from swinging in groove and cause cracking.
5) adjustment is fixing: after the glass installation of each Pin, should carry out plate adjustment, and the standard of glass adjustment is " horizontal flat, vertically, face is put down ", and adjustment glass glue-line is in the same size.After cladding glass has adjusted, should be fixed the seal gasket of surrounding as early as possible, alignment error controls, in ± 3mm, not make it accumulate, control at each layer, distributes, digests.
Further the, after cladding glass 60 being installed in described fastener, also comprise:
The cladding glass of glue-line both sides pastes protection gummed paper; And
Carry out playing glue to described cladding glass, beat after glue completes and remove described protection gummed paper.Specific as follows:
1) play application " dimethylbenzene " and degreasing cotton yarn before glue and wipe clean glass, when playing glue, scaffold is passed through in outside, and inner side realizes two-sidedly playing glue by the handling frame that hoists simultaneously.
2) on the glass of glue-line both sides, paste protection gummed paper before playing glue, gummed paper pastes the designing requirement that will meet glue-line.
3) want continuous uniform when playing glue, operating sequence is: perpendicular after first horizontal, from top to bottom.Will accomplish after injecting glue that glue-line and base material bond firm imporosity, glue-line is smooth round and smooth.
4) when playing glue the next day, the glue head accomplished fluently should be cleared up in glue-line junction, and the glue tail of glue has been beaten in excision, to ensure the connection closely unification of twice dozen of glue.
5) after glass cement is modified, should remove being pasted onto glass sized paper in time, after glass cement solidification, inside and outside glass should be cleaned, properly protect mark.
6) cleaning glass from top to bottom, and cleaning Hou Bao relevant departments carry out an acceptance inspection, and after qualified by inspection, remove immediately and operates scaffold outward.
Step S107: the step repeating described installation cladding glass, according to the erection sequence that cladding glass is preset, installs whole cladding glasss, specifically comprises:
Purlin vehicle frame 20 is moved to the top of the installation site of the first row cladding glass of curtain wall to be onstructed;
Each cladding glass in first row cladding glass is installed, the installation steps of any one cladding glass wherein in first row cladding glass comprise: be adsorbed on the adsorption piece 520 of sucker 50 by cladding glass 60, utilize elevating mechanism 40 cladding glass 60 to be moved to described installation site and is installed on described in described fastener and refute in access slot; And
After each cladding glass installation in described first row cladding glass, described purlin vehicle frame moved to the installation site of next column cladding glass and continue next column cladding glass to be installed, until all cladding glasss in whole curtain wall install.Wherein, same row cladding glass takes mode from the bottom up to install.
Especially, in a preferred embodiment of the present invention, whole cladding glasss is divided into multiple installation region, a described purlin vehicle frame is all set in installation region described in each to install described cladding glass in installation region described in each.Cladding glass in installation region described in each can be synchronous installation, also can be install respectively.
The hanging method of the present invention's indoor inclined curtain wall super large glass, adopt purlin vehicle frame and elevating mechanism combination, realize cladding glass and both can move in the horizontal direction, can vertically move again, exactly cladding glass can be in place, simple to operate, high construction efficiency.
The beneficial effect of the hanging method of the present invention's indoor inclined curtain wall super large glass is:
1) take microcomputer modelling analogue simulation, determine that scientific and rational glass installs section, erection sequence, transport and mounting means, a construction molding.
2) adopt toughened rubber-laminated vacuum hollow ultrawhite LOW-E glass, lower self-destruction rate.
3) the reasonable piecemeal of glass, controls glass weight within 500kg, avoids adopting large-scale crane mounting glass, reduce the construction Deformation of inclined curtain wall simultaneously.
4) glass hanging adopts external scaffolding over height stacking operation platform as operating platform, utilizes two-way removable electronic truss car to carry out in conjunction with eight pawl electric sucking discs, simple to operate, high construction efficiency.
The above is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention, any those skilled in the art, not departing from the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solution of the present invention, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (10)

