CN202850470U - Construction platform for installation of corner connecters of curtain wall - Google Patents
Construction platform for installation of corner connecters of curtain wall Download PDFInfo
- Publication number
- CN202850470U CN202850470U CN 201220468062 CN201220468062U CN202850470U CN 202850470 U CN202850470 U CN 202850470U CN 201220468062 CN201220468062 CN 201220468062 CN 201220468062 U CN201220468062 U CN 201220468062U CN 202850470 U CN202850470 U CN 202850470U
- Authority
- CN
- China
- Prior art keywords
- platform
- curtain wall
- connecters
- corner
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
Provided is a construction platform for installation of corner connecters of a curtain wall. Through the construction platform for the installation of the corner connecters of the curtain wall, the corner connecters of the curtain wall can be constructed normally, and the construction period can be effectively saved. The construction platform for the installation of the corner connecters of the curtain wall comprises a movable portal platform (10), wherein an overhanging construction platform (11) which extends outwards is arranged at the front end of the movable portal platform (10), and an adjustable reverse support (14) which can tightly and vertically abut against an upper layer floor slab is fixedly arranged at the rear end of the movable portal platform (10).
Description
Technical field
The utility model relates to construction work, particularly a kind of curtain wall corner brace installation platform.
Background technology
In the Glass Curtain Wall Construction process, the present normal operation hanging basket of curtain wall corner brace welding procedure is as operation platform.The deficiency that has high, the dangerous large and long construction period of construction cost, and because hanging basket need to arrange counterweight and fixing at roof, if but there is larger contracture in building at width or length direction, then the nacelle construction part does not possess execution conditions, and required hanging basket quantity is a lot.
The utility model content
Technical problem to be solved in the utility model provides curtain wall corner brace installation platform, makes curtain wall corner brace energy normal construction, and effectively saves the duration.
The technical scheme that its technical problem that solves the utility model adopts is as follows:
Curtain wall corner brace installation platform of the present utility model, it is characterized in that: it comprises movably door frame platform, the front end of this door frame platform has the outwardly directed construction platform of encorbelmenting, and its rear end then is fixedly installed the adjustable anti-support that can vertically hold out against in the upper strata floor.
The beneficial effects of the utility model are that the door frame of encorbelmenting can effectively replace hanging basket, normally carries out the installation of arc facade curtain wall corner brace energy, and is simple in structure, easy to use, safe, can effectively save the duration.
Description of drawings
This manual comprises such as next width of cloth accompanying drawing:
Fig. 1 is the structural representation of the utility model curtain wall corner brace installation platform.
The title of main member shown in the figure and corresponding mark: door frame platform 10, encorbelment construction platform 11, safety net 11a, plank 11b, safe safety cable 12, cat ladder 13, adjustable anti-support 14, balancing weight 15.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
With reference to Fig. 1, the utility model curtain wall corner brace installation platform, comprise movably door frame platform 10, the front end of this door frame platform 10 has the outwardly directed construction platform 11 of encorbelmenting, and its rear end then is fixedly installed the adjustable anti-support 14 that can vertically hold out against in the upper strata floor.For guaranteeing construction safety, the described construction platform 11 of encorbelmenting articulates with the safety cable 12 that is arranged at the upper strata floor.Rear portion at the construction platform 11 of encorbelmenting disposes balancing weight 15, and the side then disposes the cat ladder 13 up and down for the constructor.The periphery of construction platform 11 of encorbelmenting fixedly hangs safety net 11a, laying plank 11b on the skeleton of bottom.
The use procedure of the utility model curtain wall corner brace installation platform is as follows: set up door frame platform 10 at floor with steel tube fastener; Inspect for acceptance qualified after, slowly platform is shifted onto the floor edge, making encorbelment the construction platform 11 hang floor; Adjustable anti-support 14 makes it hold out against the upper strata floor, and the door frame platform can't be moved; Utilize cat ladder 13, the constructor is upper to door frame platform 10; Enter the construction platform 11 welding corner braces of encorbelmenting; Personnel left door frame platform 10 after construction was finished, and pine is transferred in adjustable anti-support 14, removed the locking of opposite house body panel 10; Door frame platform 10 is moved in the floor, move to next Work sectors along floor level.This shows that the utility model can effectively replace hanging basket, make curtain wall corner brace energy normal construction, and simple in structure, easy to use, safe, and can effectively save the duration.
Some principles of the above the utility model curtain wall corner brace installation platform that just explains through diagrams, be not be the utility model to be confined to shown in and in described concrete structure and the scope of application, so every corresponding modify that might be utilized and equivalent all belong to the claim that the utility model is applied for.
Claims (2)
1. curtain wall corner brace installation platform, it is characterized in that: it comprises movably door frame platform (10), the front end of this door frame platform (10) has the outwardly directed construction platform (11) of encorbelmenting, and its rear end then is fixedly installed the adjustable anti-support (14) that can vertically hold out against in the upper strata floor.
2. as claimed in claim 1, it is characterized in that: the described construction platform (11) of encorbelmenting articulates with the safety cable (12) that is arranged at the upper strata floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220468062 CN202850470U (en) | 2012-09-14 | 2012-09-14 | Construction platform for installation of corner connecters of curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220468062 CN202850470U (en) | 2012-09-14 | 2012-09-14 | Construction platform for installation of corner connecters of curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202850470U true CN202850470U (en) | 2013-04-03 |
Family
ID=47981682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220468062 Expired - Fee Related CN202850470U (en) | 2012-09-14 | 2012-09-14 | Construction platform for installation of corner connecters of curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202850470U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN112282356A (en) * | 2020-12-03 | 2021-01-29 | 中建四局第三建设有限公司 | Constructional column formwork reinforcing apparatus with feeding function |
CN114046029A (en) * | 2021-11-25 | 2022-02-15 | 武汉一冶建筑安装工程有限责任公司 | Construction method for putting hanging basket into front and rear curtain wall outer vertical surfaces |
WO2023208250A1 (en) * | 2022-06-02 | 2023-11-02 | 中铁七局集团有限公司 | Curtain wall construction platform |
-
2012
- 2012-09-14 CN CN 201220468062 patent/CN202850470U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103711301A (en) * | 2013-12-30 | 2014-04-09 | 江河创建集团股份有限公司 | Construction method and device for two-track movable electric basket and lifting hoist |
CN112282356A (en) * | 2020-12-03 | 2021-01-29 | 中建四局第三建设有限公司 | Constructional column formwork reinforcing apparatus with feeding function |
CN114046029A (en) * | 2021-11-25 | 2022-02-15 | 武汉一冶建筑安装工程有限责任公司 | Construction method for putting hanging basket into front and rear curtain wall outer vertical surfaces |
WO2023208250A1 (en) * | 2022-06-02 | 2023-11-02 | 中铁七局集团有限公司 | Curtain wall construction platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201649678U (en) | Semi-automatic safety protective shed for high-rise building construction | |
CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN202850470U (en) | Construction platform for installation of corner connecters of curtain wall | |
CN104831846A (en) | Hoisting method for indoor inclined curtain wall super-large glass | |
CN113789948A (en) | Large-span house roof atrium side wall sliding rail hanging basket and construction method thereof | |
CN201908447U (en) | Lift-type horizontal safety net | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN204001658U (en) | A kind of movable hanging frame of installing for cornice decorative ceiling | |
CN207092516U (en) | A kind of high-altitude construction hanging basket | |
CN203467285U (en) | Movable building exterior facade greening wall body | |
CN202324662U (en) | Installation device for foam cement composites | |
CN201401000Y (en) | Special hanging basket for installing noise barrier roof boards | |
CN204680987U (en) | The device that a kind of temporary electricity of constructing is arranged | |
CN206328110U (en) | One kind customization hanging basket apparatus | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN204983609U (en) | Hanging basket for building | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN203613826U (en) | Mobile house | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
CN204198306U (en) | A kind of device for purlin lifting in building operation | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN202787956U (en) | Multifunctional outer wall large panel | |
CN202023349U (en) | Safety device with hard covering plate and turnover plate of climbing type scaffolding platform | |
CN202064621U (en) | Conventionalized operation platform for construction of elevator shaft | |
CN204001673U (en) | Expanded metal lath fastening devices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 Termination date: 20150914 |
|
EXPY | Termination of patent right or utility model |