CN204001658U - A kind of movable hanging frame of installing for cornice decorative ceiling - Google Patents
A kind of movable hanging frame of installing for cornice decorative ceiling Download PDFInfo
- Publication number
- CN204001658U CN204001658U CN201420288152.1U CN201420288152U CN204001658U CN 204001658 U CN204001658 U CN 204001658U CN 201420288152 U CN201420288152 U CN 201420288152U CN 204001658 U CN204001658 U CN 204001658U
- Authority
- CN
- China
- Prior art keywords
- cornice
- hanger
- imitative
- track
- roller bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 12
- 238000000465 moulding Methods 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 239000000725 suspension Substances 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 abstract description 9
- 230000001360 synchronised effect Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to a kind of hanger of installing for cornice decorative ceiling.A movable hanging frame of installing for cornice decorative ceiling, it comprises one hanger, guard rail, roller bearing, track, wire rope, color steel corrugated sheet, safety net and the grooved clip of imitative cornice moulding; The one hanger of described imitative cornice moulding comprises the crossbeam of encorbelmenting, vertical suspension bracket, imitative cornice tilted rack, bottom water plane frame, all adopts square steel pipe to make; Described one hanger both sides are provided with guard rail, and guard rail is provided with safety net enclosing; Described color steel corrugated sheet adopts self threading pin to be fixed on imitative cornice tilted rack, bottom water plane frame inner side; Encorbelment crossbeam bottom arranges roller bearing, and track is located at cornice top, and roller bearing is rollably placed on track, and the crossbeam rear end of encorbelmenting adopts grooved clip and bottom to adopt reinforcing bar to fix as bearing pin; Bottom water flatrack is fixed with wire rope suspensioning with the main structure of cornicing.The utility model light and flexible, safe and reliable, can make many group hanger synchronous constructions simultaneously, greatly improved operating efficiency.
Description
Technical field
The utility model relates to hanger, relates in particular to a kind of hanger of installing for cornice decorative ceiling.
Background technology
Conventionally building structure cornice is partly outstanding metope, traditional handicraft is set up scaffold along exterior wall limit, but generally the absolute altitude of cornice is all very high, but also there is the cornice of encorbelmenting greatly, if just set up a large amount of scaffolds for safe cornice decorative system, both affect the duration, increased again construction cost.
Summary of the invention
The utility model is intended to solve the above-mentioned defect of prior art, and a kind of movable hanging frame of installing for cornice decorative ceiling is provided.The utility model light and flexible, safe and reliable, can make many group hanger synchronous constructions simultaneously, greatly improved operating efficiency.
In order to solve the problems of the technologies described above, a kind of movable hanging frame of installing for cornice decorative ceiling, it comprises one hanger, guard rail, roller bearing, track, wire rope, color steel corrugated sheet, safety net and the grooved clip of imitative cornice moulding; The one hanger of described imitative cornice moulding comprises the crossbeam of encorbelmenting, vertical suspension bracket, imitative cornice tilted rack, bottom water plane frame, all adopts square steel pipe to make; Described one hanger both sides are provided with guard rail, and guard rail is provided with safety net enclosing; Described color steel corrugated sheet adopts self threading pin to be fixed on imitative cornice tilted rack, bottom water plane frame inner side; Encorbelment crossbeam bottom arranges roller bearing, and track is located at cornice top, and roller bearing is rollably placed on track, and the crossbeam rear end of encorbelmenting adopts grooved clip and bottom to adopt reinforcing bar to fix as bearing pin; Bottom water flatrack is fixed with wire rope suspensioning with the main structure of cornicing.
The movable hanging frame device that the utility model is installed for cornice decorative ceiling, based on building structure cornice decorative system, construction produces, setting up scaffold construction technique with tradition compares, movable hanging frame device light and flexible, safe and reliable, can make many group hanger synchronous constructions, greatly improve operating efficiency, have good economic benefit simultaneously.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is further described:
Fig. 1 is the utility model schematic diagram.
The specific embodiment
As shown in Figure 1, the utility model forms by imitating cornice moulding one hanger 1,2,3,4, guard rail 5, roller bearing 6, track 7, suspending steel wire rope 8, color steel corrugated sheet 9, safety net 10, grooved clip 11 etc.
Imitative cornice moulding one hanger comprises the crossbeam 1 of encorbelmenting, vertical suspension bracket 2, imitative cornice tilted rack 3, bottom water plane frame 4, all adopts square steel pipe to make; Guard rail 5 adopts relatively small-sized square tube to make; Color steel corrugated sheet 9 adopts self threading pin to be fixed on hanger 3,4 inner sides; Guard rail 5 adopts safety net 10 enclosings; Crossbeam 1 bottom of encorbelmenting arranges roller bearing 6, and roller bearing 6 can roll on square steel pipe track 7; The crossbeam 1 rear end employing grooved clip 11 of encorbelmenting is fixing, and grooved clip is made by square tube, and bottom adopts reinforcing bar as bearing pin; Bottom water flatrack 4 adopts wire rope suspensioning to fix with the main structure of cornicing.
During construction, construct:
At eave structure top, lay two tracks 7, be welded and fixed temporarily;
At floor manufacture, organize movable hanging frame, Multipoint synchronous operation is to increase work efficiency more;
By mobile crane, movable hanging frame is lifted to cornice, the roller bearing 6 of movable hanging frame is stuck on track 7, hanger top cross beam 1 rear end is temporarily fixed on eave structure by Simple reinforced bar bearing pin with grooved clip 11, and hanger bottom water flush end adopts wire rope 8 to be suspended in cornice main structure.