1. a hanging method for indoor inclined curtain wall super large glass, is characterized in that, comprising:
The back timber of curtain wall to be onstructed arranges the purlin vehicle frame vertical with the length direction of curtain wall to be onstructed;
Described purlin vehicle frame slides setting can along the elevating mechanism of the length direction translation of described purlin vehicle frame;
Described elevating mechanism arranges sucker;
Stretch-draw curtain wall inhaul cable on the polycrystalline substance of described back timber and curtain wall to be onstructed;
Described curtain wall inhaul cable arranges the fastener of the cladding glass for installing curtain wall to be onstructed, and described fastener has refutes access slot;
Cladding glass is installed: the top described purlin vehicle frame being moved to the installation site of cladding glass to be installed, described cladding glass is adsorbed on described sucker, utilizes described elevating mechanism described cladding glass to be moved to described installation site and is installed on described in described fastener and refute in access slot;
Repeat the step of described installation cladding glass, according to the erection sequence that cladding glass is preset, whole cladding glasss is installed.
2. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1, is characterized in that, the back timber of curtain wall to be onstructed arranges the purlin vehicle frame vertical with the length direction of curtain wall to be onstructed, comprising:
Set up operating platform, described operating platform is connected with described polycrystalline substance; And
On described operating platform, described purlin vehicle frame is fixed on described back timber by connecting tooling.
3. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 2, is characterized in that, described operating platform is the full hall steel pipe scaffold of fastener type, and the full hall steel pipe scaffold of described fastener type adopts layering to set up, and comprising:
Pin is put in vertical rod, sets up bar of sweeping the floor on the ground;
Described bar of sweeping the floor sets up bridging and horizontal brace; And
Set up the scaffold of intermediate rest part and the bridging in circumferential perimeter.
4. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1, it is characterized in that, described elevating mechanism is electric block, described electric block comprises the hoist engine be arranged on the vehicle frame of described purlin that slides, is located at the assembly pulley on described hoist engine and the hook member for sucker described in hook block, and described hook member is hung at described assembly pulley by being set around the hoist cable of described assembly pulley.
5. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1, it is characterized in that, described sucker is eight pawl electric sucking discs, and described eight pawl electric sucking discs comprise chassis, are evenly laid in the multiple adsorption piece on described chassis and the connecting rod that is movably connected on described chassis.
6. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1; it is characterized in that; before described cladding glass being adsorbed on described sucker; also comprise: tying up relative two sidepieces at described cladding glass for regulating the angle of described cladding glass with two ropes, tying up at the middle part of described cladding glass for the protection of described cladding glass with two ropes.
7. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1, is characterized in that, utilizes described elevating mechanism to be moved into place by described cladding glass and be installed on described in described fastener and refutes in access slot, comprising:
First described cladding glass is moved in the horizontal direction by described elevating mechanism and be in same vertical plane with described installation site;
Again described cladding glass is vertically moved to described installation site by described elevating mechanism; And
Described cladding glass is installed on described in described fastener and refutes in access slot.
8. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 7, is characterized in that, after being installed on by described cladding glass in described fastener, also comprises:
The cladding glass of glue-line both sides pastes protection gummed paper; And
Carry out playing glue to described cladding glass, beat after glue completes and remove described protection gummed paper.
9. the hanging method of indoor inclined curtain wall super large glass as claimed in claim 1, is characterized in that, according to the erection sequence that cladding glass is preset, is installed by whole cladding glasss, comprising:
Described purlin vehicle frame is moved to the top of the installation site of the first row cladding glass of curtain wall to be onstructed;
Each cladding glass in first row cladding glass is installed, the installation steps of any one cladding glass wherein in first row cladding glass comprise: be adsorbed on described sucker by described cladding glass, utilize described elevating mechanism described cladding glass to be moved to described installation site and is installed on described in described fastener and refute in access slot; And
After each cladding glass installation in described first row cladding glass, described purlin vehicle frame moved to the installation site of next column cladding glass and continue next column cladding glass to be installed, until all cladding glasss in whole curtain wall install.
10. the hanging method of indoor inclined curtain wall super large glass as claimed in any one of claims 1-9 wherein, it is characterized in that, whole cladding glasss is divided into multiple installation region, a described purlin vehicle frame is all set in installation region described in each to install described cladding glass in installation region described in each.
CN201510185374.XA 2015-04-17 2015-04-17 Hoisting method for indoor inclined curtain wall super-large glass Active CN104831846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510185374.XA CN104831846B (en) 2015-04-17 2015-04-17 Hoisting method for indoor inclined curtain wall super-large glass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510185374.XA CN104831846B (en) 2015-04-17 2015-04-17 Hoisting method for indoor inclined curtain wall super-large glass

Publications (2)

Publication Number Publication Date
CN104831846A true CN104831846A (en) 2015-08-12
CN104831846B CN104831846B (en) 2017-04-12

Family

ID=53810016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510185374.XA Active CN104831846B (en) 2015-04-17 2015-04-17 Hoisting method for indoor inclined curtain wall super-large glass

Country Status (1)

Country Link
CN (1) CN104831846B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337520A (en) * 2016-10-28 2017-01-18 广州机施建设集团有限公司 The construction technology of large-cell point glass curtain wall
CN106869516A (en) * 2017-03-08 2017-06-20 上海市全保建筑帷幕有限公司 Electric sucking disc coordinates steam crane to change glass process
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN107558672A (en) * 2016-06-30 2018-01-09 中建八局装饰工程有限公司 Sloping roof super large glaziers method
CN110344525A (en) * 2019-07-25 2019-10-18 广东世纪达建设集团有限公司 A kind of super large plate apleuria full glass curtain wall construction method of installation
CN110409838A (en) * 2019-07-22 2019-11-05 湖北香榭丽舍幕墙装饰工程有限公司 Big glass hanging method suitable for narrow construction site
CN110439293A (en) * 2019-08-24 2019-11-12 陕西建工第九建设集团有限公司 A kind of glass curtain wall auxiliary installing device
CN114215235A (en) * 2021-12-06 2022-03-22 中建八局第二建设有限公司 Super high-rise inclined double-layer special-shaped curtain wall construction device and method
CN114233021A (en) * 2021-12-27 2022-03-25 上海市机械施工集团有限公司 Installation method of bulletproof glass
CN114718329A (en) * 2022-04-20 2022-07-08 广州市第三建筑工程有限公司 Curtain wall installation equipment, using method and curtain wall installation construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284419A (en) * 1995-04-17 1996-10-29 Taisei Corp Suspending jig for outer wall material fitting work and fitting method using that jig
JPH09310500A (en) * 1996-05-21 1997-12-02 Takenaka Komuten Co Ltd Large building lifting method
JPH1144093A (en) * 1997-07-29 1999-02-16 Sumitomo Metal Mining Co Ltd Tool for lifting external wall panel
CN2784492Y (en) * 2004-11-24 2006-05-31 白宝鲲 Hoisting system of glass curtain wall
CN2923902Y (en) * 2006-07-27 2007-07-18 白宝鲲 Suspending system of point-supporting type curtain wall
CN101109195A (en) * 2007-08-20 2008-01-23 北京江河幕墙股份有限公司 Single-layer bidirectional double-rope curtain wall support structure
CN102296830A (en) * 2010-06-22 2011-12-28 武汉凌云建筑装饰工程有限公司 Self-walking track mounting system for special-shaped frame glass curtain wall
CN202542734U (en) * 2012-01-18 2012-11-21 南车青岛四方机车车辆股份有限公司 Glass hoisting and installing device
CN103216105A (en) * 2013-04-18 2013-07-24 成军 Construction method of overhanging inhaul cable type hyperbolic glass curtain wall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08284419A (en) * 1995-04-17 1996-10-29 Taisei Corp Suspending jig for outer wall material fitting work and fitting method using that jig
JPH09310500A (en) * 1996-05-21 1997-12-02 Takenaka Komuten Co Ltd Large building lifting method
JPH1144093A (en) * 1997-07-29 1999-02-16 Sumitomo Metal Mining Co Ltd Tool for lifting external wall panel
CN2784492Y (en) * 2004-11-24 2006-05-31 白宝鲲 Hoisting system of glass curtain wall
CN2923902Y (en) * 2006-07-27 2007-07-18 白宝鲲 Suspending system of point-supporting type curtain wall
CN101109195A (en) * 2007-08-20 2008-01-23 北京江河幕墙股份有限公司 Single-layer bidirectional double-rope curtain wall support structure
CN102296830A (en) * 2010-06-22 2011-12-28 武汉凌云建筑装饰工程有限公司 Self-walking track mounting system for special-shaped frame glass curtain wall
CN202542734U (en) * 2012-01-18 2012-11-21 南车青岛四方机车车辆股份有限公司 Glass hoisting and installing device
CN103216105A (en) * 2013-04-18 2013-07-24 成军 Construction method of overhanging inhaul cable type hyperbolic glass curtain wall

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558672A (en) * 2016-06-30 2018-01-09 中建八局装饰工程有限公司 Sloping roof super large glaziers method
CN106337520A (en) * 2016-10-28 2017-01-18 广州机施建设集团有限公司 The construction technology of large-cell point glass curtain wall
CN106869516A (en) * 2017-03-08 2017-06-20 上海市全保建筑帷幕有限公司 Electric sucking disc coordinates steam crane to change glass process
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN110409838A (en) * 2019-07-22 2019-11-05 湖北香榭丽舍幕墙装饰工程有限公司 Big glass hanging method suitable for narrow construction site
CN110344525A (en) * 2019-07-25 2019-10-18 广东世纪达建设集团有限公司 A kind of super large plate apleuria full glass curtain wall construction method of installation
CN110439293A (en) * 2019-08-24 2019-11-12 陕西建工第九建设集团有限公司 A kind of glass curtain wall auxiliary installing device
CN110439293B (en) * 2019-08-24 2021-05-14 陕西建工第九建设集团有限公司 Auxiliary installation equipment for glass curtain wall
CN114215235A (en) * 2021-12-06 2022-03-22 中建八局第二建设有限公司 Super high-rise inclined double-layer special-shaped curtain wall construction device and method
CN114233021A (en) * 2021-12-27 2022-03-25 上海市机械施工集团有限公司 Installation method of bulletproof glass
CN114718329A (en) * 2022-04-20 2022-07-08 广州市第三建筑工程有限公司 Curtain wall installation equipment, using method and curtain wall installation construction method

Also Published As

Publication number Publication date
CN104831846B (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN104831846A (en) Hoisting method for indoor inclined curtain wall super-large glass
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN101936073A (en) Construction method of combined hidden frame curtain wall of glass and corrugated aluminum sheet
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN206591432U (en) Pipe installing job platform
CN106894342A (en) Pipe installing job platform and construction method
CN106638299A (en) Multifunctional operation platform and construction method
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN104032967A (en) Hoisting construction method for prefabricated assembly-type frame structure members
CN205637622U (en) Perpendicular unit glass curtain wall hoist and mount system
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN104404888B (en) A kind of large-scale aerial gradient adjustment Lift-on/Lift-off System and application
CN104060838B (en) A kind of vestibule divides into groups aerial group to Method for Installation
CN108867958A (en) A kind of frame curtain wall mounting process
CN202401753U (en) Sliding die device
CN204689552U (en) A kind of equipment jacking apparatus of zigzag
CN202850470U (en) Construction platform for installation of corner connecters of curtain wall
CN203257106U (en) Multifunctional power-driven walking type walking system
JP2008223317A (en) Gondola device and method of constructing exterior of building using the same
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN205777438U (en) A kind of suspension type steel platform legs hand cradle basis
CN205653104U (en) Walking crane of cell board curtain installation
CN204754246U (en) Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant