CN110409838A - Big glass hanging method suitable for narrow construction site - Google Patents

Big glass hanging method suitable for narrow construction site Download PDF

Info

Publication number
CN110409838A
CN110409838A CN201910663311.9A CN201910663311A CN110409838A CN 110409838 A CN110409838 A CN 110409838A CN 201910663311 A CN201910663311 A CN 201910663311A CN 110409838 A CN110409838 A CN 110409838A
Authority
CN
China
Prior art keywords
big glass
glass
big
construction site
steel basketry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910663311.9A
Other languages
Chinese (zh)
Inventor
高玉姣
刘文斌
胡克
张波
吴乔
陈成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Champs Elysees Curtain Wall Decoration Engineering Co Ltd
Original Assignee
Hubei Champs Elysees Curtain Wall Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Champs Elysees Curtain Wall Decoration Engineering Co Ltd filed Critical Hubei Champs Elysees Curtain Wall Decoration Engineering Co Ltd
Priority to CN201910663311.9A priority Critical patent/CN110409838A/en
Publication of CN110409838A publication Critical patent/CN110409838A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • B66C1/66Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Abstract

The present invention relates to a kind of big glass hanging methods suitable for narrow construction site, it is related to glass curtain wall mounting construction technical field, the following steps are included: dividing a-quadrant and B area in narrow construction site, a-quadrant is for storing relatively narrow big glass, and B area is for storing relatively wide big glass;A cabinet frame is placed on a-quadrant and B area, big glass is hauled to construction site with platform trailer, glass big on platform trailer is unloaded using truck crane, big glass is classified and manually leans against big glass on A cabinet frame while a-quadrant or B area, the big glass of placement;Steel basketry is customized, big glass block-by-block is transferred in steel basketry, big glass is fixed in steel basketry;The steel basketry for being loaded with big glass is lifted to the position for needing to prepare installation by two truck cranes, releases the fixed relationship between big glass and steel basketry.The present invention has the effect of securely and quickly lifting big glass in narrow construction site.

Description

Big glass hanging method suitable for narrow construction site
Technical field
The present invention relates to glass curtain wall mounting construction technical field, more particularly, to a kind of suitable for narrow construction site Big glass hanging method.
Background technique
Glass curtain wall, which refers to, can have certain displacement ability with respect to main structure by support system, not share main structure Institute's building external envelope structure affected or decorating structure, glass curtain wall have single-glass and two kinds of double glazing, and modern The notable feature in doctrine skyscraper epoch.
Existing some relatively low building structure, in order to build high-end and atmospheric visual impact, and also to increase Add daylighting, it usually needs big glass is installed in the periphery of building structure, rather than it is assembled to use the small glass of muti-piece to carry out.These big glass The area of glass is 2-3 square metres far super, and the length of big glass is usually at 10 meters or more, and the width of big glass is usually in 0.4-2 rice Between, and all 500 kilograms or more of weight of each piece big glass.
Since glass is carried, is shifted, installing these big glass all in some more narrow construction sites for fragile article It is extremely inconvenient, often it is delayed construction period, therefore how in narrow construction site safety and quickly to lift these big glass Glass is always the technical barrier for being difficult to capture in curtain wall engineering industry.
Summary of the invention
The purpose of the present invention one is to provide a kind of big glass hanging method suitable for narrow construction site, and having can be Narrow construction site securely and quickly lifts the advantages of big glass.
Above-mentioned purpose one of the invention has the technical scheme that a kind of suitable for narrow construction site Big glass hanging method, comprising the following steps:
Step 1 divides a-quadrant and B area in narrow construction site, and the a-quadrant is used to store relatively narrow big glass, The B area is for storing relatively wide big glass;
Step 2 places multiple A cabinet frames on a-quadrant and B area, is then hauled big glass with platform trailer existing to construction , then glass big on platform trailer is unloaded using truck crane, is classified then referring to the width of big glass in the area A Domain or B area, the big glass of placement while, manually lean against big glass on the A cabinet frame;
Step 3, customizes different size of steel basketry according to big glass size, and the big glass block-by-block for preparing installation is transferred to institute It states in steel basketry, and big glass is fixed in the steel basketry;
The steel basketry for being loaded with big glass is lifted to the position for needing to prepare installation by two truck cranes, is released big by step 4 Fixed relationship between glass and steel basketry installs big glass after removing steel basketry.
By using above-mentioned technical proposal, lifting glass is gone using truck crane rather than tower crane first, is because big glass is Breakables, unloading and hoisting process need the movement of fine height or distance, and need to drink spike to put down gently, because tower crane is usually Stand shaken in the air it is larger, it is difficult to the movement for guaranteeing fine height or distance, it is advantageous to use truck crane;Secondly sufficiently sharp With the space of narrow construction site, a-quadrant and B area are marked off, to be respectively intended to put the big glass of different in width, is conducive to Staff chooses the big glass of correspondingly-sized, and space utilization rate is high, and big glass on construction ground is put and is unlikely to ten Divide messy;Furthermore the setting of A cabinet frame is conducive to big glass and keeps standing opposite state in a-quadrant and B area, not only stable Safety, and be conducive to the subsequent big glass of lifting;Simultaneously because the presence of steel basketry, is needing big glass being lifted to installation position When setting, first big glass can be put into steel basketry, then can relievedly be gone to promote steel basketry with truck crane, steel during being somebody's turn to do Basketry has good protective effect to big glass, and to prevent big glass breakage, safety is higher, moreover it is possible to effectively avoid economic damage It loses.
The present invention is further arranged to, and in step 2, the big glass of the a-quadrant disposably marches into the arena and is all on board Afterwards, the big glass of the B area point is multiple batches of marches into the arena.
By using above-mentioned technical proposal, by the sub-category admission of big glass of different size, and by the big of wider width Glass admission in batches is conducive to the space for making full use of narrow construction site, and will not delay construction period.
The present invention is further arranged to, in step 2, when the big glass that will be unloaded on platform trailer, in big glass length It is tied with suspender belt at a quarter in direction and at the three of four parts, is then sling big glass by suspender belt with truck crane respectively, When big glass is slowly promoted to it is liftoff 8-12 centimetres high when, check whether suspender belt secured, confirm no problem after again slowly by big glass Glass is hoisted to A cabinet frame overhead, then big glass is made slowly to fall again, and big glass puts steady rear dismounting suspender belt.
By using above-mentioned technical proposal, for big glass during being transferred to A cabinet frame, it is safe more to insure, Ke Yiyou Effect prevents from leading to safety accident and economic loss because suspender belt is loose, and even if there is suspender belt not enough firmly to happen, greatly Glass is fallen from 8-12 centimetres of height is also unlikely to break damage.
The present invention is further arranged to, and in step 2, has first been cemented in the position that A cabinet frame can be in contact with big glass Then the sheet rubber of 15-25 cm thick makes big glass lean to A cabinet frame again, and is put between the ipsilateral adjacent big glass of A cabinet frame Insulation foam.
By using above-mentioned technical proposal, big glass and A cabinet frame rigid contact is can be effectively prevented in sheet rubber, big to prevent Glass hits A cabinet frame and damaged, to big glass with good protective effect;Same insulation foam also has good buffering Effect, and then be not easy due to shock damaged between adjacent big glass, has good protective effect to big glass, and conveniently by Block takes out big glass.
The present invention is further arranged to, and in step 3, customizes different size of plank flume, the wood according to big glass size Board slot is made by block board, and before big glass is put into steel basketry, plank flume is sheathed on to the length direction two of big glass End, is then tied plank flume and big glass with bandage, and big glass is put into steel basketry and then with bandage by big glass and steel Basketry ties.
By using above-mentioned technical proposal, plank flume has good protection effect to the corner of big glass, prevents big glass Edge damage and broken angle phenomenon occurs because of shock in hoisting process, it is safer, and also bandage can both make plank flume and big glass It is securely connected between glass, and can make securely to connect between big glass and steel basketry.
The present invention is further arranged to, and the steel basketry is formed by square tubes soldering, and the steel basketry includes: rectangular hollow frame Frame, main suspension ring and secondary suspension ring, there are two the main suspension ring settings and is installed on the top of the rectangular hollow frame, and the pair is hung Ring is installed on the outside of the lower half portion of the rectangular hollow frame.
By using above-mentioned technical proposal, the steel basketry of said structure design, sound construction facilitates and accommodates big glass with auxiliary Help big glass hanging, and make it is simple, at low cost, it is light-weight and carrying is facilitated to shift.
The present invention is further arranged to, and the bottom of the rectangular hollow frame is fixed with the more supporting bars made of angle steel, The upper surface of the supporting bar is fixed with the buffer substrate tablet of 15-25 cm thick, and the upper surface of the buffer substrate tablet is provided with non-slip texture.
By using above-mentioned technical proposal, supporting bar has good auxiliary supporting role, Er Qiehuan to the bottom of big glass The design of punching is it is possible to prevente effectively from supporting bar is contacted with the bottom rigid of big glass, to prevent big glass from breaking in hoisting process Damage has good protective effect to big glass, and the non-slip texture of simultaneous buffering on piece can prevent the basal sliding of big glass, It is safer.
The present invention is further arranged to, and in step 4, two truck cranes are referred to as main crane and secondary crane, and main crane is used It being connected in the main suspension ring, secondary crane is used to connect with the secondary suspension ring,
Main crane and secondary crane drive steel basketry to rise simultaneously when lifting, and when steel basketry rises to aerial, main crane is slowly promoted, Secondary crane slowly declines, and the promotion rate of main crane is consistent with the secondary fall off rate of crane, erects completely to steel basketry Afterwards, it separates secondary crane with secondary suspension ring, then steel basketry and big glass is hoisted near installation site overhead with main crane.
By using above-mentioned technical proposal, under normal circumstances steel basketry be laid flat along length direction on the ground, with It is packed into wherein convenient for big glass, and big glass is typically all to keep vertical state during installation, it therefore through the above steps, can be with Very steadily safely the big glass of traverse is lifted near installation site overhead, and ensures that big glass at this time is vertical shape State is constructed more convenient.
The present invention is further arranged to, and the A cabinet frame is formed by square tubes soldering, the A cabinet frame include: bottom bar, oblique side lever, Cross bar and connecting rod,
The oblique side lever is provided with four and is two-by-two one group, and oblique side lever described in every group is arranged in splayed, the cross bar setting Have more and be connected between the oblique side lever of ipsilateral two, the connecting rod be connected to group two oblique side levers it Between, the cross bar and the connecting rod are horizontally disposed,
The bottom bar is set to the bottom of two oblique side levers with group, and the length of the bottom bar is greater than with described in two of group The distance between oblique side lever.
By using above-mentioned technical proposal, the A cabinet frame of said structure design, structure is more stable, and big glass is facilitated to lean to, And be placed in it is relatively stable on ground, make it is simple, at low cost, it is light-weight and facilitate carrying shift.
The present invention is further arranged to, and auxiliary hanging ring, the both ends following table of the bottom bar are fixed at the top of the oblique side lever Face is provided with the anti-skid stud in insertion ground.
By using above-mentioned technical proposal, when needing to carry A cabinet frame, auxiliary hanging ring can be convenient staff for A word Frame is sling, and is shifted more convenient;When A cabinet frame is placed on ground, anti-skid stud can prevent A cabinet frame from sliding on the ground, into And it is safer when glass is leant against on A cabinet frame greatly.
In conclusion advantageous effects of the invention are as follows:
It first, removing lifting glass using truck crane rather than tower crane first, is unloaded and lifted because big glass is breakables Journey needs the movement of fine height or distance, and needs to drink spike to put down gently, because tower crane is usually to stand to shake larger, hardly possible in the air To guarantee the movement of fine height or distance, it is advantageous to use truck crane;Next makes full use of the space of narrow construction site, A-quadrant and B area are divided, to be respectively intended to put the big glass of different in width, is conducive to staff and chooses correspondingly-sized Big glass, space utilization rate are high, and big glass is put and is unlikely to very messy on construction ground;Furthermore the setting of A cabinet frame, has Standing opposite state is kept in a-quadrant and B area conducive to big glass, not only stable safety, but also it is big to be conducive to subsequent lifting Glass;Simultaneously because big glass first can be put into steel when needing big glass being lifted to installation site by the presence of steel basketry In basketry, it then can relievedly be gone to promote steel basketry with truck crane, steel basketry has good guarantor to big glass during being somebody's turn to do Shield effect, to prevent big glass breakage, safety is higher, moreover it is possible to effectively avoid economic loss;
Second, supporting bar has good auxiliary supporting role to the bottom of big glass, and the design of buffer substrate tablet can effectively be kept away Exempt from supporting bar to contact with the bottom rigid of big glass, to prevent big glass damaged in hoisting process, have to big glass good Protective effect, the non-slip texture of simultaneous buffering on piece can prevent the basal sliding of big glass, safer.
Detailed description of the invention
Fig. 1 is the flow diagram of the embodiment of the present invention;
Fig. 2 be in the embodiment of the present invention big glass in the stacking schematic diagram of narrow construction site;
Fig. 3 is the structural schematic diagram of A cabinet frame in the embodiment of the present invention;
Fig. 4 is that big glass is leaned in the status diagram on A cabinet frame in the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of steel basketry in the embodiment of the present invention;
Fig. 6 is the enlarged drawing in Fig. 5 at A;
Fig. 7 is the structural schematic diagram of plank flume in the embodiment of the present invention.
Appended drawing reference: 1, A cabinet frame;11, bottom bar;12, oblique side lever;13, cross bar;14, connecting rod;15, hanging ring is assisted;16, Anti-skid stud;2, steel basketry;21, rectangular hollow frame;22, main suspension ring;23, secondary suspension ring;24, supporting bar;25, buffer substrate tablet;251, prevent Sliding lines;3, plank flume;4, sheet rubber;5, insulation foam;101, glass installation region;102, a-quadrant;103, B area;104, Big glass;105, platform trailer;106, truck crane.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It is wrapped referring to Fig.1 with Fig. 4 for a kind of big glass hanging method suitable for narrow construction site disclosed by the invention Include following steps:
S1 step 1 divides a-quadrant 102 and B area 103 in narrow construction site, and a-quadrant 102 is relatively narrow for storing Big glass 104, B area 103 is for storing relatively wide big glass 104;S2 step 2, on a-quadrant 102 and B area 103 Multiple A cabinet frames 1 are placed, then big glass 104 is hauled to construction site with platform trailer 105, then uses truck crane 106 Glass 104 big on platform trailer 105 is unloaded, classified then referring to the width of big glass 104 in a-quadrant 102 or Person's B area 103, big glass 104 of placement whiles, manually lean against big glass 104 on A cabinet frame 1;S3 step 3, according to big It is as shown in Figure 5 that 104 size of glass customizes different size of steel basketry 2(), 104 block-by-block of big glass for preparing installation is transferred to In steel basketry 2, and big glass 104 is fixed in steel basketry 2;S4 step 4 will be loaded with big glass by two truck cranes 106 104 lifting of steel basketry 2 releases the fixed relationship between big glass 104 and steel basketry 2, moves to the position for needing to prepare installation Except installing big glass 104 after steel basketry 2.
In step 2, after the big glass 104 of a-quadrant 102 disposably marches into the arena and is all on board, the big glass of B area 103 104 points multiple batches of to march into the arena, by the sub-category admission of big glass 104 of different size, and in batches by the big glass 104 of wider width Secondary admission is conducive to the space for making full use of narrow construction site, and will not delay construction period.
In step 2, when by unloading the big glass 104 on platform trailer 105, at four points of big 104 length direction of glass One of tied respectively with suspender belt at place and the three of four parts, then big glass 104 is sling by suspender belt with truck crane 106, when big When glass 104 is slowly promoted to liftoff 8-12 centimetres high, check whether suspender belt is secured, again slowly by big glass after confirmation no problem 104 are hoisted to 1 overhead of A cabinet frame, and big glass 104 is then made slowly to fall again, and big glass 104 puts steady rear dismounting suspender belt.Big glass 104 during being transferred to A cabinet frame 1, and it is safe more to insure, can be effectively prevented because suspender belt is loose cause safety accident and Economic loss, and even if there is suspender belt not enough firmly to happen, big glass 104 fall also unlikely from 8-12 centimetres of height It is damaged in breaking.
In conjunction with shown in Fig. 2 and Fig. 3, in step 2, first cemented in the position that A cabinet frame 1 can be in contact with big glass 104 Then the sheet rubber 4 of 15-25 cm thick makes big glass 104 lean to A cabinet frame 1, and the adjacent big glass ipsilateral in A cabinet frame 1 again Insulation foam 5 is put between 104.Big glass 104 and 1 rigid contact of A cabinet frame can be effectively prevented in sheet rubber 4, to prevent big glass Glass 104 hits A cabinet frame 1 and damaged, to big glass 104 with good protective effect;Same insulation foam 5 also has good Buffer function, and then be not easy due to shock damaged between adjacent big glass 104, there is good protection work to big glass 104 With, and block-by-block is facilitated to take out big glass 104.
A cabinet frame 1 is formed by square tubes soldering, and A cabinet frame 1 includes: bottom bar 11, oblique side lever 12, cross bar 13 and connecting rod 14, oblique side Bar 12 is provided with four and is two-by-two one group, and every group of oblique side lever 12 is arranged in splayed, and cross bar 13 is provided with more and is connected to Between the oblique side lever 12 of ipsilateral two, connecting rod 14 is connected between two oblique side levers 12 with group, cross bar 13 and connecting rod 14 Horizontally disposed, bottom bar 11 is set to the bottom of two oblique side levers 12 with group, and the length of bottom bar 11 is greater than two of same group tiltedly The distance between side lever 12.The A cabinet frame 1 of said structure design, structure is more stable, and big glass 104 is facilitated to lean to, and places In relatively stable on ground, make it is simple, at low cost, it is light-weight and carrying is facilitated to shift.
The top of oblique side lever 12 is fixed with auxiliary hanging ring 15, and the both ends lower surface of bottom bar 11 is provided with anti-in insertion ground Sliding nail 16, when needing to carry A cabinet frame 1, auxiliary hanging ring 15 can be convenient staff and sling A cabinet frame 1, shift more square Just;When A cabinet frame 1 is placed on ground, anti-skid stud 16 can prevent A cabinet frame 1 from sliding on the ground, and then big glass 104 is tiltedly It is safer when leaning against on A cabinet frame 1.
In conjunction with shown in Fig. 5 and Fig. 6, in step 4, two truck crane 106(are as shown in Figure 2) it is referred to as main crane and pair Crane, main crane is used for and main suspension ring 22 connects, and secondary crane is used for and secondary suspension ring 23 connects, when lifting main crane and secondary crane it is same When drive steel basketry 2 rise, when steel basketry 2 rises to aerial, main crane is slowly promoted, and secondary crane slowly declines, and main crane Promotion rate it is consistent with the secondary fall off rate of crane, after steel basketry 2 erects completely, divide secondary crane with secondary suspension ring 23 From then steel basketry 2 and big glass 104 are hoisted near installation site overhead with main crane.
Steel basketry 2 is to lay flat along length direction on the ground under normal circumstances, in order to which big glass 104 is packed into it In, and big glass 104 is typically all holding vertical state during installation, therefore through the above steps, it can very steady safety The big glass 104 of traverse is lifted near installation site overhead by ground, and ensures that big glass 104 at this time is vertical state, is applied Work is more convenient.
Steel basketry 2 is formed by square tubes soldering, and steel basketry 2 includes: rectangular hollow frame 21, main suspension ring 22 and secondary suspension ring 23, There are two the settings of main suspension ring 22 and is installed on the top of rectangular hollow frame 21, and secondary suspension ring 23 is installed on rectangular hollow frame 21 On the outside of lower half portion.The steel basketry 2 of said structure design, sound construction facilitate and accommodate big glass 104 to assist big glass 104 Lifting, and make it is simple, at low cost, it is light-weight and facilitate carrying shift.
The bottom of rectangular hollow frame 21 is fixed with more supporting bar 24 made of angle steel, and the upper surface of supporting bar 24 is fixed with The buffer substrate tablet 25 of 15-25 cm thick, the upper surface of buffer substrate tablet 25 are provided with non-slip texture 251.Bottom of the supporting bar 24 to big glass 104 Portion have good auxiliary supporting role, and buffer substrate tablet 25 design it is possible to prevente effectively from supporting bar 24 and big glass 104 bottom Portion's rigid contact has good protective effect to big glass 104, simultaneously to prevent big glass 104 damaged in hoisting process Non-slip texture 251 on buffer substrate tablet 25 can prevent the basal sliding of big glass 104, safer.
In conjunction with shown in Fig. 5 and Fig. 7, in step 3, different size of plank flume 3, plank are customized according to big 104 size of glass Slot 3 is made by block board, and before big glass 104 is put into steel basketry 2, plank flume 3 is sheathed on to the length of big glass 104 Then direction both ends are tied plank flume 3 and big glass 104 with bandage, big glass 104 is put into steel basketry 2 and then with tying up Big glass 104 and steel basketry 2 are tied plank flume 3 by band has good protection effect to the corner of big glass 104, prevents big glass Edge damage and broken angle phenomenon occur in hoisting process because of shock for glass 104, safer, and bandage can both make plank flume 3 It is securely connected between big glass 104, and can make securely to connect between big glass 104 and steel basketry 2.
The implementation principle of the present embodiment are as follows: lifting glass is gone using truck crane 106 rather than tower crane first, is because of big glass 104 be breakables, and unloading and hoisting process need the movement of fine height or distance, and need to drink spike to put down gently, because of tower crane Usually stand shaken in the air it is larger, it is difficult to the movement for guaranteeing fine height or distance, it is advantageous to use truck crane 106; Next makes full use of the space of narrow construction site, marks off a-quadrant 102 and B area 103, to be respectively intended to put different width The big glass 104 of degree is conducive to the big glass 104 that staff chooses correspondingly-sized, and space utilization rate is high, and in construction field The big glass 104 on ground, which is put, is unlikely to very messy;Furthermore the setting of A cabinet frame 1 is conducive to big glass 104 in a-quadrant 102 and B Standing opposite state is kept in region 103, not only stable safety, but also be conducive to the subsequent big glass 104 of lifting;Simultaneously because steel Big glass 104 can be first put into steel basketry 2 by the presence of basketry 2 when needing big glass 104 being lifted to installation site, Then it can relievedly be gone to promote steel basketry 2 with truck crane 106, steel basketry 2 has good guarantor to big glass 104 during being somebody's turn to do Shield effect, to prevent big glass 104 damaged, safety is higher, moreover it is possible to effectively avoid economic loss.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (10)

1. a kind of big glass hanging method suitable for narrow construction site, which comprises the following steps:
Step 1 divides a-quadrant (102) and B area (103) in narrow construction site, and the a-quadrant (102) is for storing phase To relatively narrow big glass (104), the B area (103) is for storing relatively wide big glass (104);
Step 2 places multiple A cabinet frames (1) on a-quadrant (102) and B area (103), then uses platform trailer (105) will Then big glass (104) haul is unloaded glass (104) big on platform trailer (105) using truck crane (106) to construction site Under, it is classified then referring to the width of big glass (104) in a-quadrant (102) or B area (103), the big glass of placement Manually big glass (104) is leant against on the A cabinet frame (1) while glass (104);
Step 3 customizes different size of steel basketry (2) according to big glass (104) size, will prepare the big glass (104) of installation Block-by-block is transferred in the steel basketry (2), and big glass (104) is fixed in the steel basketry (2);
Step 4 prepares installation by steel basketry (2) lifting to the needs that two truck cranes (106) will be loaded with big glass (104) Position, release the fixed relationship between big glass (104) and steel basketry (2), remove steel basketry (2) and big glass is installed afterwards (104)。
2. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that in step In two, after the big glass (104) of the a-quadrant (102) disposably marches into the arena and is all on board, the big glass of the B area (103) (104) divide multiple batches of march into the arena.
3. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that in step In two, when big glass (104) that will be unloaded on platform trailer (105), at a quarter of big glass (104) length direction and It is tied, is then sling big glass (104) by suspender belt with truck crane (106), when big glass with suspender belt respectively at the three of four parts (104) when being slowly promoted to liftoff 8-12 centimetres high, check whether suspender belt is secured, again slowly by big glass after confirmation no problem (104) it is hoisted to A cabinet frame (1) overhead, big glass (104) is then made slowly to fall again, big glass (104) is removed after putting surely and hung Band.
4. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that in step In two, the sheet rubber (4) of 15-25 cm thick first is cemented in the position that A cabinet frame (1) can be in contact with big glass (104), then It leans to big glass (104) A cabinet frame (1), and is put into insulation foam between the ipsilateral adjacent big glass (104) of A cabinet frame (1) (5)。
5. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that in step Three, different size of plank flume (3) is customized according to big glass (104) size, the plank flume (3) is made by block board, Before big glass (104) is put into steel basketry (2), plank flume (3) is sheathed on to the length direction both ends of big glass (104), so Plank flume (3) and big glass (104) are tied with bandage afterwards, big glass (104) is put into steel basketry (2) and then uses bandage Big glass (104) and steel basketry (2) are tied.
6. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that the steel Basketry (2) is formed by square tubes soldering, and the steel basketry (2) includes: rectangular hollow frame (21), main suspension ring (22) and secondary suspension ring (23), the main suspension ring (22) is arranged there are two and is installed on the top of the rectangular hollow frame (21), the secondary suspension ring (23) it is installed on the outside of the lower half portion of the rectangular hollow frame (21).
7. the big glass hanging method according to claim 6 suitable for narrow construction site, which is characterized in that the square The bottom of shape hollow frame (21) is fixed with the more supporting bars made of angle steel (24), and the upper surface of the supporting bar (24) is fixed with The upper surface of the buffer substrate tablet (25) of 15-25 cm thick, the buffer substrate tablet (25) is provided with non-slip texture (251).
8. the big glass hanging method according to claim 6 suitable for narrow construction site, which is characterized in that in step Four, two truck cranes (106) are referred to as main crane and secondary crane, and main crane is used for and the main suspension ring (22) connection, pair are hung Vehicle is used for and the secondary suspension ring (23) connection,
Main crane and secondary crane drive steel basketry (2) to rise simultaneously when lifting, and when steel basketry (2) rises to aerial, main crane is slow Slow to be promoted, secondary crane slowly declines, and the promotion rate of main crane is consistent with the secondary fall off rate of crane, complete to steel basketry (2) After erecting entirely, separates secondary crane with secondary suspension ring (23), then hung steel basketry (2) and big glass (104) with main crane It is transported near installation site overhead.
9. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that the A Cabinet frame (1) is formed by square tubes soldering, and the A cabinet frame (1) includes: bottom bar (11), oblique side lever (12), cross bar (13) and connecting rod (14),
The oblique side lever (12) is provided with four and is two-by-two one group, and oblique side lever (12) described in every group is arranged in splayed, described Cross bar (13) is provided with more and is connected between the oblique side lever (12) of ipsilateral two, and the connecting rod (14) is connected to together Between two oblique side levers (12) of group, the cross bar (13) and the connecting rod (14) are horizontally disposed,
The bottom bar (11) is set to the bottom of two oblique side levers (12) with group, and the length of the bottom bar (11) is greater than together The distance between two oblique side levers (12) of group.
10. the big glass hanging method according to claim 1 suitable for narrow construction site, which is characterized in that described Auxiliary hanging ring (15) is fixed at the top of oblique side lever (12), the both ends lower surface of the bottom bar (11) is provided in insertion ground Anti-skid stud (16).
CN201910663311.9A 2019-07-22 2019-07-22 Big glass hanging method suitable for narrow construction site Pending CN110409838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910663311.9A CN110409838A (en) 2019-07-22 2019-07-22 Big glass hanging method suitable for narrow construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910663311.9A CN110409838A (en) 2019-07-22 2019-07-22 Big glass hanging method suitable for narrow construction site

Publications (1)

Publication Number Publication Date
CN110409838A true CN110409838A (en) 2019-11-05

Family

ID=68362453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910663311.9A Pending CN110409838A (en) 2019-07-22 2019-07-22 Big glass hanging method suitable for narrow construction site

Country Status (1)

Country Link
CN (1) CN110409838A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021740A (en) * 2019-12-05 2020-04-17 北京市第五建筑工程集团有限公司 Construction method of daylighting roof combined hoisting system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1239094A1 (en) * 2001-03-09 2002-09-11 Levolux A.T. Limited Apparatus for and a method of attaching items to curtain walling
CN104818787A (en) * 2015-04-17 2015-08-05 常州汇森电子有限公司 Installation and construction method for large suspension glass curtain walls
CN104831846A (en) * 2015-04-17 2015-08-12 中国建筑第八工程局有限公司 Hoisting method for indoor inclined curtain wall super-large glass
CN205169268U (en) * 2015-12-04 2016-04-20 重庆航墙玻璃有限公司 Glass frame
CN106629379A (en) * 2016-12-12 2017-05-10 重庆兆冠玻璃有限公司 Glass lifting device for glass processing factory
CN107489215A (en) * 2017-07-27 2017-12-19 温州建设集团有限公司 A kind of construction technology of new network type glass curtain wall
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN107558672A (en) * 2016-06-30 2018-01-09 中建八局装饰工程有限公司 Sloping roof super large glaziers method
CN109184057A (en) * 2018-09-19 2019-01-11 杭州中宙建工集团有限公司 Superelevation rib supports suspension type hollow glass curtain wall construction method
CN208471368U (en) * 2018-07-16 2019-02-05 江苏亚太吊具有限公司 It is a kind of for lifting the complete suspender of breakables
CN109577656A (en) * 2018-12-30 2019-04-05 山西五建集团有限公司 Large span lighting roof glass curtain construction method of installation

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1239094A1 (en) * 2001-03-09 2002-09-11 Levolux A.T. Limited Apparatus for and a method of attaching items to curtain walling
CN104818787A (en) * 2015-04-17 2015-08-05 常州汇森电子有限公司 Installation and construction method for large suspension glass curtain walls
CN104831846A (en) * 2015-04-17 2015-08-12 中国建筑第八工程局有限公司 Hoisting method for indoor inclined curtain wall super-large glass
CN205169268U (en) * 2015-12-04 2016-04-20 重庆航墙玻璃有限公司 Glass frame
CN107558672A (en) * 2016-06-30 2018-01-09 中建八局装饰工程有限公司 Sloping roof super large glaziers method
CN106629379A (en) * 2016-12-12 2017-05-10 重庆兆冠玻璃有限公司 Glass lifting device for glass processing factory
CN107489215A (en) * 2017-07-27 2017-12-19 温州建设集团有限公司 A kind of construction technology of new network type glass curtain wall
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN208471368U (en) * 2018-07-16 2019-02-05 江苏亚太吊具有限公司 It is a kind of for lifting the complete suspender of breakables
CN109184057A (en) * 2018-09-19 2019-01-11 杭州中宙建工集团有限公司 Superelevation rib supports suspension type hollow glass curtain wall construction method
CN109577656A (en) * 2018-12-30 2019-04-05 山西五建集团有限公司 Large span lighting roof glass curtain construction method of installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021740A (en) * 2019-12-05 2020-04-17 北京市第五建筑工程集团有限公司 Construction method of daylighting roof combined hoisting system
CN111021740B (en) * 2019-12-05 2023-09-05 北京市第五建筑工程集团有限公司 Construction method of daylighting roof and roof combined hoisting system

Similar Documents

Publication Publication Date Title
US9205288B2 (en) Base for supporting an upstanding mast
CN207048306U (en) Sliding formwork flexibility platform
JP5818533B2 (en) Jig for lifting a structure with a crane
CN110409838A (en) Big glass hanging method suitable for narrow construction site
US2472843A (en) Material handling device
CN208456596U (en) Hanging scaffold level adjustment system in vertical shaft well
CN207209752U (en) A kind of steel structure hoisting instrument
CN103991800A (en) Roof surface crane for building
WO2017186078A1 (en) Fire hose box
CN111634802A (en) Material crane for building construction
CN206842828U (en) Stainless steel tube dock container handling instrument
JP4935265B2 (en) Pallet transportation pallet
JP5745384B2 (en) Exterior wall material mounting system
CN204152219U (en) Side fascia stone tongs
CN207374992U (en) The accumulating stent of concrete plate-type component
CN208347276U (en) A kind of construction bracket
CN108560932A (en) A kind of construction material simple lifting appliance
CN103879880A (en) Building material loading and unloading hanging fork
CN205954146U (en) Silicon wafer stick hoisting device
CN211568315U (en) A gallows mechanism for express delivery unmanned aerial vehicle
JPH09227069A (en) Hung-moving method and device therefor
CN213169399U (en) Supporting plate for building construction
CN203740865U (en) Lifting fork for loading and unloading of building materials
JP3176251U (en) Portable silo hanging device
CN210884931U (en) Arch skeleton bank protection prefabricated section handling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191105