Operator enters movable hanging frame from cornice top, carries out the keel 13 of cornice, the construction of decorative panel 12.
After the decorative system in movable hanging frame region has been constructed, operator is upper to cornice top, opens grooved clip 11, loosen suspending steel wire rope 8, promote hanger to the position of not constructing, fix grooved clip 11 and suspending steel wire rope 8, proceed the construction in next piece district.
Claims (1)
1. a movable hanging frame of installing for cornice decorative ceiling, is characterized in that, it comprises one hanger, guard rail, roller bearing, track, wire rope, color steel corrugated sheet, safety net and the grooved clip of imitative cornice moulding; The one hanger of described imitative cornice moulding comprises the crossbeam of encorbelmenting, vertical suspension bracket, imitative cornice tilted rack, bottom water plane frame, all adopts square steel pipe to make; Described one hanger both sides are provided with guard rail, and guard rail is provided with safety net enclosing; Described color steel corrugated sheet adopts self threading pin to be fixed on imitative cornice tilted rack, bottom water plane frame inner side; Encorbelment crossbeam bottom arranges roller bearing, and track is located at cornice top, and roller bearing is rollably placed on track, and the crossbeam rear end of encorbelmenting adopts grooved clip and bottom to adopt reinforcing bar to fix as bearing pin; Bottom water flatrack is fixed with wire rope suspensioning with the main structure of cornicing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420288152.1U CN204001658U (en) | 2014-06-03 | 2014-06-03 | A kind of movable hanging frame of installing for cornice decorative ceiling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420288152.1U CN204001658U (en) | 2014-06-03 | 2014-06-03 | A kind of movable hanging frame of installing for cornice decorative ceiling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204001658U true CN204001658U (en) | 2014-12-10 |
Family
ID=52041681
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420288152.1U Expired - Fee Related CN204001658U (en) | 2014-06-03 | 2014-06-03 | A kind of movable hanging frame of installing for cornice decorative ceiling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204001658U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105197845A (en) * | 2015-09-19 | 2015-12-30 | 山东德建集团有限公司 | Lifting hanging type hanging basket roof cornice construction device and use method |
| CN105952130A (en) * | 2016-06-24 | 2016-09-21 | 中国建筑第六工程局有限公司 | Suspension platform for constructing eave part of building and installation method thereof |
| CN108277971A (en) * | 2018-04-09 | 2018-07-13 | 上海市机械施工集团有限公司 | A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing |
| CN115288406A (en) * | 2022-07-25 | 2022-11-04 | 中建八局广西建设有限公司 | Operating platform for metal roof cornice |
-
2014
- 2014-06-03 CN CN201420288152.1U patent/CN204001658U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105197845A (en) * | 2015-09-19 | 2015-12-30 | 山东德建集团有限公司 | Lifting hanging type hanging basket roof cornice construction device and use method |
| CN105952130A (en) * | 2016-06-24 | 2016-09-21 | 中国建筑第六工程局有限公司 | Suspension platform for constructing eave part of building and installation method thereof |
| CN108277971A (en) * | 2018-04-09 | 2018-07-13 | 上海市机械施工集团有限公司 | A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing |
| CN115288406A (en) * | 2022-07-25 | 2022-11-04 | 中建八局广西建设有限公司 | Operating platform for metal roof cornice |
| CN115288406B (en) * | 2022-07-25 | 2023-09-12 | 中建八局广西建设有限公司 | Operating platform for cornice of metal roof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201261942Y (en) | Stand platform for cantilevered concrete structure construction | |
| CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN203095547U (en) | Hanging basket installation system used for beveled building | |
| CN202767488U (en) | Steel pipe fastener hanging type handling frame | |
| CN204001658U (en) | A kind of movable hanging frame of installing for cornice decorative ceiling | |
| CN102444271B (en) | Suspended scaffolding | |
| CN202751338U (en) | Rail type suspension basket | |
| CN202626841U (en) | Concrete device for wrapping main arch by hanging method | |
| CN204551852U (en) | Can dismantle bar mineral wool board hidden keel furred ceiling | |
| CN204703534U (en) | A kind of large-scale unit plates of curtain wall two-rail hanging apparatus | |
| CN104295083A (en) | Guidance and hanging separated cantilever beam composite structure of integrated climbing frame | |
| CN103654610A (en) | Rail type hanging basket | |
| CN203856186U (en) | Suspension type manned pulley trolley for mounting large-scaled storage tank subsidiary facilities | |
| CN203113793U (en) | Large formwork installation system of oblique structure | |
| CN203238948U (en) | Hollow ultrahigh formwork profile steel platform | |
| CN204311724U (en) | Hanging basket suspension device far away from structural edge | |
| CN202658867U (en) | Overhanging construction platform | |
| CN204728554U (en) | Integral structure of ceiling keel and double-layer construction platform | |
| CN202064359U (en) | Crossbeam wet-joint overhanging construction device | |
| CN105672641A (en) | Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof | |
| CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support | |
| CN202031308U (en) | Inverted-hanging type scaffold | |
| CN105926915B (en) | Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude | |
| CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
| CN203961090U (en) | A kind of ceiling structure with angle steel conversion layer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |